| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 7, 2025 | 62W60 | CookDuPageDistrict 1 | This work includes trombone mast arm and pole replacement, installation of LED signal heads, traffic signal posts, installation of accessible pedestrian signals with ADA compliant ramps at various locations in District 1. | — | Executed | H & H Electric Co. $1,375,723 · | ||
| Mar 7, 2025 | 62W61 | VariousDistrict 1 | This work includes replacement of existing span wire mounted traffic signals with new mast arm mounted traffic signals. installation of LED signal heads, traffic signal posts and mast arms, installation of accessible pedestrian signals, ADA ramp improvements, connection to KDOT and LCDOT centralized traffic signal systems at various locations in District 1. | — | Executed | H & H Electric Co. $2,125,601 · | ||
| Mar 7, 2025 | 62W63 | CookDistrict 1 | This is a parking lot resurfacing improvement includes pavement removal, drainage structure adjustment, placement of subbase material, HMA binder course HMA surface course, Portland cement concrete, thermoplastic pavement markings. Located in the IDOT Hillside Maintenance Yard at, 4160 May St., Hillside, IL. | — | Executed | A Lamp Concrete Contractors, Inc. $794,968 · | ||
| Mar 7, 2025 | 62W73 | CookDistrict 1 | Standard and Design Overlay and ADA Improvements and all incidental and collateral work (2.89-Mile) Standard and Designed Overlay with ADA improvements on Green Bay Road from Scott Avenue to Kenilworth Avenue located in the Villages of Kenilworth, Winnetka and Glencoe within Cook County. | — | Rejected | Peter Baker & Son Co. $4,682,472 · | ||
| Mar 7, 2025 | 62W87 | CookDistrict 1 | (9.76-Mile) Standard Overlay, Bridge Deck Overlay, Bridge Repair, Bridge Superstructure Replacement, Sign Structures, Lighting, and ITS. Location of Work: I-94 (Bishop Ford Freeway) from West of Martin Luther King Dr to US 6 (159th St) within the Cities of Chicago and Calumet and the Villages of Burnham Riverdale, South Holland and Dolton. | — | Active | Lorig Construction Company $81,370,819 · | ||
| Mar 7, 2025 | 62X21 | CookLakeDistrict 1 | Cleaning and painting designated steel surfaces This is a bridge painting project consists of cleaning and painting designated steel surfaces. Location #1: IL-58 (Dempster St) over I-94 (Edens Expwy) Village of Skokie in Cook County SN: 016-0943. Location #2: Clavey Rd over US-41 (Edens) City of Highland Park in Lake County SN: 049-0165. Location #3: Tower Rd over I-94/US-41 (Edens) Village of Northfield in Cook County SN: 016-0815. | — | Executed | ERA-Valdivia Contractors, Inc. $1,181,744 · | ||
| Mar 7, 2025 | 62X36 | McHenryDistrict 1 | This is a milled rumble strip project. This project begins at the south of the intersection of IL Route 31 (Richmond Road) and Pioneer Drive and proceeds in a northernly direction for 5.204 miles to south of the intersection of IL 31 Tryon Grove Road and U.S. Route 12. The project is located within the Villages of Ringwood and Richmond and the Townships of Richmond and McHenry in McHenry County. | — | Executed | Payne & Dolan, Inc. $348,412 · | ||
| Mar 7, 2025 | 62X76 | CookDuPageWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-55 Expressway from ILL 43 (Harlem Ave) to Reed Road in Cook, DuPage, and Will Counties. | — | Executed | Thor General Contracting LLC $305,910 · | ||
| Mar 7, 2025 | 62X77 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-94 (Bishop Ford Expwy) from Dan Ryan Expwy to I-80 in Cook County, on IL-394 from I-80 to IL 1 (Dixie Hwy) in Cook and Will Counties, on Stony Island Ave from I-94 to US 12 (95th St) and on 103rd St from Cottage Groove to Stony Island. | — | Executed | Thor General Contracting LLC $477,405 · | ||
