Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Apr 24, 2026 74D56 FayetteDistrict 7 7.4 miles of crack and joint sealing on I-70 from 1 mile west of US 40 at Brownstown to 2 miles west of St Elmo. — Executed Nov 25 New Complete Asphalt Service Co. $331,047 ·
Apr 24, 2026 74D60 FayetteDistrict 7 Installation of fencing at the Fayette County Maintenance Storage Facility. — Executed Nov 25 New Midwest Fence Corporation $80,191 ·
Apr 24, 2026 74D61 VariousDistrict 7 Painting of 14 bridges on various routes in various counties of District 7. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $2,124,012 ·
Apr 24, 2026 74D63 WayneDistrict 7 Cleaning and painting 4 bridges carrying various routes over I-64. (SN 096-0036, 096-0041, 096-0042 and 096-0060) — Executed Nov 25 New Eagle Painting & Maintenance Company, Inc. $669,591 ·
Apr 24, 2026 74E17 EdwardsWabashDistrict 7 12.9 miles of tree removal along IL 1 from 0.2 miles south of Empire Street to 0.5 miles north of Browns/Grayville Road. — Executed Nov 25 New Wayne's Tree Service $377,009 ·
Apr 24, 2026 74E18 MaconDistrict 7 3.5 miles of milling and resurfacing on IL 105/IL 121 from north of Eldorado Street to Wood Street in Decatur and on IL 105 from 0.1 miles east of 26th Street to 0.3 miles east of Bender Drive in Decatur. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $994,305 ·
Apr 24, 2026 74E19 MaconDistrict 7 3.6 miles of patching on IL 48, IL 121 from north of Cundiff Road to 0.3 miles south of Pershing Road in Decatur. — Executed Nov 25 New Beniach Construction Co., Inc. $957,736 ·
Apr 24, 2026 74E20 LawrenceDistrict 7 8.9 miles of patching on US 50 from the Embarrass River to IL 33 and on IL 33 from US 50 to 0.1 miles north of the Indiana state line. — Executed Nov 25 New Beniach Construction Co., Inc. $409,633 ·
Apr 24, 2026 74E22 CrawfordDistrict 7 0.3 miles of resurfacing, aggregate wedge shoulder and HMA shoulders on IL 1 south of IL 33 to 0.3 miles south of IL 33, including shoulder reconstruction on IL 33 from IL 1 to 1 mile west of IL 1. — Executed Nov 25 New Ambraw Asphalt Materials, Inc. $287,489 ·
Apr 24, 2026 74E23 CrawfordLawrenceDistrict 7 Tree removal on IL 33 in Crawford and Lawrence Counties. — Executed Nov 25 New Wayne's Tree Service $322,207 ·
Apr 24, 2026 74E24 JasperDistrict 7 10.6 miles of shoulder reconstruction on IL 33 from IL 130 to the Crawford County line. — Executed Nov 25 New Howell Paving, Inc. $215,113 ·
Apr 24, 2026 74E25 RichlandDistrict 7 Chip seal at 3 locations on Old US 50: 1) from IL 250 to Suntone Road; 2) 0.4 miles east of Primsrose Road to 0.5 miles west of Claremont Road; 3) Claremount Road to the Lawrence County line. — Executed Nov 25 New Mt. Carmel Stabilization Group, Inc. $538,201 ·
Apr 24, 2026 74E29 WabashDistrict 7 Washing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel. — Executed Nov 25 New All States Painting, Inc. $58,028 ·
Apr 24, 2026 74E31 VariousDistrict 7 Repairing, replacing, servicing and maintaining the electrical systems in good operating conditions throughout District 7. — Executed Nov 25 New Bodine Electric of Decatur $596,150 ·
Apr 24, 2026 76N37 WashingtonDistrict 8 4 miles of resurfacing on IL 160 / IL 177 from the Clinton County line to the west city limits of Okawville. — Executed Nov 25 New The Kilian Corporation $3,340,535 ·
Apr 24, 2026 76U41 CalhounDistrict 8 9.7 miles of resurfacing on IL 100/IL 16 from IL 96 in Kampsville to IL 16 in Hardin. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $7,451,559 ·
Apr 24, 2026 76U53 VariousDistrict 8 Lighting and traffic signal modernization at various locations in District 8. — Executed Nov 25 New Electrico, Inc. $2,846,040 ·
