| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jun 11, 2021 | 72L80 | ChristianDistrict 6 | 2 miles of standard overlay on US 51 from the Shelby County line to just south of Cold Springs Road in Pana. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,002,190 · | ||
| Jun 11, 2021 | 72L99 | ChristianDistrict 6 | 0.5 miles of standard overlay on McAdam Drive from west of IL 48 to north of IL 29 in Taylorville. | — | Executed | Truman L. Flatt & Sons Co., Inc. $288,657 · | ||
| Jun 11, 2021 | 72M60 | AdamsDistrict 6 | Vertical realignment on I-57 in the city of Marblehead. | — | Executed | Diamond Construction Company $90,440 · | ||
| Jun 11, 2021 | 72M77 | PikeDistrict 6 | Deck patching on SN 075-0098 and SN 075 075-0099 carrying I-72 over Norfolk Southern Railroad, 1.5 miles west of the Barry Interchange. | — | Executed | Freesen, a div of UCM, Inc. $556,101 · | ||
| Jun 11, 2021 | 72M84 | MacoupinDistrict 6 | Superstructure and substructure repairs on SN 059-0016 carrying IL 111 over Macoupin Creek, 3.5 miles northeast of IL 267 near Medora. | — | Executed | RCS Construction, Inc. $341,990 · | ||
| Jun 11, 2021 | 72M85 | SangamonDistrict 6 | Deck patching on SN 084-0510 carrying eastbound Sangamon Avenue over Illinois Central Railroad, 0.25 miles west of I-55. | — | Executed | Freesen, a div of UCM, Inc. $248,937 · | ||
| Jun 11, 2021 | 72M86 | MontgomeryDistrict 6 | Deck and substructure repairs on SN 068-0018 carrying IL 48/127 over West Fork of Shoal Creek, at the west edge of Raymond. | — | Executed | Stutz Excavating, Inc. $216,629 · | ||
| Jun 11, 2021 | 72M88 | AdamsDistrict 6 | Bridge bearing replacement and steel repairs on SN 001-0048 carrying Columbus Road over I-172, 1.4 miles north of IL 104. | — | Executed | Sangamo Construction Company $108,627 · | ||
| Jun 11, 2021 | 72M89 | AdamsDistrict 6 | Deck patching on SN 001-0077 carrying IL 61 over Big Neck Creek, 1 mile west of IL 61/IL 94 JCT. | — | Executed | County Contractors, Inc. $155,483 · | ||
| Jun 11, 2021 | 72M90 | SangamonDistrict 6 | Bridge bearing replacement and steel repairs on two I-55 overhead bridges South of Springfield. (SN 084-0081 and 084-0099) | — | Executed | White Construction LLC $164,543 · | ||
| Jun 11, 2021 | 72M95 | SangamonDistrict 6 | Weed spraying along various routes in Sangamon County. | — | Executed | Endrizzi Contracting, Inc $198,875 · | ||
| Jun 11, 2021 | 72M96 | SangamonDistrict 6 | Tree removal and seeding at the District 6 Sign Shop on MacArthur Boulevard in Springfield. | — | Executed | Homer Tree Service, Inc. $71,711 · | ||
| Jun 11, 2021 | 72M97 | SangamonDistrict 6 | Seeding on the infields of the East Lake Shore Drive and I-55 interchange. | — | Executed | Cardno, Inc. $48,098 · | ||
| Jun 11, 2021 | 74462 | MaconDistrict 7 | 0.7 miles of patching, milling, HMA resurfacing and longitudinal joint sealant on IL 121 from 0.1 miles south of Kile Street to the Garfield Avenue Underpass in Decatur. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,166,105 · | ||
| Jun 11, 2021 | 74898 | VariousDistrict 7 | 4.6 miles of new shoulder and safety improvements on IL 128 from 1550E south of Cowden to IL 33. | — | Executed | Howell Paving, Inc. $993,469 · | ||