| Mar 7, 2025 | 62X79 | CookLakeDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish located on I-94 (Edens Expwy) / US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy) in Cook and Lake Counties. | — | Executed | The Final Connection, Inc. $164,400 · | ||
| Mar 7, 2025 | 62X90 | LakeDistrict 1 | The pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, dec The work to be done under Arterial Cleaning shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish located on various State maintained arterial routes located within the county of Lake. | — | Executed | Central Sweeping of Illinois, LLC $2,728,800 · | ||
| Mar 7, 2025 | 62X91 | VariousDistrict 1 | The pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, dec The work to be done under Arterial Cleaning shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish. Location is on various State maintained arterial routes located within Kane and McHenry Counties. | — | Executed | Central Sweeping of Illinois, LLC $1,982,600 · | ||
| Mar 7, 2025 | 62X95 | VariousDistrict 1 | Weed Spraying within various areas in District 1 and IDOT District 1 maintenance yards: Alsip, Oakbrook, Gurnee, and Northbrook. | — | Executed | ALLEN CHASE ENTERPRISES INC. $338,044 · | ||
| Mar 7, 2025 | 64N01 | WhitesideDistrict 2 | 8.25 miles of patching, milling and resurfacing on I-88 from Elkhorn Creek to US 30. Expansion joint replacement, deck patching, concrete overlay, and miscellaneous other bridge repairs to SN's: 098-0073, 098-0074, 098-0075, 098-0076, 098-0087, and 098-0088. Demolition and removal of SN's 098-0089 and 098-0090. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $26,883,771 · | ||
| Mar 7, 2025 | 64R02 | LeeDistrict 2 | Reconstruction of sidewalk ramps for those with disabilities at ramps deemed uncompliant, patching, milling, and resurfacing along various state routes in Dixon, Illinois. Gross Length 4,163 ft. | — | Executed | Martin & Company Excavating $4,036,696 · | ||
| Mar 7, 2025 | 64S33 | StephensonDistrict 2 | Bridge repairs and joint replacement on SN 089-0030, carrying IL 73 over Indian Creek in Winslow. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $447,987 · | ||
| Mar 7, 2025 | 64S87 | Rock IslandDistrict 2 | Traffic signals upgrade at Barstow Rd 0.6 mile northeast of IL 92 interchange in Carbon Cliff. | — | Executed | Davenport Electric Contract Company $321,496 · | ||
| Mar 7, 2025 | 64T20 | HenryDistrict 2 | Bridge repairs and approach and deck overlay on SN 037-0143, carrying US 6 over Mosquito Creek, 0.3 miles west of I-280. | — | Executed | Martin & Company Excavating $263,536 · | ||
| Mar 7, 2025 | 64T81 | WhitesideDistrict 2 | 0.5 miles of resurfacing on US 30 from IL 78 to Garden Plain Rd in Morrison | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $218,027 · | ||
| Mar 7, 2025 | 64T82 | Rock IslandDistrict 2 | Standard overlay on Airport Rd from 0.56 mile to 0.86 mile east of Rock Island - Milan Parkway. 0.6 mile gross length. | — | Executed | Brandt Construction Co. $266,278 · | ||
| Mar 7, 2025 | 64T91 | WhitesideDistrict 2 | Full bridge cleaning and painting at SN 098-0033 carrying US 30 over Elkhorn Creek 0.6 mile west of Como Rd. | — | Executed | ERA-Valdivia Contractors, Inc. $289,059 · | ||
| Mar 7, 2025 | 64U07 | Rock IslandDistrict 2 | Bridge washing of 11 structures along I-74 in Rock Island County. | — | Executed | Pressure Washing Unlimited Inc. $68,100 · | ||
| Mar 7, 2025 | 64U08 | WinnebagoDistrict 2 | Bridge washing of SN 101-0133 and 101-0134 over the Kishwaukee River in Winnebago County. | — | Executed | Pressure Washing Unlimited Inc. $20,900 · | ||
| Mar 7, 2025 | 64U09 | BooneWinnebagoDistrict 2 | Bridge washing of 9 structures in Boone and Winnebago Counties. | — | Executed | Pressure Washing Unlimited Inc. $58,850 · | ||
