IDOT Jobs

2021 · 952 jobs · — Sign up free
★ My Jobs

952 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Apr 23, 2021 60V39 LakeDistrict 1 This traffic signal installation and channelization project begins about 652.5 feet (0.12 miles) west of the intersection of IL 173 (FAP 303) and North Lake Avenue and proceeds in a southerly/easterly direction for 1462.3 feet (0.28 miles). This project also begins at the center of the intersection of IL 173 (FAP 303) and North Lake Avenue. — Executed Nov 26 New Dunnet Bay Construction Company $3,128,974 ·
Apr 23, 2021 60X72 CookDistrict 1 The construction of a parking lot, storm sewer removal and replacement of existing frame and lid with bolted f The improvement consists of the construction of a parking lot, storm sewer removal and replacement of existing frame and lid with bolted frame and ltd. The work is located on IL 64 (North Ave.) at pump station #12 in Melrose Park. — Executed Nov 26 New Martam Construction Incorporated $361,804 ·
Apr 23, 2021 61G09 CookDistrict 1 Resurfacing Park Boulevard from Irving Park Road to Schaumburg Road in Streamwood. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $1,304,037 ·
Apr 23, 2021 61G58 KaneDistrict 1 Roadway reconstruction, lighting, water main, landscaping, pavement markings, on East New York Street from Farnsworth Avenue to Welsh Drive in Aurora. — Executed Nov 26 New Martam Construction Incorporated $7,777,000 ·
Apr 23, 2021 61G91 KaneDistrict 1 Traffic Signal modernization at three intersections, sidewalk improvements, and pavement markings at Fabyan Parkway and IL 131, Orchard Road at Acutt Road and Rochester Drive, and Orchard Road from US 30 to Jericho Road in Batavia, Montgomery and unincorporated Kane County. — Executed Nov 26 New H & H Electric Co. $645,740 ·
Apr 23, 2021 61G94 McHenryDistrict 1 Remove existing box culvert, construct single-span CIP slab bridge, and reconstruct approach pavement on Kishwaukee Valley Road over a tributary of Rush Creek, 0.2 miles east of Root Road. — Executed Nov 26 New Lorig Construction Company $1,545,703 ·
Apr 23, 2021 61G95 WillDistrict 1 Resurfacing, curb and gutter, sidewalk replacement, ornamental lighting, brick paver sidewalk, landscaping and pavement markings on IL 171 from 11th Street to 10th Street and on IL 7 from IL 171 to Hamilton Street in Lockport. — Executed Nov 26 New R. W. Dunteman Company $1,793,189 ·
Apr 23, 2021 61G96 WillDistrict 1 Resurfacing, curb and gutter replacement, sidewalk replacement, and pavement markings on West Street from Corning Avenue to Joliet Road in Peotone. — Executed Nov 26 New P. T. Ferro Construction Co. $321,841 ·
Apr 23, 2021 61G97 DuPageDistrict 1 Resurfacing Eola Road from Oakhurst Drive to US 34 in Aurora. — Executed Nov 26 New K-Five Construction Corporation $1,046,723 ·
Apr 23, 2021 61G99 CookDistrict 1 Concrete Sidewalk, curb and gutter replacement, tree removal, and landscaping on US 30 from Orchard Drive to the east village limits on Rockwell Street in Park Forest. — Executed Nov 26 New Copenhaver Construction, Inc. $243,209 ·
Apr 23, 2021 61H00 WillDistrict 1 Resurfacing, curb and gutter replacement, sidewalk replacement, and pavement markings on Court Street from Elder Lane to Eastgate Avenue in Monee. — Executed Nov 26 New Iroquois Paving Corporation $256,749 ·
Apr 23, 2021 61H01 CookDistrict 1 Resurfacing, HMA pavement patching, curb and gutter repairs on Old Willow Road from South Wolf Road to US 45 in Prospect Heights. — Executed Nov 26 New Arrow Road Construction Co. $510,388 ·
