| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 8, 2019 | 60M72 | CookDistrict 1 | Bridge deck overlay, joint repairs, structural repair of concrete and steel to I-94 at IL 68 (Dundee Road). | — | Executed | Rausch Infrastructure, LLC $1,199,708 · | ||
| Mar 8, 2019 | 60M75 | DuPageDistrict 1 | Bridge deck overlay and bridge joint repair improvement of Emroy Ave over I-290. | — | Executed | Martam Construction Incorporated $396,588 · | ||
| Mar 8, 2019 | 60N00 | WillDistrict 1 | Bridge deck overlay and joint repairs on the bridge carrying US 52 over Forked Creek. | — | Executed | MYS, Incorporated $301,046 · | ||
| Mar 8, 2019 | 60N83 | CookDistrict 1 | Rehabilitation and widening on SN 016-0533 carrying Willow Road over Lehigh and SOO line in Glenview. | — | Executed | Lorig Construction Company $8,661,763 · | ||
| Mar 8, 2019 | 60P68 | DuPageDistrict 1 | Resurfacing on IL-56 from Naperville Rd. to IL 53; includes retrofitting sidewalks to comply with ADA and Signal modernaization at the intersection with Park Ave. | — | Executed | K-Five Construction Corporation $3,038,712 · | ||
| Mar 8, 2019 | 60R65 | CookDistrict 1 | Overlay 016-2525 bridge deck with thin polymer in the City of Harvey. | — | Executed | MYS, Incorporated $116,107 · | ||
| Mar 8, 2019 | 60R68 | LakeDistrict 1 | Bridge deck scarification and latex concrete overlay, retrofitting bridge parapets, and reconstruction of transverse bridge joints to IL 43 over IL 120. | — | Executed | Areatha Construction Co., Inc. $1,777,994 · | ||
| Mar 8, 2019 | 60R69 | CookDistrict 1 | Deck patching, deck scarification, latex concrete overlay abutment repairs, joint repairs, slab repairs and debris removal on Golf Road over the East and West Fork N. Branch Chicago River (SN 016-0355, 016-0356, 016-1256 and 016-1257) | — | Executed | Martam Construction Incorporated $973,368 · | ||
| Mar 8, 2019 | 60R75 | CookDistrict 1 | Bridge deck scarification and latex concrete overlay, reconstruction of transverse bridge joints, and substructure repairs on US 30 over Thorn Creek. | — | Executed | MYS, Incorporated $380,278 · | ||
| Mar 8, 2019 | 60T49 | CookDistrict 1 | Resurfacing and pedestrian ramp improvements on US 14 (Northwest Highway) through the Village of Arlington Heights, Village of Mount Prospect and the city of Des Plaines | — | Executed | Arrow Road Construction Co. $4,073,824 · | ||
| Mar 8, 2019 | 60W87 | CookDistrict 1 | Surface preparation and painting of structrual steel, containment and disposal of lead waste and maintenance of traffic at 5 bridge structures located on IL 171 and on I-55 in Villages of McCook and Summit. | — | Executed | Eagle Painting & Maintenance Company, Inc. $2,284,150 · | ||
| Mar 8, 2019 | 61F40 | WillDistrict 1 | Construct an extension of Kings Road from Rodeo Drive to Hassert Boulevard in Bollingbrook. | — | Executed | K-Five Construction Corporation & Herlihy Mid-Continent Company $7,485,866 · | ||
| Mar 8, 2019 | 61F41 | CookDistrict 1 | Roadway reconstruction on Irving Park Road from east of IL 59 to Bartlett Road in Streamwood. | — | Executed | Plote Construction, Inc. $6,796,581 · | ||