| Mar 7, 2025 | 64U10 | VariousDistrict 2 | Bridge washing of 9 structures in Boone and Winnebago Counties. | — | Executed | Pressure Washing Unlimited Inc. $92,050 · | ||
| Mar 7, 2025 | 64U11 | VariousDistrict 2 | Bridge washing of 12 structures in various counties. | — | Executed | Pressure Washing Unlimited Inc. $94,625 · | ||
| Mar 7, 2025 | 64U25 | OgleDistrict 2 | 7.931 miles of HMA milling and resurfacing on IL 64 from Chana Rd to Il 251. | — | Executed | Martin & Company Excavating $3,123,589 · | ||
| Mar 7, 2025 | 64U27 | WinnebagoDistrict 2 | 7.54 Miles Hot-Mix Asphalt pavement overlay, 0.2 Mi W of Pecatonica Rd_to 0.2 mile W of Falconer Rd. | — | Executed | Rock Road Companies, Inc. $3,578,388 · | ||
| Mar 7, 2025 | 64U29 | HenryDistrict 2 | Standard overlay on IL 82 from 700N south of Cambridge to IL 17. Approximately 5.87 miles. | — | Executed | Advanced Asphalt Company $2,998,150 · | ||
| Mar 7, 2025 | 64U30 | StephensonDistrict 2 | 4.63 miles of HMA milling and resurfacing on US 20 from Rees Rd to 0.4 mile west of Flansburg Rd. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,614,512 · | ||
| Mar 7, 2025 | 64U33 | WhitesideDistrict 2 | 15.3 miles of milling and resurfacing on Moline Rd. from East St. in Erie to IL 78 and 3rd Ave. in Lyndon to US 30. | — | Executed | Civil Constructors Inc. dba Helm Civil and Valley Construction Co., J.V. $7,840,008 · | ||
| Mar 7, 2025 | 66K70 | BureauDistrict 3 | 350 ft of Bridge Repairs (SN 006-0097) over Green River, 1.4 MI W OF IL 40. | — | Executed | Martin & Company Excavating $650,504 · | ||
| Mar 7, 2025 | 66M57 | DeKalbDistrict 3 | HMA milling and resurfacing (designed overlay), culvert replacement, pavement marking, ditch cleaning and raised reflective markers on IL 72 beginning at IL-23 (N) and ends at Kane County Line; HMA milling and resurfacing (standard overlay), pavement marking, and raised reflective markers on IL 23 beginning at IL 72 and ends at the McHenry County line. 7.183 miles gross length. | — | Executed | Curran Contracting Company $2,734,986 · | ||
| Mar 7, 2025 | 66N41 | PutnamDistrict 3 | Washing the entire structural steel superstructure, washing and sealing the concrete (deck surface, inside face of parapets, top surface of the abutments and piers) at Structure No. 078-0047 carrying IL Route 89 over the Illinois River approximately 0.91 mile south of US Route 6. | — | Executed | All States Painting, Inc. $74,028 · | ||
| Mar 7, 2025 | 66N42 | LaSalleDistrict 3 | Washing the entire structural steel superstructure, washing and sealing the concrete (deck surface, inside face of parapets, top surface of the abutments and piers) at various structures over the Illinois River in LaSalle County. | — | Executed | Interstate Maintenance, Incorporated $262,302 · | ||
| Mar 7, 2025 | 66P13 | FordDistrict 3 | Class B pavement patching on F.A.P. Route 796 (IL 115) beginning at Pine Street (1450E Rd.) in Piper City and ending at the Intersection of IL 115/116. Approximately 8.5 miles gross length. | — | Executed | G. M. Sipes Construction, Inc. $622,863 · | ||
| Mar 7, 2025 | 66P49 | DeKalbDistrict 3 | HMA milling and resurfacing patching, pavement marking and reflective markers on FAP 307 (IL 64), from 0.2 mile east of Airport Rd to Kane County Line in DeKalb County. Approximately 2.946 miles gross length. | — | Executed | Curran Contracting Company $1,541,645 · | ||
| Mar 7, 2025 | 66P51 | GrundyDistrict 3 | Milling and resurfacing 1.15 miles of OR 129 from Main St. to Carbon Hill Rd. in Gardner, along with the replacement of 3 culverts within the Project Bounds. | — | Executed | D. Construction, Inc. $680,856 · | ||