Apr 23, 2021 61H02 DuPageDistrict 1 Resurfacing, curb and gutter, traffic signals, sidewalks and pavement markings on Grand Avenue, from US 20 to County Line Road in Elmhurst and Bensenville. — Executed Nov 26 New K-Five Construction Corporation $3,916,382 ·
Apr 23, 2021 61H03 McHenryDistrict 1 Resurfacing Haligus Road from north of Ballard Road to Lakewood Road in Lakewood. — Executed Nov 26 New Geske and Sons, Inc. $510,590 ·
Apr 23, 2021 61H04 McHenryDistrict 1 Resurfacing Valley View Road from Nish Road to south of IL 176 in Prairie Grove — Executed Nov 26 New Geske and Sons, Inc. $367,518 ·
Apr 23, 2021 61H06 CookDistrict 1 Streetscape improvements on St. Charles Road from Mannheim Road to 25th Avenue in Bellwood. — Executed Nov 26 New Landmark Contractors, Inc. $964,551 ·
Apr 23, 2021 61H08 CookDistrict 1 Resurfcing, curb and gutter, sidewalk replacement, detector loops and pavement markings on Kensington Road from Dryden Place to Regency Drive West in Arlington Heights. — Executed Nov 26 New Arrow Road Construction Co. $1,282,651 ·
Apr 23, 2021 61H09 CookDistrict 1 Resurfacing Salem Drive from the village limits to Bode Road, Jones Road from Highland Boulevard to Hassel Road, and Hassell Road from Rosedale to Jones Road in Hoffman Estates. — Executed Nov 26 New Schroeder Asphalt Services, Inc. $651,585 ·
Apr 23, 2021 62633 CookDistrict 1 (4,391-Ft) Intersection improvement including channelization, traffic signal modernization and resurfacing of IL 58 at Niles Center Rd. and at US 41 (Skokie Blvd.) in the Village of Skokie. — Executed Nov 26 New Alliance Contractors, Inc. $4,496,491 ·
Apr 23, 2021 62K80 CookWillDistrict 1 Demolition and reconstruction of the existing bridge deck and concrete approaches, resurfacing to meet the bridge approaches, reconstruction and expansion of outside shoulders, removal and replacement of existing guar guardrail, and various drainage and grading improvements. — Executed Nov 26 New D. Construction, Inc. $2,056,069 ·
Apr 23, 2021 62L52 CookDistrict 1 (1.762-Mile) Cleaning and sealing longitudinal joints in the existing HMA pavement between traffic lanes and curb and gutter, restriping pavement marking in the City of Chicago, Lake and North Chicago Townships. — Executed Nov 26 New SKC Construction, Inc. $183,344 ·
Apr 23, 2021 62L82 DuPageDistrict 1 (3.9-Mile) Crack and joint sealing on US 20 (Lake Street) from I-355 to IL 83 (Kingery Highway) within the Village of Addison. — Executed Nov 26 New Freehill Asphalt, Inc. $335,213 ·
Apr 23, 2021 62L89 CookDistrict 1 (1.73-Mile) SMART overlay (resurfacing) and ADA improvement project on Dempster St. from east of Skokie Blvd. to McCormick Ave. within the Village of Skokie in Cook County. — Executed Nov 26 New Builders Paving, LLC $2,092,030 ·
Apr 23, 2021 62M04 CookDistrict 1 (3.553-Mile) Crack and Joint Sealing pavement preservation project. Includes renewal of pavement markings. Location: FAP 344: IL 83 from S. of Weiland Rd to Palatine Rd in the City of Prospect Heights and the Village — Executed Nov 26 New SKC Construction, Inc. $179,385 ·
Apr 23, 2021 62M13 CookDistrict 1 SMART Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAU 3520: Gross Point Road from N of Oakton St to Howard St in the Village of Morton Grove and Skokie. — Executed Nov 26 New Peter Baker & Son Co. $545,253 ·
Apr 23, 2021 62M15 WillDistrict 1 (1.06-Mile) SMART Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAP 112: IL 53 from South of I-55 to Joliet Road, in the Village of Bolingbrook and Romeoville. — Executed Nov 26 New K-Five Construction Corporation $1,563,017 ·
Apr 23, 2021 62M16 WillDistrict 1 (2.78-Mile) Smart Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAP 607: US 52/ 6/ 30 Jefferson St. from Joyce Rd.to Bluff St., within the City of Joliet. — Executed Nov 26 New D. Construction, Inc. $2,573,421 ·
