18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Nov 4, 2020 | 0228-02-051NH 2B20(218) | Gaines Lubbock |
INSTALL CABLE MEDIAN BARRIERUS 62 · | $11,055,057 | $8,857,058 | GRATIOT CONSTRUCTION, LTD. | -19.9% | 6 |
| Nov 4, 2020 | 1123-02-016C 1123-2-16 | Karnes Corpus Christi |
REHAB ROADWAY AND WIDENFM 81 · | $9,901,543 | $8,531,764 | HUNTER INDUSTRIES, LTD. | -13.8% | 7 |
| Nov 4, 2020 | 0011-10-027STP 2021(166) | Palo Pinto Fort Worth |
RESURFACE ROADWAYUS 180 · | $10,139,184 | $8,439,322 | NORTHEASTERN PAVERS, LLC | -16.8% | 9 |
| Nov 4, 2020 | 2150-04-076C 2150-4-76 | Webb Laredo |
GRADE, INLETS, CONC. PAV., SIGNS, & PAV. MRKGS.FM 1472 · | $6,897,420 | $6,359,706 | ANDERSON COLUMBIA CO., INC. | -7.8% | 4 |
| Nov 4, 2020 | 0172-01-056C 172-1-56 | Tarrant Fort Worth |
CONSTRUCT PEDESTRIAN INFRASTRUCTUREBU 287P · | $5,865,066 | $5,671,661 | RAGLE CONSTRUCTION, INC. | -3.3% | 8 |
| Nov 4, 2020 | 0062-04-050NH 2021(099) | Cass Atlanta |
INSTALL MEDIAN BARRIERUS 59 · | $7,472,559 | $4,434,953 | H. V. CAVER, INC. | -40.7% | 11 |
| Nov 4, 2020 | 0693-01-037STP 2021(097) | Howard Abilene |
MILL, SPOT REPAIR, OVERLAYSH 350 · | $3,411,024 | $3,221,957 | RK HALL, LLC | -5.5% | 4 |
| Nov 4, 2020 | 0269-03-036BR 2021(118) | Lavaca Yoakum |
REPLACE BRIDGE AND APPROACHESUA 77 · | $4,126,614 | $3,098,286 | HILL COUNTRY BRIDGE, INC. | -24.9% | 10 |
| Nov 4, 2020 | 0912-00-590C 912-00-590 | Harris Houston |
NEW TRAFFIC SIGNALSVA · | $2,035,137 | $2,193,801 | VACA UNDERGROUND UTILITIES INC | +7.8% | 6 |
| Nov 4, 2020 | 2296-01-056STP 2B20(122)HES | Ector Odessa |
INSTALL MEDIAN BARRIERSH 191 · | $2,129,944 | $2,056,073 | MIJELUM, L.L.C. | -3.5% | 8 |
| Nov 4, 2020 | 0700-01-044C 700-1-44 | Burnet Austin |
OVERLAYSH 71 · | $2,800,397 | $2,046,868 | LONE STAR PAVING COMPANY | -26.9% | 6 |
| Nov 4, 2020 | 0043-04-082NH 2021(103) | Hardeman Childress |
MILL/INLAYUS 287 · | $2,129,780 | $1,952,687 | A. L. HELMCAMP, INC. | -8.3% | 6 |
| Nov 4, 2020 | 6367-63-001TMC - 636763001 | Travis Austin |
WIM SCALE PARTSIH 35 · | $1,808,915 | $1,817,730 | INTERNATIONAL ROAD DYNAMICS CORPORATION | +0.5% | 1 |
| Nov 4, 2020 | 0511-03-012STP 2021(110) | Hays Austin |
RESURFACE ROADWAYRM 32 · | $1,892,370 | $1,671,960 | HUNTER INDUSTRIES, LTD. | -11.6% | 7 |
| Nov 4, 2020 | 6369-89-001MMC - 636989001 | Taylor Abilene |
MATERIALS ONLY: DENSE GRADED HMAIH 20 · | $1,617,670 | $1,558,815 | VULCAN CONSTRUCTION MATERIALS, LLC | -3.6% | 2 |
