IDOT Jobs

All dates · 10,653 jobs · $20,005,846,000 Sign up free
★ My Jobs

10,653 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Mar 8, 2019 60M72 CookDistrict 1 Bridge deck overlay, joint repairs, structural repair of concrete and steel to I-94 at IL 68 (Dundee Road). — Executed Nov 26 New Rausch Infrastructure, LLC $1,199,708 ·
Mar 8, 2019 60M75 DuPageDistrict 1 Bridge deck overlay and bridge joint repair improvement of Emroy Ave over I-290. — Executed Nov 26 New Martam Construction Incorporated $396,588 ·
Mar 8, 2019 60N00 WillDistrict 1 Bridge deck overlay and joint repairs on the bridge carrying US 52 over Forked Creek. — Executed Nov 26 New MYS, Incorporated $301,046 ·
Mar 8, 2019 60N83 CookDistrict 1 Rehabilitation and widening on SN 016-0533 carrying Willow Road over Lehigh and SOO line in Glenview. — Executed Nov 26 New Lorig Construction Company $8,661,763 ·
Mar 8, 2019 60P68 DuPageDistrict 1 Resurfacing on IL-56 from Naperville Rd. to IL 53; includes retrofitting sidewalks to comply with ADA and Signal modernaization at the intersection with Park Ave. — Executed Nov 26 New K-Five Construction Corporation $3,038,712 ·
Mar 8, 2019 60R65 CookDistrict 1 Overlay 016-2525 bridge deck with thin polymer in the City of Harvey. — Executed Nov 26 New MYS, Incorporated $116,107 ·
Mar 8, 2019 60R68 LakeDistrict 1 Bridge deck scarification and latex concrete overlay, retrofitting bridge parapets, and reconstruction of transverse bridge joints to IL 43 over IL 120. — Executed Nov 26 New Areatha Construction Co., Inc. $1,777,994 ·
Mar 8, 2019 60R69 CookDistrict 1 Deck patching, deck scarification, latex concrete overlay abutment repairs, joint repairs, slab repairs and debris removal on Golf Road over the East and West Fork N. Branch Chicago River (SN 016-0355, 016-0356, 016-1256 and 016-1257) — Executed Nov 26 New Martam Construction Incorporated $973,368 ·
Mar 8, 2019 60R75 CookDistrict 1 Bridge deck scarification and latex concrete overlay, reconstruction of transverse bridge joints, and substructure repairs on US 30 over Thorn Creek. — Executed Nov 26 New MYS, Incorporated $380,278 ·
Mar 8, 2019 60T49 CookDistrict 1 Resurfacing and pedestrian ramp improvements on US 14 (Northwest Highway) through the Village of Arlington Heights, Village of Mount Prospect and the city of Des Plaines — Executed Nov 26 New Arrow Road Construction Co. $4,073,824 ·
Mar 8, 2019 60W87 CookDistrict 1 Surface preparation and painting of structrual steel, containment and disposal of lead waste and maintenance of traffic at 5 bridge structures located on IL 171 and on I-55 in Villages of McCook and Summit. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $2,284,150 ·
Mar 8, 2019 61F40 WillDistrict 1 Construct an extension of Kings Road from Rodeo Drive to Hassert Boulevard in Bollingbrook. — Executed Nov 26 New K-Five Construction Corporation & Herlihy Mid-Continent Company $7,485,866 ·
Mar 8, 2019 61F41 CookDistrict 1 Roadway reconstruction on Irving Park Road from east of IL 59 to Bartlett Road in Streamwood. — Executed Nov 26 New Plote Construction, Inc. $6,796,581 ·
Mar 8, 2019 61F44 WillDistrict 1 Replace the bridge carrying TR 68 over Lily Creek, 0.1 mil north of Caton Farm Road in Plainfield Township. — Executed Nov 26 New D. Construction, Inc. $945,717 ·
Mar 8, 2019 61F45 KaneDistrict 1 Replace the bridge carrying Silver Glen Road over Otter Creek. — Executed Nov 26 New D. Construction, Inc. $2,118,804 ·
Mar 8, 2019 61F47 LakeDistrict 1 Resurfacing Greenwood Avenue from Wilmot Road to Waukegan Road in Deerfield. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $1,668,129 ·