Apr 23, 2021 62M26 CookDistrict 1 Bridge deck overlay and joint repair The improvement of McHenry Road over Wheeling Drainage Ditch consists of bridge deck overlay and joint repair. The improvement is located in the Village of Wheeling in Cook County, IL. — Executed Nov 26 New Lorig Construction Company $446,325 ·
Apr 23, 2021 62M27 WillDistrict 1 Bridge Deck and Approach repairs This improvement consists of Bridge Deck and Approach repairs. Structural repair of Concrete, deck scarification, deck latex concrete overlay, approach HMA overlay, bridge deck grooving in Green Garden Township. — Executed Nov 26 New P. T. Ferro Construction Co. $128,281 ·
Apr 23, 2021 62M31 CookDistrict 1 This is a bridge repair project that includes bridge deck overlay, partial depth approach reconstruction, joint reconstruction, concrete bridge deck repair, full depth bridge deck repair. Located: IL Route 7 at 86th Ave. within within the Village of Palos Park. — Executed Nov 26 New Lorig Construction Company $298,774 ·
Apr 23, 2021 62M36 DuPageDistrict 1 A full and partial depth deck and approach slab repairs, bridge deck scarification, a new latex concrete overl This project is located on IL.83 over the Salt Creek within the Village of Villa Park in DuPage County. This work consists of a full and partial depth deck and approach slab repairs, bridge deck scarification, a new latex concrete overlay, deck drain adjustments and pavement marking. — Executed Nov 26 New Martam Construction Incorporated $741,297 ·
Apr 23, 2021 62M40 CookDistrict 1 Bridge Preservation Project, including bridge deck overlay (scarification and latex concrete overlay), deck repairs, reconstructing transverse joints. Location: Bridge carrying Roosevelt Rd over Des Plaines River, East of IL 171 in the Village of Forest Park in Cook County. — Executed Nov 26 New MYS, Incorporated $512,616 ·
Apr 23, 2021 62N30 CookDistrict 1 A Bridge Substructure Repair in the City of Chicago, and the Village of Skokie and Wilmette in the Townships o (0.102-Mile) Improvement on I-94 at IL 50 (Cicero Ave.), II 58 (Dempster Ave.) and Lake Ave. consist of a Bridge Substructure Repair in the City of Chicago, and the Village of Skokie and Wilmette in the Townships of New Trier, Jefferson and Niles. — Executed Nov 26 New Rausch Infrastructure, LLC $830,616 ·
Apr 23, 2021 62N92 CookDuPageDistrict 1 Litter/Debris removal from edge of pavement to the Pedestrian Barrier on I-55 - Stevenson expressway from IL 4 (150-Mile) Improvement consists of Litter/Debris removal from edge of pavement to the Pedestrian Barrier on I-55 - Stevenson expressway from IL 43 (Harlem Ave.) to I-355. — Executed Nov 26 New Western Remac, Inc. $207,720 ·
Apr 23, 2021 64G99 OgleDistrict 2 Cold milling, Cold In-Place (CIP) Recycling, HMA resurfacing on IL Route 64 from 0.1 mile East of US 52 to 0.04 mile West of IL 26. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $1,497,763 ·
Apr 23, 2021 64J97 HenryDistrict 2 6.27 MILES, Resurfacing from Galva - Atkinson Road to West Street in Kewanee. — Executed Nov 26 New Advanced Asphalt Company $2,403,550 ·
Apr 23, 2021 64M91 LeeDistrict 2 0.80 miles, Cold milling, pavement patching, HMA resurfacing, ADA improvement and traffic signal modernization from West of Page drive to US 52/IL 26 in Dixon. — Executed Nov 26 New Martin & Company Excavating $2,016,252 ·
Apr 23, 2021 64P29 WinnebagoDistrict 2 Milling, patching, and hot-mix asphalt resurfacing on IL Route 70 from Pecatonica River to 0.1 mile west of Safford Road in Rockford. — Executed Nov 26 New Rock Road Companies, Inc. $4,379,698 ·