| Jun 11, 2021 | 74942 | ClayDistrict 7 | 10.1 miles of patching, milling, resurfacing and aggregate wedge shoulders on Kinmundy Road from the Marion County line to US 45 in Louisville. | — | Executed | Howell Paving, Inc. $3,018,575 · | ||
| Jun 11, 2021 | 74989 | FayetteDistrict 7 | Bridge deck overlay and bridge deck repairs on SN 026-0051 carrying IL 185 over Hurricane Creek Branch, 0.5 miles southeast of the Montgomery County line. | — | Executed | Sangamo Construction Company $191,537 · | ||
| Jun 11, 2021 | 74990 | FayetteDistrict 7 | Replacing expansion joints, bearings and constructing a bridge deck overlay on SN 026-0035 carrying US 51 over Sandy Run Creek, located 1.5 miles south of US 40. | — | Executed | Sangamo Construction Company $746,372 · | ||
| Jun 11, 2021 | 74A20 | EffinghamDistrict 7 | 4.2 miles of SMART inlay of mainline, shoulders and median crossovers and installation of traffic counter equipment on I-57 from the North Tri-level to the Shelby County line, north of Effingham. | — | Executed | Howell Paving, Inc. $3,962,885 · | ||
| Jun 11, 2021 | 74A30 | FayetteDistrict 7 | Bridge joint and bearing replacement on SN 026-0089 carrying IL 140 over Hurricane Creek, 0.9 miles southeast of US 40. | — | Executed | Samron Midwest Contracting, Inc. $161,698 · | ||
| Jun 11, 2021 | 74A31 | ClayDistrict 7 | 1.1 miles of milling, resurfacing and aggregate wedge shoulders on Old US 50 west of Industrial Drive to east of US 45. | — | Executed | Howell Paving, Inc. $268,496 · | ||
| Jun 11, 2021 | 74A38 | EffinghamDistrict 7 | 0.5 miles of patching along US 45 from north of Rickleman Avenue to north of Technology Drive in Effingham. | — | Executed | Kinney Contractors, Inc. $489,579 · | ||
| Jun 11, 2021 | 74A42 | VariousDistrict 7 | 1.3 miles of smart inlay under overhead structures in Fayette, Effingham and Cumberland Counties. | — | Executed | Howell Paving, Inc. $1,291,659 · | ||
| Jun 11, 2021 | 74A43 | ClarkDistrict 7 | Scale replacement at the Marshall Weigh Station on I-70. | — | Executed | MYS, Incorporated $412,905 · | ||
| Jun 11, 2021 | 74A47 | VariousDistrict 7 | 35 miles of pavement patching on US 50 from Flora to Sumner. | — | Executed | G. M. Sipes Construction, Inc. $708,085 · | ||
| Jun 11, 2021 | 74A50 | VariousDistrict 7 | 11.6 miles of seal coat on various routes in Wayne, Edwards and Wabash Counties. | — | Executed | Mt. Carmel Stabilization Group, Inc. $565,732 · | ||
| Jun 11, 2021 | 74A51 | VariousDistrict 7 | 18.7 miles of patching and A-2 surface treatment on various routes in Clay, Richland and Lawrence Counties. | — | Executed | Mt. Carmel Stabilization Group, Inc. $582,745 · | ||
| Jun 11, 2021 | 74A52 | MaconShelbyDistrict 7 | 2.3 miles of chip seal at various locations in Macon and Shelby Counties. | — | Executed | Dunn Company $148,468 · | ||
| Jun 11, 2021 | 74A53 | FayetteDistrict 7 | 1 mile of pavement patching on eastbound I-70 at the Brownstown Weigh Station. | — | Executed | Beniach Construction Co., Inc. $194,956 · | ||
| Jun 11, 2021 | 74A54 | ClarkDistrict 7 | Bridge deck repairs and joint replacement on SN 012-0014 carrying IL 1 over CSX Railroad, 0.5 miles north of US 40 at Marshall. | — | Executed | Sangamo Construction Company $721,349 · | ||
| Jun 11, 2021 | 74A57 | VariousDistrict 7 | Repairs of location-specific motorist caused guardrail damage and on-call repairs of guardrail damage throughout District 7. | — | Executed | COLLINS & HERMANN, INC. $780,664 · | ||
