IDOT Jobs

All dates · 10,653 jobs · $20,005,846,000 Sign up free
★ My Jobs

10,653 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jun 13, 2025 62V14 CookDistrict 1 Resurfacing the existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings, ADA (1.472-Mile) This project consists of resurfacing the existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings, ADA Improvements for curb ramps. Located along Sacramento Blvd in the City of Chicago in Cook County. — Executed Nov 25 New MAT Construction Leasing, Inc. $2,054,601 ·
Jun 13, 2025 62V39 LakeDistrict 1 Resurfacing of the existing HMA pavement with HMA surface course, adding 4-foot wide HMA shoulders, thermoplas (1.91-Mile) Project consists of resurfacing of the existing HMA pavement with HMA surface course, adding 4-foot wide HMA shoulders, thermoplastic pavement markings. This project is located along US 45 in the Village of Antioch and the Township of Antioch in Lake County. — Executed Nov 25 New Payne & Dolan, Inc. $1,630,685 ·
Jun 13, 2025 62V52 McHenryDistrict 1 (9,601-Ft) SMART Overlay and Standard Overlay, ADA sidewalk ramp improvement, pavement patching, milling of existing HMA surface, placing HMA surface course and HMA binder course, drainage structures adjustment and cleaning, pavement markings, sidewalk ramp improvements. Project located on IL 176 (State Road) in the Village of Island Lake. — Executed Nov 25 New Curran Contracting Company $2,389,468 ·
Jun 13, 2025 62V57 McHenryDistrict 1 (2.62-Mile) Designed overlay and new (HMA) shoulder reconstruction project includes asphalt removal, earth excavation, pavement patching, resurfacing with (HMA), full-depth (HMA) shoulder, pavement markings, raised reflective pavement markers, shoulder and centerline rumble strips. Located along IL Route 176 from East of Haligus Road to West of US 14 (Virginia Street) in the City of Crystal Lake. — Executed Nov 25 New Curran Contracting Company $2,685,966 ·
Jun 13, 2025 62V58 LakeDistrict 1 (2.02-Mile) SMART Overlay, Shoulder Repair and ADA Improvements consists (HMA) removal, earth excavation, pavement patching, resurfacing with (HMA) asphalt, full depth hot-mix asphalt shoulder, placement of pavement markings, installation of raised reflective pavement markers, ADA ramps, traffic signals, detector loops. Project located on IL 131 (Green Bay Road) from IL 173 (Rosecrans Road) to Russell Road in the City of Zion. — Executed Nov 25 New Peter Baker & Son Co. $3,524,201 ·
Jun 13, 2025 62V88 DuPageDistrict 1 Curb and gutter spot repairs, sidewalk removal and replacement for curb ramps for sidewalks (ADA), cold asphal (3,848-Ft) Designed Overlay, ADA Improvements, New Shoulders consists of curb and gutter spot repairs, sidewalk removal and replacement for curb ramps for sidewalks (ADA), cold asphalt pavement milling, patches (Class D), replace existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, longitudinal joint sealing, resurfacing (inlay) with HMA binder and surface course, new thermoplastic pavement markings and raised reflective pavement markers, accessible pedestrian sig — Executed Nov 25 New R. W. Dunteman Company $1,208,153 ·
Jun 13, 2025 62W15 WillDistrict 1 (1.59-Mile) Replace light towers with poles, LED luminaries, foundations, conduits/cables, restorations. Project located in the Villages of Mokena, Orland Park, and Tinley Park in Will County, at I-80 and US-45 interchange. — Executed Nov 25 New John Burns Construction Company $1,709,237 ·
Jun 13, 2025 62W90 VariousDistrict 1 Replacement of old controllers, replace fiber optic cable, network switches, PTZ cameras, and controllers among other equipment to allow for remote access and monitoring capabilities, complete the ATMS system in Lake County allowing for fully remote access to all intersection. There are one hundred fifteen locations proposed on this project located in mainly in Lake County with fewer location in Cook and McHenry Counties. — Executed Nov 25 New H & H Electric Co. $3,357,143 ·