Apr 24, 2026 76U66 MadisonDistrict 8 21.4 miles of underdrain cleaning and headwall replacement on IL 255 from I-270 to US 67 in Godfrey. — Rejected Nov 25 New
Apr 24, 2026 76U70 GreeneDistrict 8 15.5 miles of patching on US 67 from Cain Street in Roodhouse to Jack Pine Drive in Carollton. — Executed Nov 25 New Keeley & Sons, Inc. $1,293,514 ·
Apr 24, 2026 76U75 St. ClairDistrict 8 Milling and resurfacing the bridge approach for SN 082-0305 carrying IL 163 over S. Prairie DuPont Creek, 2.4 miles north of IL 158. — Executed Nov 25 New Christ Bros. Asphalt, Inc. $96,028 ·
Apr 24, 2026 76U79 St. ClairDistrict 8 1 mile of chip seal / fog seal on Bunkum Road from 37th Street in East St. Louis to IL 111 in Washington Park. — Executed Nov 25 New DMS Contracting, Inc. $178,021 ·
Apr 24, 2026 76U84 MadisonDistrict 8 Bridge painting on SN 060-0215 carrying Fairmont Avenue over I-255. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $461,190 ·
Apr 24, 2026 76U85 MadisonDistrict 8 Bridge painting on SN 060-0213 carrying IL 3 over IL 140 in Alton. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $578,070 ·
Apr 24, 2026 76U87 MadisonDistrict 8 Bridge painting on SN 060-0073 carrying IL 140 over I-55 in Hamel and SN 060-0077 carrying US 40 over Silver Creek near Troy. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $956,121 ·
Apr 24, 2026 76U93 ClintonDistrict 8 0.9 miles of Bureau of Research test pavement alongside US 50 from Crackerneck Road to Russland Road. — Executed Nov 25 New Evergreen Roadworks, LLC $130,702 ·
Apr 24, 2026 76V05 RandolphDistrict 8 55.2 miles of patching on IL 3 from the Monroe County line to the Jackson County line and on IL 150 from the Mississippi River in Chester to the Perry County line. — Executed Nov 25 New G. M. Sipes Construction, Inc. $1,969,789 ·
Apr 24, 2026 76V07 St. ClairDistrict 8 9.4 miles of patching on IL 157 from IL 163 to the Madison County line and on Forest Boulevard from the AandS Railroad to IL 157. — Executed Nov 25 New Kinney Contractors, Inc. $1,394,429 ·
Apr 24, 2026 76V10 MarionDistrict 8 24.5 miles of patching on I-57 from 0.7 miles north of IL 161 to the Fayette County line. — Executed Nov 25 New G. M. Sipes Construction, Inc. $1,565,730 ·
Apr 24, 2026 76V14 VariousDistrict 8 Various types of patching on State-maintained roads within various counties of District 8. — Executed Nov 25 New Keeley & Sons, Inc. $2,792,065 ·
Apr 24, 2026 78495 JeffersonDistrict 9 Replacement of existing box culverts (SN 041-7065 and 041-7066) carrying IL 15 over unnamed ditches near Panzier Lane. — Executed Nov 25 New Samron Midwest Contracting, Inc. $663,975 ·
Apr 24, 2026 78A24 UnionDistrict 9 Slope repair near the intersection of IL 127 and Chestnut Street in Alto Pass. — Executed Nov 25 New Samron Midwest Contracting, Inc. $654,437 ·
Apr 24, 2026 78B36 FranklinDistrict 9 Joint replacement, repairs and overlay on SN 028-0020 carrying IL 14 over the Big Muddy River, east of Buckner. — Executed Nov 25 New E. T. Simonds Construction Company $1,755,135 ·
Apr 24, 2026 78B45 AlexanderDistrict 9 Bridge work at 2 locations on IL 127: 1) Joint reconstruction/elimination and HMA overlay on SN 002-0033; 2) HMA overlay on SN 002-0035. — Executed Nov 25 New Samron Midwest Contracting, Inc. $664,632 ·
Apr 24, 2026 78B46 HamiltonDistrict 9 Bridge deck overlay with partial and full depth patching on SN 033-0041 carrying IL 142 over Blue Creek and SN 033-0043 carrying IL 142 over Big Creek. — Executed Nov 25 New E. T. Simonds Construction Company $376,010 ·
Apr 24, 2026 78B47 WilliamsonDistrict 9 Bridge overlay on SN 100-0070 carrying IL 166 over South Fork Saline River. — Executed Nov 25 New Samron Midwest Contracting, Inc. $304,465 ·