| Jun 11, 2021 | 76G57 | MadisonDistrict 8 | 4.8 miles of resurfacing and ADA improvements on IL 111/3 from Alby Street to Broadway in Alton. | — | Executed | Charles E. Mahoney Co. $5,947,763 · | ||
| Jun 11, 2021 | 76K85 | JerseyDistrict 8 | 3.2 miles of resurfacing on IL 16 from Grange Hall Road to the Macoupin County line. | — | Executed | Charles E. Mahoney Co. $2,660,060 · | ||
| Jun 11, 2021 | 76L09 | St. ClairDistrict 8 | 3.6 miles of resurfacing on IL 3 from 0.8 miles north of Monsanto Avenue to 0.1 miles south of Ruby Street in Cahokia. | — | Executed | Christ Bros. Asphalt, Inc. $6,649,341 · | ||
| Jun 11, 2021 | 76L14 | St. ClairDistrict 8 | 4.9 miles of design overlay resurfacing and ADA improvements on IL 15 from 0.1 miles west of Bluebird Lane to 1st Street in Fayetteville, and HMA overlay with JT replacement on SN 082-0295 and SN 082-0106. | — | Executed | The Kilian Corporation $3,732,610 · | ||
| Jun 11, 2021 | 76L96 | CalhounGreeneDistrict 8 | Ramp work and parking lot resurfacing along IL 108 at the Kampsville Ferry. | — | Executed | Keeley & Sons, Inc. $2,272,194 · | ||
| Jun 11, 2021 | 76M36 | MadisonDistrict 8 | Discharge box culvert replacement at the Collinsville Pump Station #2 east of I-255, south of I-55/70. | — | Executed | Stutz Excavating, Inc. $54,536 · | ||
| Jun 11, 2021 | 76N14 | MarionDistrict 8 | 6.4 miles of microsurfacing and ADA improvements on US 50 from US 51 to 0.1 miles east of Selmaville Road. | — | Executed | Beniach Construction Co., Inc. $633,631 · | ||
| Jun 11, 2021 | 76N41 | St. ClairDistrict 8 | Storm water pump station rehab at the 25th Street Pump Station, south of I-64. | — | Executed | Haier Plumbing and Heating, Inc. $99,197 · | ||
| Jun 11, 2021 | 76N60 | VariousDistrict 8 | Delivery, setup and pickup of traffic control devices throughout District 8. | — | Rejected | |||
| Jun 11, 2021 | 76N61 | VariousDistrict 8 | Highway lighting and traffic signal repair and maintenance at various locations throughout District 8. | — | Executed | Wissehr Electric, Inc. $724,808 · | ||
| Jun 11, 2021 | 76N62 | VariousDistrict 8 | Patching at various locations throughout District 8. | — | Executed | Kinney Contractors, Inc. $698,898 · | ||
| Jun 11, 2021 | 76N63 | VariousDistrict 8 | Weed spraying along I-64, I-55, I-55/70, I-255, I-270 and IL 255 in various counties of District 8. | — | Executed | ALLEN CHASE ENTERPRISES INC. $179,401 · | ||
| Jun 11, 2021 | 76N70 | RandolphDistrict 8 | Bituminous surface treatment with fog seal on IL 154 from Burns Avenue to the Perry County line. | — | Executed | DMS Contracting, Inc. $496,286 · | ||
| Jun 11, 2021 | 76N72 | MadisonDistrict 8 | 2.7 miles of SMART overlay along IL 111/IL 267/US 67 from the Jersey County line to 0.1 miles north of Airport Road in Godfrey. | — | Executed | Charles E. Mahoney Co. $1,138,537 · | ||
| Jun 11, 2021 | 76N84 | ClintonDistrict 8 | 0.8 miles of Bureau of Research test pavement alongside US 50 from Crackerneck Road to Russland Road. | — | Executed | Baxmeyer Construction, Inc. $3,239,778 · | ||
| Jun 11, 2021 | 76N85 | St. ClairDistrict 8 | Parking lot improvements at the District 8 T/M Building in Fairview Heights. | — | Executed | The Kilian Corporation $874,252 · | ||