| Mar 8, 2019 | 61F44 | WillDistrict 1 | Replace the bridge carrying TR 68 over Lily Creek, 0.1 mil north of Caton Farm Road in Plainfield Township. | — | Executed | D. Construction, Inc. $945,717 · | ||
| Mar 8, 2019 | 61F45 | KaneDistrict 1 | Replace the bridge carrying Silver Glen Road over Otter Creek. | — | Executed | D. Construction, Inc. $2,118,804 · | ||
| Mar 8, 2019 | 61F47 | LakeDistrict 1 | Resurfacing Greenwood Avenue from Wilmot Road to Waukegan Road in Deerfield. | — | Executed | A Lamp Concrete Contractors, Inc. $1,668,129 · | ||
| Mar 8, 2019 | 61F48 | CookDistrict 1 | Sidewalk construction adjacent to 79th Street from Garden Lane to Oak Grove Avenue in the Village of Justice. | — | Executed | A Lamp Concrete Contractors, Inc. $113,944 · | ||
| Mar 8, 2019 | 61F49 | CookDistrict 1 | Reconstruction of Northfield Road from Winnetka Road to Willow Road in the Village of Northfield. | — | Executed | A Lamp Concrete Contractors, Inc. $1,588,343 · | ||
| Mar 8, 2019 | 61F54 | CookDistrict 1 | Resurfacing Schick Road from Petersdorf Road to Fairfax Lane, and resurfacing Petersdorf Road from Schick Road to Army Trial Road in the Village of Bartlett. | — | Executed | Plote Construction, Inc. $1,214,960 · | ||
| Mar 8, 2019 | 61F57 | KaneDistrict 1 | construction of a dedicated entrance ramp from northbound Randall Road to eastbound US 20, removal of the Weld Road connection to Randall Road, creation of a cul-de-sac on Weld Road and the reconfiguration of Randall Road, in the City of Elgin. | — | Executed | Curran Contracting Company $6,244,244 · | ||
| Mar 8, 2019 | 61F59 | KaneDistrict 1 | Trffic signal interconnect along Indian Trail between Aurora Avenue and Pennsbury Lane in Aurora. | — | Executed | H & H Electric Co. $826,220 · | ||
| Mar 8, 2019 | 61F60 | CookDistrict 1 | Construction of a multi-use path along Brainard Avenue from Joliet Road to 55th Street in the City of Countryside. | — | Executed | K-Five Construction Corporation $964,375 · | ||
| Mar 8, 2019 | 61F61 | WillDistrict 1 | Resurfacing Burville Road from stte Street to IL 394 in the Village of Crete. | — | Executed | Iroquois Paving Corporation $395,403 · | ||
| Mar 8, 2019 | 61F62 | DuPageDistrict 1 | Roadway reconstruction on Washington Street from Town Road to Arbor Avenue in the city of West Chicago. | — | Executed | Schroeder Asphalt Services, Inc. $1,120,972 · | ||
| Mar 8, 2019 | 62C14 | KaneDistrict 1 | Bridge deck replacement with widened roadway, new expansion joints, and approach slab replacement on IL 38 over UPRR. | — | Executed | Herlihy Mid-Continent Company $2,789,910 · | ||
| Mar 8, 2019 | 62D38 | LakeDistrict 1 | Remove and replace original section of the culvert (approximately 40 ft) in the center portion of the culvert carrying IL 21 (Milwaukee Ave.) over a ditch in the village of Vernon Hills (SN 049-0599) | — | Executed | Martam Construction Incorporated $377,924 · | ||
| Mar 8, 2019 | 62F35 | McHenryDistrict 1 | Bridge joint repairs and deck overlay on SN 056-0007 carrying US 14/IL 173 (Division Street) over UPRR in the City of Harvard. | — | Executed | Sjostrom & Sons, Inc. $1,257,790 · | ||
| Mar 8, 2019 | 62F37 | CookDistrict 1 | Repairs on Bridge SN 016-0225 carrying US 34 (Ogden Avenue) over IHB Railroad in the Village of LaGrange. | — | Executed | D. Construction, Inc. $513,202 · | ||