Jun 13, 2025 62X02 CookDistrict 1 (420.25-Ft) HMA Pavement Patching and resurfacing, storm sewer installation, drainage structure installation, bridge deck overlay, superstructure repairs, substructure repairs. This project is in the City of Chicago and Village of Riverdale, Cook County, on IL 1 (Halsted Street, FAU 3730) over Little Calumet River. — Executed Nov 25 New D. Construction, Inc. $4,238,796 ·
Jun 13, 2025 62X29 CookDistrict 1 Joint sealing, concrete removal, concrete superstructure, wing wall modifications, approach slab repair, struc (900-Ft) Bridge joint repair and replacement, and bridge approach pavement improvement consists of joint sealing, concrete removal, concrete superstructure, wing wall modifications, approach slab repair, structural repair of concrete, HMA surface removal, butt joints, PCC surface removal, HMA surface course, full depth HMA Class D patches, guardrail removal, guardrail, pavement markings, Class SI concrete, tree removal, This project is located in the Village of Thornton, in Cook County. — Executed Nov 25 New MYS, Incorporated $882,083 ·
Jun 13, 2025 62X33 KaneDistrict 1 Hot-mix asphalt surface removal, pavement patching, resurfacing with asphalt binder course and asphalt surface (6.70-Mile) Design overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with asphalt binder course and asphalt surface course, placement of thermoplastic pavement markings. Located on Illinois Rte. FAP 567, IL 38, from Dekalb County Line to IL 47 (Main Street) within the Village of Elburn in Kane County. — Rejected Nov 25 New Builders Paving, LLC $4,414,888 ·
Jun 13, 2025 62X34 WillDistrict 1 Asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, conc (2.88-Mile) Designed overlay and pedestrian ramp (ADA) project consists of asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, concrete sidewalk removal replacement, resurfacing with asphalt binder course and asphalt surface course, pavement markings. The improvement is in the Cities of Braidwood and Wilmington in Will County. — Executed Nov 25 New Iroquois Paving Corporation $1,353,712 ·
Jun 13, 2025 62X35 McHenryDistrict 1 Pavement patching, hot-mix asphalt surface removal, resurfacing with polymerized hot-mix asphalt surface cours (2.68-Mile) This project consists of pavement patching, hot-mix asphalt surface removal, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in Dorr Township and in the City of Woodstock in McHenry County. — Executed Nov 25 New Plote Construction, Inc. $2,341,185 ·
Jun 13, 2025 62X42 CookDistrict 1 This work includes trombone mast arm and pole replacement, installation of LED signal heads, traffic signal posts, installation of accessible pedestrian signals located in various locations in District 1. — Executed Nov 25 New Hecker and Company, Inc. $1,733,690 ·
Jun 13, 2025 62X59 KaneDistrict 1 (1.12-Mile) Designed Overlay, Traffic Signal Modernization, ADA Improvement consists asphalt surface removal, pavement patching, (HMA) binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, traffic signal modernization, accessible pedestrian signal improvements, detector loop replacement, raised reflective pavement markers, pavement marking. Located within the City of Elgin in Kane County. — Executed Nov 25 New Plote Construction, Inc. $2,838,180 ·
Jun 13, 2025 62X60 DuPageDistrict 1 Designed overlay, ADA improvements, and collateral work necessary to complete the project (2,909-Ft) Improvement consists of Designed overlay, ADA improvements, and collateral work necessary to complete the project. Located on Gary-s Mill Road from IL. 38 to IL. 59 in the City of West Chicago. — Executed Nov 25 New R. W. Dunteman Company $842,712 ·
Jun 13, 2025 62X61 KaneDistrict 1 Hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermop (2,955-Ft) Design Overlay and ADA improvements consist of hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermoplastic pavement marking, sidewalk removal and replacement. Project is located in the Cities of Highwood and Highland Park, Lake County. — Executed Nov 25 New Peter Baker & Son Co. $922,469 ·