| Mar 7, 2025 | 66P78 | VariousDistrict 3 | Weed spraying to aid in weed control along various routes in Bureau, LaSalle, Grundy, Livingston, Kankakee, Iroquois, and Ford Counties. | — | Executed | The Daltons Inc. $168,697 · | ||
| Mar 7, 2025 | 66P83 | LivingstonDistrict 3 | Cleaning and painting all structural steel of SN 053-0160 carrying IL 17 over Prairie Creek, 1.0 mile east of IL 23. | — | Executed | ERA-Valdivia Contractors, Inc. $143,680 · | ||
| Mar 7, 2025 | 66P84 | KankakeeDistrict 3 | Cleaning and painting all steel components of structure 046-0114 carrying I-57 over Minnie Creek, 4.3 miles north of the Chebanse interchange. | — | Executed | ERA-Valdivia Contractors, Inc. $127,908 · | ||
| Mar 7, 2025 | 66P95 | LaSalleDistrict 3 | HMA milling and resurfacing on the frontage road, parallel to IL 23 on the north side of Streator, and is approximately 0.22 mile long. | — | Executed | Kankakee Valley Construction Company, Inc. $180,130 · | ||
| Mar 7, 2025 | 66R00 | VariousDistrict 3 | Litter removal from the interstate highways at interchanges and rest areas throughout District 3. | — | Active | The Final Connection, Inc. $327,337 · | ||
| Mar 7, 2025 | 66R05 | LaSalleDistrict 3 | Replacing the 6" centerline pavement marking with 9" contrast pavement marking tape and replacing the 8" lane lines at interchange ramps on I-39 from north of Oglesby Interchange at M.M. 54 to M.M. 76.4. | — | Executed | A. C. Pavement Striping Co. $936,906 · | ||
| Mar 7, 2025 | 66R06 | LaSalleLivingstonDistrict 3 | Contrast pavement marking of the 8" lane lines on IL 23 at Richards Rd in LaSalle County and ending at Adams St in Livingston County and also on IL 18 beginning at Second Ave and ending at Wasson St in LaSalle County. | — | Executed | Varsity Striping & Construction Co. $268,247 · | ||
| Mar 7, 2025 | 66R07 | VariousDistrict 3 | Removal and replacement of damaged or deteriorated sand module impact attenuators on various interstate routes in various counties in District 3. | — | Executed | |||
| Mar 7, 2025 | 66R09 | LivingstonDistrict 3 | Excavating and grading existing shoulders and placing aggregate shoulders on OR 66 from IL Route 116 to E. 1600 Road. | — | Executed | H. J. Eppel & Co. $88,186 · | ||
| Mar 7, 2025 | 66R29 | BureauDistrict 3 | 2.3 miles HMA milling and resurfacing, patching, pavement marking, and reflective markers on SBI 7C (2775E RD), from US 6 to IL 29 in Bureau County. | — | Executed | Advanced Asphalt Company $1,461,525 · | ||
| Mar 7, 2025 | 66R30 | BureauDistrict 3 | HMA milling and resurfacing, patching, pavement marking and reflective markers on SBI 88 (NEW BEDFORD RD), from Main St in New Bedford to IL 40 in Bureau County. 1.74 mile gross length. | — | Executed | Advanced Asphalt Company $985,903 · | ||
| Mar 7, 2025 | 66R34 | IroquoisDistrict 3 | HMA milling and resurfacing 2" (SMART) of the mainline, shoulder work, pavement marking, and raised reflectors on FAI 57 from 0.5 mile north of IL 116 to 1.6 miles north of CH4. 4.88 miles gross. | — | Executed | Iroquois Paving Corporation $9,823,667 · | ||
| Mar 7, 2025 | 68E50 | KnoxDistrict 4 | Widening and resurfacing, culvert replacements, culvert repairs, drainage improvements, and guardrail upgrades on IL 180 from IL 167 to US 150 in Knox County. Approximately 10.48 miles. | — | Executed | Gunther Construction, a div of UCM, Inc. $29,190,217 · | ||
| Mar 7, 2025 | 68F90 | PutnamDistrict 4 | 5.91 miles of resurfacing (PPP) project extends from 1.4 miles east of the I-180/IL 26 interchange to IL 89. | — | Executed | Advanced Asphalt Company $5,166,321 · | ||
| Mar 7, 2025 | 68H31 | TazewellDistrict 4 | Bridge deck sealing at various locations in Tazewell County. | — | Executed | All States Painting, Inc. $348,300 · | ||
