Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 19, 2018 46487 VariousDistrict 6 Installing or replacing tourist attraction or business logo signs, guide signs and supports at locations throughout the state as described in individual work orders. — Executed Nov 26 New T.M.F. Construction Company $482,900 ·
Jan 19, 2018 60J13 CookDistrict 1 Culvert replacement and improvements to ADA pedestrian ramps and the retaining wall in the Village of Northbrook. — Executed Nov 26 New Copenhaver Construction, Inc. $6,214,342 ·
Jan 19, 2018 60X59 WillDistrict 1 Intersection improvement and signal installation at the intersection of North Bolingbrook Drive and Royce Road in the Village of Bolingbrook. — Executed Nov 26 New P. T. Ferro Construction Co. $774,315 ·
Jan 19, 2018 60Y25 CookDistrict 1 Reconstruct the intersection of IL 83 and IL 171, including new traffic signals, roadway lighting and box and pipe culvert replacements east of the Village of Lemont. — Executed Nov 26 New D. Construction, Inc. $6,665,294 ·
Jan 19, 2018 61D87 CookDistrict 1 Resurfacing Harding Avenue from Brainard Avenue to Kemman Avenue in the Village of LaGrange Park. — Executed Nov 26 New Arrow Road Construction Co. $857,459 ·
Jan 19, 2018 61E13 LakeDistrict 1 Resurfacing 21st Street from Sheridan Road east for 1,600 ft., and 29th Street from Lewis Avenue to Galilee Avenue in the City of Zion. — Executed Nov 26 New Peter Baker & Son Co. $456,777 ·
Jan 19, 2018 61E18 KaneDistrict 1 Reconstruct the intersection of IL 25 at Spring Street including traffic signal improvements, street lighting, and curb, gutter and sidewalks; construction of a pedestrian bridge over the Fox River; reconfiguration of the multi-modal access for pedestrians and vehicular traffic; relocation of the Pace bus staging area and the expansion of the existing commuter parking lot. Project is located in the City of Aurora. — Executed Nov 26 New Judlau Contracting, Inc. $14,271,674 ·
Jan 19, 2018 61E19 CookDistrict 1 Resurfacing Oketo Avenue from Lawrence Avenue to Montrose Avenue, and Wilson Avenue from Oketo Avenue to Harlem Avenue in the Village of Harwood Heights. — Executed Nov 26 New J. A. Johnson Paving Company $498,777 ·
Jan 19, 2018 61E20 CookDistrict 1 Pedestrian path from 135th Street to College Drive in the City of Palos Heights. — Executed Nov 26 New Davis Concrete Construction Co. $553,985 ·
Jan 19, 2018 61E21 CookDistrict 1 Tree planting along IL 50 from 167th Street to 163rd Street in the City of Oak Forest. — Executed Nov 26 New McGinty Bros., Inc. $49,965 ·
Jan 19, 2018 61E25 CookDistrict 1 Resurfacing, traffic signals, sidewalks, and street lighting on FAU 3723 (JFK Blvd.) from Arlington Heights Rd. to Elk Grove Blvd., and on FAU 3724 (Elk Grove Blvd.) from Arlington Heights Rd. to Victoria Ln. in Elk Grove Village. The sidewalk and railing on the structure carrying JFK Blvd. over Salt Creek will be removed and replaced. — Executed Nov 26 New K-Five Construction Corporation $2,989,961 ·
Jan 19, 2018 61E26 DuPageDistrict 1 Resurfacing Fullerton Avenue from Bloomingdale Road to Glen Elleyn Road in the Village of Glendale Heights. — Executed Nov 26 New J. A. Johnson Paving Company $1,453,953 ·
Jan 19, 2018 61E28 LakeDistrict 1 Replace the bridge carrying Forest Avenue over Ravine Ditch #7, south of Hazel Avenue in the City of Highland Park. — Executed Nov 26 New Lorig Construction Company $2,655,120 ·
Jan 19, 2018 61E30 WillDistrict 1 Reconstruct Rathje Road from Joliet Road to Corning Avenue in the Village of Peotone. — Executed Nov 26 New P. T. Ferro Construction Co. $1,623,160 ·