Apr 23, 2021 64P30 LeeDistrict 2 Cold milling, pavement patching and hot-mix asphalt resurfacing along US 52 from Water Street in Amboy to North of Henkle Road. — Executed Nov 26 New Advanced Asphalt Company $4,129,760 ·
Apr 23, 2021 64P65 WhitesideDistrict 2 Removal and replacement of existing expansion joints on SN 098-0032 carrying US 30 over Elkhorn Creek. — Executed Nov 26 New Martin & Company Excavating $147,606 ·
Apr 23, 2021 64P66 CarrollDistrict 2 Removal and replacement of existing expansion joints, along with partial replacement of the South bridge approach slab and the adjacent sidewalk on SN 008-0041 carrying IL 84 over the SOO line RR. — Executed Nov 26 New Martin & Company Excavating $187,212 ·
Apr 23, 2021 64P68 VariousDistrict 2 Installing signs and posts along State maintained routes. — Executed Nov 26 New Countryman, Inc. $235,534 ·
Apr 23, 2021 64P69 HenryDistrict 2 Cleaning and painting structural steel on SN's 037-0029 and 037-0030 carrying 1-80 over Mineral Creek located 0.7 mile North of US 6, and SN 037-0079 carrying US 6 over 1-80. — Executed Nov 26 New Three Star Painting, Inc. $396,650 ·
Apr 23, 2021 64P70 HenryDistrict 2 Cleaning and painting structural steel on SN 037-0112 carrying TR 196-D over 1-80 located 0.9 mile southeast of IL 82, SN 037-0113 carrying TR 216 over 1-80 located 2.0 miles southeast of IL 82 and SN 037-0118 carrying TR 468 over 1-80 located 1.5 miles east of IL 78. — Executed Nov 26 New Three Star Painting, Inc. $595,000 ·
Apr 23, 2021 64P71 Rock IslandDistrict 2 Cleaning and painting structural steel SN's 081-0030 and 081-0031 carrying I-280 over Case Creek located 2.0 miles west of I-74. — Executed Nov 26 New Three Star Painting, Inc. $179,995 ·
Apr 23, 2021 64P72 LeeDistrict 2 Cleaning and painting structural steel on SN 052-0059 carrying Welland Road over 1-39. — Executed Nov 26 New Three Star Painting, Inc. $190,000 ·
Apr 23, 2021 64P74 WhitesideDistrict 2 Milling and resurfacing on US 30 from Jackson Street to French Creek East of Morrison. — Executed Nov 26 New Martin & Company Excavating $438,325 ·
Apr 23, 2021 64P96 VariousDistrict 2 Removal of dead trees along state maintained routes. — Executed Nov 26 New Endrizzi Contracting, Inc $375,100 ·
Apr 23, 2021 66B52 LaSalleDistrict 3 The reconstruction of the existing intersection into a PCC roundabout The project is located in the intersection of US 6 and IL 178, north of Utica in LaSalle county and consists of the reconstruction of the existing intersection into a PCC roundabout. The project also includes earthwork, seeding, drainage improvements, permanent lighting and removal of existing traffic equipment. The project length is 0.42 miles. — Executed Nov 26 New R. W. Dunteman Company $2,442,377 ·
Apr 23, 2021 66E14 BureauDistrict 3 3P mill and resurface. — Executed Nov 26 New Advanced Asphalt Company $4,496,640 ·
Apr 23, 2021 66K60 BureauDistrict 3 7.3 miles of milling and resurfacing, ADA improvements. — Executed Nov 26 New Advanced Asphalt Company $2,816,475 ·
Apr 23, 2021 66L01 LaSalleDistrict 3 0.71 mile. Latex overlay, cleaning and painting of structural steel and expansion joint replacement. SN 050-0200 IL 251 over 1-39; 0.5 Miles north of IL 71. — Executed Nov 26 New D. Construction, Inc. $1,921,508 ·
Apr 23, 2021 66L22 IroquoisDistrict 3 Bridge painting This work is located at Structure No. 038-0130, TR 95 over 1-57, approximately 3.48 miles South of IL 116 and Structure No. 038-0131 carrying TR 109 over 1-57, approximately 5.59 miles South of IL 116 in Iroquois. This work consists of bridge painting. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $384,278 ·