| Mar 8, 2019 | 62F49 | CookWillDistrict 1 | 6.45 miles of 3P resurfacing and ADA ramps on IL 43 from north of US 30 to just north of US 6. | — | Executed | D. Construction, Inc. $5,880,439 · | ||
| Mar 8, 2019 | 62F54 | DuPageDistrict 1 | 2.5 miles of resurfacing and ADA sidewalk improvements on IL 64 (North Avenue) from Villa Avenue to the Cook County line in the Village of Villa Park and the City of Elmhurst. | — | Executed | R. W. Dunteman Company $2,773,288 · | ||
| Mar 8, 2019 | 62F66 | CookDistrict 1 | 1.91 miles of HMA resurfcing, pavement patching, removal and replacement of curb and gutter, sidewalk removal and replacement and placement of thermoplastic markings along Avondale Avenue from Ogallah Avenue to Bryn Mawr Avenue in Chicago. | — | Executed | Arrow Road Construction Co. $1,771,483 · | ||
| Mar 8, 2019 | 62G21 | CookDistrict 1 | Resurfacing and pedestrian ramp improvements on US 12/20/41 (Indianapolis Ave) from S. Ewing Ave. to 106th Street in the City of Chicago. | — | Executed | MAT Construction Leasing, Inc. $1,035,977 · | ||
| Mar 8, 2019 | 62G47 | CookDistrict 1 | 7.33 miles of resurfacing and pedestrian ramp projects on IL 171 (First Ave.) from 43rd Street to Des Plaines River Road. | — | Executed | R. W. Dunteman Company $7,076,939 · | ||
| Mar 8, 2019 | 62G48 | McHenryDistrict 1 | Removal and replacement of culvert SN 056-0227 on IL 31 in the City of McHenry. | — | Executed | Alliance Contractors, Inc. $1,033,397 · | ||
| Mar 8, 2019 | 62G50 | CookDistrict 1 | Deck overlay, joint repair and structural steel repair on SN 016-0344 carrying US 45 over the Cal Sag Channel in Palos Township. | — | Executed | MYS, Incorporated $474,229 · | ||
| Mar 8, 2019 | 62G58 | LakeDistrict 1 | 2 miles of resurfacing on IL 137 (Amstutz Expressway) from IL 120 (Belvidere Street) to just south of IL 137 (Greenwood Avenue) in the City of Waukegan. | — | Executed | J. A. Johnson Paving Company $2,327,169 · | ||
| Mar 8, 2019 | 62G62 | DuPageDistrict 1 | 6 miles of resurfacing on US 34 (Ogden Avenue) from Ivanhoe Ave to east of IL 83 (Kingery Highway in the Villages of Lisle, Downers Grove, Westmont and Clarendon Hills. | — | Executed | R. W. Dunteman Company $7,098,580 · | ||
| Mar 8, 2019 | 62G64 | DuPageDistrict 1 | 2.4 miles of resurfacing and pedestrian ramp improvements on US 20 (W. Lake Street) from west of Summerfield Drive to west of I-355 (Veterans Memorial Tollway) in the Villages of Addison and Bloomingdale. | — | Executed | K-Five Construction Corporation $3,428,345 · | ||
| Mar 8, 2019 | 62G67 | CookDistrict 1 | Resurfacing and ADA pedestrian ramp improvements on vincennes Avenue from 119th Street to 127th Street in Blue Island. | — | Executed | K-Five Construction Corporation $827,549 · | ||
| Mar 8, 2019 | 62G80 | CookDistrict 1 | 3P resurfacing and median rehabilitation with pedestrian ramps along 127th Street/Burr Oak Ave from east of I-294 to Atesian Avenue in Blue Island. | — | Executed | Gallagher Asphalt Corporation $3,053,618 · | ||
| Mar 8, 2019 | 62G90 | LakeDistrict 1 | Sheet pile retaining wall and parking improvement at Illinois Beach State Park | — | Executed | Alliance Contractors, Inc. $953,418 · | ||