Jan 19, 2018 61E31 DuPageDistrict 1 Resurfacing Poplar Avenue from Park Avenue to Vallette Street in the City of Elmhurst. — Executed Nov 26 New J. A. Johnson Paving Company $596,413 ·
Jan 19, 2018 61E33 LakeDistrict 1 Traffic signal improvement on US 12 from IL 176 to IL 22. — Executed Nov 26 New Home Towne Electric, Inc. $898,265 ·
Jan 19, 2018 61E36 McHenryDistrict 1 Resurfacing Ringwood Road from Spring Grove Road to IL 120, and Barnard Mill Road from Ringwood Road to Illinois Route 31 in the Village of Ringwood. — Executed Nov 26 New Curran Contracting Company $1,610,135 ·
Jan 19, 2018 62B16 CookDistrict 1 Reconstruction and signing at the intersection of Golf Road and Cumberland Circle in the city of Des Plaines. — Executed Nov 26 New Martam Construction Incorporated $4,574,690 ·
Jan 19, 2018 62C34 McHenryDistrict 1 Intersection improvement on IL 47 at O'Brien/Vanderkarr Road and Thayer Road between the City of Woodstock and the village of Hebron. — Executed Nov 26 New Curran Contracting Company $2,047,474 ·
Jan 19, 2018 62C90 VariousDistrict 1 Shoulder repair at various locations in the villages of South Elgin, Sugar Grove, Bensenville, North Aurora, West Dundee, Carpentersville, Elburn, Lily Lake, Huntley, and the cities of Batavia, Elgin, Geneva, St. Charles and Aurora. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $228,844 ·
Jan 19, 2018 62D54 CookDuPageWillDistrict 1 Guardrail and traffic barrier terminal removal and replacement on various arterial and expressway routes. — Executed Nov 26 New Kujo, Inc. $537,608 ·
Jan 19, 2018 62F78 CookDistrict 1 Bridge substructure repairs to SN 016-0669 on I-90/94 at Addison in Chicago, SN 016-0511 and SN 016-0512 on I-190 at Des Plaines River Road in Rosemont. — Executed Nov 26 New F. H. Paschen, S.N. Nielsen & Associates LLC $589,497 ·
Jan 19, 2018 62F79 CookDuPageDistrict 1 Cleaning and painting existing steel structures at various locations in the villages of Elmhurst, Wood Dale, Oakbrook, Westchester and LaGrange Park. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $679,108 ·
Jan 19, 2018 62F80 CookDistrict 1 Cleaning and painting existing steel structures at various locations in the villages of Hodgkins, Willow Springs, Cicero and the city of Chicago. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $1,258,379 ·
Jan 19, 2018 62G04 VariousDistrict 1 Pavement patching, miscellaneous traffic control and deck slab repairs on various expressways in District 1. — Executed Nov 26 New Copenhaver Construction, Inc. $2,180,500 ·
Jan 19, 2018 64K27 OgleDistrict 2 Cold milling, HMA resurfacing, and bridge deck repairs on IL 2 from Rock River Bridge in Grand Detour to 0.3 mile south of Pines Road in Oregon. — Executed Nov 26 New Martin & Company Excavating $5,970,636 ·
Jan 19, 2018 64L35 Rock IslandDistrict 2 Demolition and removal of buildings adjacent to IL 92 located 0.3 miles north of Brights Court, near Illinois City. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $213,944 ·
Jan 19, 2018 64M57 VariousDistrict 2 "On Call" guardrail and fence repairs along various routes in the northern section of District 2. — Executed Nov 26 New Northern Contracting, Inc. $385,777 ·
Jan 19, 2018 64M58 VariousDistrict 2 "On call" guardrail and fence repairs along various routes in the southern section of District 2. — Executed Nov 26 New Northern Contracting, Inc. $430,282 ·