| Jun 11, 2021 | 76P02 | St. ClairDistrict 8 | Culvert repair on IL 161 over Ash Creek, 2.7 miles west of IL 4 (SN 082-2003). | — | Executed | Stutz Excavating, Inc. $237,695 · | ||
| Jun 11, 2021 | 76P04 | St. ClairDistrict 8 | Bridge deck, joint replacement and approach roadway repairs at 2 locations: 1) SN 082-0192 and 082-0193 carrying I-64 over IL 161, 1.5 miles west of New Baden; 2) SN 082-0194 and 082-0195 carrying I-64 over Norfolk Southern Railroad, 1.4 miles south of the county line. | — | Executed | The Kilian Corporation $743,980 · | ||
| Jun 11, 2021 | 76P06 | MadisonSt. ClairDistrict 8 | Traffic signal repair and replacement at various locations: 1) IL 3 at Monsanto Avenue; 2) IL 3 at IL 157; 3) IL 15 at Racehorse Road; 4) IL 157 at Kazilek; 5) IL 140 at Stanley Road; 6) US 50 at Smiley Street. | — | Executed | Wissehr Electric, Inc. $433,531 · | ||
| Jun 11, 2021 | 76P25 | GreeneDistrict 8 | 3.2 miles of SMART overlay resurfacing and pavement patching on IL 108 from IL 267 to the Macoupin County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $882,674 · | ||
| Jun 11, 2021 | 76P33 | MadisonDistrict 8 | Traffic signal modernization on IL 111/US 67/ IL 143 from Lars Hoffman Crossing to IL 143. | — | Executed | Wissehr Electric, Inc. $745,299 · | ||
| Jun 11, 2021 | 76P45 | St. ClairDistrict 8 | 0.3 miles of patching, mainline and interchange resurfacing, and HMA shoulders on US 50 from EB I-64 ramps to 0.1 miles west of Schantz Road in O-Fallon. | — | Executed | Christ Bros. Asphalt, Inc. $1,099,909 · | ||
| Jun 11, 2021 | 76P47 | MadisonSt. ClairDistrict 8 | Railroad interconnect at 4 locations: 1) US 67 at Ridge, 2) US 67 at Henry, 3) US 40 at Douglas, 4) Lebanon Avenue at West Boulevard. | — | Executed | Wissehr Electric, Inc. $197,580 · | ||
| Jun 11, 2021 | 76P48 | St. ClairDistrict 8 | Bridge painting at the Poplar Street Complex on I-55/64 westbound CD over Trendly Avenue. (SN 082-0254) | — | Executed | Capital Industrial Services $1,293,300 · | ||
| Jun 11, 2021 | 76P49 | St. ClairDistrict 8 | 2.7 miles of patching on westbound I-55/64 from the Mississippi River to the I-64 Tri-Level. | — | Executed | Keeley & Sons, Inc. $443,202 · | ||
| Jun 11, 2021 | 76P52 | MadisonDistrict 8 | Traffic signal cabinet replacement at multiple locations: 1) IL 3/IL 111 at Seminary Street in Alton, 2) IL 3 at IL 143 in Wood River, 3) IL 111 at IL 140 in Bethalto, 4) IL 111 at Horseshoe Lake Pond in Pontoon Beach, 5) IL 143 / IL 157 at Buchanan Street in Edwardsville. | — | Executed | Electrico, Inc. $124,353 · | ||
| Jun 11, 2021 | 78612 | JacksonDistrict 9 | Removal and reconstruction of concrete pavement, ADA ramp improvements and minor signal modifications on IL 149/127 at the intersections of IL 149 (Walnut Street) and IL 127 (5th Street). | — | Executed | E. T. Simonds Construction Company $538,623 · | ||
| Jun 11, 2021 | 78660 | JacksonDistrict 9 | Conversion of 2 intersections to Restricted Crossing U-Turn intersections: 1) IL 13/127 and Ava Road; 2) IL 13/127 and Grange Hall Road. | — | Executed | Samron Midwest Contracting, Inc. $5,732,354 · | ||