| Nov 4, 2020 | 6371-15-001RMC - 637115001 | Kaufman Dallas |
RETROREFLECTORIZED PAVEMENT MARKERS AND MARKINGSIH 20 · | $1,406,746 | $1,477,985 | STRIPING TECHNOLOGY, L.P. | +5.1% | 2 |
| Nov 4, 2020 | 0043-14-026NH 2B20(225) | Wichita Wichita Falls |
MILL AND OVERLAYSL 11 · | $1,691,633 | $1,360,148 | ZACK BURKETT CO. | -19.6% | 5 |
| Nov 4, 2020 | 6369-90-001MMC - 636990001 | Howard Abilene |
MATERIALS ONLY DENSE GRADED HMAIH 20 · | $1,411,500 | $1,307,000 | RK HALL, LLC | -7.4% | 2 |
| Nov 4, 2020 | 0047-02-154STP 2021(104)HES | Grayson Paris |
IMPROVE TRAFFIC SIGNALS; INTERCONNECT SIGNALSSS 503 · | $1,369,401 | $1,257,374 | NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION | -8.2% | 7 |
| Nov 4, 2020 | 0683-02-070STP 2021(111)HES | Travis Austin |
TRAFFIC SIGNAL IMPROVEMENTSRM 620 · | $1,441,564 | $1,229,141 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -14.7% | 3 |
| Nov 4, 2020 | 0354-06-031STP 2B20(119)HES | Andrews Odessa |
SAFETY LIGHTING AT INTERSECTIONSH 115 · | $1,302,733 | $1,156,358 | VACA UNDERGROUND UTILITIES INC | -11.2% | 6 |
| Nov 4, 2020 | 6369-92-001MMC - 636992001 | Taylor Abilene |
MATERIALS ONLY: HMCLIH 20 · | $1,260,000 | $1,110,300 | ZACK BURKETT CO. | -11.9% | 2 |
| Nov 4, 2020 | 6371-16-001RMC - 637116001 | Kaufman Dallas |
VEGETATION MANAGEMENT (NORTH SIDE)IH 20 · | $1,096,135 | $1,076,692 | CROSS PLUS CONSTRUCTION, LLC | -1.8% | 4 |
| Nov 4, 2020 | 6369-75-001RMC - 636975001 | Potter Amarillo |
DISTRICT WIDE ON CALL STRIPINGIH 40 · | $1,237,673 | $930,051 | PMI PAVEMENT MARKING, LLC | -24.9% | 4 |
| Nov 4, 2020 | 6366-79-001RMC - 636679001 | Navarro Dallas |
REMOVAL AND DISPOSAL OF DRIFTWOOD AND DEBRISFM 3041 · | $972,000 | $901,225 | CROSS PLUS CONSTRUCTION, LLC | -7.3% | 5 |
| Nov 4, 2020 | 6372-23-001RMC - 637223001 | El Paso El Paso |
MBGF, CHAINLINK FENCE & ROCK WALL REPAIRIH 10 · | $873,811 | $794,293 | SYNERGY PROJECT CONTRACTORS, INC. | -9.1% | 7 |
| Nov 4, 2020 | 0913-00-107STP 2B20(208) | De Witt Yoakum |
STRIPINGVA · | $1,007,314 | $783,592 | BATTERSON, LLP | -22.2% | 9 |
| Nov 4, 2020 | 6368-18-001RMC - 636818001 | Ellis Dallas |
CLEANING & SWEEPING HIGHWAYS & DEBRIS REMOVALIH 35E · | $1,000,120 | $750,478 | SWEEPING CORPORATION OF AMERICA, INC. | -25.0% | 3 |
| Nov 4, 2020 | 6366-80-001RMC - 636680001 | Navarro Dallas |