Jan 19, 2018 64M75 StephensonDistrict 2 Cold milling, HMA resurfacing and constructing HMA shoulder on Titan Tire Road from Springfield Drive to Dead End. HMA resurfacing on Sunny Hill Drive from US 20 to the cul-de-sac located west of Rock City Road. — Executed Nov 26 New Martin & Company Excavating $168,073 ·
Jan 19, 2018 66C84 FordDistrict 3 Bridge Replacement (SN 027-0012) over Big Four Ditch, 3.0 miles south of IL 9. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $1,511,121 ·
Jan 19, 2018 66D34 FordDistrict 3 Removal of existing double box culvert to be replaced by a double 8'x5' precast box culvert located on IL 47, 1.6 miles north of IL 9 in Gibson City. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $327,585 ·
Jan 19, 2018 66H10 BureauLaSalleDistrict 3 "On Call" repair and maintenance of traffic signals, flashing beacons and roadway lighting throughout District 3. — Executed Nov 26 New Meade Inc. $88,323 ·
Jan 19, 2018 66H60 GrundyDistrict 3 Remove Ash trees for Emerald Ash Borer control along I-80 and I-55 in Grundy County. — Executed Nov 26 New LaJobie Mosley d/b/a Lion Construction 1 LLC $107,383 ·
Jan 19, 2018 66H69 VariousDistrict 3 Sealing Bridge decks parapets/curbs on numerous structures on various routes throughout DeKalb, Kendall, Grundy, and LaSalle Counties. — Executed Nov 26 New All States Painting, Inc. $196,850 ·
Jan 19, 2018 66H74 BureauDistrict 3 Cleaning and painting bridge SN 006-0115 carrying CH 10 over I-80, 1.25 miles east of the Henry County line. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $271,374 ·
Jan 19, 2018 66H75 BureauDistrict 3 Cleaning and painting bridge SN 006-0124 carrying TR 188 over I-80, 4.3 miles west of IL 26 in Bureau County. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $211,120 ·
Jan 19, 2018 66H77 BureauDistrict 3 Cleaning and painting bridge SN 006-0131 carrying CH 27 over I-80, 0.5 mile west of I-180. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $212,380 ·
Jan 19, 2018 66H78 BureauDistrict 3 Cleaning and painting bridge SN 006-0132 carrying East Road/CH 19 over I-80, 3 miles east of I-180. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $211,130 ·
Jan 19, 2018 66H79 BureauDistrict 3 Cleaning and painting structural steel on SN 006-0097 carrying IL 92 over Green River, 1.4 miles west of IL 40. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $197,620 ·
Jan 19, 2018 66H84 GrundyDistrict 3 Washing and concrete sealing bridge SN 032-0099 carrying IL 47 over the Illinois River and the I and M canal, 1.2 mies south of US 6. — Executed Nov 26 New M & M Concrete, Inc. $53,993 ·
Jan 19, 2018 66H85 LaSalleDistrict 3 Washing and concrete sealing bridge SN 050-0246 carrying IL 170 over the Illinois River and River Road, 1.4 miles south of US 6. — Executed Nov 26 New M & M Concrete, Inc. $43,989 ·
Jan 19, 2018 66H86 LaSalleDistrict 3 Washing and concrete sealing bridge SN 050-0219 carrying CH 15 over the Illinois River, 0.41 miles south of US 6. — Executed Nov 26 New M & M Concrete, Inc. $43,996 ·
Jan 19, 2018 66H87 LaSalleDistrict 3 Washing and concrete sealing bridge SN 050-0180 carrying IL 23/71 over the Illinois River and Access Rd., 1 mile south of US 6. — Executed Nov 26 New M & M Concrete, Inc. $49,999 ·
Jan 19, 2018 66H89 LaSalleDistrict 3 Washing and concrete sealing bridge SN 050-0237 carrying IL 351 over the Illinois River, 1.2 miles south of US 6. — Executed Nov 26 New M & M Concrete, Inc. $42,999 ·
Jan 19, 2018 66H90 LaSalleDistrict 3 Washing and concrete sealing bridge SN 050-0079 carrying IL 251 over the Illinois River, Water Street, Iowa Interstate Railroad and Illinois Railway, 0.26 mile south of US 6. — Executed Nov 26 New M & M Concrete, Inc. $48,000 ·