Jun 13, 2025 62X62 CookDistrict 1 (1466-Ft) Pavement patching, hot-mix asphalt surface removal, resurfacing with hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in Evanston Township and in the City of Evanston. — Executed Nov 25 New Peter Baker & Son Co. $1,005,325 ·
Jun 13, 2025 62X64 CookDistrict 1 (4,602-Ft) Smart Overlay improvements include curb and gutter spot repairs (remove and replace), hot-mix asphalt (HMA) surface removal and replacement with (cold milling and inlay), full-depth patches (Class D), thermoplastic pavement markings, raised reflective pavement markers, detector loops. Located on I-55 North Frontage Road from County Line Road to Commonwealth Drive within the Village of Burr Ridge. — Executed Nov 25 New K-Five Construction Corporation $511,057 ·
Jun 13, 2025 62X66 McHenryDistrict 1 Pavement patching, milling of existing asphalt surface, polymerized HMA binder course and HMA surface course, (2.93-Mile) Standard Overlay consists of pavement patching, milling of existing asphalt surface, polymerized HMA binder course and HMA surface course, thermoplastic and hot spray pavement markings, grading and shaping ditches. This project located in Coral Township, in McHenry County. — Executed Nov 25 New Plote Construction, Inc. $1,405,173 ·
Jun 13, 2025 62X67 KaneDistrict 1 Asphalt surface removal, placement of (HMA) surface course, pavement patching, pavement markings SMART Overlay and Standard Overlay improvement project consists of asphalt surface removal, placement of (HMA) surface course, pavement patching, pavement markings. The project is located in the villages of Hampshire and Pingree Grove within Kane County. — Executed Nov 25 New Curran Contracting Company $2,654,662 ·
Jun 13, 2025 62X68 McHenryDistrict 1 (HMA) surface removal, pavement patching, concrete sidewalk removal and replacement, polymerized (HMA) surface (1.06-Mile) Standard Overlay and Pedestrian Ramp (ADA) project consists of (HMA) surface removal, pavement patching, concrete sidewalk removal and replacement, polymerized (HMA) surface course and binder course, thermoplastic and hot spray pavement marking, combination concrete curb and gutter removal and replacement. Project is in the City of Marengo in Marengo, Seneca, and Coral Townships in McHenry County. — Executed Nov 25 New Schroeder Asphalt Services, Inc. $881,875 ·
Jun 13, 2025 62X69 KaneDistrict 1 (1.79-Mile) SMART and Designed Overlay, ADA Improvements, New Shoulders Improvements include curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), (HMA) surface removal and replacement, (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, pavement marking, pedestrian signals (APS) improvements and detector loops. Location: IL 56 (Butterfield Road), from East of IL 25 River Road to We — Executed Nov 25 New Geneva Construction Company LLC. $2,713,457 ·
Jun 13, 2025 62X70 CookDistrict 1 0.48-mile) Standard Overlay, ADA Improvements includes curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps (ADA), hot-mix asphalt surface removal and replacements (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, new thermoplastic pavement markings and raised reflective pavement markers, accessible pedestrian signals (APS) improvements and detector loops. Location: Niles Center Road, from south of M — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $755,632 ·
Jun 13, 2025 62X71 CookDistrict 1 Asphalt surface removal, mix asphalt resurfacing, sidewalk removal, placement of thermoplastic pavement markin (1.08-Mile) Standard Overlay project consists of asphalt surface removal, mix asphalt resurfacing, sidewalk removal, placement of thermoplastic pavement markings, combination curb and gutter removal and replacement, installation of concrete sidewalk and detectable warnings, drainage structure adjustments and pedestrian ramp improvements. Located on Pershing Road from 56th Court to ILL 50 (Cicero Avenue) within the Village of Stickney and the Town of Cicero in Cook County. — Executed Nov 25 New K-Five Construction Corporation $1,538,560 ·