ON-CALL TRAFFIC CONTROL SERVICESSH 31 · | $724,300 | $693,000 | NIXON ENGINEERING | -4.3% | 3 |
| Nov 4, 2020 | 6370-07-001MMC - 637007001 | Taylor Abilene |
MATERIALS ONLY ASPPMIH 20 · | $625,400 | $601,575 | ZACK BURKETT CO. | -3.8% | 2 |
| Nov 4, 2020 | 6369-96-001MMC - 636996001 | Howard Abilene |
MATERIALS ONLY EMULSIONSIH 20 · | $621,900 | $543,054 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -12.7% | 2 |
| Nov 4, 2020 | 6370-08-001MMC - 637008001 | Howard Abilene |
MATERIALS ONLY ASPPMIH 20 · | $556,500 | $523,250 | ZACK BURKETT CO. | -6.0% | 3 |
| Nov 4, 2020 | 6368-17-001RMC - 636817001 | Ellis Dallas |
REMOVAL AND DISPOSAL OF DRIFTWOOD AND DEBRISFM 813 · | $557,400 | $514,000 | FOWLER CONSTRUCTION | -7.8% | 4 |
| Nov 4, 2020 | 6369-95-001MMC - 636995001 | Taylor Abilene |
MATERIALS ONLY EMULSIONSIH 20 · | $562,680 | $485,580 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -13.7% | 2 |
| Nov 4, 2020 | 6368-56-001RMC - 636856001 | Bee Corpus Christi |
TRAFFIC SIGNAL UPGRADEUS 59 · | $905,894 | $472,245 | VACA UNDERGROUND UTILITIES INC | -47.9% | 6 |
| Nov 4, 2020 | 0081-02-073NH 2B20(016) | Tarrant Fort Worth |
TRANSPORTATION NON-ROADWAYUS 377 · | $353,840 | $451,589 | SELECT MAINTENANCE, L.L.C. | +27.6% | 5 |
| Nov 4, 2020 | 6367-56-001RMC - 636756001 | Bowie Atlanta |
CALLOUT PREFABRICATED PAVEMENT MARKINGSUS 59 · | $493,908 | $447,950 | STRIPING TECHNOLOGY, L.P. | -9.3% | 3 |
| Nov 4, 2020 | 6369-71-001RMC - 636971001 | Harrison Atlanta |
TREE & STUMP REMOVAL (S)US 59 · | $482,000 | $445,429 | H. V. CAVER, INC. | -7.6% | 3 |
| Nov 4, 2020 | 6368-16-001RMC - 636816001 | Ellis Dallas |
ROADSIDE MOWINGSH 34 · | $520,600 | $437,843 | CEN-TEX IRRIGATION SYSTEMS, INC. | -15.9% | 5 |
| Nov 4, 2020 | 6369-72-001RMC - 636972001 | Upshur Atlanta |
TREE & STUMP REMOVAL (WEST)US 259 · | $516,750 | $406,674 | CATOCON, INC. | -21.3% | 6 |
| Nov 4, 2020 | 6365-27-001RMC - 636527001 | Johnson Fort Worth |
REFLECTORIZED PAVEMENT MARKINGS_AND RUMBLE STRIPSIH 35W · | $433,779 | $354,566 | TRP CONSTRUCTION GROUP, LLC | -18.3% | 6 |
| Nov 4, 2020 | 6372-48-001RMC - 637248001 | El Paso El Paso |
BARRICADES, SIGNS AND TRAFFIC CONTROLIH 10 · | $427,500 | $342,860 | APACHE BARRICADE & SIGN | -19.8% | 5 |
| Nov 4, 2020 | 6369-70-001RMC - 636970001 | Bowie Atlanta |
TREE & STUMP REMOVAL (NORTH)IH 30 · | $360,500 | $296,454 | H. V. CAVER, INC. | -17.8% | 6 |