| Jun 11, 2021 | 78680 | SalineDistrict 9 | Replacing the existing two-span deck beam bridge with a new triple opening, cast in place box culvert on IL 34/145, approximately 0.5 miles south of Harrisburg. (SN 083-0017) | — | Executed | E. T. Simonds Construction Company $1,135,942 · | ||
| Jun 11, 2021 | 78684 | JeffersonDistrict 9 | Replacing the 3-span bridge with a new triple, cast in place box culvert on IL 37, 1.2 miles south of IL 148. (SN 041-0031) | — | Executed | E. T. Simonds Construction Company $781,564 · | ||
| Jun 11, 2021 | 78788 | SalineDistrict 9 | Construction of a RCUT intersection at the intersection of IL 13 and Carrier Mills Road and resurfacing IL 13 from the Williamson County line to West Poplar Street in Harrisburg. | — | Executed | Southern Illinois Asphalt Co., Inc. $6,632,826 · | ||
| Jun 11, 2021 | 78810 | HamiltonDistrict 9 | 10.9 miles of HMA surface removal, HMA surfacing, pavement patching and ADA ramp improvements on IL 14 from Marshall Avenue in McLeansboro to the Franklin County line and IL 142 from Golf Course Road to Randolph Street (IL 14) in McLeansboro. | — | Executed | E. T. Simonds Construction Company $3,937,445 · | ||
| Jun 11, 2021 | 78812 | FranklinWilliamsonDistrict 9 | Retrofitting ADA ramps, relocating and installing pedestrian push buttons and signal heads at the intersection of IL 149 and Jefferson Street in West Frankfort and the intersections of IL 37 and 4th Street, Broadway Boulevard, and 8th Street in Johnston City. | — | Executed | Samron Midwest Contracting, Inc. $192,459 · | ||
| Jun 11, 2021 | 78842 | GallatinDistrict 9 | 0.42 miles of patching at the intersection of IL 13 and IL 1. | — | Executed | E. T. Simonds Construction Company $261,336 · | ||
| Jun 11, 2021 | 78846 | AlexanderJeffersonDistrict 9 | Replacing diaphragms on SN 041-0039 carrying IL 37 over Southern Railroad, 3 miles south of Dix and plating floor beams on SN 002-0009 on Old IL 3 over Sexton Creek in Gale. | — | Executed | E. T. Simonds Construction Company $141,043 · | ||
| Jun 11, 2021 | 78847 | WhiteDistrict 9 | Installation of weigh-in-motion system on I-64 in the westbound lanes, 2 miles west of IL 1. | — | Executed | E. T. Simonds Construction Company $559,660 · | ||
| Jun 11, 2021 | 78852 | PulaskiDistrict 9 | Milling, resurfacing, guardrail and drainage work on IL 37 from Feather Trail to 0.2 miles south of Mounds Road. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,726,369 · | ||
| Jun 11, 2021 | 78854 | JeffersonDistrict 9 | Patching on IL 15 in Mount Vernon from Zachery Street to 44th Street, I-57 NB and SB exit ramps at IL 15, and I-57 at MM 83 in the SB driving lane. | — | Executed | Kinney Contractors, Inc. $181,863 · | ||
| Jun 11, 2021 | 78855 | PulaskiDistrict 9 | Replace the existing pipe culvert with a 36- pipe culvert on IL 37 just south of the Johnson County line, near Goines Lane. | — | Executed | Piney Creek Construction & Repair $41,631 · | ||
| Jun 11, 2021 | 78856 | PerrySalineDistrict 9 | Signal and highway lighting upgrades at the intersection of IL 154 and IL 150 in Perry County and the intersection of US 45 and Old IL 13 in Saline County. | — | Executed | Wissehr Electric, Inc. $86,998 · | ||
| Jun 11, 2021 | 78867 | VariousDistrict 9 | Electrical repair and/or replacement on various routes in various counties in District 9. | — | Executed | Brown Electric, Inc. $109,307 · | ||