Apr 23, 2021 66L28 KankakeeDistrict 3 Signal Mast Arm Removal and Replacement - at River St and Station St in Kankakee. — Executed Nov 26 New Van-Mack Electric Co. $210,000 ·
Apr 23, 2021 66L30 IroquoisKankakeeDistrict 3 This project consists of 3.85 miles of shoulder widening and rumble strip installation on IL 1 from 150 feet west of W Circle Dr in St Anne in Kankakee County to E 3100N Rd in Iroquois County. — Executed Nov 26 New Iroquois Paving Corporation $1,088,767 ·
Apr 23, 2021 66L32 BureauDistrict 3 The installation of approximately 5 This project consists of the installation of approximately 5.24 miles of high tension cable median barrier from the Henry/Bureau County Line to 0.42 miles West of 600E Rd. — Executed Nov 26 New Advanced Asphalt Company $1,112,433 ·
Apr 23, 2021 66L33 LaSalleDistrict 3 The installation of approximately 5 This project consists of the installation of approximately 5.92 miles of high tension cable median barrier from 1.09 miles South of N 36th Rd to 0.88 miles South of N 42nd Rd in LaSalle County. — Executed Nov 26 New Advanced Asphalt Company $1,322,328 ·
Apr 23, 2021 66L41 IroquoisDistrict 3 Removing existing HMA and aggregate subbase surfaces, repair and preparation of base course, and placing a pol This work is located at the Illinois Department of Transpiration, District 3, Buckley Maintenance Facility in Iroquois County. This work consists of removing existing HMA and aggregate subbase surfaces, repair and preparation of base course, and placing a polymer HMA asphalt binder cse. (2¼" lift) and a polymer HMA surface *See Remarks*. — Executed Nov 26 New Iroquois Paving Corporation $333,002 ·
Apr 23, 2021 66L52 GrundyDistrict 3 This pollinator project is located at Three Rivers Rest Areas on I-80 west of Minooka. This work will include herbicide, seeding, planting, landscaping and maintenance. — Executed Nov 26 New Nettle Creek Nursery, Inc. $377,962 ·
Apr 23, 2021 66L54 DeKalbDistrict 3 The removal and replacement of expansion joints and deck patching on SN 019-0036 This work is located at FAP 573 on US 30 on SN 019-0036 at Little Rock Creek 0.5 miles West of Hinckley in Dekalb County. This work consists of the removal and replacement of expansion joints and deck patching on SN 019-0036. — Executed Nov 26 New Martin & Company Excavating $250,265 ·
Apr 23, 2021 66L56 LaSalleLivingstonDistrict 3 Placing aggregate wedge shoulder This work is located on FAP 786 (IL 170) beginning at the intersection of IL 170 and N 21st Rd in LaSalle County and ending at the intersection of IL 170 and IL 17 in Livingston County (+/- 12.0 miles). This work consists of placing aggregate wedge shoulder. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $135,304 ·
Apr 23, 2021 66L61 KendallLaSalleDistrict 3 The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Kendall and LaSalle Counties. — Executed Nov 26 New H & H Electric Co. $49,983 ·
Apr 23, 2021 66L62 BureauLaSalleDistrict 3 The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Bureau and LaSalle Counties. — Executed Nov 26 New Laser Electric, Inc. $71,890 ·
Apr 23, 2021 66L63 GrundyDistrict 3 The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Grundy County. — Executed Nov 26 New Outsen Electric, Incorporated $51,970 ·
Apr 23, 2021 66L64 VariousDistrict 3 The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Livingston, Ford, Grundy, and Iroquois Counties. — Executed Nov 26 New Leo P. Kelly Electric, Incorporated $50,340 ·
Apr 23, 2021 66L65 IroquoisKankakeeDistrict 3 The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Kankakee and Iroquois Counties. — Executed Nov 26 New Outsen Electric, Incorporated $65,170 ·