Jan 19, 2018 66H94 IroquoisDistrict 3 Routing and crack sealing 15.94 miles on I-57 from Gilman to Ashkum. — Executed Nov 26 New Freehill Asphalt, Inc. $65,778 ·
Jan 19, 2018 66H99 KankakeeLivingstonDistrict 3 Removal, replacement and rewiring of light towers, light poles and their foundations at 2 locations in Livingston County and at 1 location in Kankakee County. — Executed Nov 26 New Bodine Electric of Decatur $770,899 ·
Jan 19, 2018 68B67 PeoriaDistrict 4 Resurfacing on US 24 from south of IL 9 to north of Pfeiffer Road and on IL 9 from US 24 to 0.27 miles east. — Executed Nov 26 New Advanced Asphalt Company $3,038,514 ·
Jan 19, 2018 68D90 VariousDistrict 4 District wide weed spraying. — Executed Nov 26 New The Daltons Inc. $213,068 ·
Jan 19, 2018 70789 ChampaignDistrict 5 8.445 miles of resurfacing and drainage improvements on I-74 from University Avenue to 2 miles east of the St. Joseph interchange in Urbana. — Executed Nov 26 New Open Road Paving Company LLC $14,888,887 ·
Jan 19, 2018 70C54 ChampaignDouglasMcLeanDistrict 5 High friction surface treatment at various locations in District 5. — Executed Nov 26 New Open Road Paving Company LLC $1,539,345 ·
Jan 19, 2018 70C84 ChampaignDeWittDistrict 5 Painting four bridge structures at various locations in Champaign and Dewitt Counties. — Executed Nov 26 New Three Star Painting, Inc. $512,660 ·
Jan 19, 2018 72J83 SangamonDistrict 6 3.4 miles of surface removal and replacement, shoulder and guardrail work, and structure repair on I-55/I-72/BL I-55 from north of Southwind Road to 0.5 mile north of Stevenson Drive in Springfield. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $11,538,790 ·
Jan 19, 2018 72J85 AdamsHancockDistrict 6 Cleaning of three bridges: (1)SN 001-019, US 24 EB over Mississippi River in Quincy; (2) SN 001-0068, US 24 WB over the Mississippi River in Quincy; (3) SN 034-0062, US 136 over the Mississippi River near Keokuk, Iowa. — Executed Nov 26 New Interstate Maintenance, Incorporated $63,982 ·
Jan 19, 2018 72K12 LoganDistrict 6 Bituminous surface treatment A-1 and A-2 from 2.1 miles south of Kickapoo Creek to the McLean County line. — Executed Nov 26 New Beniach Construction Co., Inc. $297,741 ·
Jan 19, 2018 72K18 LoganTazewellDistrict 4 Bituminous surface treatment A-2 and leveling binder on Armington Road from Monroe Street in Armington to US 136 and on Old IL 121 (CR 2500 E) from US 136 to the Tazewell County line. — Executed Nov 26 New Beniach Construction Co., Inc. $353,547 ·
Jan 19, 2018 72K19 LoganDistrict 6 Bituminous surface treatment A-2 on Old IL 121 from 0.7 mile north of Sugar Creek and continuing south for 4.5 miles. — Executed Nov 26 New Beniach Construction Co., Inc. $413,769 ·
Jan 19, 2018 72K20 MorganDistrict 6 Painting of 5 bridges on I-72 in Morgan County. — Executed Nov 26 New Venus Painting Co. $584,450 ·
Jan 19, 2018 72K28 MontgomeryDistrict 6 5.6 miles of micro-surfacing and centerline pavement markings on I-55 in Montgomery County. — Executed Nov 26 New Microsurfacing Contractors, LLC, a Division of Byrne & Jones Enterprises $303,295 ·
Jan 19, 2018 72K29 CassSangamonDistrict 6 17 miles of micro-surfacing on IL 125 from east of IL 78 in Virginia to Richland Creek east of Pleasant Plains. — Executed Nov 26 New A. C. Pavement Striping Co. $286,943 ·
Jan 19, 2018 72K30 PikeDistrict 6 Cleaning and painting two bridges on IL 96 in Pike County. — Executed Nov 26 New All States Painting, Inc. $158,000 ·