| Jun 11, 2021 | 78868 | VariousDistrict 9 | Repairing or fixing damaged guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a workorder basis throughout District 9. | — | Executed | COLLINS & HERMANN, INC. $1,060,592 · | ||
| Jun 11, 2021 | 78870 | JeffersonWilliamsonDistrict 9 | PPC I-beam repair and substructure repairs on SN 041-0096 carrying IL 148 over over the Big Muddy River east of Waltonville in Jefferson County and PPC I-beam repair, deck patching and substructure repairs on SN 100-0072 carrying IL 37 over Crab Orchard Creek south of Marion in Williamson County. | — | Executed | Samron Midwest Contracting, Inc. $396,056 · | ||
| Jun 11, 2021 | 78877 | AlexanderDistrict 9 | Joint replacement on SN 002-0005 carrying US 60/62 over the Mississippi River. | — | Rejected | Samron Midwest Contracting, Inc. $5,868,810 · | ||
| Jun 11, 2021 | 78883 | JeffersonDistrict 9 | Patching on I-64 from the Washington County line to the I-57 / I-64 Tri-Level, north of Mt. Vernon. | — | Executed | G. M. Sipes Construction, Inc. $216,264 · | ||
| Jun 11, 2021 | 85706 | WinnebagoDistrict 2 | Construction of the Perryville Bike Path Extension on the east side of Perryville Road from Hart Road to IL 173 in Loves Park. | — | Executed | Fischer Excavating, Inc. $1,067,494 · | ||
| Jun 11, 2021 | 85708 | WinnebagoDistrict 2 | On-Street bike routes on various roadways in South Beloit. Project includes signing, pavement markings, sidewalk replacement, curb and gutter replacement, HMA surfce course, and pdestrian signals. | — | Executed | Norwest Construction, Inc. $379,485 · | ||
| Jun 11, 2021 | 87725 | IroquoisDistrict 3 | Replace the bridge carrying CH 4 over Pike Creek, 3.3 miles west of IL Rt 1. | — | Rejected | Iroquois Paving Corporation $1,016,600 · | ||
| Jun 11, 2021 | 87741 | GrundyDistrict 3 | Replace the bridge carrying Grand Ridge Road over Murry Slough, 2 miles east of Mazon. | — | Executed | D. Construction, Inc. $897,148 · | ||
| Jun 11, 2021 | 87747 | IroquoisDistrict 3 | Resurfacing CH 4 from the Ford County line to 500 E Road. | — | Executed | Iroquois Paving Corporation $2,188,307 · | ||
| Jun 11, 2021 | 87748 | KankakeeDistrict 3 | Resurfacing CH 47 from CH 6 to IL 17. | — | Executed | Kankakee Valley Construction Company, Inc. $466,200 · | ||
| Jun 11, 2021 | 87751 | LivingstonDistrict 3 | PCC pavement reconstruction, storm sewers, curb and gutter, sidewalks and pavement markings on Indiana Avenue from Illini Avenue to the east corporate limits of Pontiac. | — | Executed | Opperman Construction Co. $1,268,954 · | ||
| Jun 11, 2021 | 87762 | BureauDistrict 3 | Replace the bridge carrying TR 130 over Silver Creek, 7.0 miles southeast of Buda. | — | Executed | Curnyn Construction Co. $311,681 · | ||
| Jun 11, 2021 | 89681 | TazewellDistrict 4 | Realignment, pavement reconstruction, culvert extensions, culverts and pavement markings on Allentown Road from 1000 feet east of Court Street and extending 1,000 feet into the city of Pekin. | — | Executed | Otto Baum Company, Inc. $617,543 · | ||
| Jun 11, 2021 | 89725 | TazewellDistrict 4 | Construction of a PCC multi-use path and drainage items along Centennial Drive from Spring Creek Road to IL 8 in Washington. | — | Rejected | Knapp Concrete Contractors, Inc. $388,163 · | ||