Apr 23, 2021 66L66 DeKalbDistrict 3 The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in DeKalb County. — Executed Nov 26 New H & H Electric Co. $54,015 ·
Apr 23, 2021 66L70 BureauDistrict 3 Weed spraying to aid in weed control This project is located along FAI 80 (I-80) in Bureau county. The work consists of weed spraying to aid in weed control. — Executed Nov 26 New Endrizzi Contracting, Inc $99,891 ·
Apr 23, 2021 68F68 VariousDistrict 4 Bridge deck sealing at various structures throughout District Four. — Executed Nov 26 New All States Painting, Inc. $189,900 ·
Apr 23, 2021 68F76 VariousDistrict 4 Crack and joint sealing at various locations in Knox, Peoria, and Tazewell Counties. — Executed Nov 26 New Denler, Inc. $500,279 ·
Apr 23, 2021 68F95 VariousDistrict 4 Pavement markings on various routes in various counties throughout District Four. — Executed Nov 26 New Varsity Striping & Construction Co. $300,626 ·
Apr 23, 2021 68G09 MarshallDistrict 4 Rout and seal along Interstate 39 from 2 mile south of IL Route 17 to LaSalle County line and IL Route 18 from IL Route 29 in Henry to the Illinois River. — Executed Nov 26 New Freehill Asphalt, Inc. $239,675 ·
Apr 23, 2021 68G18 PeoriaDistrict 4 Longitudinal joint repair and partial depth patching along US 150 (War Memorial Drive) from West of Brandywine Drive to IL 29 (Adams St) in Peoria. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $515,084 ·
Apr 23, 2021 68G19 VariousDistrict 4 Installation of new traffic signal cabinets, traffic signal controllers, communications equipment, and video detection systems at various locations in District Four. — Executed Nov 26 New Laser Electric, Inc. $434,861 ·
Apr 23, 2021 68G20 MarshallMcLeanWoodfordDistrict 4 Installation of communications duct, communications vaults, and fiber optic cable along Interstate 39 from the Interstate 55 interchange to Illinois Route 17 in District Four. — Executed Nov 26 New Gerstner Electric, Inc. $1,837,876 ·
Apr 23, 2021 68G21 PeoriaTazewellDistrict 4 Installation of new traffic signal cabinets, traffic signal controllers, communications equipment, and video detection systems at various locations in District Four. — Executed Nov 26 New Laser Electric, Inc. $482,887 ·
Apr 23, 2021 68G22 WoodfordDistrict 4 Removal of existing high mast towers and installation of new lighting system at Interstate 39 at the Minonk interchange and replacement of light towers at Interstate 74 Mackinaw Dells rest areas. — Executed Nov 26 New Laser Electric, Inc. $279,781 ·
Apr 23, 2021 68G23 TazewellDistrict 4 Installation of overhead light poles, luminaires, flashing beacons, signs, pavement markings, rumble strips on IL Route 9 in Woodford County. — Executed Nov 26 New Laser Electric, Inc. $122,483 ·
Apr 23, 2021 68G24 VariousDistrict 4 Electrical maintenance contract (maintenance and repair 04 traffic signals, overhead lighting, and ITS facilities). — Executed Nov 26 New Laser Electric, Inc. $649,929 ·
Apr 23, 2021 70947 VermilionDistrict 5 3P Policy (Standard Overlay) Resurfacing from S OF TILTON TO S OF CATLIN. — Executed Nov 26 New Open Road Paving Company LLC $1,396,862 ·
Apr 23, 2021 70990 DeWittDistrict 5 3P Resurfacing Standard overlay, ADA improvements from Logan Co. line to Van Buren St. in Clinton. Project length 9.48 miles. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $4,310,314 ·
Apr 23, 2021 70C16 DeWittDistrict 5 3P Resurfacing Standard overlay from Logan Co. line to 0.3 miles W. of US 51 at Clinton. Project length 9.91 miles. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $4,197,068 ·