| Mar 8, 2019 | 62G98 | WillDistrict 1 | Removal and replacement of bridge decks of SN 099-0286, 099-0005 and 099-0304 c carrying I-55 over BNSF Railroad and Grant Creek in Wilminton and Channahon Townships. | — | Executed | D. Construction, Inc. $7,870,946 · | ||
| Mar 8, 2019 | 62H01 | DuPageDistrict 1 | Bridge deck overlay, joint repair, structural repair of concrete, drainage structure adjustment and concrete repair of beam ends for the structures carrying IL 83 of US 34 and the BNSF Railroad in the Villages of Hinsdale, Clarendon Hills and Westmont. | — | Executed | Herlihy Mid-Continent Company $2,269,678 · | ||
| Mar 8, 2019 | 62H04 | DuPageDistrict 1 | Bridge deck scarification, latex overlay, joint repairs, structural concrete and steel repairs on IL 38 (Roosevelt Road) over Salt Creek, also Bridge deck scarification, latex overlay, and joint repairs on IL 38 Frontage Road over Salt Creek. | — | Executed | Martam Construction Incorporated $1,330,256 · | ||
| Mar 8, 2019 | 62H07 | CookDistrict 1 | 0.5 miles of HMA resurfacing, pavement patching, milled shoulder rumble strips and pavement marking on IL 19 from Taft Avenue to Seymour Avenue in Chicago. | — | Executed | Plote Construction, Inc. $673,920 · | ||
| Mar 8, 2019 | 62H14 | VariousDistrict 1 | Vegetation management on various expressway and primary routes along Historic US Route 66 | — | Executed | Endrizzi Contracting, Inc $422,930 · | ||
| Mar 8, 2019 | 62H17 | CookDistrict 1 | Structural repairs of concrete on the structure carrying Joliet Road over the BandOCT RR in the Village of McCook | — | Executed | D. Construction, Inc. $262,345 · | ||
| Mar 8, 2019 | 62H19 | CookDistrict 1 | Bridge joint replacement and bridge deck sealing on SN 016-0273 carrying Torrence Avenue over I-80/I-94 in the Village of Lansing | — | Executed | D. Construction, Inc. $272,594 · | ||
| Mar 8, 2019 | 62H24 | DuPageDistrict 1 | 2.4 miles of resurfacing and pedestrian ramp work on IL 56 (Butterfield Road) from the Kane County line to the CNRR overpass in Aurora. | — | Executed | Geneva Construction Company $1,241,694 · | ||
| Mar 8, 2019 | 62H27 | CookDistrict 1 | Routing, cleaning, and sealing longitudinal cracks in the existing HMA pavement, and longitudinal joints between existing pavement and Curb and gutter and restriping with hot spray thermoplastic pavement marking. | — | Executed | Denler, Inc. $252,444 · | ||
| Mar 8, 2019 | 62H30 | DuPageDistrict 1 | Routing, cleaning, and sealing longitudinal cracks in the existing HMA pavement; longitudinal joints between the existing HMA pavement and curb and gutter; and restriping with hot spray thermoplastic pavement marking. | — | Executed | Freehill Asphalt, Inc. $285,968 · | ||
| Mar 8, 2019 | 62H32 | KaneDistrict 1 | 7.55 miles of Resurfacing (SMART) and pedestrian ramp project on IL 64 from IL 47 to Randall Road. | — | Executed | Curran Contracting Company $2,608,470 · | ||
| Mar 8, 2019 | 62H35 | WillDistrict 1 | Repairs on SN 099-0056 carrying I-80 over the Des Plaines River in Joliet. | — | Executed | Lakes & Rivers Contracting, Inc. $847,500 · | ||
| Mar 8, 2019 | 62H39 | LakeDistrict 1 | Demolition of a single-family home in Mundelein and an auto repair building in Grayslake. | — | Executed | Lima Contractors $158,946 · | ||