| Nov 4, 2020 | 0889-04-080STP 2021(126) | Smith Tyler |
FLASHING CHEVRONSFM 346 · | $126,660 | $103,274 | JASCO | -18.5% | 6 |
| Oct 29, 2020 | 6371-63-001RMC - 637163001 | Culberson El Paso |
MOWING HIGHWAY RIGHT-OF-WAYIH 10 · | $297,000 | $215,791 | MIJELUM, L.L.C. | -27.3% | 4 |
| Oct 27, 2020 | 6372-74-001MMC - 637274001 | Washington Bryan |
DENSE-GRADED HOT-MIX ASPHALT(MATERIAL ONLY)US 290 · | $282,500 | $292,500 | BIG CREEK CONSTRUCTION, LTD. | +3.5% | 2 |
| Oct 27, 2020 | 6372-72-001MMC - 637272001 | Robertson Bryan |
DENSE-GRADED HOT-MIX ASPHALT(MATERIALS ONLY)SH 6 · | $282,500 | $282,750 | KNIFE RIVER CORPORATION - SOUTH | +0.1% | 2 |
| Oct 27, 2020 | 6372-67-001MMC - 637267001 | Freestone Bryan |
DENSE-GRADED HOT-MIX ASPHALT(MATERIALS ONLY)US 84 · | $287,000 | $279,900 | BIG CREEK CONSTRUCTION, LTD. | -2.5% | 1 |
| Oct 27, 2020 | 6372-65-001MMC - 637265001 | Brazos Bryan |
DENSE-GRADED HOT-MIX ASPHALT(MATERIALS ONLY)SH 6 · | $289,500 | $276,100 | KNIFE RIVER CORPORATION - SOUTH | -4.6% | 2 |
| Oct 27, 2020 | 6372-66-001MMC - 637266001 | Burleson Bryan |
DENSE-GRADED HOT-MIX ASPHALT(MATERIALS ONLY)SH 36 · | $260,000 | $258,000 | KNIFE RIVER CORPORATION - SOUTH | -0.8% | 2 |
| Oct 27, 2020 | 6372-69-001MMC - 637269001 | Leon Bryan |
DENSE-GRADED HOT-MIX ASPHALT(MATERIALS ONLY)US 79 · | $260,000 | $256,000 | BIG CREEK CONSTRUCTION, LTD. | -1.5% | 1 |
| Oct 27, 2020 | 6372-73-001MMC - 637273001 | Walker Bryan |
DENSE-GRADED HOT-MIX ASPHALT(MATERIALS ONLY)IH 45 · | $270,000 | $255,000 | BIG CREEK CONSTRUCTION, LTD. | -5.6% | 2 |
| Oct 27, 2020 | 6372-71-001MMC - 637271001 | Milam Bryan |
DENSE-GRADED HOT-MIX ASPHALT(MATERIALS ONLY)US 79 · | $260,000 | $254,000 | BIG CREEK CONSTRUCTION, LTD. | -2.3% | 3 |
| Oct 27, 2020 | 6372-68-001MMC - 637268001 | Grimes Bryan |
DENSE-GRADED HOT-MIX ASPHALT(MATERIALS ONLY)SH 105 · | $250,000 | $252,000 | KNIFE RIVER CORPORATION - SOUTH | +0.8% | 3 |
| Oct 27, 2020 | 6372-70-001MMC - 637270001 | Madison Bryan |
DENSE-GRADED HOT-MIX ASPHALT(MATERIALS ONLY)US 190 · | $227,500 | $224,000 | BIG CREEK CONSTRUCTION, LTD. | -1.5% | 2 |
| Oct 27, 2020 | 6372-60-001MMC - 637260001 | Walker Bryan |
HYDRAULIC CEMENT (MATERIALS ONLY)IH 45 · | $178,824 | $143,208 | AKA-MATERIALS | -19.9% | 2 |
| Oct 27, 2020 | 6372-59-001MMC - 637259001 | Brazos Bryan |
HYDRAULIC CEMENT (MATERIALS ONLY)SH 6 · | $128,020 | $103,044 | AKA-MATERIALS | -19.5% | 2 |