| Mar 7, 2025 | 68J17 | McDonoughDistrict 4 | 12 miles of Cape Seal on IL 9 from the Hancock County Line to US 67 in Good Hope in McDonough County. | — | Executed | A. C. Pavement Striping Co. $1,625,964 · | ||
| Mar 7, 2025 | 68J19 | MarshallPeoriaWoodfordDistrict 4 | Crack and joint sealing at various locations in Peoria, Marshall, and Woodford Counties. | — | Executed | Denler, Inc. $858,085 · | ||
| Mar 7, 2025 | 68J27 | VariousDistrict 4 | Installation of ITS and traffic signal equipment at various locations in District 4. | — | Rejected | Oberlander Electric Co. $382,690 · | ||
| Mar 7, 2025 | 68J33 | VariousDistrict 4 | Districtwide weed spraying. | — | Executed | The Daltons Inc. $157,527 · | ||
| Mar 7, 2025 | 68J40 | HendersonDistrict 4 | Bridge repair to SN 036-0040 including replacing expansion joints, epoxy crack injection, and patching. | — | Executed | Brandt Construction Co. $625,000 · | ||
| Mar 7, 2025 | 68J86 | VariousDistrict 4 | Electrical maintenance contract (maintenance and repair D4 traffic signals, overhead lighting, and ITS facilities). | — | Executed | Laser Electric, Inc. $651,955 · | ||
| Mar 7, 2025 | 70D55 | McLeanDistrict 5 | 10.76 miles of pavement rehab - Designed Overlay Resurfacing (INT-3rd), underdrains, patching, paving and low speed weigh in motion scale from 0.3 mile west of TR 90 (725 E Rd) south of Carlock to I-55 north of Normal (including ramps and Carlock weigh stations). | — | Executed | Rowe Construction, a div of UCM, Inc. $36,874,418 · | ||
| Mar 7, 2025 | 70F98 | EdgarDistrict 5 | HMA surface removal and resurfacing at various locations along US 150 mainline and shoulder pavement from 125' west of Lower Terre Haute Rd in Paris ,IL to a point approximately 0.3 mile west of CNRL Railroad including the Sulphur Springs Rd and Court St intersection. 2.531 miles gross length. | — | Executed | Evergreen Roadworks, LLC $6,670,718 · | ||
| Mar 7, 2025 | 70G42 | DeWittPiattVermilionDistrict 5 | Constructing push walls and slabs at the IDOT Maintenance Facilities of Clinton, Monticello, and Fithian within Dewitt, Vermilion, and Piatt Counties. | — | Executed | Big O Services, LLC $289,172 · | ||
| Mar 7, 2025 | 70G76 | VariousDistrict 5 | Bridge deck sealing of 109 structures in DeWitt, Piatt, and McLean Counties. | — | Executed | All States Painting, Inc. $188,013 · | ||
| Mar 7, 2025 | 70H32 | VermilionDistrict 5 | 1.14 miles of SMART overlay on US 136 from 0.1 mile west of Lynch Spur in Danville to Indiana State Line. | — | Executed | Cross Construction, Inc. $717,409 · | ||
| Mar 7, 2025 | 70H33 | ChampaignDistrict 5 | 6.15 miles of microsurfacing 2 pass, 0.8 mile south of Washington St in Urbana to Madison St in Philo. | — | Executed | A. C. Pavement Striping Co. $997,903 · | ||
| Mar 7, 2025 | 70H45 | McLeanDistrict 5 | Bridge deck repairs to SN's 057-0127, 057-0132, and 057-0161 in McLean County. | — | Executed | Stark Excavating, Inc. $958,366 · | ||
| Mar 7, 2025 | 70H52 | PiattDistrict 5 | 2.756 miles of Crack and Joint Sealing from Dewitt/Piatt Co Line to 1 mile E of 900E Rd W of Mansfield. | — | Executed | Complete Asphalt Service Co. $32,351 · | ||
| Mar 7, 2025 | 70H53 | DeWittDistrict 5 | 3.069 miles of Smart Resurfacing on US 51 from Tributary Long Point Creek to south of Main Street north of Clinton and north of Heritage Rd to north of Texas Church Rd south of Clinton. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,171,692 · | ||
| Mar 7, 2025 | 70H55 | ChampaignDistrict 5 | 0.063 mile PCC pavement patching under ICRR in Rantoul. | — | Executed | G. M. Sipes Construction, Inc. $344,184 · | ||