Apr 24, 2026 78B48 MassacPulaskiDistrict 9 Bridge deck overlay on SN 077-0037 carrying IL 37 over Hodges Bayou; on SN 077-0036 carrying IL 169 over tributary; on SN 064-0039 carrying IL 169 over Patterson Branch. — Executed Nov 25 New Samron Midwest Contracting, Inc. $912,998 ·
Apr 24, 2026 78B50 PulaskiDistrict 9 Substructure repairs on SN 077-0002 carrying I-57 southbound over Old US 51 in Pulaski. — Executed Nov 25 New E. T. Simonds Construction Company $1,137,235 ·
Apr 24, 2026 78B79 VariousDistrict 9 Removal of existing stop sign panel assemblies and furnishing / installing new solar powered, illuminated LED stop signs at 5 intersections at various locations in District 9. — Executed Nov 25 New Samron Midwest Contracting, Inc. $47,810 ·
Apr 24, 2026 78B86 MassacDistrict 9 Repairs on SN 064-0036 carrying US 45 over Massac Creek, 1.5 miles west of I-24. — Executed Nov 25 New E. T. Simonds Construction Company $287,587 ·
Apr 24, 2026 78B87 SalineDistrict 9 Joint repairs, wingwall repairs and bridge deck overlay on SN 083-0052 and 083-0053 carrying IL 13 over Bankston Fork. — Executed Nov 25 New E. T. Simonds Construction Company $501,499 ·
Apr 24, 2026 78C09 JohnsonDistrict 9 Resurfacing on Old US 45 beginning at US 45 and proceeding 0.47 miles to the northeast. — Executed Nov 25 New Samron Midwest Contracting, Inc. $186,558 ·
Apr 24, 2026 80B05 WillDistrict 1 Class B patches, Diamond Grinding, ADA ramp improvements, pavement marking restriping This improvement consists of class B patches, Diamond Grinding, ADA ramp improvements, pavement marking restriping. This project is located on IL 7 (Theodore Ave) at the asphalt concrete joint approximately 100 ft west of US 30 and extends east approximately 9293 ft east to the concrete asphalt joint at IL 53 in the Cities of Crest Hill and Joliet. — Executed Nov 25 New D. Construction, Inc. $1,433,491 ·
Apr 24, 2026 80B07 DuPageDistrict 1 Hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement (1.52-Mile) Smart Overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement of thermoplastic pavement markings. located on Rohlwing Rd (Illinois Route FAP 870 IL 53), beginning south of 75th Street and ending at the Will County Line in the Village of Woodridge in DuPage County. — Executed Nov 25 New Builders Paving, LLC $1,578,728 ·
Apr 24, 2026 80B09 CookDistrict 1 (HMA) surface removal, resurfacing with (HMA) surface course, polymerized (HMA) surface course, and polymerize (9,682.91) Standard Overlay and ADA improvements project consists of (HMA) surface removal, resurfacing with (HMA) surface course, polymerized (HMA) surface course, and polymerized (HMA) binder course, thermoplastic pavement markings and preformed plastic pavement markings, ADA and APS improvements, pavement patching, combination concrete curb and gutter removal and replacement The project is located within the Village of Elk Grove in Elk Grove Township in Cook County. — Executed Nov 25 New Builders Paving, LLC $4,440,808 ·
Apr 24, 2026 80B10 McHenryDistrict 1 Milling of the existing hot-mix asphalt (HMA) surface, pavement patching, resurfacing with hot-mix asphalt sur (13,136-Ft) Smart Overlay project consists of milling of the existing hot-mix asphalt (HMA) surface, pavement patching, resurfacing with hot-mix asphalt surface course, longitudinal joint sealing, placement of thermoplastic pavement markings. Located on US Route 14 from State Line Road to North of Oak Grove Road in unincorporated McHenry County. — Executed Nov 25 New Peter Baker & Son Co. $1,180,922 ·