Jun 13, 2025 62X74 CookDistrict 1 Repairing bridge drainage system as shown on the plans and any incidental collateral work necessary to complet This improvement consists of repairing bridge drainage system as shown on the plans and any incidental collateral work necessary to complete the improvements Located in the Cities of Chicago and Blue Island and Village of Hillside in Cook County. — Executed Nov 25 New D. Construction, Inc. $913,615 ·
Jun 13, 2025 62X99 WillDistrict 1 Building demolition for ten (10) residential and/or commercial parcels and outbuildings, include removing any The work consists of building demolition for ten (10) residential and/or commercial parcels and outbuildings, include removing any structure above and below the ground, main building frames, attached and detached buildings, facilities, and filling of basements, removal of fences, sidewalks and driveways, utilities, and trees, grading and seeding. Located in the City of Joliet, in the vicinity of FAI Route 80 (Interstate 80) and Des Plaines River in Will County. — Executed Nov 25 New C & D Recycling Services, Inc. $469,833 ·
Jun 13, 2025 62Y02 CookKaneDistrict 1 Cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work (0.01-Mile) This is a bridge painting project consists of cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work. This project has two locations: (SN 045-0037 and SN 047-0029) 1) Galena Blvd over IL-56 in the Village of Sugar Grove. 2) US 30 over Blackberry Creek in the Village of Montgomery. — Executed Nov 25 New Capital Industrial Services, LLC $499,333 ·
Jun 13, 2025 62Y04 CookDistrict 1 Bridge substructure repairs to the SN 016-0511 (EB) and SN 016-0512 (WB) Structures of I-190 over Des Plaines (349- FT) Scope of work consist of bridge substructure repairs to the SN 016-0511 (EB) and SN 016-0512 (WB) Structures of I-190 over Des Plaines River Road. Improvement is located in the Village of Rosemont in Cook County. — Executed Nov 25 New Areatha Construction Co., Inc. $694,687 ·
Jun 13, 2025 62Y07 CookDistrict 1 Cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work (0.01-Mile) Bridge Painting project consists of cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work. This project has two locations: (SN 016-2665 and SN 016-0537) 1) US 12/ 20/ 45 (LaGrange Rd) over I-55, in the City of Countryside and Village of Hodgkins;2) Willow Springs Rd over I-55 in the City of Countryside. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $642,843 ·
Jun 13, 2025 62Y08 VariousDistrict 1 Repair and replacement work order contract for Impact Attenuators, Sand Barrels and Miscellaneous Traffic Control in coordination with MCHD to enhance roadway safety and manage traffic flow effectively. Location on various State maintained expressway and arterial routes within the counties of Cook, DuPage, Will, Lake, McHenry and Kane. — Executed Nov 25 New ROADSAFE TRAFFIC SYSTEMS, INC. $2,141,300 ·
Jun 13, 2025 62Y10 VariousDistrict 1 Pruning and/or removing dead, dying, diseased and hazardous trees and limbs, while providing proper traffic co This project consists of pruning and/or removing dead, dying, diseased and hazardous trees and limbs, while providing proper traffic control on a work basis. Located in District One (counties of Cook, DuPage, Kane, Lake, McHenry, and Will). — Executed Nov 25 New Homer Tree Service, Inc. $536,830 ·
Jun 13, 2025 64B40 Jo DaviessDistrict 2 4.07 miles of reconstruction of US 20 from 0.2 mile west of Logemann Rd to Rush St in Stockton. — Executed Nov 25 New Civil Constructors, Inc. d/b/a Helm Civil and Fischer Excavating, Inc. J.V. $31,655,626 ·