| Mar 8, 2019 | 62H41 | CookDistrict 1 | 2.4 miles of resurfacing and pedestrian ramp upgrades on IL 171 (Archer Ave.) from west of Ashland Avenue to State Street in the City of Chicago. | — | Executed | MAT Construction Leasing, Inc. $1,424,366 · | ||
| Mar 8, 2019 | 62H43 | CookDistrict 1 | 2.3 miles of resurfacing and pedestrian ramp improvements on US 14 from Western Avenue to Vernon Avenue through the cities of Des Plaines and Park Ridge. | — | Executed | Arrow Road Construction Co. $2,276,865 · | ||
| Mar 8, 2019 | 62H55 | WillDistrict 1 | 9.62 miles of Shoulder rumble strip installation on I-80 at various locations between the Will County line and US 30. | — | Executed | D. Construction, Inc. $277,857 · | ||
| Mar 8, 2019 | 62H68 | WillDistrict 1 | Bridge structural steel repair and bearing replacement of the bridges carrying I-80 over Des Plaines River in Joliet | — | Executed | ICC Group Inc. $4,978,000 · | ||
| Mar 8, 2019 | 64D70 | WinnebagoDistrict 2 | 1.94 miles milling and resurfacing of mainline and 1.97 miles of resurfacing of frontage roads 0.2 mile south of Sandy Hollow Rd in Rockford to 0.2 mile south of Backhawk Rd and Frontage roads; structure removal and culvert replacement drainage ditch 1.5 miles south of US 20 in Rockford | — | Executed | Curran Contracting Company $6,048,894 · | ||
| Mar 8, 2019 | 64J41 | BooneWinnebagoDistrict 2 | 4.37 miles of HMA resurfacing on IL 173 from 0.1 mile west of the Winnebago county line to 0.2 mile west of IL 76. | — | Executed | William Charles Construction Company, LLC $1,641,800 · | ||
| Mar 8, 2019 | 64K59 | Jo DaviessDistrict 2 | 1.15 miles of HMA resurfacing and ADA improvements on US 20, from Powder House Road Hill to 3rd Street in Galena. | — | Executed | Civil Constructors, Inc. $808,424 · | ||
| Mar 8, 2019 | 64M80 | Jo DaviessDistrict 2 | Building removals at 481 Sisinawa Avenue, East Dubuque and 11653 US 20 NW of Galena. | — | Executed | Law Excavating, Inc. $64,388 · | ||
| Mar 8, 2019 | 64M94 | WhitesideDistrict 2 | Ultra-thin bonded wearing course on I-88 from 1/2 mile west of IL 78 to Elkhorn Creek. | — | Executed | Martin & Company Excavating $1,593,387 · | ||
| Mar 8, 2019 | 64N11 | LeeDistrict 2 | Clean and paint structural steel on SN 052-055 carrying Chicago Road over I-39. | — | Executed | Civil Coatings and Construction Inc. $382,590 · | ||
| Mar 8, 2019 | 64N12 | LeeDistrict 2 | Clean and paint structural steel on SN 052-0054 carrying Beemerville Road over I-39. | — | Executed | Civil Coatings and Construction Inc. $196,150 · | ||
| Mar 8, 2019 | 64N18 | VariousDistrict 2 | Roadside restoration of right-of-way turf damage caused by motorists along state maintained routes in District 2 | — | Executed | O'Brien Civil Works, Inc. $69,560 · | ||
| Mar 8, 2019 | 64N22 | Rock IslandDistrict 2 | Cold Milling and HMA resurfacing in the southbound lane | — | Executed | Valley Construction Co. $111,889 · | ||
| Mar 8, 2019 | 64N25 | CarrollDistrict 2 | Expansion joint replacement and concrete overlay on SN 008-0005 carrying US 52 over Straddle Creek located 3.4 miles east of IL 78. | — | Executed | Civil Constructors, Inc. $384,720 · | ||
