| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 46487 | VariousDistrict 6 | Installing or replacing tourist attraction or business logo signs, guide signs and supports at locations throughout the state as described in individual work orders. | — | Executed | T.M.F. Construction Company $482,900 · | ||
| Jan 19, 2018 | 60J13 | CookDistrict 1 | Culvert replacement and improvements to ADA pedestrian ramps and the retaining wall in the Village of Northbrook. | — | Executed | Copenhaver Construction, Inc. $6,214,342 · | ||
| Jan 19, 2018 | 60X59 | WillDistrict 1 | Intersection improvement and signal installation at the intersection of North Bolingbrook Drive and Royce Road in the Village of Bolingbrook. | — | Executed | P. T. Ferro Construction Co. $774,315 · | ||
| Jan 19, 2018 | 60Y25 | CookDistrict 1 | Reconstruct the intersection of IL 83 and IL 171, including new traffic signals, roadway lighting and box and pipe culvert replacements east of the Village of Lemont. | — | Executed | D. Construction, Inc. $6,665,294 · | ||
| Jan 19, 2018 | 61D87 | CookDistrict 1 | Resurfacing Harding Avenue from Brainard Avenue to Kemman Avenue in the Village of LaGrange Park. | — | Executed | Arrow Road Construction Co. $857,459 · | ||
| Jan 19, 2018 | 61E13 | LakeDistrict 1 | Resurfacing 21st Street from Sheridan Road east for 1,600 ft., and 29th Street from Lewis Avenue to Galilee Avenue in the City of Zion. | — | Executed | Peter Baker & Son Co. $456,777 · | ||
| Jan 19, 2018 | 61E18 | KaneDistrict 1 | Reconstruct the intersection of IL 25 at Spring Street including traffic signal improvements, street lighting, and curb, gutter and sidewalks; construction of a pedestrian bridge over the Fox River; reconfiguration of the multi-modal access for pedestrians and vehicular traffic; relocation of the Pace bus staging area and the expansion of the existing commuter parking lot. Project is located in the City of Aurora. | — | Executed | Judlau Contracting, Inc. $14,271,674 · | ||
| Jan 19, 2018 | 61E19 | CookDistrict 1 | Resurfacing Oketo Avenue from Lawrence Avenue to Montrose Avenue, and Wilson Avenue from Oketo Avenue to Harlem Avenue in the Village of Harwood Heights. | — | Executed | J. A. Johnson Paving Company $498,777 · | ||
| Jan 19, 2018 | 61E20 | CookDistrict 1 | Pedestrian path from 135th Street to College Drive in the City of Palos Heights. | — | Executed | Davis Concrete Construction Co. $553,985 · | ||
| Jan 19, 2018 | 61E21 | CookDistrict 1 | Tree planting along IL 50 from 167th Street to 163rd Street in the City of Oak Forest. | — | Executed | McGinty Bros., Inc. $49,965 · | ||
| Jan 19, 2018 | 61E25 | CookDistrict 1 | Resurfacing, traffic signals, sidewalks, and street lighting on FAU 3723 (JFK Blvd.) from Arlington Heights Rd. to Elk Grove Blvd., and on FAU 3724 (Elk Grove Blvd.) from Arlington Heights Rd. to Victoria Ln. in Elk Grove Village. The sidewalk and railing on the structure carrying JFK Blvd. over Salt Creek will be removed and replaced. | — | Executed | K-Five Construction Corporation $2,989,961 · | ||
| Jan 19, 2018 | 61E26 | DuPageDistrict 1 | Resurfacing Fullerton Avenue from Bloomingdale Road to Glen Elleyn Road in the Village of Glendale Heights. | — | Executed | J. A. Johnson Paving Company $1,453,953 · | ||
| Jan 19, 2018 | 61E28 | LakeDistrict 1 | Replace the bridge carrying Forest Avenue over Ravine Ditch #7, south of Hazel Avenue in the City of Highland Park. | — | Executed | Lorig Construction Company $2,655,120 · | ||
| Jan 19, 2018 | 61E30 | WillDistrict 1 | Reconstruct Rathje Road from Joliet Road to Corning Avenue in the Village of Peotone. | — | Executed | P. T. Ferro Construction Co. $1,623,160 · | ||