Jun 13, 2025 64J66 WinnebagoDistrict 2 1.21 miles ADA sidewalk ramps, HMA patching, RTL widening, video detection systems, and sign replacement from Fairview Ave to Rockford College Dr. — Executed Nov 25 New Stenstrom Excavation & Blacktop, Inc. $1,848,165 ·
Jun 13, 2025 64M38 WinnebagoDistrict 2 2.184 mi Designed Overlay, patching, milling, retaining wall repair, and ADA Improvements from Snow Ave in Loves Park to Whitman St in Rockford and Forest Hills Rd from Landstrom Rd to IL 251. — Executed Nov 25 New Rock Road Companies, Inc. $7,698,386 ·
Jun 13, 2025 64M76 LeeDistrict 2 Remove and replace culvert over a drainage way 0.3 mile south of US 30, north of Amboy on US 52. — Executed Nov 25 New Martin & Company Excavating $493,527 ·
Jun 13, 2025 64P13 OgleDistrict 2 Hot-Mix Asphalt resurfacing south of IL-72 (W) to south of Willow St and ADA improvements on IL-72. 4.51 gross miles. — Executed Nov 25 New Martin & Company Excavating $4,385,762 ·
Jun 13, 2025 64R15 BooneWinnebagoDistrict 2 1.05 miles of HMA resurfacing (SMART overlay) from 0.3 miles east of Kishwaukee River to 0.4 miles west of Wheeler Rd on US 20. — Executed Nov 25 New Rock Road Companies, Inc. $2,406,956 ·
Jun 13, 2025 64R16 Rock IslandDistrict 2 5.39 miles of milling and resurfacing on I-74: I-280/US 6 Interchange to Henry County Line and I-280: Milan Beltway to the I-74/US 6 Interchange. — Executed Nov 25 New Advanced Asphalt Company $11,584,709 ·
Jun 13, 2025 64S25 WinnebagoDistrict 2 Deck repair, joint replacement, deck overlay, and other miscellaneous repairs carrying SN 101-0145 over Baxter Road, 1 mile north of Ogle County Line. — Executed Nov 25 New Martin & Company Excavating $1,028,867 ·
Jun 13, 2025 64S28 WhitesideDistrict 2 Bridge deck overlay, joint replacement and miscellaneous repairs on SN 098-0055 carrying Cordova Rd over I-88, 2.5 miles west of Erie. — Executed Nov 25 New Brandt Construction Co. $705,219 ·
Jun 13, 2025 64S51 WinnebagoDistrict 2 2.98 miles of pavement patching, cold milling, HMA resurfacing, ADA improvement, and traffic signal modifications on IL 251 from Windsor Rd in Loves Park to 0.3 miles south of Il 173 in Machesney Park. — Executed Nov 25 New Rock Road Companies, Inc. $8,243,328 ·
Jun 13, 2025 64T30 OgleWinnebagoDistrict 2 Crack joint sealing on US 20 from 0.2 mi W of Falconer Rd to Simpson Rd and US BUS 20 from US 20 to Weldon Rd SW of Rockford. US 64 from 0.1 mi E of US 52 to ILL 26. IL 70 from Pecatonica River to 0.1 mi W of Safford Rd in Rockford. 4.91 miles gross length. — Executed Nov 25 New
Jun 13, 2025 64T31 LeeDistrict 2 Crack joint sealing on US 52 from Water St in Amboy to north of Henkel Rd and on IL 2 from Page Dr in Dixon to US 52/IL 26. 4,227 ft gross length. — Executed Nov 25 New Denler, Inc. $255,552 ·
Jun 13, 2025 64T32 HenryDistrict 2 1.82 miles of crack joint sealing on IL 81 from Galva-Atkinson Rd to WestSt in Kewanee and from US 150 to 0.4 miles west of I-74. — Executed Nov 25 New Denler, Inc. $160,257 ·
Jun 13, 2025 64T33 WhitesideDistrict 2 2.85 miles of crack joint sealing on IL 84 from US 30 to south of 12th Ave in Albany and on US 30 from IandM Feeder Canal 0.3 miles east of ILL 40 in Rock Falls to Lee County Line. — Executed Nov 25 New Denler, Inc. $195,171 ·
Jun 13, 2025 64T74 WinnebagoDistrict 2 0.725 miles advanced tree removal along US 20 from Mill Rd to 0.3 miles east of Kishwaukee River. — Executed Nov 25 New Homer Tree Service, Inc. $87,480 ·
Jun 13, 2025 64T97 OgleDistrict 2 Bridge deck repairs, joint replacement, and miscellaneous repairs on SN 071-0064, carrying Ritchie Rd over I-39, 0.5 miles south of I-88. — Executed Nov 25 New Martin & Company Excavating $315,487 ·
Jun 13, 2025 64T98 StephensonDistrict 2 Bridge deck repairs, joint replacement and miscellaneous repairs on SN 089-0068 carrying IL 73 over tributary of Yellow Creek, 0.50 miles south of US 20. — Executed Nov 25 New Martin & Company Excavating $758,588 ·
Jun 13, 2025 64T99 StephensonDistrict 2 Bridge deck repairs, joint replacement and miscellaneous repairs on SN 089-0072, carrying IL 26 over drainage ditch, 0.40 miles south of McConnell Rd. — Executed Nov 25 New Martin & Company Excavating $394,921 ·