Apr 24, 2026 80B12 McHenryDistrict 1 Pavement patching, pavement widening, and curb removal and repair (705.72-Ft) HMA surface removal and overlaying consist of pavement patching, pavement widening, and curb removal and repair. Drainage, grading, and landscaping improvements. Located near the intersection of US 12 and Commercial Street, in the Village of Richmond in McHenry County, Illinois. — Executed Nov 25 New Alliance Contractors, Inc. $393,625 ·
Apr 24, 2026 80B20 McHenryDistrict 1 Class B patches, and joint sealing, curb and gutter removal and replacement, drainage structure adjustments, p (2.42-Mile) PCC pavement patching improvement consists of Class B patches, and joint sealing, curb and gutter removal and replacement, drainage structure adjustments, placement of modified urethane pavement markings and raised reflective pavement markers, ADA improvements, APS installation. Located on IL Route 120 (Elm St.) from West of Martin Rd. to E. Green St. within the City of McHenry in McHenry County. — Executed Nov 25 New Triggi Construction, Inc. $1,799,920 ·
Apr 24, 2026 80B21 CookDistrict 1 (HMA) surface removal, (HMA) resurfacing, pavement reconstruction of existing PCC pavement (remove and replace (3,373-Ft) Smart Overlay consists of (HMA) surface removal, (HMA) resurfacing, pavement reconstruction of existing PCC pavement (remove and replace), sidewalk removal, thermoplastic pavement markings, combination curb and gutter removal and replacement, concrete sidewalk and detectable warnings, drainage structure adjustments and pedestrian ramp improvements. This project is in the Village of Schaumburg in Cook County. — Executed Nov 25 New K-Five Construction Corporation $4,582,944 ·
Apr 24, 2026 80B26 CookDistrict 1 Pavement patching, hot-mix asphalt surface removal resurfacing with binder and surface course, sidewalk ramps This improvement consists of pavement patching, hot-mix asphalt surface removal resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers located in the City of Blue Island and Village of Calumet Park in Cook County. — Executed Nov 25 New Gallagher Asphalt Corporation $2,940,592 ·
Apr 24, 2026 80B27 CookDistrict 1 (HMA) surface removal, resurfacing with polymerized (HMA) surface course, (HMA) binder course, and polymerized (3.104-Mile) Designed and Smart Overlay and ADA improvements project consists of (HMA) surface removal, resurfacing with polymerized (HMA) surface course, (HMA) binder course, and polymerized (HMA) binder course, thermoplastic pavement markings, ADA and APS improvements, pavement patching, combination concrete curb and gutter removal and replacement and median repair. The project is located within the City of Des Plaines in Maine Township in Cook County. — Executed Nov 25 New Plote Construction, Inc. $5,915,339 ·
Apr 24, 2026 80B30 CookDistrict 1 (2.3-Mile) Design Overlay and shoulder widening project includes HMA removal, earth excavation, pavement patching, resurfacing with HMA, full depth HMA shoulder, placement of pavement markings, installation of raised reflective markers, ADA ramps, pedestrian signals, detector loops. Located on IL 171 (Archer Avenue) in the Village of Lemont, Cook County. — Executed Nov 25 New K-Five Construction Corporation $4,118,431 ·
Apr 24, 2026 80B31 WillDistrict 1 Design Overlay and new Hot-Mix Asphalt Shoulder project includes hot-mix asphalt removal, earth excavation, pavement patching, resurfacing with hot-mix asphalt, full depth hot-mix asphalt shoulder, placement of pavement markings, ADA Improvements, installation of raised reflective pavement markers. Located on US Route 45 (LaGrange Road) in the Township of Green Garden and Village of Manhattan in Will County. — Executed Nov 25 New P. T. Ferro Construction Co. $2,127,428 ·
