(1,202,133,6-2,4)TS-1
- Let date
- Friday, June 11, 2021
- Contract
- 76P52 · job page
- District
- District 8
- County
- Madison
- Highway
- Limits
- Traffic signal cabinet replacement at multiple locations: 1) IL 3/IL 111 at Seminary Street in Alton, 2) IL 3 at IL 143 in Wood River, 3) IL 111 at IL 140 in Bethalto, 4) IL 111 at Horseshoe Lake Pond in Pontoon Beach, 5) IL 143 / IL 157 at Buchanan Street in Edwardsville.
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Electrico, Inc. Low bidder | $124,353 | ||
| 2 | Wissehr Electric, Inc. | $124,487 | +0.1% | |
| 3 | Gerstner Electric, Inc. | $132,494 | +6.5% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Electrico, Inc. | #2 Wissehr Electri… | #3 Gerstner Electr… |
|---|---|---|---|---|---|---|---|---|
| 1 | X8950105 | REM EX TR CONT & CAB | 5 | EACH | $250.00 | $425.00 | $16.00 | |
| 2 | 67100100 | MOBILIZATION | 1 | L SUM | $4,000.00 | $6,111.00 | $4,538.00 | |
| 3 | 70102630 | TR CONT & PROT 701601 | 1 | L SUM | $0.0100 | $0.0100 | $1.00 | |
| 4 | 70102632 | TR CONT & PROT 701602 | 1 | L SUM | $0.0100 | $0.0100 | $1.00 | |
| 5 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $0.0100 | $0.0100 | $1.00 | |
| 6 | 85000200 | MAIN EX TR SIG INSTAL | 5 | EACH | $250.00 | $0.0100 | $475.00 | |
| 7 | 85700200 | FAC T4 CAB | 5 | EACH | $18,500.00 | $18,149.00 | $19,470.00 | |
| 8 | 86200300 | UNINTER POWER SUP EXT | 1 | EACH | $7,500.00 | $7,610.00 | $7,538.00 | |
| 9 | 87301155 | ELCBL C SIGNAL 12 7C | 300 | FOOT | $0.0100 | $3.19 | $2.40 | |
| 10 | 88040150 | SH P LED 1F 5S BM | 1 | EACH | $0.0100 | $1,129.00 | $1,240.00 | |
| 11 | 88500100 | INDUCTIVE LOOP DETECT | 102 | EACH | $175.00 | $155.00 | $170.00 | |
| 12 | 89502375 | REMOV EX TS EQUIP | 5 | EACH | $0.0100 | $0.0100 | $262.00 |