| Jan 19, 2018 | 61E31 | DuPageDistrict 1 | Resurfacing Poplar Avenue from Park Avenue to Vallette Street in the City of Elmhurst. | — | Executed | J. A. Johnson Paving Company $596,413 · | ||
| Jan 19, 2018 | 61E33 | LakeDistrict 1 | Traffic signal improvement on US 12 from IL 176 to IL 22. | — | Executed | Home Towne Electric, Inc. $898,265 · | ||
| Jan 19, 2018 | 61E36 | McHenryDistrict 1 | Resurfacing Ringwood Road from Spring Grove Road to IL 120, and Barnard Mill Road from Ringwood Road to Illinois Route 31 in the Village of Ringwood. | — | Executed | Curran Contracting Company $1,610,135 · | ||
| Jan 19, 2018 | 62B16 | CookDistrict 1 | Reconstruction and signing at the intersection of Golf Road and Cumberland Circle in the city of Des Plaines. | — | Executed | Martam Construction Incorporated $4,574,690 · | ||
| Jan 19, 2018 | 62C34 | McHenryDistrict 1 | Intersection improvement on IL 47 at O'Brien/Vanderkarr Road and Thayer Road between the City of Woodstock and the village of Hebron. | — | Executed | Curran Contracting Company $2,047,474 · | ||
| Jan 19, 2018 | 62C90 | VariousDistrict 1 | Shoulder repair at various locations in the villages of South Elgin, Sugar Grove, Bensenville, North Aurora, West Dundee, Carpentersville, Elburn, Lily Lake, Huntley, and the cities of Batavia, Elgin, Geneva, St. Charles and Aurora. | — | Executed | Phoenix Corporation of the Quad Cities $228,844 · | ||
| Jan 19, 2018 | 62D54 | CookDuPageWillDistrict 1 | Guardrail and traffic barrier terminal removal and replacement on various arterial and expressway routes. | — | Executed | Kujo, Inc. $537,608 · | ||
| Jan 19, 2018 | 62F78 | CookDistrict 1 | Bridge substructure repairs to SN 016-0669 on I-90/94 at Addison in Chicago, SN 016-0511 and SN 016-0512 on I-190 at Des Plaines River Road in Rosemont. | — | Executed | F. H. Paschen, S.N. Nielsen & Associates LLC $589,497 · | ||
| Jan 19, 2018 | 62F79 | CookDuPageDistrict 1 | Cleaning and painting existing steel structures at various locations in the villages of Elmhurst, Wood Dale, Oakbrook, Westchester and LaGrange Park. | — | Executed | ERA-Valdivia Contractors, Inc. $679,108 · | ||
| Jan 19, 2018 | 62F80 | CookDistrict 1 | Cleaning and painting existing steel structures at various locations in the villages of Hodgkins, Willow Springs, Cicero and the city of Chicago. | — | Executed | ERA-Valdivia Contractors, Inc. $1,258,379 · | ||
| Jan 19, 2018 | 62G04 | VariousDistrict 1 | Pavement patching, miscellaneous traffic control and deck slab repairs on various expressways in District 1. | — | Executed | Copenhaver Construction, Inc. $2,180,500 · | ||
| Jan 19, 2018 | 64K27 | OgleDistrict 2 | Cold milling, HMA resurfacing, and bridge deck repairs on IL 2 from Rock River Bridge in Grand Detour to 0.3 mile south of Pines Road in Oregon. | — | Executed | Martin & Company Excavating $5,970,636 · | ||
| Jan 19, 2018 | 64L35 | Rock IslandDistrict 2 | Demolition and removal of buildings adjacent to IL 92 located 0.3 miles north of Brights Court, near Illinois City. | — | Executed | Phoenix Corporation of the Quad Cities $213,944 · | ||
| Jan 19, 2018 | 64M57 | VariousDistrict 2 | "On Call" guardrail and fence repairs along various routes in the northern section of District 2. | — | Executed | Northern Contracting, Inc. $385,777 · | ||
| Jan 19, 2018 | 64M58 | VariousDistrict 2 | "On call" guardrail and fence repairs along various routes in the southern section of District 2. | — | Executed | Northern Contracting, Inc. $430,282 · | ||