Jan 19, 2018 72K31 MorganDistrict 6 Cleaning and painting the bridge carrying Morton Avenue over I-72 near Jacksonville. — Executed Nov 26 New All States Painting, Inc. $378,000 ·
Jan 19, 2018 72K33 LoganDistrict 6 Weed spraying on various routes in Logan County. — Executed Nov 26 New The Daltons Inc. $40,805 ·
Jan 19, 2018 72K34 SangamonDistrict 6 Weed spraying on various routes in Sangamon County. — Executed Nov 26 New The Daltons Inc. $47,186 ·
Jan 19, 2018 72K35 MontgomeryDistrict 6 Tree removal at the Coalfield Rest Area on I-55. — Executed Nov 26 New Clean Cut Tree Service, Inc. $65,011 ·
Jan 19, 2018 74723 EffinghamDistrict 7 0.88 mile of roadway reconstruction on US 45 from West Salt Creek to 0.2 mile south of 500N. — Executed Nov 26 New Howell Paving, Inc. $3,170,914 ·
Jan 19, 2018 74789 EffinghamDistrict 7 PCC removal and replacement, curb and gutter removal and replacement, sidewalk removal and replacement, and pavement marking at the northbound and southbound Green Creek Rest Areas on I-57. — Executed Nov 26 New Beniach Construction Co., Inc. $1,183,077 ·
Jan 19, 2018 74794 ClarkDistrict 7 Slope stabilization using a cellular confinement system on I-70, 5 miles east of Martinsville. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $186,824 ·
Jan 19, 2018 74803 MaconDistrict 7 12.6 miles of Class A and Class B pavement patching on US 51 from E. Damon Avenue in Decatur to the Macon/Dewitt County line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $357,936 ·
Jan 19, 2018 74806 ColesDistrict 7 9 miles of Class A pavement patching on I-57 from MP 182 to MP 191. — Executed Nov 26 New G. M. Sipes Construction, Inc. $293,827 ·
Jan 19, 2018 74808 ClayEffinghamDistrict 7 12.9 miles of aggregate shoulders on Dieterrich/Clay City Road. — Executed Nov 26 New Howell Paving, Inc. $212,290 ·
Jan 19, 2018 74809 ClarkDistrict 7 9 miles of aggregate shoulders on IL 49 at Westerfield. — Executed Nov 26 New Howell Paving, Inc. $114,104 ·
Jan 19, 2018 74811 LawrenceRichlandDistrict 7 12.8 miles of Class B pavement patching on US 50 between IL 130 and IL 250. — Executed Nov 26 New Kinney Contractors, Inc. $255,614 ·
Jan 19, 2018 74820 VariousDistrict 7 weed spraying along I-57 and I-70. — Executed Nov 26 New The Daltons Inc. $101,463 ·
Jan 19, 2018 74821 EffinghamDistrict 7 Tree removal and seeding along I-57 from MP 165 to MP 168 in Effingham County. — Executed Nov 26 New J & M Highway Safety, LLC $95,000 ·
Jan 19, 2018 76G56 MadisonDistrict 8 Bridge replacement (SN 060-0082) and roadway grade raise on IL 143 over Indian Creek, 0.3 miles east of Wanda Road. — Executed Nov 26 New Keller Construction, Inc. $2,364,049 ·
Jan 19, 2018 76J11 St. ClairDistrict 8 Improvements on 2 bridges on IL 15 over Richland Creek. — Executed Nov 26 New The Kilian Corporation $4,946,423 ·
Jan 19, 2018 76K22 MadisonDistrict 8 Bridge repairs on SN 060-0083 carrying IL 143 over Cahokia Creek, north of Edwardsville. — Executed Nov 26 New The Kilian Corporation $459,755 ·
Jan 19, 2018 76K61 St. ClairDistrict 8 Installation of a weigh-in-motion data collection system on I-64, west of Summerfield South Road. — Executed Nov 26 New Electrico, Inc. $292,808 ·
Jan 19, 2018 76K62 MadisonDistrict 8 Installation of a weigh-in-motion data collection system on I-270, east of IL 157. — Executed Nov 26 New Electrico, Inc. $290,168 ·
Jan 19, 2018 76K93 St. ClairDistrict 8 Installation of traffic signals on IL 161 at the I-64 eastbound ramps. — Executed Nov 26 New Wissehr Electric, Inc. $139,899 ·