Mar 8, 2019 61F48 CookDistrict 1 Sidewalk construction adjacent to 79th Street from Garden Lane to Oak Grove Avenue in the Village of Justice. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $113,944 ·
Mar 8, 2019 61F49 CookDistrict 1 Reconstruction of Northfield Road from Winnetka Road to Willow Road in the Village of Northfield. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $1,588,343 ·
Mar 8, 2019 61F54 CookDistrict 1 Resurfacing Schick Road from Petersdorf Road to Fairfax Lane, and resurfacing Petersdorf Road from Schick Road to Army Trial Road in the Village of Bartlett. — Executed Nov 26 New Plote Construction, Inc. $1,214,960 ·
Mar 8, 2019 61F57 KaneDistrict 1 construction of a dedicated entrance ramp from northbound Randall Road to eastbound US 20, removal of the Weld Road connection to Randall Road, creation of a cul-de-sac on Weld Road and the reconfiguration of Randall Road, in the City of Elgin. — Executed Nov 26 New Curran Contracting Company $6,244,244 ·
Mar 8, 2019 61F59 KaneDistrict 1 Trffic signal interconnect along Indian Trail between Aurora Avenue and Pennsbury Lane in Aurora. — Executed Nov 26 New H & H Electric Co. $826,220 ·
Mar 8, 2019 61F60 CookDistrict 1 Construction of a multi-use path along Brainard Avenue from Joliet Road to 55th Street in the City of Countryside. — Executed Nov 26 New K-Five Construction Corporation $964,375 ·
Mar 8, 2019 61F61 WillDistrict 1 Resurfacing Burville Road from stte Street to IL 394 in the Village of Crete. — Executed Nov 26 New Iroquois Paving Corporation $395,403 ·
Mar 8, 2019 61F62 DuPageDistrict 1 Roadway reconstruction on Washington Street from Town Road to Arbor Avenue in the city of West Chicago. — Executed Nov 26 New Schroeder Asphalt Services, Inc. $1,120,972 ·
Mar 8, 2019 62C14 KaneDistrict 1 Bridge deck replacement with widened roadway, new expansion joints, and approach slab replacement on IL 38 over UPRR. — Executed Nov 26 New Herlihy Mid-Continent Company $2,789,910 ·
Mar 8, 2019 62D38 LakeDistrict 1 Remove and replace original section of the culvert (approximately 40 ft) in the center portion of the culvert carrying IL 21 (Milwaukee Ave.) over a ditch in the village of Vernon Hills (SN 049-0599) — Executed Nov 26 New Martam Construction Incorporated $377,924 ·
Mar 8, 2019 62F35 McHenryDistrict 1 Bridge joint repairs and deck overlay on SN 056-0007 carrying US 14/IL 173 (Division Street) over UPRR in the City of Harvard. — Executed Nov 26 New Sjostrom & Sons, Inc. $1,257,790 ·
Mar 8, 2019 62F37 CookDistrict 1 Repairs on Bridge SN 016-0225 carrying US 34 (Ogden Avenue) over IHB Railroad in the Village of LaGrange. — Executed Nov 26 New D. Construction, Inc. $513,202 ·
Mar 8, 2019 62F49 CookWillDistrict 1 6.45 miles of 3P resurfacing and ADA ramps on IL 43 from north of US 30 to just north of US 6. — Executed Nov 26 New D. Construction, Inc. $5,880,439 ·
Mar 8, 2019 62F54 DuPageDistrict 1 2.5 miles of resurfacing and ADA sidewalk improvements on IL 64 (North Avenue) from Villa Avenue to the Cook County line in the Village of Villa Park and the City of Elmhurst. — Executed Nov 26 New R. W. Dunteman Company $2,773,288 ·
Mar 8, 2019 62F66 CookDistrict 1 1.91 miles of HMA resurfcing, pavement patching, removal and replacement of curb and gutter, sidewalk removal and replacement and placement of thermoplastic markings along Avondale Avenue from Ogallah Avenue to Bryn Mawr Avenue in Chicago. — Executed Nov 26 New Arrow Road Construction Co. $1,771,483 ·
Mar 8, 2019 62G21 CookDistrict 1 Resurfacing and pedestrian ramp improvements on US 12/20/41 (Indianapolis Ave) from S. Ewing Ave. to 106th Street in the City of Chicago. — Executed Nov 26 New MAT Construction Leasing, Inc. $1,035,977 ·