| Mar 8, 2019 | 64N26 | CarrollDistrict 2 | Expansion joint replacement, concrete overlay and beam end repairs on SN 008-0033 carying IL 40 over Johnson Creek | — | Executed | Civil Constructors, Inc. $264,553 · | ||
| Mar 8, 2019 | 64N27 | Jo DaviessDistrict 2 | Expansion joint replacement, concrete overlay, repair and paint beam ends on SN 043-0039 carrying IL 78 over the Plum River | — | Executed | Civil Constructors, Inc. $427,850 · | ||
| Mar 8, 2019 | 64N28 | LeeDistrict 2 | Expansion joint replacement, deck patching, and concrete overlay on SN 052-0060 carrying US 52 over the Green River. | — | Rejected | Sjostrom & Sons, Inc. $387,637 · | ||
| Mar 8, 2019 | 64N29 | HenryDistrict 2 | Expansion joint replacement, concrete overlay, repair and paint beam ends on SN 037-0138 carrying IL 82 over South Branch of the Edwards River. | — | Executed | Civil Constructors, Inc. $449,103 · | ||
| Mar 8, 2019 | 66J11 | IroquoisDistrict 3 | 4.96 miles of shoulder widening and rumble strip installation on IL 49 from just north of E 4300 Rd to 200' south of Mud Creek. | — | Executed | Iroquois Paving Corporation $1,187,960 · | ||
| Mar 8, 2019 | 66J44 | LaSalleDistrict 3 | Clean and paint structural steel and steel components on SN 050-0188 carrying IL 71 over Covel Creek. | — | Executed | ERA-Valdivia Contractors, Inc. $231,505 · | ||
| Mar 8, 2019 | 66J45 | DeKalbDistrict 3 | Cleaning and painting all structural steel and other related steel components of SN 019-0030 carrying IL 72 over Owens Creek. | — | Executed | ERA-Valdivia Contractors, Inc. $156,660 · | ||
| Mar 8, 2019 | 66J50 | LaSalleDistrict 3 | Class B pavement patching, curb and gutter, and concrete median removal and replacement on IL 23 from Grace Community Church North of Streator to the intersection of IL 23 and N. 17th Rd. (Richards Road) | — | Executed | Scanlon Excavating & Concrete, Inc. $85,394 · | ||
| Mar 8, 2019 | 66J53 | LivingstonDistrict 3 | Microsurfacing full-width existing pavement on IL 116 from Pearl Street in Pontiac to IL 47. The project is 10.61 miles | — | Executed | Beniach Construction Co., Inc. $537,261 · | ||
| Mar 8, 2019 | 66J54 | LaSalleDistrict 3 | crack and joint sealing on IL 251 from 0.3 mile south of N 31st Rd. to I-80, and 1-pass full-width microsurfacing on IL 251 from I-80 to US 6 in Peru. | — | Executed | Asphalt Stone Company $692,705 · | ||
| Mar 8, 2019 | 66J55 | LaSalleDistrict 3 | 9.76 miles of crack and joint sealing on IL 71 from north of I-80 to US 52. | — | Executed | Complete Asphalt Service Co. $32,347 · | ||
| Mar 8, 2019 | 66J59 | KankakeeDistrict 3 | Removal and replacement of a cross road culvert located 0.4 miles north of 5000S RD at STA. 870+00. | — | Executed | Misfits Construction Company $32,945 · | ||
| Mar 8, 2019 | 66J61 | KendallDistrict 3 | Adding aggregate shoulders to US-52 from LaSalle County Line to Will County Line. | — | Executed | Phoenix Corporation of the Quad Cities $175,911 · | ||
| Mar 8, 2019 | 66J75 | KendallLaSalleDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders | — | Executed | H & H Electric Co. $46,600 · | ||
| Mar 8, 2019 | 66J76 | BureauLaSalleDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. | — | Executed | Laser Electric, Inc. $75,883 · | ||