| Oct 27, 2020 | 6365-85-001MMC - 636585001 | Brewster El Paso |
DE-ICING/ANTI-ICING (MATERIAL ONLY)SH 118 · | $110,300 | $75,375 | THE BARGAIN SOURCE | -31.7% | 3 |
| Oct 27, 2020 | 6368-20-001MMC - 636820001 | El Paso El Paso |
DE-ICING/ANTI-ICING (MATERIAL ONLY)US 54 · | $96,425 | $65,800 | THE BARGAIN SOURCE | -31.8% | 3 |
| Oct 27, 2020 | 6372-58-001MMC - 637258001 | Washington Bryan |
HYDRAULIC CEMENT (MATERIALS ONLY)SH 36 · | $57,912 | $44,266 | AKA-MATERIALS | -23.6% | 2 |
| Oct 27, 2020 | 6365-35-001MMC - 636535001 | Brewster El Paso |
HYDRAULIC CEMENT (MATERIALS ONLY)SH 118 · | $17,539 | $34,899 | TOUCHSTONE RESOURCES, LLC | +99.0% | 2 |
| Oct 27, 2020 | 6365-88-001MMC - 636588001 | El Paso El Paso |
HYDRAULIC CEMENT (MATERIALS ONLY)SL 375 · | $5,420 | $10,960 | TOUCHSTONE RESOURCES, LLC | +102.2% | 2 |
| Oct 23, 2020 | 6372-87-001MMC - 637287001 | Collin Dallas |
WINTER MATERIALS ONLYSH 5 · | $156,210 | $238,500 | DIGG COMMERCIAL, LLC | +52.7% | 2 |
| Oct 23, 2020 | 6366-10-001RMC - 636610001 | Kaufman Dallas |
MISCELLANEOUS CONCRETE REPAIRUS 80 · | $200,450 | $190,350 | SJ&J CONSTRUCTION, LLC | -5.0% | 7 |
| Oct 23, 2020 | 6365-69-001RMC - 636569001 | Rockwall Dallas |
TREE TRIMMING & TREE AND BRUSH REMOVALIH 30 · | $205,140 | $164,721 | EASTGATE SERVICES | -19.7% | 11 |
| Oct 23, 2020 | 6371-85-001MMC - 637185001 | Dallas Dallas |
CONCRETE ROADWAY MATERIALS ONLYIH 45 · | $38,304 | $46,368 | DIGG COMMERCIAL, LLC | +21.1% | 1 |
| Oct 23, 2020 | 6367-57-001MMC - 636757001 | Kaufman Dallas |
WINTER WEATHER MATERIALS ONLYSH 34 · | $24,000 | $35,800 | DIGG COMMERCIAL, LLC | +49.2% | 3 |
| Oct 23, 2020 | 6371-86-001MMC - 637186001 | Dallas Dallas |
CONCRETE REPAIR MATERIALS ONLYIH 45 · | $20,520 | $33,480 | DIGG COMMERCIAL, LLC | +63.2% | 1 |
| Oct 23, 2020 | 6371-84-001MMC - 637184001 | Dallas Dallas |
CONCRETE REPAIR MATERIALS ONLYIH 45 · | $22,800 | $30,000 | DIGG COMMERCIAL, LLC | +31.6% | 1 |
| Oct 23, 2020 | 6366-09-001MMC - 636609001 | Angelina Lufkin |
DELIVER BRINE TO 9 COUNTIES IN LFK DISTBU 69J · | $47,124 | $27,258 | CLEMENTS FLUIDS HENDERSON, LTD. | -42.2% | 1 |
| Oct 23, 2020 | 6368-58-001MMC - 636858001 | Ellis Dallas |
WINTER WEATHER MATERIALS (MATERIALS ONLY)FM 876 · | $13,200 | $14,080 | DIGG COMMERCIAL, LLC | +6.7% | 3 |
| Oct 22, 2020 | 6366-50-001MMC - 636650001 | Lampasas Brownwood |