| Mar 7, 2025 | 72255 | SangamonDistrict 6 | 6 miles of resurfacing with drainage improvements on IL 123 from 0.4 miles east of IL 29, east of Athens, to West Outer Road, 0.3 miles west of I-55. | — | Executed | P. H. Broughton & Sons, Inc. $2,490,973 · | ||
| Mar 7, 2025 | 72321 | SangamonDistrict 6 | 3 miles of resurfacing on IL 4 (Veterans Parkway) from 0.2 miles north of Greenbriar Drive to 0.1 miles south of Prairie Crossing Drive in Springfield. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $8,892,709 · | ||
| Mar 7, 2025 | 72322 | VariousDistrict 6 | Bridge deck sealing on various routes in District 6. | — | Executed | All States Painting, Inc. $279,580 · | ||
| Mar 7, 2025 | 72590 | VariousDistrict 6 | Maintenance and repair of surveillance cameras, vehicle detectors, dynamic message signs, advanced traffic management systems, fiber optic communications, traffic signal interconnects, ethernet networks, and all peripheral equipment throughout District 6. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $141,700 · | ||
| Mar 7, 2025 | 72602 | VariousDistrict 6 | Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the eastern half of District 6. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $535,685 · | ||
| Mar 7, 2025 | 72603 | VariousDistrict 6 | Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the western half of District 6. | — | Executed | Bodine Electric of Decatur $292,133 · | ||
| Mar 7, 2025 | 72608 | ScottDistrict 6 | Bridge deck patching, joint repairs, and approach repairs on SN 086-0016 and SN 086-0019 carrying Hillview Road over Sandy Creek and Little Sandy Creek in southern Scott County. | — | Executed | Freesen, a div of UCM, Inc. $383,898 · | ||
| Mar 7, 2025 | 72651 | SangamonDistrict 6 | Bridge painting on SN 084-0145 carrying Farmingdale Road over I-72, 2.6 miles west of Wabash Avenue, west of Springfield. | — | Executed | Three Star Painting, Inc. $210,000 · | ||
| Mar 7, 2025 | 72652 | AdamsDistrict 6 | Bridge painting on SN 001-0069 carrying OR 79 over I-172, 2.2 miles south of IL 57. | — | Executed | Three Star Painting, Inc. $240,000 · | ||
| Mar 7, 2025 | 72736 | PikeDistrict 6 | Installation of a virtual weigh-in-motion system on eastbound I-72 from 0.6 miles west of CH 3 and proceeding for 300- to the east. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,392,377 · | ||
| Mar 7, 2025 | 72748 | LoganDistrict 6 | Bridge deck patching on SN 054-0031 carrying IL-54 over Lake Fork Creek in southern Logan County. | — | Executed | Otto Baum Company, Inc. $215,000 · | ||
| Mar 7, 2025 | 72749 | ChristianDistrict 6 | Bridge deck patching on four bridges carrying IL 104 over Lake Sangchris west of Kinkaid. (SN 011-0019, 011-0020, 011-0021, and 011-0022) | — | Executed | Freesen, a div of UCM, Inc. $425,495 · | ||
| Mar 7, 2025 | 72759 | SangamonDistrict 6 | 0.3 miles of pavement reconstruction, ADA improvements and traffic signal upgrades on 5th Street (Business I-55) from Spruce Street to Ash Street in Springfield. | — | Executed | Kinney Contractors, Inc. $5,348,364 · | ||
| Mar 7, 2025 | 72831 | MacoupinDistrict 6 | Resurfacing on IL 16 from east of Rose Lane in Shipman to 0.3 miles west of IL 159. | — | Executed | Charles E. Mahoney Co. $1,368,306 · | ||
| Mar 7, 2025 | 72832 | MenardDistrict 6 | 4.7 miles of resurfacing on IL 97 from 0.2 miles northwest of Waring Street to the CandIM Railroad, partial width resurfacing on IL 97 from the CandIM Railroad to north of Jefferson Street and partial width resurfacing on IL 97 from the IL 97 / IL 123 Junction to 0.1 miles east of the junction. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $2,260,205 · | ||
| Mar 7, 2025 | 72D99 | SangamonDistrict 6 | 4.9 miles of resurfacing on Old US 36 from 0.2 miles west of Loami Bates Road to 0.7 miles south of I-72. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $2,068,376 · | ||