Jun 13, 2025 64U00 WinnebagoDistrict 2 Bridge deck repairs, joint replacement and miscellaneous repairs on SN 101-0046, carrying US 20 WB over US 20 BR EB, 3 miles west of Rockford. — Executed Nov 25 New Martin & Company Excavating $485,744 ·
Jun 13, 2025 64U19 OgleDistrict 2 7.92 miles of HMA milling and resurfacing on IL 72 from IL 26 in Forreston to 0.3 mi E of Mt. Morris Rd E of Leaf River. — Executed Nov 25 New Civil Constructors, Inc. d/b/a/ Helm Civil $5,307,008 ·
Jun 13, 2025 64U22 OgleDistrict 2 9.33 miles of patching, milling, and resurfacing on IL 26 from south of Willow St. in Forreston to Hillside Dr. north of Polo on FAP_316. — Executed Nov 25 New Civil Constructors, Inc. d/b/a/ Helm Civil $5,308,846 ·
Jun 13, 2025 64U24 StephensonDistrict 2 4.06 miles of designed overlay, milling, and patching from Brush Creek to Cedar Creek at NCL of Cedarville on IL 26. — Executed Nov 25 New Civil Constructors, Inc. d/b/a/ Helm Civil $2,355,396 ·
Jun 13, 2025 64U26 WinnebagoDistrict 2 4.96 miles of HMA pavement overlay on FAP 734 from 0.8 miles north of Roscoe Rd to Prairie Hill Rd in South Beloit. — Executed Nov 25 New Rock Road Companies, Inc. $2,041,578 ·
Jun 13, 2025 64U41 LeeDistrict 2 .3 miles of longitudinal joint repair along IL 38 in Franklin Grove. — Executed Nov 25 New Martin & Company Excavating $58,245 ·
Jun 13, 2025 64U51 WinnebagoDistrict 2 1.48 miles of bridge fabrication on I-39 from 0.3 miles east of Mulford Rd to 0.2 miles north of Harrison Ave. — Executed Nov 25 New DeLong's Inc. of Missouri $10,408,494 ·
Jun 13, 2025 64U52 WinnebagoDistrict 2 4.3 miles of pavement patching, widening, and fence repairs on I-39 from 0.8 mi north_of Blackhawk Rd to 0.4 mi north of Harrison Ave (including interchange ramps) and US 20 from 0.6 miles west of Mulford Rd to I-39. — Active Nov 25 New G. M. Sipes Construction, Inc. $3,920,847 ·
Jun 13, 2025 64U55 VariousDistrict 2 Tree removal along various routes throughout District 2. — Executed Nov 25 New Homer Tree Service, Inc. $151,000 ·
Jun 13, 2025 66B58 FordDistrict 3 Spot improvement, drainage ditch approximately 3.7 miles south of IL 116 on IL 115. — Executed Nov 25 New Riber Construction, Inc. $1,643,145 ·
Jun 13, 2025 66F94 IroquoisDistrict 3 Bridge Deck Replacement for SN 038-0048 carrying IL 54 over I 57 at the interchange in Onarga. — Executed Nov 25 New Iroquois Paving Corporation $5,007,493 ·
Jun 13, 2025 66H59 IroquoisDistrict 3 7.7 gross miles of HMA milling and resurfacing, pavement patching, structure repairs, rest area repairs including: ADA ramps, curb and gutter repairs, pavement joint repairs, pavement marking, and raised reflectors on I-57 from the Buckley Interchange to the Ford County Line. — Executed Nov 25 New Iroquois Paving Corporation $30,611,903 ·
Jun 13, 2025 66K63 DeKalbDistrict 3 1370 ft of Superstructure Replacement (SN 019-0030) over Owens Creek, 1.3 miles west of Kirkland. — Executed Nov 25 New Civil Constructors, Inc. d/b/a/ Helm Civil $3,866,805 ·
Jun 13, 2025 66K71 BureauDistrict 3 Bridge replacement of SN 006-0089 and interchange lighting at IL-40 (overhead), 3.4 miles north of Buda. — Executed Nov 25 New D. Construction, Inc. $9,911,953 ·
Jun 13, 2025 66M23 IroquoisDistrict 3 Bridge replacements of SN 038-0151 and SN 038-0152 on FAI 57(I-57) over Louis Creek, 0.7 miles north of Buckley interchange. — Executed Nov 25 New Iroquois Paving Corporation $5,792,936 ·
Jun 13, 2025 66N05 LaSalleDistrict 3 Cleaning and painting all structural steel of two structures, Location 1: SN 050-0195 carrying US 6 over I-39, 2.7 mi. east of IL 351 near LaSalle; Location 2: SN 053-0181 carrying CH 19 (F.A.S. 270) over I-39, 2.3 mi. north of US 52. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $946,914 ·
Jun 13, 2025 66N36 LaSalleDistrict 3 Latex Overlay, Expansion Joints, and Deck Repairs to SN 050-0177/-0178 on I-39 at SN 050-0177/0178 carrying I-39 over I-80, 2.6 miles west of IL 178. — Executed Nov 25 New D. Construction, Inc. $3,715,629 ·