PROVIDE LRA (MATERIALS ONLY)US 281 · | $293,264 | $269,963 | VULCAN CONSTRUCTION MATERIALS, LLC | -7.9% | 2 |
| Oct 22, 2020 | 6366-48-001MMC - 636648001 | Brown Brownwood |
PROVIDE LRA (MATERIALS ONLY)US 377 · | $255,052 | $239,185 | VULCAN CONSTRUCTION MATERIALS, LLC | -6.2% | 2 |
| Oct 22, 2020 | 6366-49-001MMC - 636649001 | Comanche Brownwood |
PROVIDE LRA (MATERIALS ONLY)SH 16 · | $245,831 | $223,148 | VULCAN CONSTRUCTION MATERIALS, LLC | -9.2% | 3 |
| Oct 22, 2020 | 6366-55-001MMC - 636655001 | Brown Brownwood |
PROVIDE EMULSION (MATERIAL ONLY)US 377 · | $114,980 | $107,860 | MARTIN RESOURCE MANAGEMENT CORPORATION | -6.2% | 4 |
| Oct 22, 2020 | 6372-05-001MMC - 637205001 | Brown Brownwood |
WINTER WEATHER MAT (MATERIALS ONLY)US 183 · | $39,220 | $65,240 | DIGG COMMERCIAL, LLC | +66.3% | 1 |
| Oct 22, 2020 | 6366-56-001MMC - 636656001 | San Saba Brownwood |
PROVIDE EMULSION (MATERIAL ONLY)US 190 · | $38,250 | $36,000 | MARTIN RESOURCE MANAGEMENT CORPORATION | -5.9% | 4 |
| Oct 22, 2020 | 6372-10-001MMC - 637210001 | Comanche Brownwood |
WINTER WEATHER MATERIALS (BRINE)SH 16 · | $12,950 | $22,200 | DIGG COMMERCIAL, LLC | +71.4% | 2 |
| Oct 22, 2020 | 6372-11-001MMC - 637211001 | Stephens Brownwood |
WINTER WEATHER MAT (COMPLEX CHLORIDE)US 180 · | $23,113 | $16,942 | THE BARGAIN SOURCE | -26.7% | 2 |
| Oct 22, 2020 | 6365-89-001MMC - 636589001 | Brewster El Paso |
LIME (MATERIALS ONLY)SH 118 · | $2,000 | $12,800 | DIGG COMMERCIAL, LLC | +540.0% | 2 |
| Oct 22, 2020 | 6365-78-001MMC - 636578001 | El Paso El Paso |
LIME (MATERIAL ONLY)US 54 · | $1,000 | $7,500 | E.V.G. ENTERPRISE | +650.0% | 2 |
| Oct 20, 2020 | 6371-99-001MMC - 637199001 | Deaf Smith Amarillo |
TY I & TY II SALT (MATERIALS ONLY)US 385 · | $283,800 | $332,624 | UNITED SALT CORPORATION | +17.2% | 2 |
| Oct 20, 2020 | 6372-01-001MMC - 637201001 | Carson Amarillo |
TYPE I&II SALT(MATERIALS ONLY)US 60 · | $290,825 | $304,583 | UNITED SALT CORPORATION | +4.7% | 2 |
| Oct 20, 2020 | 6372-00-001MMC - 637200001 | Sherman Amarillo |
TYPE I&II SALT(MATERIALS ONLY)US 54 · | $276,750 | $261,322 | UNITED SALT CORPORATION | -5.6% | 2 |
| Oct 20, 2020 | 6366-94-001MMC - 636694001 | Potter Amarillo |
SCREENINGS WINTER (MATERIALS ONLY)IH 40 · | $145,142 | $155,952 | DIGG COMMERCIAL, LLC | +7.4% | 2 |
| Oct 20, 2020 | 6371-96-001RMC - 637196001 | Gray Amarillo |
CLEANING AND SWEEPING HIGHWAYSIH 40 · | $140,038 | $128,658 | CTX SPECIAL SERVICES CO LLC | -8.1% | 3 |