| Jun 11, 2021 | 89785 | PeoriaDistrict 4 | Sidewalk construction on Allen Road from 0.6 mile north of Wilhelm Rd. to Whilhelm Rd. and on Orange Prairie Road from Landens Way to War Memorial Drive in Peoria | — | Executed | Otto Baum Company, Inc. $109,223 · | ||
| Jun 11, 2021 | 89801 | PeoriaDistrict 4 | Rehabilitate the bridge carrying Truitt Road over Hollow Creek. Remove and replace superstructure, backwalls at the abutments and repair piers. | — | Executed | Stark Excavating, Inc. $827,258 · | ||
| Jun 11, 2021 | 89808 | HendersonDistrict 4 | HMA removal and rubbilization of the PCC base on Roseville Road from CH 9 to IL 116. | — | Executed | Brandt Construction Co. $128,910 · | ||
| Jun 11, 2021 | 91594 | DouglasDistrict 5 | Replace the bridge carrying CH6 of the Kaskaskia River, 4.65 miles north of Garrett. | — | Executed | Stark Excavating, Inc. $1,361,451 · | ||
| Jun 11, 2021 | 91602 | McLeanDistrict 5 | Resurfacing, shoulder rumble strips, guardrail, traffic barrier terminals and pavement markings on CH 37 from north of Northtown Road to CH 12 in Hudson. | — | Executed | Rowe Construction, a div of UCM, Inc. $2,045,287 · | ||
| Jun 11, 2021 | 91605 | ChampaignDistrict 5 | Construction of trail amenities including PCC paths, parking facility, signing, bicycle repair station and bicycle racks. Project begins at Main Street in Urbana to 7th St. in St. Joseph. | — | Executed | Stark Excavating, Inc. $283,478 · | ||
| Jun 11, 2021 | 93765 | AdamsDistrict 6 | Cold-in-place recycling and HMA overlay on Ch 48 from East 1900th St. to East 2200th Street. | — | Executed | Diamond Construction Company $1,149,311 · | ||
| Jun 11, 2021 | 93766 | AdamsDistrict 6 | Cape Seal and Pavement markings on CH 7 from North 1850th Ave. to Westpoint Pleasant Rd. | — | Executed | A. C. Pavement Striping Co. $164,085 · | ||
| Jun 11, 2021 | 93770 | ChristianDistrict 6 | Cold-in-place recycling, resufacing, pavement patching and shoulder widening on CH 12 from South County Road to IL 29. | — | Executed | P. H. Broughton & Sons, Inc. $2,872,364 · | ||
| Jun 11, 2021 | 95641 | EdwardsDistrict 7 | Earth Excavation, processing soil-cement bse course, aggregate surfce, A-3 bituminous surfce treatment and pipe culverts on CH1 from 2.3 miles north of IL 15 for 1.00 mile. | — | Executed | Shores Builders, Inc. $652,388 · | ||
| Jun 11, 2021 | 95894 | LawrenceDistrict 7 | Replace the existing double barrel box culvert carrying CH 11 over a tributary to Raccoon Creek with a one span precast concrete deck beam bridge, located 6.0 miles southwwest of Bridgeport. | — | Executed | Depew and Owen Builders, Inc. $418,488 · | ||
| Jun 11, 2021 | 95896 | ShelbyDistrict 7 | Replace the bridge carrying TR 176 over Swafford Creek, 1 mile southwest of Shelbyville. | — | Executed | Depew and Owen Builders, Inc. $296,588 · | ||
| Jun 11, 2021 | 95897 | FayetteDistrict 7 | Remove two concrete culverts and replace with two concrete box culverts, steel sheet piling and HMA pavement on CH23 at Little Creek Tributary, 4 miles west of St. Peter. | — | Executed | Plocher Construction Company, Inc. $790,480 · | ||
| Jun 11, 2021 | 95899 | CrawfordDistrict 7 | Replace the bridge carrying TR 245 over Freeport Creek, 0.6 mile east of Freeport. | — | Executed | Howell Paving, Inc. $539,620 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.