Jun 13, 2025 66P52 GrundyDistrict 3 Bridge Repairs TR 110 (SN 032-0077) over I-55 0.3 MI N of the Livingston County Line. — Executed Nov 25 New D. Construction, Inc. $952,217 ·
Jun 13, 2025 66P53 LaSalleDistrict 3 Bridge deck repairs,bridge deck latex overlay, pavement patching, and pavement marking replacement_on IL 23 in Ottawa. — Executed Nov 25 New D. Construction, Inc. $1,897,015 ·
Jun 13, 2025 66P54 LaSalleDistrict 3 Milling and resurfacing designed overlay of Il 251 including 4' safety shoulders, shoulder rumble strips, and centerline rumble strips from US 52 to the north limit. 10.99 miles gross. — Executed Nov 25 New Advanced Asphalt Company $6,445,788 ·
Jun 13, 2025 66R18 KankakeeDistrict 3 Centerline joint sealing, microsurfacing, shoulder widening and rumble strips on IL Route 17 at two locations, 1: beginning at the east approach of SN 046-0027 and ending 0.5 mi. east of 19000W Rd; 2: beginning 0.01 mi. west of 12000W Rd. and ending 0.11 mi. east of 5000W Rd. — Executed Nov 25 New Kankakee Valley Construction Company, Inc. $1,599,488 ·
Jun 13, 2025 66R32 BureauDistrict 3 Staged construction of 13.54 miles of 2" milling and stone matrix asphalt surface paving on the I-80 driving and passing lanes between Princeton and Ladd. — Executed Nov 25 New Advanced Asphalt Company $17,962,555 ·
Jun 13, 2025 66R42 KankakeeDistrict 3 Traffic Signal Mast Arm Replacement at the intersections of US 45/US 52 and River Road and at US 45/ US 52 and South Tec Drive. — Active Nov 25 New Van-Mack Electric Co. $689,984 ·
Jun 13, 2025 66R45 VariousDistrict 3 Installation, maintenance, and pickup/removal of smart traffic monitoring systems or real-time traffic control systems completed on a work order basis for repairs and maintenance activities. — Executed Nov 25 New Traffic Control and Protection LLC dba High Star Traffic $676,713 ·
Jun 13, 2025 66R47 LaSalleDistrict 3 Class A Pavement Patching and Cross Stitching on I-39 at US-52 interchange ramps. — Executed Nov 25 New G. M. Sipes Construction, Inc. $456,512 ·
Jun 13, 2025 66R51 BureauDistrict 3 Pollinator project will include herbicide, seeding, landscaping, and maintenance at the Great Sauk Trail Rest Area EB and WB on I-80 near mm 51. — Rejected Nov 25 New Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $468,223 ·
Jun 13, 2025 66R52 IroquoisDistrict 3 Class B pavement patching and other related construction work on Il Route 1 at the intersection of IL Route 1 and US Route 24 near Watseka and ending at the Vermilion County Line. — Executed Nov 25 New G. M. Sipes Construction, Inc. $680,867 ·
Jun 13, 2025 66R53 FordDistrict 3 Class B pavement patching and other related construction work on IL Route 47 beginning at the Champaign County Line to the intersection of IL Route 9/54 in Gibson City. 4.02 miles gross length. — Executed Nov 25 New G. M. Sipes Construction, Inc. $567,919 ·
Jun 13, 2025 66R54 FordDistrict 3 6.43 gross miles of Class A pavement patching and other related construction work on FAI 57 (I-57) beginning at the Champaign County Line to the Iroquois County Line. — Executed Nov 25 New G. M. Sipes Construction, Inc. $385,485 ·
Jun 13, 2025 66R57 FordDistrict 3 5.51 gross miles of Class B pavement patching and other related construction work on FAP 71A (IL 54) beginning at the Champaign County Line to the Intersection of IL Route 9/47. — Executed Nov 25 New G. M. Sipes Construction, Inc. $479,131 ·
Jun 13, 2025 66R71 VariousDistrict 3 One year contract to repair damaged High Tension Cable Median Barrier, Guardrail, Attenuators, etc., caused by motorists along various routes in District 3. — Executed Nov 25 New Northern Contracting, Inc. $1,878,255 ·
Jun 13, 2025 68510 HenryDistrict 4 Bridge replacement: SN's 037-0019, 037-0049, 037-0020, and 037-0053 carrying Interstate 74 over IL Route 17 west of Woodhull. — Rejected Nov 25 New IHC Construction Companies, L.L.C. $15,796,785 ·