| Jan 19, 2018 | 64M75 | StephensonDistrict 2 | Cold milling, HMA resurfacing and constructing HMA shoulder on Titan Tire Road from Springfield Drive to Dead End. HMA resurfacing on Sunny Hill Drive from US 20 to the cul-de-sac located west of Rock City Road. | — | Executed | Martin & Company Excavating $168,073 · | ||
| Jan 19, 2018 | 66C84 | FordDistrict 3 | Bridge Replacement (SN 027-0012) over Big Four Ditch, 3.0 miles south of IL 9. | — | Executed | Tobey's Construction & Cartage, Inc. $1,511,121 · | ||
| Jan 19, 2018 | 66D34 | FordDistrict 3 | Removal of existing double box culvert to be replaced by a double 8'x5' precast box culvert located on IL 47, 1.6 miles north of IL 9 in Gibson City. | — | Executed | Tobey's Construction & Cartage, Inc. $327,585 · | ||
| Jan 19, 2018 | 66H10 | BureauLaSalleDistrict 3 | "On Call" repair and maintenance of traffic signals, flashing beacons and roadway lighting throughout District 3. | — | Executed | Meade Inc. $88,323 · | ||
| Jan 19, 2018 | 66H60 | GrundyDistrict 3 | Remove Ash trees for Emerald Ash Borer control along I-80 and I-55 in Grundy County. | — | Executed | LaJobie Mosley d/b/a Lion Construction 1 LLC $107,383 · | ||
| Jan 19, 2018 | 66H69 | VariousDistrict 3 | Sealing Bridge decks parapets/curbs on numerous structures on various routes throughout DeKalb, Kendall, Grundy, and LaSalle Counties. | — | Executed | All States Painting, Inc. $196,850 · | ||
| Jan 19, 2018 | 66H74 | BureauDistrict 3 | Cleaning and painting bridge SN 006-0115 carrying CH 10 over I-80, 1.25 miles east of the Henry County line. | — | Executed | ERA-Valdivia Contractors, Inc. $271,374 · | ||
| Jan 19, 2018 | 66H75 | BureauDistrict 3 | Cleaning and painting bridge SN 006-0124 carrying TR 188 over I-80, 4.3 miles west of IL 26 in Bureau County. | — | Executed | ERA-Valdivia Contractors, Inc. $211,120 · | ||
| Jan 19, 2018 | 66H77 | BureauDistrict 3 | Cleaning and painting bridge SN 006-0131 carrying CH 27 over I-80, 0.5 mile west of I-180. | — | Executed | ERA-Valdivia Contractors, Inc. $212,380 · | ||
| Jan 19, 2018 | 66H78 | BureauDistrict 3 | Cleaning and painting bridge SN 006-0132 carrying East Road/CH 19 over I-80, 3 miles east of I-180. | — | Executed | ERA-Valdivia Contractors, Inc. $211,130 · | ||
| Jan 19, 2018 | 66H79 | BureauDistrict 3 | Cleaning and painting structural steel on SN 006-0097 carrying IL 92 over Green River, 1.4 miles west of IL 40. | — | Executed | ERA-Valdivia Contractors, Inc. $197,620 · | ||
| Jan 19, 2018 | 66H84 | GrundyDistrict 3 | Washing and concrete sealing bridge SN 032-0099 carrying IL 47 over the Illinois River and the I and M canal, 1.2 mies south of US 6. | — | Executed | M & M Concrete, Inc. $53,993 · | ||
| Jan 19, 2018 | 66H85 | LaSalleDistrict 3 | Washing and concrete sealing bridge SN 050-0246 carrying IL 170 over the Illinois River and River Road, 1.4 miles south of US 6. | — | Executed | M & M Concrete, Inc. $43,989 · | ||
| Jan 19, 2018 | 66H86 | LaSalleDistrict 3 | Washing and concrete sealing bridge SN 050-0219 carrying CH 15 over the Illinois River, 0.41 miles south of US 6. | — | Executed | M & M Concrete, Inc. $43,996 · | ||
| Jan 19, 2018 | 66H87 | LaSalleDistrict 3 | Washing and concrete sealing bridge SN 050-0180 carrying IL 23/71 over the Illinois River and Access Rd., 1 mile south of US 6. | — | Executed | M & M Concrete, Inc. $49,999 · | ||
| Jan 19, 2018 | 66H89 | LaSalleDistrict 3 | Washing and concrete sealing bridge SN 050-0237 carrying IL 351 over the Illinois River, 1.2 miles south of US 6. | — | Executed | M & M Concrete, Inc. $42,999 · | ||
| Jan 19, 2018 | 66H90 | LaSalleDistrict 3 | Washing and concrete sealing bridge SN 050-0079 carrying IL 251 over the Illinois River, Water Street, Iowa Interstate Railroad and Illinois Railway, 0.26 mile south of US 6. | — | Executed | M & M Concrete, Inc. $48,000 · | ||