Mar 8, 2019 62G47 CookDistrict 1 7.33 miles of resurfacing and pedestrian ramp projects on IL 171 (First Ave.) from 43rd Street to Des Plaines River Road. — Executed Nov 26 New R. W. Dunteman Company $7,076,939 ·
Mar 8, 2019 62G48 McHenryDistrict 1 Removal and replacement of culvert SN 056-0227 on IL 31 in the City of McHenry. — Executed Nov 26 New Alliance Contractors, Inc. $1,033,397 ·
Mar 8, 2019 62G50 CookDistrict 1 Deck overlay, joint repair and structural steel repair on SN 016-0344 carrying US 45 over the Cal Sag Channel in Palos Township. — Executed Nov 26 New MYS, Incorporated $474,229 ·
Mar 8, 2019 62G58 LakeDistrict 1 2 miles of resurfacing on IL 137 (Amstutz Expressway) from IL 120 (Belvidere Street) to just south of IL 137 (Greenwood Avenue) in the City of Waukegan. — Executed Nov 26 New J. A. Johnson Paving Company $2,327,169 ·
Mar 8, 2019 62G62 DuPageDistrict 1 6 miles of resurfacing on US 34 (Ogden Avenue) from Ivanhoe Ave to east of IL 83 (Kingery Highway in the Villages of Lisle, Downers Grove, Westmont and Clarendon Hills. — Executed Nov 26 New R. W. Dunteman Company $7,098,580 ·
Mar 8, 2019 62G64 DuPageDistrict 1 2.4 miles of resurfacing and pedestrian ramp improvements on US 20 (W. Lake Street) from west of Summerfield Drive to west of I-355 (Veterans Memorial Tollway) in the Villages of Addison and Bloomingdale. — Executed Nov 26 New K-Five Construction Corporation $3,428,345 ·
Mar 8, 2019 62G67 CookDistrict 1 Resurfacing and ADA pedestrian ramp improvements on vincennes Avenue from 119th Street to 127th Street in Blue Island. — Executed Nov 26 New K-Five Construction Corporation $827,549 ·
Mar 8, 2019 62G80 CookDistrict 1 3P resurfacing and median rehabilitation with pedestrian ramps along 127th Street/Burr Oak Ave from east of I-294 to Atesian Avenue in Blue Island. — Executed Nov 26 New Gallagher Asphalt Corporation $3,053,618 ·
Mar 8, 2019 62G90 LakeDistrict 1 Sheet pile retaining wall and parking improvement at Illinois Beach State Park — Executed Nov 26 New Alliance Contractors, Inc. $953,418 ·
Mar 8, 2019 62G98 WillDistrict 1 Removal and replacement of bridge decks of SN 099-0286, 099-0005 and 099-0304 c carrying I-55 over BNSF Railroad and Grant Creek in Wilminton and Channahon Townships. — Executed Nov 26 New D. Construction, Inc. $7,870,946 ·
Mar 8, 2019 62H01 DuPageDistrict 1 Bridge deck overlay, joint repair, structural repair of concrete, drainage structure adjustment and concrete repair of beam ends for the structures carrying IL 83 of US 34 and the BNSF Railroad in the Villages of Hinsdale, Clarendon Hills and Westmont. — Executed Nov 26 New Herlihy Mid-Continent Company $2,269,678 ·
Mar 8, 2019 62H04 DuPageDistrict 1 Bridge deck scarification, latex overlay, joint repairs, structural concrete and steel repairs on IL 38 (Roosevelt Road) over Salt Creek, also Bridge deck scarification, latex overlay, and joint repairs on IL 38 Frontage Road over Salt Creek. — Executed Nov 26 New Martam Construction Incorporated $1,330,256 ·
Mar 8, 2019 62H07 CookDistrict 1 0.5 miles of HMA resurfacing, pavement patching, milled shoulder rumble strips and pavement marking on IL 19 from Taft Avenue to Seymour Avenue in Chicago. — Executed Nov 26 New Plote Construction, Inc. $673,920 ·
Mar 8, 2019 62H14 VariousDistrict 1 Vegetation management on various expressway and primary routes along Historic US Route 66 — Executed Nov 26 New Endrizzi Contracting, Inc $422,930 ·
Mar 8, 2019 62H17 CookDistrict 1 Structural repairs of concrete on the structure carrying Joliet Road over the BandOCT RR in the Village of McCook — Executed Nov 26 New D. Construction, Inc. $262,345 ·