Apr 24, 2026 80B39 CookDistrict 1 Resurfacing and existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings, sid (4.42-Mile) Designed Overlay, standard overlay, and ADA improvements consists of resurfacing and existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings, sidewalks. Location along US 34 (Ogden Ave) in the Cities of Brookfield, LaGrange, Lyons, and Riverside in Cook County. — Executed Nov 25 New K-Five Construction Corporation $6,442,571 ·
Apr 24, 2026 80B46 WillDistrict 1 Concrete removal, concrete superstructure, steel reinforcement bars, finger plate expansion joints, bridge dec (500-Ft) Bridge Repair and Bridge Deck Latex Overlay project consists of concrete removal, concrete superstructure, steel reinforcement bars, finger plate expansion joints, bridge deck scarification, latex overlay, and grooving, structural repair of concrete, deck slab repair and diamond grinding including HMA surface removal, butt joints, HMA surface course, shoulder removal and HMA reconstruction, guardrail removal and replacement, pavement markings, road closure, detour installation and maint — Executed Nov 25 New D. Construction, Inc. $583,219 ·
Apr 24, 2026 80B48 CookDistrict 1 (1,800-Ft) Bridge Deck Overlay includes hydro scarification of the existing bridge deck, concrete patching. The existing guardrail and bridge rails will be updated to meet standards. Pavement marking will be reestablished at the end of the construction. Project is in the city of Chicago, Cook County, Illinois, along Central Avenue over the North Branch of the Chicago River. — Executed Nov 25 New Martam Construction Incorporated $1,108,954 ·
Apr 24, 2026 80B54 DuPageDistrict 1 Bridge painting on various routes in DuPage County. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $921,204 ·
Apr 24, 2026 80B55 CookDistrict 1 Bridge painting of the structures (Roosevelt Rd This improvement consists of bridge painting of the structures (Roosevelt Rd. over I-90/94 (Dan Ryan Expwy) SN: 016-0478, and Wilson Ave. over I-94 (Edens Expwy) SN: 016-2038. All structures are located at City of Chicago. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $1,123,158 ·
Apr 24, 2026 80B62 CookDistrict 1 (373.8-Ft) Bridge Deck latex concrete overlay, bridge and approach slab scarification, full and partial depth repairs to bridge slab and approach slab, HMA overlay on approach slabs, bridge deck grooving, concrete repair, maintenance of traffic, pavement marking, ADA ramps located on the Chicago Avenue bridge over I-90/94 in the City of Chicago in Cook County. — Executed Nov 25 New Martam Construction Incorporated $1,446,233 ·
Apr 24, 2026 80B68 DuPageDistrict 1 Concrete surface removal, placement of HMA binder and surface courses, pavement patching, placement of pavemen (13,313-Ft) This work consists of concrete surface removal, placement of HMA binder and surface courses, pavement patching, placement of pavement markings, ADA improvements. The project is located along FAP Route 338 (IL 59) and extends from McCoy drive to Artesian Road in DuPage County Illinois. — Executed Nov 25 New D. Construction, Inc. $4,613,164 ·
Apr 24, 2026 80B76 WillDistrict 1 The removal and replacement of a fixed platform scale includes removal and replacement of pavement and shoulde (500-Ft) Project consists of the removal and replacement of a fixed platform scale includes removal and replacement of pavement and shoulders along the ramp curb and gutter removal and replacement, drainage improvements, sidewalk improvements, pavement marking, landscaping, and erosion control. Location on westbound I-80 at the westbound Frankfort weigh station in Village of Tinley Park, Will County. — Executed Nov 25 New D. Construction, Inc. $1,101,862 ·