Jan 19, 2018 78470 HamiltonDistrict 9 Removal and replacement of SN 033-0005 carrying IL 14 over a creek in McLeansboro. — Executed Nov 26 New Kieffer Bros. Construction Co., Inc. $324,050 ·
Jan 19, 2018 78544 JacksonDistrict 9 Removal of two structures (SN 039-0015, SN 039-0051) over abandoned Illinois Central Golf railroad and construction of a 12' X 10' box culvert and bike path, 3 miles west of Carbondale. — Executed Nov 26 New E. T. Simonds Construction Company $1,927,198 ·
Jan 19, 2018 78577 FranklinJeffersonDistrict 9 Crack sealing on 6 structures on I-57 in Franklin and Jefferson Counties. — Executed Nov 26 New E. T. Simonds Construction Company $110,873 ·
Jan 19, 2018 78592 WilliamsonDistrict 9 8.8 miles of roadway improvement including guardrail and culvert liner on IL 148. — Executed Nov 26 New E. T. Simonds Construction Company $3,348,417 ·
Jan 19, 2018 78597 SalineDistrict 9 Concrete shoulders, traffic signals and pavement markings at the intersection of IL 13 and Old IL 13 in Harrisburg. — Executed Nov 26 New Brown Electric, Inc. $228,251 ·
Jan 19, 2018 78614 FranklinJeffersonDistrict 9 Cleaning and painting 9 bridges on I-57. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $1,214,294 ·
Jan 19, 2018 78616 WilliamsonDistrict 9 Roadway improvement on IL 37 from south of IL 148 to Pulleys Mill. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $214,032 ·
Jan 19, 2018 78620 FranklinDistrict 9 Addition of a non-automatic transfer switch and associated conduit and cabling at the West Frankfort pump station in West Frankfort. — Executed Nov 26 New F. W. Electric, Inc. $29,450 ·
Jan 19, 2018 78621 HamiltonJeffersonWilliamsonDistrict 9 Cleaning and painting portions of 3 structures. — Executed Nov 26 New Thomas Industrial Coatings, Inc. $165,153 ·
Jan 19, 2018 78625 VariousDistrict 9 Weed spraying along various routes. — Executed Nov 26 New The Daltons Inc. $160,542 ·
Jan 19, 2018 85660 LeeDistrict 2 Resurfacing CH 22/Eldena Road from US 52 to South Eldena Road. — Executed Nov 26 New Martin & Company Excavating $325,315 ·
Jan 19, 2018 85661 LeeDistrict 2 Resurfacing Harmon Road from US 30 to Sterling Road. — Executed Nov 26 New Martin & Company Excavating $249,800 ·
Jan 19, 2018 85662 WinnebagoDistrict 2 Installation of new traffic signals at the intersection of Bauer Parkway and Victory Lane in Machesney Park. — Executed Nov 26 New William Charles Construction Co, LLC $295,091 ·
Jan 19, 2018 87675 BureauDistrict 3 Resurfacing from the Henry County line to the corporate limits of New Bedford. — Executed Nov 26 New Advanced Asphalt Company $1,194,338 ·
Jan 19, 2018 87681 LivingstonDistrict 3 Cleaning and repainting of the soffit, fascia, and exterior wood parts, and cleaning and tuck pointing on the historic Dwight train depot in the Village of Dwight. — Rejected Nov 26 New D. Construction, Inc. $103,093 ·
Jan 19, 2018 89664 KnoxDistrict 4 Roadway reconstruction on FAS 393(CH4) from CH 15 to IL 17. — Executed Nov 26 New Halverson Construction Co., Inc. $4,167,747 ·
Jan 19, 2018 89699 KnoxDistrict 4 Rehabilitate the bridge carrying Farnham Street over the BNSF Railroad, 0.3 mile north of East Main Street in Galesburg. — Executed Nov 26 New Sangamo Construction Company $2,191,737 ·
Jan 19, 2018 89709 PeoriaDistrict 4 Reconstruction of Old Galena Road between Boy Scout Road and Cedar Hills Drive, including new traffic signals at Cedar Hills Drive. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $3,759,289 ·
1–100 of 855Next ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.