Mar 8, 2019 62H19 CookDistrict 1 Bridge joint replacement and bridge deck sealing on SN 016-0273 carrying Torrence Avenue over I-80/I-94 in the Village of Lansing — Executed Nov 26 New D. Construction, Inc. $272,594 ·
Mar 8, 2019 62H24 DuPageDistrict 1 2.4 miles of resurfacing and pedestrian ramp work on IL 56 (Butterfield Road) from the Kane County line to the CNRR overpass in Aurora. — Executed Nov 26 New Geneva Construction Company $1,241,694 ·
Mar 8, 2019 62H27 CookDistrict 1 Routing, cleaning, and sealing longitudinal cracks in the existing HMA pavement, and longitudinal joints between existing pavement and Curb and gutter and restriping with hot spray thermoplastic pavement marking. — Executed Nov 26 New Denler, Inc. $252,444 ·
Mar 8, 2019 62H30 DuPageDistrict 1 Routing, cleaning, and sealing longitudinal cracks in the existing HMA pavement; longitudinal joints between the existing HMA pavement and curb and gutter; and restriping with hot spray thermoplastic pavement marking. — Executed Nov 26 New Freehill Asphalt, Inc. $285,968 ·
Mar 8, 2019 62H32 KaneDistrict 1 7.55 miles of Resurfacing (SMART) and pedestrian ramp project on IL 64 from IL 47 to Randall Road. — Executed Nov 26 New Curran Contracting Company $2,608,470 ·
Mar 8, 2019 62H35 WillDistrict 1 Repairs on SN 099-0056 carrying I-80 over the Des Plaines River in Joliet. — Executed Nov 26 New Lakes & Rivers Contracting, Inc. $847,500 ·
Mar 8, 2019 62H39 LakeDistrict 1 Demolition of a single-family home in Mundelein and an auto repair building in Grayslake. — Executed Nov 26 New Lima Contractors $158,946 ·
Mar 8, 2019 62H41 CookDistrict 1 2.4 miles of resurfacing and pedestrian ramp upgrades on IL 171 (Archer Ave.) from west of Ashland Avenue to State Street in the City of Chicago. — Executed Nov 26 New MAT Construction Leasing, Inc. $1,424,366 ·
Mar 8, 2019 62H43 CookDistrict 1 2.3 miles of resurfacing and pedestrian ramp improvements on US 14 from Western Avenue to Vernon Avenue through the cities of Des Plaines and Park Ridge. — Executed Nov 26 New Arrow Road Construction Co. $2,276,865 ·
Mar 8, 2019 62H55 WillDistrict 1 9.62 miles of Shoulder rumble strip installation on I-80 at various locations between the Will County line and US 30. — Executed Nov 26 New D. Construction, Inc. $277,857 ·
Mar 8, 2019 62H68 WillDistrict 1 Bridge structural steel repair and bearing replacement of the bridges carrying I-80 over Des Plaines River in Joliet — Executed Nov 26 New ICC Group Inc. $4,978,000 ·
Mar 8, 2019 64D70 WinnebagoDistrict 2 1.94 miles milling and resurfacing of mainline and 1.97 miles of resurfacing of frontage roads 0.2 mile south of Sandy Hollow Rd in Rockford to 0.2 mile south of Backhawk Rd and Frontage roads; structure removal and culvert replacement drainage ditch 1.5 miles south of US 20 in Rockford — Executed Nov 26 New Curran Contracting Company $6,048,894 ·
Mar 8, 2019 64J41 BooneWinnebagoDistrict 2 4.37 miles of HMA resurfacing on IL 173 from 0.1 mile west of the Winnebago county line to 0.2 mile west of IL 76. — Executed Nov 26 New William Charles Construction Company, LLC $1,641,800 ·
Mar 8, 2019 64K59 Jo DaviessDistrict 2 1.15 miles of HMA resurfacing and ADA improvements on US 20, from Powder House Road Hill to 3rd Street in Galena. — Executed Nov 26 New Civil Constructors, Inc. $808,424 ·
Mar 8, 2019 64M80 Jo DaviessDistrict 2 Building removals at 481 Sisinawa Avenue, East Dubuque and 11653 US 20 NW of Galena. — Executed Nov 26 New Law Excavating, Inc. $64,388 ·