Apr 24, 2026 80B79 CookWillDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot LITTER PICKING consists of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish which has accumulated on the highway located on I-94 (Bishop Ford Expwy) from Dan Ryan Expwy to I-80 in Cook County, on IL-394 from I-80 to IL 1 (Dixie Hwy) in Cook and Will Counties, on Stony Island Ave from I-94 to US 12 (95th St) and on 103rd St from Cottage Groove to Stony Island. — Executed Nov 25 New Charles & Charlie Janitorial Landscaping LLC $628,506 ·
Apr 24, 2026 80B80 CookLakeDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot LITTER PICKING. The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish which has accumulated on the highway located on I-94 (Edens Expwy) / US 41 (Skokie Hwy) expressway from Clavey Road to I-90 (Kennedy Expwy) in Cook and Lake Counties. — Executed Nov 25 New Orlando Lawn Service, Inc. $150,790 ·
Apr 24, 2026 80C49 CookDistrict 1 Milling the existing (HMA) surface, pavement patching, resurfacing with (HMA) surface course and (HMA) binder (2.66-Mile) Designed Overlay, New shoulders, and curb ramps improvements consists of milling the existing (HMA) surface, pavement patching, resurfacing with (HMA) surface course and (HMA) binder course, replacing aggregate shoulders with (HMA) shoulders, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, thermoplastic pavement markings, joint and crack filling, joint or crack routing in (PCC Pavement), restriping with modified urethane pavem — Executed Nov 25 New K-Five Construction Corporation $4,164,775 ·
Apr 24, 2026 80C85 McHenryDistrict 1 Pavement removal, earth excavation and placement of embankment, box culvert installation, storm sewer installa (15,400-Ft) Roadway Reconstruction Project consists of pavement removal, earth excavation and placement of embankment, box culvert installation, storm sewer installation, new PCC pavement with concrete curb and gutter, sidewalk and shared use path construction, traffic signals and interconnection installations water main relocation, pavement marking, landscaping, erosion and sediment control. Location in the City of McHenry, Village of Prairie Grove, and unincorporated Nunda Township within McHe — Executed Nov 25 New Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $49,786,194 ·
Apr 24, 2026 80D22 VariousDistrict 1 Pruning and/or removing dead, dying, diseased and hazardous trees and limbs, while providing proper traffic co The work to be performed and completed under this contract consists of pruning and/or removing dead, dying, diseased and hazardous trees and limbs, while providing proper traffic control on a work order basis. This work is located within the right-of-way limits of state-maintained routes located in District One. — Executed Nov 25 New Homer Tree Service, Inc. $968,950 ·
Apr 24, 2026 85792 StephensonDistrict 2 Cold-In-Place Recycling on Orangeville Road from McConnell Road to 0.3 miles east of the west corporate limits of Orangeville. — Rejected Nov 25 New W K Construction Company, Inc. $582,004 ·
Apr 24, 2026 85793 LeeDistrict 2 Resurfacing on Brooklyn Road from US 30 to IL 251. — Executed Nov 25 New Martin & Company Excavating $1,489,962 ·
Apr 24, 2026 85797 LeeDistrict 2 Replace the bridge carrying Indian Head Road over Red Oak Ditch. — Executed Nov 25 New Martin & Company Excavating $582,765 ·
Apr 24, 2026 85798 WinnebagoDistrict 2 Rehabilitation of the Rock River Bridge carring Roscoe Road over the Rock River . Includes; concrete bridge deck replacement, steel girder repairs, bearing replacement at eaach abutment, guardrail, HMA approach and shoulders. — Executed Nov 25 New ICC Group Inc. $4,934,200 ·