Apr 23, 2021 70D99 ChampaignDistrict 5 5.3 miles of micro-surfacing joint repair of center line on us 45, from Curtis Rd in savoy to N of Tolono. — Executed Nov 26 New Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $279,272 ·
Apr 23, 2021 70E18 McLeanDistrict 5 Designed Overlay on Old Rte. 66 from Logan Co. line to Shirley for a net length of 9.57 miles. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $5,233,531 ·
Apr 23, 2021 70E49 McLeanDistrict 5 Interstate Bridge Preservation/ Bridge Deck Overlay at I-39/US 51 Over Mackinaw River North of Hudson. — Executed Nov 26 New Stark Excavating, Inc. $3,710,497 ·
Apr 23, 2021 70E81 VermilionDistrict 5 12.963 Miles of Smart Resurfacing from Ford County Line to IL Rte. 1 at Hoopeston. — Executed Nov 26 New Cross Construction, Inc. $3,925,502 ·
Apr 23, 2021 70E83 DeWittDistrict 5 5.601 Miles. SMART Resurfacing, ILL 54 to ILL 10 N of Weldon. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $1,982,180 ·
Apr 23, 2021 70E92 DouglasEdgarDistrict 5 12.579 Miles of Cape Seal Operations from ILL 130 South to ILL 49. — Executed Nov 26 New Beniach Construction Co., Inc. $933,139 ·
Apr 23, 2021 70F02 DeWittPiattDistrict 5 Bridge beam replacement and bridge repair at SN 074-0076 and 020-0045. — Executed Nov 26 New White Construction LLC $880,524 ·
Apr 23, 2021 70F04 DeWittDistrict 5 5.179 miles of micro surfacing joint repair from Mclean/Dewitt co line to the Dewitt/Piatt Co. line. — Executed Nov 26 New Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $353,199 ·
Apr 23, 2021 70F05 McLeanDistrict 5 Class a special patching on nearly 2 miles of Eb/Wb 1-74 near Carlock. — Executed Nov 26 New Kinney Contractors, Inc. $121,468 ·
Apr 23, 2021 70F06 McLeanDistrict 5 .245 Miles of Partial Width Resurfacing Under Veterans Parkway and Under I-55B in Bloomington. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $143,207 ·
Apr 23, 2021 70F08 DouglasDistrict 5 11.36 MI of patching along FAI 57 from S of Arcola to N of Tuscola. — Executed Nov 26 New Beniach Construction Co., Inc. $136,258 ·
Apr 23, 2021 70F09 ChampaignDistrict 5 0.253 miles, patching, at 1-74 North of Mahomet on ILL 47. — Executed Nov 26 New G. M. Sipes Construction, Inc. $145,616 ·
Apr 23, 2021 70F10 VermilionDistrict 5 3.072 Ml of patching on FAS 331 from US 150 to Homer/Catlin Rd. — Executed Nov 26 New G. M. Sipes Construction, Inc. $138,517 ·
Apr 23, 2021 70F11 VermilionDistrict 5 1.36 Mi of patching on FAI 74 from L Street in Tilton to E of IL 1 in Danville. — Executed Nov 26 New G. M. Sipes Construction, Inc. $358,400 ·
Apr 23, 2021 70F12 ChampaignDistrict 5 0.425 Miles, Longitudinal joint repair, Guardian Dr. to 1-74 Ramps in Urbana. — Executed Nov 26 New Cross Construction, Inc. $79,277 ·
Apr 23, 2021 70F13 ChampaignDistrict 5 Partial width resurfacing 0.216 Mi on US 150, between Elm St to Main St; 0.089 Mi on IL US 150; 0.033 Mi on ILL 49, just N of US 150. — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $245,749 ·
Apr 23, 2021 72L67 SangamonDistrict 6 Bridge deck repairs on I-55 over the Sangamon River (2.7 miles north of IL 54/ Sangamon Avenue); I-55 over IL 54 / Sangamon Avenue; I-55 over the IC Railroad (0.3 miles north of IL 54 / Sangamon Avenue). (SN 084-0014, 084-0015, 084-0016, 084-0017, 084-0018, 084-0019) — Executed Nov 26 New Freesen, a div of UCM, Inc. $3,848,623 ·
Apr 23, 2021 72M53 MacoupinDistrict 6 Painting SN 059-0009 carrying IL 4 over Union Pacific Railroad, 0.9 miles north of Staunton. — Rejected Nov 26 New Eagle Painting & Maintenance Company, Inc. $216,315 ·
301–400 of 952‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.