| Mar 8, 2019 | 66J77 | GrundyDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. | — | Executed | Van-Mack Electric Co. $49,650 · | ||
| Mar 8, 2019 | 66J78 | VariousDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. | — | Executed | Leo P. Kelly Electric, Incorporated $56,560 · | ||
| Mar 8, 2019 | 66J79 | IroquoisKankakeeDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. | — | Executed | Van-Mack Electric Co. $64,110 · | ||
| Mar 8, 2019 | 66J80 | DeKalbDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. | — | Executed | H & H Electric Co. $46,600 · | ||
| Mar 8, 2019 | 68B78 | WarrenDistrict 4 | Resurfacing on US 34/US 67/IL 100/IL 164 from 0.25 mile south of 11th Ave. to 0.9 mile east of 11th Street in Monmouth. | — | Executed | Gunther Construction, a div of UCM, Inc. $7,678,838 · | ||
| Mar 8, 2019 | 68C63 | TazewellDistrict 4 | Culvert replacement on IL 98, 0.1 mile east of Cole Hollow Rd (SN 090-1002) | — | Executed | Kinney Contractors, Inc. $734,500 · | ||
| Mar 8, 2019 | 68D10 | KnoxDistrict 4 | Replacement of a single box culvert with a double (SN-048-2008), HMA pavement, guardrail replacement, earthwork, and other collateral work necessary, located 0.6 mile west of IL-180 near Victoria. | — | Executed | Kinney Contractors, Inc. $979,988 · | ||
| Mar 8, 2019 | 68D22 | PeoriaDistrict 4 | Resurfacing, ADA improvements, traffic signal improvements, and drainage improvements along IL Rte 29 south of US Rte 150 to Abington St in Peoria. | — | Executed | Advanced Asphalt Company $1,972,818 · | ||
| Mar 8, 2019 | 68E14 | TazewellDistrict 4 | Substructure repairs to SN 090-0037 carrying US RTE 150 over Farm Creek, TWP Railroad, and Norfolk Southern Railroad. | — | Executed | Otto Baum Company, Inc. $138,518 · | ||
| Mar 8, 2019 | 68E28 | WoodfordDistrict 4 | Cold in-place recycling on IL 117 from IL 116 to Mill St in Eureka. | — | Executed | Advanced Asphalt Company $1,373,783 · | ||
| Mar 8, 2019 | 68E36 | PeoriaDistrict 4 | Bituminous surface treatment- A1 on IL Rte 91 from the Stark county line. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $169,369 · | ||
| Mar 8, 2019 | 68E62 | PeoriaDistrict 4 | Landscaping along I-74 from Ellis St to the Illinois River. | — | Executed | Central Landscaping, LP $122,806 · | ||
| Mar 8, 2019 | 68E63 | VariousDistrict 4 | Pavement markings throughout District 4. | — | Executed | Varsity Striping & Construction Co. $435,795 · | ||
| Mar 8, 2019 | 68E64 | VariousDistrict 4 | Guardrail repairs caused by motorists (MCHD) and cable guardrail repairs (high tensions cable barrier). | — | Executed | Northern Contracting, Inc. $682,239 · | ||
| Mar 8, 2019 | 68E66 | HendersonDistrict 4 | Crack and joint sealing on US 34 (Biggsvile Bypass) and on IL 94/IL 116 from 1425N to 0.14 mile south of 1500N. | — | Executed | Complete Asphalt Service Co. $160,990 · | ||
| Mar 8, 2019 | 68E67 | VariousDistrict 4 | Bridge deck sealing on various structures district wide. | — | Executed | M & M Concrete, Inc. $250,000 · | ||
| Mar 8, 2019 | 68E68 | MarshallMasonTazewellDistrict 4 | Bridge washing of eleven bridges over the Illinois River | — | Executed | All States Painting, Inc. $881,690 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.