Jun 13, 2025 68A86 FultonDistrict 4 5.3 miles of resurfacing on IL 78 from 0.1 mile south of North Clark Rd to US 136 and on US 136 from west of the IL 78 Junction Wye to east of the IL 78 Junction Wye. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $10,405,096 ·
Jun 13, 2025 68D49 StarkDistrict 4 Resurfacing on Esceola Spur for 2.33 miles from East Osceola Rd to IL 93 in Stark County. — Executed Nov 25 New Advanced Asphalt Company $1,050,212 ·
Jun 13, 2025 68H96 HendersonDistrict 4 200' of slope stabilization with rip-rap north of 2600N on IL 94 in Henderson County. — Executed Nov 25 New J.C. Dillon, Inc. $90,624 ·
Jun 13, 2025 68J39 TazewellDistrict 4 1.4 miles of PCC Class B patching on Il Route 8 in Tazewell County. — Executed Nov 25 New G. M. Sipes Construction, Inc. $487,762 ·
Jun 13, 2025 68J42 TazewellDistrict 4 Bridge joints and bearing repairs SN 090-0043 over Mud Creek east of Morton, IL. — Executed Nov 25 New Stark Excavating, Inc. $547,991 ·
Jun 13, 2025 68J44 FultonDistrict 4 Cleaning of woody debris around SN 029-0025 carrying IL Route 95 over Spoon River in Fulton County. — Executed Nov 25 New CSD Environmental Services, Inc. $94,842 ·
Jun 13, 2025 68J63 TazewellDistrict 4 Standard overlay and ADA ramp improvements on BUS 24/Peoria St/Walnut St from west of Wood St to east centerline of Washington in Tazewell County. 5,231 gross feet. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $2,166,199 ·
Jun 13, 2025 68J79 TazewellDistrict 4 Removal and replacement of traffic signal mast arm on US 24 (Main St) at Wesley Rd in Creve Coeur. — Executed Nov 25 New Laser Electric, Inc. $233,127 ·
Jun 13, 2025 68J80 PeoriaDistrict 4 Removal and replacement of traffic signal mast arms at US 150 (War Memorial Drive) and Allen Rd/Charter Oak Rd in Peoria. — Executed Nov 25 New Oberlander Electric Co. $239,436 ·
Jun 13, 2025 68J81 MarshallDistrict 4 Removal of existing high mast light towers and installation of new lighting system along Interstate 39 at the Illinois Route 17 interchange in Marshall County. — Executed Nov 25 New Oberlander Electric Co. $665,773 ·
Jun 13, 2025 68K10 VariousDistrict 4 70.6 gross miles of added aggregate surface to shoulders along various routes in District 4. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $492,482 ·
Jun 13, 2025 70E30 EdgarDistrict 5 Parking improvement at Paris D5 Headquarters. — Executed Nov 25 New McCarthy Improvement Company $1,111,995 ·
Jun 13, 2025 70H64 VariousDistrict 5 On-call lighting repairs in the District West field areas consisting of DeWitt, McLean, and Piatt Counties. — Executed Nov 25 New
Jun 13, 2025 70H65 VariousDistrict 5 East Field area lighting repairs in Champaign, Vermilion, Edgar, and Douglas Counties. — Executed Nov 25 New Champaign Signal and Lighting Co. a division of Evergreen Roadworks, LLC $354,350 ·
Jun 13, 2025 70H67 VariousDistrict 5 District-wide on-call tree removal. — Executed Nov 25 New CSD Environmental Services, Inc. $182,500 ·
Jun 13, 2025 72263 MorganDistrict 6 6.7 miles of HMA resurfacing and concrete median replacement on US 67 / IL 100 from the Cass County line to the IL 104 Junction; US 67 / IL 100 / IL 104 from the IL 104 Junction to the IL 100 Junction; US 67 / IL 104 from the IL 100 Junction to 2.2 miles east; and IL 100 from the US 67 / IL 104 Junction to 0.3 miles south. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $9,038,193 ·
Jun 13, 2025 72316 LoganDistrict 6 1.6 miles of resurfacing on Kickapoo Street from south of I-55 BUS, north of Lincoln, to north of IL 10/121 in Lincoln. — Executed Nov 25 New Truman L. Flatt & Sons Co., Inc. $1,188,874 ·
Jun 13, 2025 72343 HancockDistrict 6 Expansion joint removal and deck/approach patching on SN 034-0067 carrying IL 96 over Crystal Creek, 3.1 miles south of US 136 near Hamilton. — Executed Nov 25 New County Contractors, Inc. $318,495 ·
7,001–7,100 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.