Mar 8, 2019 64M94 WhitesideDistrict 2 Ultra-thin bonded wearing course on I-88 from 1/2 mile west of IL 78 to Elkhorn Creek. — Executed Nov 26 New Martin & Company Excavating $1,593,387 ·
Mar 8, 2019 64N11 LeeDistrict 2 Clean and paint structural steel on SN 052-055 carrying Chicago Road over I-39. — Executed Nov 26 New Civil Coatings and Construction Inc. $382,590 ·
Mar 8, 2019 64N12 LeeDistrict 2 Clean and paint structural steel on SN 052-0054 carrying Beemerville Road over I-39. — Executed Nov 26 New Civil Coatings and Construction Inc. $196,150 ·
Mar 8, 2019 64N18 VariousDistrict 2 Roadside restoration of right-of-way turf damage caused by motorists along state maintained routes in District 2 — Executed Nov 26 New O'Brien Civil Works, Inc. $69,560 ·
Mar 8, 2019 64N22 Rock IslandDistrict 2 Cold Milling and HMA resurfacing in the southbound lane — Executed Nov 26 New Valley Construction Co. $111,889 ·
Mar 8, 2019 64N25 CarrollDistrict 2 Expansion joint replacement and concrete overlay on SN 008-0005 carrying US 52 over Straddle Creek located 3.4 miles east of IL 78. — Executed Nov 26 New Civil Constructors, Inc. $384,720 ·
Mar 8, 2019 64N26 CarrollDistrict 2 Expansion joint replacement, concrete overlay and beam end repairs on SN 008-0033 carying IL 40 over Johnson Creek — Executed Nov 26 New Civil Constructors, Inc. $264,553 ·
Mar 8, 2019 64N27 Jo DaviessDistrict 2 Expansion joint replacement, concrete overlay, repair and paint beam ends on SN 043-0039 carrying IL 78 over the Plum River — Executed Nov 26 New Civil Constructors, Inc. $427,850 ·
Mar 8, 2019 64N28 LeeDistrict 2 Expansion joint replacement, deck patching, and concrete overlay on SN 052-0060 carrying US 52 over the Green River. — Rejected Nov 26 New Sjostrom & Sons, Inc. $387,637 ·
Mar 8, 2019 64N29 HenryDistrict 2 Expansion joint replacement, concrete overlay, repair and paint beam ends on SN 037-0138 carrying IL 82 over South Branch of the Edwards River. — Executed Nov 26 New Civil Constructors, Inc. $449,103 ·
Mar 8, 2019 66J11 IroquoisDistrict 3 4.96 miles of shoulder widening and rumble strip installation on IL 49 from just north of E 4300 Rd to 200' south of Mud Creek. — Executed Nov 26 New Iroquois Paving Corporation $1,187,960 ·
Mar 8, 2019 66J44 LaSalleDistrict 3 Clean and paint structural steel and steel components on SN 050-0188 carrying IL 71 over Covel Creek. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $231,505 ·
Mar 8, 2019 66J45 DeKalbDistrict 3 Cleaning and painting all structural steel and other related steel components of SN 019-0030 carrying IL 72 over Owens Creek. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $156,660 ·
Mar 8, 2019 66J50 LaSalleDistrict 3 Class B pavement patching, curb and gutter, and concrete median removal and replacement on IL 23 from Grace Community Church North of Streator to the intersection of IL 23 and N. 17th Rd. (Richards Road) — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $85,394 ·
Mar 8, 2019 66J53 LivingstonDistrict 3 Microsurfacing full-width existing pavement on IL 116 from Pearl Street in Pontiac to IL 47. The project is 10.61 miles — Executed Nov 26 New Beniach Construction Co., Inc. $537,261 ·
Mar 8, 2019 66J54 LaSalleDistrict 3 crack and joint sealing on IL 251 from 0.3 mile south of N 31st Rd. to I-80, and 1-pass full-width microsurfacing on IL 251 from I-80 to US 6 in Peru. — Executed Nov 26 New Asphalt Stone Company $692,705 ·
Mar 8, 2019 66J55 LaSalleDistrict 3 9.76 miles of crack and joint sealing on IL 71 from north of I-80 to US 52. — Executed Nov 26 New Complete Asphalt Service Co. $32,347 ·
Mar 8, 2019 66J59 KankakeeDistrict 3 Removal and replacement of a cross road culvert located 0.4 miles north of 5000S RD at STA. 870+00. — Executed Nov 26 New Misfits Construction Company $32,945 ·