| Oct 20, 2020 | 6371-42-001MMC - 637142001 | Potter Amarillo |
MAG CHLORIDE GRANULAR(MATERIAL ONLY)IH 40 · | $84,000 | $60,552 | GMCO COMMODITIES CORPORATION | -27.9% | 2 |
| Oct 20, 2020 | 6371-41-001MMC - 637141001 | Randall Amarillo |
LIQUID MAGNESIUM CHLORIDE(MATERIAL ONLY)IH 27 · | $102,000 | $33,984 | GMCO COMMODITIES CORPORATION | -66.7% | 2 |
| Oct 19, 2020 | 6356-27-001MMC - 635627001 | Fayette Yoakum |
LIME (MATERIAL ONLY)IH 10 · | $204,950 | $220,890 | TEXAS LIME COMPANY | +7.8% | 2 |
| Oct 19, 2020 | 6356-26-001MMC - 635626001 | Victoria Yoakum |
LIME (MATERIAL ONLY)US 59 · | $172,950 | $187,266 | TEXAS LIME COMPANY | +8.3% | 2 |
| Oct 16, 2020 | 6371-98-001MMC - 637198001 | Childress Childress |
SUPPLY SALT (MATERIAL ONLY)US 287 · | $256,450 | $277,979 | UNITED SALT CORPORATION | +8.4% | 2 |
| Oct 15, 2020 | 6369-88-001MMC - 636988001 | Fannin Paris |
DE-ICING/ANTI-ICING MATERIALS - MATERIALS ONLYUS 82 · | $140,000 | $136,896 | THE BARGAIN SOURCE | -2.2% | 3 |
| Oct 15, 2020 | 6371-58-001RMC - 637158001 | Hopkins Paris |
LANDSCAPE MAINTENANCEIH 30 · | $35,000 | $44,480 | RDA VEGETATION MANAGEMENT LLC | +27.1% | 2 |
| Oct 14, 2020 | 6368-63-001RMC - 636863001 | Dimmit Laredo |
MOWING OF HIGHWAYS RIGHT OF WAYUS 83 · | $287,343 | $264,327 | R&M INCORPORATED | -8.0% | 1 |
| Oct 14, 2020 | 6366-74-001RMC - 636674001 | Zavala Laredo |
MOWING OF HIGHWAYS RIGHT OF WAYUS 83 · | $183,762 | $169,043 | R&M INCORPORATED | -8.0% | 2 |
| Oct 14, 2020 | 6368-74-001RMC - 636874001 | La Salle Laredo |
CLEANING & SWEEPING HWY AND LITTERIH 35 · | $222,861 | $167,890 | CTX SPECIAL SERVICES CO LLC | -24.7% | 2 |
| Oct 14, 2020 | 6366-69-001MMC - 636669001 | Maverick Laredo |
EMULSION CONTRACT MATERIALS ONLYUS 277 · | $100,800 | $112,380 | ERGON ASPHALT & EMULSIONS, INC. | +11.5% | 1 |
| Oct 14, 2020 | 6371-02-001RMC - 637102001 | Zavala Laredo |
CLEANING & SWEEPING OF HWY AND LITTER PUUS 83 · | $125,290 | $86,920 | CTX SPECIAL SERVICES CO LLC | -30.6% | 3 |
| Oct 13, 2020 | 6367-46-001RMC - 636746001 | Harris Houston |
TREE TRIMMING AND BRUSH REMOVALSL 8 · | $228,764 | $212,173 | ROAD SOLUTIONS L.L.C. | -7.3% | 6 |
| Oct 13, 2020 | 6324-66-001RMC - 632466001 | Johnson Fort Worth |
TREE TRIMMING, TREE AND BRUSH REMOVALFM 4 · | $228,753 | $186,103 | AZA CONSTRUCTION INC | -18.6% | 8 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.