| Mar 7, 2025 | 72G18 | AdamsDistrict 6 | Bridge replacement of SN 001-0016 carrying IL 57 over Harkness Creek at Bluff Hall. | — | Executed | County Contractors, Inc. $874,583 · | ||
| Mar 7, 2025 | 74327 | FayetteDistrict 7 | Replacement of SN 026-0068 carrying IL 185 over Lone Grove Branch just east of County Road 2300E, approximately 1 mile east of St. Peter. | — | Executed | Samron Midwest Contracting, Inc. $1,228,617 · | ||
| Mar 7, 2025 | 74A28 | LawrenceDistrict 7 | Bridge superstructure replacement on SN 051-0033 carrying US 50 frontage road over Allison Ditch, 2 miles east of the Airport Road interchange. | — | Executed | C-Hill Civil Contractors, Inc. $430,600 · | ||
| Mar 7, 2025 | 74C45 | LawrenceDistrict 7 | 10.2 miles of resurfacing on US 50 from 0.2 miles east of IL 250 to the Embarras River and on US 50 BUS from US 50 to IL 250/US 50 BUS in Lawrenceville. | — | Executed | Ambraw Asphalt Materials, Inc. $4,591,977 · | ||
| Mar 7, 2025 | 74C96 | EffinghamDistrict 7 | Patching, bridge deck overlay, bridge joint repair/replacement, bridge deck repairs on SN 026-2004 on US 45 (Banker Street) at CSXT Railroad (overhead), 0.2 miles south of US 40. | — | Executed | Sangamo Construction Company $1,553,456 · | ||
| Mar 7, 2025 | 74D01 | FayetteDistrict 7 | Bridge painting at 4 locations in Fayette County. , Cleaning and painting 4 structures in Fayette County. | — | Executed | Eagle Painting & Maintenance Company, Inc. $789,601 · | ||
| Mar 7, 2025 | 74D03 | MaconDistrict 7 | Painting of 2 bridge structures: SN 058-0087 carrying Kirby Road over I-72 northeast of Decatur and SN 058-0127 carrying US 36 over IL 48 in Decatur. | — | Executed | Eagle Painting & Maintenance Company, Inc. $387,334 · | ||
| Mar 7, 2025 | 74D05 | VariousDistrict 7 | Bridge deck sealing of 93 bridge decks on various routes in Macon, Moultrie and Shelby Counties. | — | Executed | All States Painting, Inc. $179,337 · | ||
| Mar 7, 2025 | 74D33 | FayetteDistrict 7 | Stiffener connection repairs on SN 026-0102 and SN 026-0103 carrying I-70 over IL 140 and the CSXT Railroad, 0.8 miles east of the Bond County line. | — | Executed | William Charles Construction Company, LLC $1,412,000 · | ||
| Mar 7, 2025 | 74D38 | WabashDistrict 7 | Washing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel. | — | Executed | M & M Concrete, Inc. $54,800 · | ||
| Mar 7, 2025 | 76K02 | St. ClairDistrict 8 | Bridge repair, approach roadway and painting on SN 082-0017 carrying I-55/70 over the CSX, KCS, NS, and TRRA Railroads and two private access roads, just east of the I-55/64/70 Tri-Level Interchange near the City of East St. Louis. | — | Executed | Keeley & Sons, Inc. $35,988,571 · | ||
| Mar 7, 2025 | 76L49 | St. ClairDistrict 8 | 0.6 miles of chip seal / fog seal on Summerfield Road / Main Street from Old US 50 to Casad Street in Summerfield. | — | Rejected | DMS Contracting, Inc. $104,126 · | ||
| Mar 7, 2025 | 76R99 | St. ClairDistrict 8 | 7 miles of resurfacing with bridge and ramp repairs on I-64 from 0.2 miles west of IL 157 to 0.3 miles west of Greenmount Road. | — | Executed | The Kilian Corporation and Christ Brothers Asphalt $76,871,166 · | ||
| Mar 7, 2025 | 76T06 | St. ClairDistrict 8 | Bridge painting on SN 082-0192 and 082-0193 carrying I-64 over IL 161 in New Baden. | — | Executed | Eagle Painting & Maintenance Company, Inc. $258,280 · | ||
| Mar 7, 2025 | 76T83 | MonroeDistrict 8 | 3.51 miles of Slurry Seal on IL 3 from just north of Market Street to just north of Vandebrook Drive in Waterloo. | — | Executed | A. C. Pavement Striping Co. $879,340 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.