Mar 8, 2019 66J61 KendallDistrict 3 Adding aggregate shoulders to US-52 from LaSalle County Line to Will County Line. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $175,911 ·
Mar 8, 2019 66J75 KendallLaSalleDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders — Executed Nov 26 New H & H Electric Co. $46,600 ·
Mar 8, 2019 66J76 BureauLaSalleDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. — Executed Nov 26 New Laser Electric, Inc. $75,883 ·
Mar 8, 2019 66J77 GrundyDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. — Executed Nov 26 New Van-Mack Electric Co. $49,650 ·
Mar 8, 2019 66J78 VariousDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. — Executed Nov 26 New Leo P. Kelly Electric, Incorporated $56,560 ·
Mar 8, 2019 66J79 IroquoisKankakeeDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. — Executed Nov 26 New Van-Mack Electric Co. $64,110 ·
Mar 8, 2019 66J80 DeKalbDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. — Executed Nov 26 New H & H Electric Co. $46,600 ·
Mar 8, 2019 68B78 WarrenDistrict 4 Resurfacing on US 34/US 67/IL 100/IL 164 from 0.25 mile south of 11th Ave. to 0.9 mile east of 11th Street in Monmouth. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $7,678,838 ·
Mar 8, 2019 68C63 TazewellDistrict 4 Culvert replacement on IL 98, 0.1 mile east of Cole Hollow Rd (SN 090-1002) — Executed Nov 26 New Kinney Contractors, Inc. $734,500 ·
Mar 8, 2019 68D10 KnoxDistrict 4 Replacement of a single box culvert with a double (SN-048-2008), HMA pavement, guardrail replacement, earthwork, and other collateral work necessary, located 0.6 mile west of IL-180 near Victoria. — Executed Nov 26 New Kinney Contractors, Inc. $979,988 ·
Mar 8, 2019 68D22 PeoriaDistrict 4 Resurfacing, ADA improvements, traffic signal improvements, and drainage improvements along IL Rte 29 south of US Rte 150 to Abington St in Peoria. — Executed Nov 26 New Advanced Asphalt Company $1,972,818 ·
Mar 8, 2019 68E14 TazewellDistrict 4 Substructure repairs to SN 090-0037 carrying US RTE 150 over Farm Creek, TWP Railroad, and Norfolk Southern Railroad. — Executed Nov 26 New Otto Baum Company, Inc. $138,518 ·
Mar 8, 2019 68E28 WoodfordDistrict 4 Cold in-place recycling on IL 117 from IL 116 to Mill St in Eureka. — Executed Nov 26 New Advanced Asphalt Company $1,373,783 ·
Mar 8, 2019 68E36 PeoriaDistrict 4 Bituminous surface treatment- A1 on IL Rte 91 from the Stark county line. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $169,369 ·
Mar 8, 2019 68E62 PeoriaDistrict 4 Landscaping along I-74 from Ellis St to the Illinois River. — Executed Nov 26 New Central Landscaping, LP $122,806 ·
Mar 8, 2019 68E63 VariousDistrict 4 Pavement markings throughout District 4. — Executed Nov 26 New Varsity Striping & Construction Co. $435,795 ·
Mar 8, 2019 68E64 VariousDistrict 4 Guardrail repairs caused by motorists (MCHD) and cable guardrail repairs (high tensions cable barrier). — Executed Nov 26 New Northern Contracting, Inc. $682,239 ·
Mar 8, 2019 68E66 HendersonDistrict 4 Crack and joint sealing on US 34 (Biggsvile Bypass) and on IL 94/IL 116 from 1425N to 0.14 mile south of 1500N. — Executed Nov 26 New Complete Asphalt Service Co. $160,990 ·
Mar 8, 2019 68E67 VariousDistrict 4 Bridge deck sealing on various structures district wide. — Executed Nov 26 New M & M Concrete, Inc. $250,000 ·
Mar 8, 2019 68E68 MarshallMasonTazewellDistrict 4 Bridge washing of eleven bridges over the Illinois River — Executed Nov 26 New All States Painting, Inc. $881,690 ·
1,001–1,100 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.