| Jan 19, 2018 | 66H94 | IroquoisDistrict 3 | Routing and crack sealing 15.94 miles on I-57 from Gilman to Ashkum. | — | Executed | Freehill Asphalt, Inc. $65,778 · | ||
| Jan 19, 2018 | 66H99 | KankakeeLivingstonDistrict 3 | Removal, replacement and rewiring of light towers, light poles and their foundations at 2 locations in Livingston County and at 1 location in Kankakee County. | — | Executed | Bodine Electric of Decatur $770,899 · | ||
| Jan 19, 2018 | 68B67 | PeoriaDistrict 4 | Resurfacing on US 24 from south of IL 9 to north of Pfeiffer Road and on IL 9 from US 24 to 0.27 miles east. | — | Executed | Advanced Asphalt Company $3,038,514 · | ||
| Jan 19, 2018 | 68D90 | VariousDistrict 4 | District wide weed spraying. | — | Executed | The Daltons Inc. $213,068 · | ||
| Jan 19, 2018 | 70789 | ChampaignDistrict 5 | 8.445 miles of resurfacing and drainage improvements on I-74 from University Avenue to 2 miles east of the St. Joseph interchange in Urbana. | — | Executed | Open Road Paving Company LLC $14,888,887 · | ||
| Jan 19, 2018 | 70C54 | ChampaignDouglasMcLeanDistrict 5 | High friction surface treatment at various locations in District 5. | — | Executed | Open Road Paving Company LLC $1,539,345 · | ||
| Jan 19, 2018 | 70C84 | ChampaignDeWittDistrict 5 | Painting four bridge structures at various locations in Champaign and Dewitt Counties. | — | Executed | Three Star Painting, Inc. $512,660 · | ||
| Jan 19, 2018 | 72J83 | SangamonDistrict 6 | 3.4 miles of surface removal and replacement, shoulder and guardrail work, and structure repair on I-55/I-72/BL I-55 from north of Southwind Road to 0.5 mile north of Stevenson Drive in Springfield. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $11,538,790 · | ||
| Jan 19, 2018 | 72J85 | AdamsHancockDistrict 6 | Cleaning of three bridges: (1)SN 001-019, US 24 EB over Mississippi River in Quincy; (2) SN 001-0068, US 24 WB over the Mississippi River in Quincy; (3) SN 034-0062, US 136 over the Mississippi River near Keokuk, Iowa. | — | Executed | Interstate Maintenance, Incorporated $63,982 · | ||
| Jan 19, 2018 | 72K12 | LoganDistrict 6 | Bituminous surface treatment A-1 and A-2 from 2.1 miles south of Kickapoo Creek to the McLean County line. | — | Executed | Beniach Construction Co., Inc. $297,741 · | ||
| Jan 19, 2018 | 72K18 | LoganTazewellDistrict 4 | Bituminous surface treatment A-2 and leveling binder on Armington Road from Monroe Street in Armington to US 136 and on Old IL 121 (CR 2500 E) from US 136 to the Tazewell County line. | — | Executed | Beniach Construction Co., Inc. $353,547 · | ||
| Jan 19, 2018 | 72K19 | LoganDistrict 6 | Bituminous surface treatment A-2 on Old IL 121 from 0.7 mile north of Sugar Creek and continuing south for 4.5 miles. | — | Executed | Beniach Construction Co., Inc. $413,769 · | ||
| Jan 19, 2018 | 72K20 | MorganDistrict 6 | Painting of 5 bridges on I-72 in Morgan County. | — | Executed | Venus Painting Co. $584,450 · | ||
| Jan 19, 2018 | 72K28 | MontgomeryDistrict 6 | 5.6 miles of micro-surfacing and centerline pavement markings on I-55 in Montgomery County. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne & Jones Enterprises $303,295 · | ||
| Jan 19, 2018 | 72K29 | CassSangamonDistrict 6 | 17 miles of micro-surfacing on IL 125 from east of IL 78 in Virginia to Richland Creek east of Pleasant Plains. | — | Executed | A. C. Pavement Striping Co. $286,943 · | ||
| Jan 19, 2018 | 72K30 | PikeDistrict 6 | Cleaning and painting two bridges on IL 96 in Pike County. | — | Executed | All States Painting, Inc. $158,000 · | ||
| Jan 19, 2018 | 72K31 | MorganDistrict 6 | Cleaning and painting the bridge carrying Morton Avenue over I-72 near Jacksonville. | — | Executed | All States Painting, Inc. $378,000 · | ||
| Jan 19, 2018 | 72K33 | LoganDistrict 6 | Weed spraying on various routes in Logan County. | — | Executed | The Daltons Inc. $40,805 · | ||
| Jan 19, 2018 | 72K34 | SangamonDistrict 6 | Weed spraying on various routes in Sangamon County. | — | Executed | The Daltons Inc. $47,186 · | ||
| Jan 19, 2018 | 72K35 | MontgomeryDistrict 6 | Tree removal at the Coalfield Rest Area on I-55. | — | Executed | Clean Cut Tree Service, Inc. $65,011 · | ||
| Jan 19, 2018 | 74723 | EffinghamDistrict 7 | 0.88 mile of roadway reconstruction on US 45 from West Salt Creek to 0.2 mile south of 500N. | — | Executed | Howell Paving, Inc. $3,170,914 · | ||
| Jan 19, 2018 | 74789 | EffinghamDistrict 7 | PCC removal and replacement, curb and gutter removal and replacement, sidewalk removal and replacement, and pavement marking at the northbound and southbound Green Creek Rest Areas on I-57. | — | Executed | Beniach Construction Co., Inc. $1,183,077 · | ||
| Jan 19, 2018 | 74794 | ClarkDistrict 7 | Slope stabilization using a cellular confinement system on I-70, 5 miles east of Martinsville. | — | Executed | Phoenix Corporation of the Quad Cities $186,824 · | ||
| Jan 19, 2018 | 74803 | MaconDistrict 7 | 12.6 miles of Class A and Class B pavement patching on US 51 from E. Damon Avenue in Decatur to the Macon/Dewitt County line. | — | Executed | G. M. Sipes Construction, Inc. $357,936 · | ||
| Jan 19, 2018 | 74806 | ColesDistrict 7 | 9 miles of Class A pavement patching on I-57 from MP 182 to MP 191. | — | Executed | G. M. Sipes Construction, Inc. $293,827 · | ||
| Jan 19, 2018 | 74808 | ClayEffinghamDistrict 7 | 12.9 miles of aggregate shoulders on Dieterrich/Clay City Road. | — | Executed | Howell Paving, Inc. $212,290 · | ||
| Jan 19, 2018 | 74809 | ClarkDistrict 7 | 9 miles of aggregate shoulders on IL 49 at Westerfield. | — | Executed | Howell Paving, Inc. $114,104 · | ||
| Jan 19, 2018 | 74811 | LawrenceRichlandDistrict 7 | 12.8 miles of Class B pavement patching on US 50 between IL 130 and IL 250. | — | Executed | Kinney Contractors, Inc. $255,614 · | ||
| Jan 19, 2018 | 74820 | VariousDistrict 7 | weed spraying along I-57 and I-70. | — | Executed | The Daltons Inc. $101,463 · | ||
| Jan 19, 2018 | 74821 | EffinghamDistrict 7 | Tree removal and seeding along I-57 from MP 165 to MP 168 in Effingham County. | — | Executed | J & M Highway Safety, LLC $95,000 · | ||
| Jan 19, 2018 | 76G56 | MadisonDistrict 8 | Bridge replacement (SN 060-0082) and roadway grade raise on IL 143 over Indian Creek, 0.3 miles east of Wanda Road. | — | Executed | Keller Construction, Inc. $2,364,049 · | ||
| Jan 19, 2018 | 76J11 | St. ClairDistrict 8 | Improvements on 2 bridges on IL 15 over Richland Creek. | — | Executed | The Kilian Corporation $4,946,423 · | ||
| Jan 19, 2018 | 76K22 | MadisonDistrict 8 | Bridge repairs on SN 060-0083 carrying IL 143 over Cahokia Creek, north of Edwardsville. | — | Executed | The Kilian Corporation $459,755 · | ||
| Jan 19, 2018 | 76K61 | St. ClairDistrict 8 | Installation of a weigh-in-motion data collection system on I-64, west of Summerfield South Road. | — | Executed | Electrico, Inc. $292,808 · | ||
| Jan 19, 2018 | 76K62 | MadisonDistrict 8 | Installation of a weigh-in-motion data collection system on I-270, east of IL 157. | — | Executed | Electrico, Inc. $290,168 · | ||
| Jan 19, 2018 | 76K93 | St. ClairDistrict 8 | Installation of traffic signals on IL 161 at the I-64 eastbound ramps. | — | Executed | Wissehr Electric, Inc. $139,899 · | ||
| Jan 19, 2018 | 78470 | HamiltonDistrict 9 | Removal and replacement of SN 033-0005 carrying IL 14 over a creek in McLeansboro. | — | Executed | Kieffer Bros. Construction Co., Inc. $324,050 · | ||
| Jan 19, 2018 | 78544 | JacksonDistrict 9 | Removal of two structures (SN 039-0015, SN 039-0051) over abandoned Illinois Central Golf railroad and construction of a 12' X 10' box culvert and bike path, 3 miles west of Carbondale. | — | Executed | E. T. Simonds Construction Company $1,927,198 · | ||
| Jan 19, 2018 | 78577 | FranklinJeffersonDistrict 9 | Crack sealing on 6 structures on I-57 in Franklin and Jefferson Counties. | — | Executed | E. T. Simonds Construction Company $110,873 · | ||
| Jan 19, 2018 | 78592 | WilliamsonDistrict 9 | 8.8 miles of roadway improvement including guardrail and culvert liner on IL 148. | — | Executed | E. T. Simonds Construction Company $3,348,417 · | ||
| Jan 19, 2018 | 78597 | SalineDistrict 9 | Concrete shoulders, traffic signals and pavement markings at the intersection of IL 13 and Old IL 13 in Harrisburg. | — | Executed | Brown Electric, Inc. $228,251 · | ||
| Jan 19, 2018 | 78614 | FranklinJeffersonDistrict 9 | Cleaning and painting 9 bridges on I-57. | — | Executed | ERA-Valdivia Contractors, Inc. $1,214,294 · | ||
| Jan 19, 2018 | 78616 | WilliamsonDistrict 9 | Roadway improvement on IL 37 from south of IL 148 to Pulleys Mill. | — | Executed | Southern Illinois Asphalt Co., Inc. $214,032 · | ||
| Jan 19, 2018 | 78620 | FranklinDistrict 9 | Addition of a non-automatic transfer switch and associated conduit and cabling at the West Frankfort pump station in West Frankfort. | — | Executed | F. W. Electric, Inc. $29,450 · | ||
| Jan 19, 2018 | 78621 | HamiltonJeffersonWilliamsonDistrict 9 | Cleaning and painting portions of 3 structures. | — | Executed | Thomas Industrial Coatings, Inc. $165,153 · | ||
| Jan 19, 2018 | 78625 | VariousDistrict 9 | Weed spraying along various routes. | — | Executed | The Daltons Inc. $160,542 · | ||
| Jan 19, 2018 | 85660 | LeeDistrict 2 | Resurfacing CH 22/Eldena Road from US 52 to South Eldena Road. | — | Executed | Martin & Company Excavating $325,315 · | ||
| Jan 19, 2018 | 85661 | LeeDistrict 2 | Resurfacing Harmon Road from US 30 to Sterling Road. | — | Executed | Martin & Company Excavating $249,800 · | ||
| Jan 19, 2018 | 85662 | WinnebagoDistrict 2 | Installation of new traffic signals at the intersection of Bauer Parkway and Victory Lane in Machesney Park. | — | Executed | William Charles Construction Co, LLC $295,091 · | ||
| Jan 19, 2018 | 87675 | BureauDistrict 3 | Resurfacing from the Henry County line to the corporate limits of New Bedford. | — | Executed | Advanced Asphalt Company $1,194,338 · | ||
| Jan 19, 2018 | 87681 | LivingstonDistrict 3 | Cleaning and repainting of the soffit, fascia, and exterior wood parts, and cleaning and tuck pointing on the historic Dwight train depot in the Village of Dwight. | — | Rejected | D. Construction, Inc. $103,093 · | ||
| Jan 19, 2018 | 89664 | KnoxDistrict 4 | Roadway reconstruction on FAS 393(CH4) from CH 15 to IL 17. | — | Executed | Halverson Construction Co., Inc. $4,167,747 · | ||
| Jan 19, 2018 | 89699 | KnoxDistrict 4 | Rehabilitate the bridge carrying Farnham Street over the BNSF Railroad, 0.3 mile north of East Main Street in Galesburg. | — | Executed | Sangamo Construction Company $2,191,737 · | ||
| Jan 19, 2018 | 89709 | PeoriaDistrict 4 | Reconstruction of Old Galena Road between Boy Scout Road and Cedar Hills Drive, including new traffic signals at Cedar Hills Drive. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $3,759,289 · |
1–100 of 855Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.