Apr 24, 2026 87893 GrundyDistrict 3 Construct a three-span PPC deck beam bridge to carry Rice Road over East Fork Mazon River. Includes HMA approach, patching, guardrail and HMA Shoulders. — Executed Nov 25 New D. Construction, Inc. $2,879,699 ·
Apr 24, 2026 87899 KendallDistrict 3 Reconstruction of Ridge Road to an HMA four-lane from Holt Road to Black Road. Includes; curb and gutter, raised median, driveways, drainage improvements, traffic signals, and a shared-use path. — Executed Nov 25 New Austin Tyler Construction, Inc. $32,828,299 ·
Apr 24, 2026 87900 LivingstonDistrict 3 Resurfacing Kangley Road from the LaSalle County line to IL 17. — Executed Nov 25 New Kankakee Valley Construction Company, Inc. $805,843 ·
Apr 24, 2026 87907 GrundyDistrict 3 Sidewalk construction along East North Street, North Jackson Street, and East Washington Street in Gardner. — Executed Nov 25 New D. Construction, Inc. $163,783 ·
Apr 24, 2026 87909 LaSalleDistrict 3 Sidewalk construction and ADA ramps on various routes near Marseilles Elementary School in Marseilles. — Executed Nov 25 New Davis Concrete Construction Co. $274,017 ·
Apr 24, 2026 89844 McDonoughDistrict 4 Replace the bridge carrying Berlin Road over Camp Creek, 0.4 mile north of Bellingham Road. — Executed Nov 25 New County Contractors, Inc. $2,420,262 ·
Apr 24, 2026 89871 HendersonDistrict 4 Construct a three-span PPC deck beam structure to carry CH 15 over Lone Tree Ditch. Includes; HMA approach, and guardrail. — Executed Nov 25 New County Contractors, Inc. $1,814,953 ·
Apr 24, 2026 89898 TazewellDistrict 4 Resurfacing on Broadway Road from Springfield Road to the I-55 Interchange. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $2,149,810 ·
Apr 24, 2026 91652 VermilionDistrict 5 Replace the bridge carrying TR 13 over Whiskey Creek Branch located 2 miles southeast of Rankin. — Executed Nov 25 New Big O Services, LLC $413,282 ·
Apr 24, 2026 93783 MorganDistrict 6 HMA resurfacing on South Diamond Street from Greenwood Avenue to Michigan Avenue in South Jacksonville. Includes; curb and gutter, sidewalks, and storm sewer. — Executed Nov 25 New K. E. Vas Company $1,699,658 ·
Apr 24, 2026 93850 MontgomeryDistrict 6 Construct PCC sidewalk with ADA ramps along State Street and Taylor Aveue from the Litchfield Public Library to the Litchfield J.D. Colt School in Litchfield. — Executed Nov 25 New KRB Excavating, Inc. $282,586 ·
Apr 24, 2026 95A04 RichlandDistrict 7 Replace existing aggregate shoulder with HMA shoulder with rumble strips on St. Marie Road from the Jasper County Line to IL 150. — Executed Nov 25 New Ambraw Asphalt Materials, Inc. $2,499,037 ·
Apr 24, 2026 95A07 LawrenceDistrict 7 Construct HMA shoulders with rumble strips, and replace the existing pipe culverts on Chauncey Road from Poland Lane to Trinity Lane. — Executed Nov 25 New Ambraw Asphalt Materials, Inc. $1,286,849 ·
Apr 24, 2026 95A08 WayneDistrict 7 HMA resurfacing on CH 13 from CR 600 N to CR 875 N in Wayne County. Includes; aggregate wedge shoulders and pavement markings. — Executed Nov 25 New E. T. Simonds Construction Company $914,921 ·
Apr 24, 2026 97808 St. ClairDistrict 8 Resurfacing on Longacre Drive from Union Hill Road to IL 159 in Fairview Heights. — Executed Nov 25 New The Kilian Corporation $1,289,612 ·
Apr 24, 2026 97840 MadisonDistrict 8 HMA resurfacing, patching, sidewalks, curb and gutter on Wood River Avenue from Ferguson Avenue to the north city limits of Wood River. — Executed Nov 25 New Christ Bros. Asphalt, Inc. $1,584,636 ·
Apr 24, 2026 97865 St. ClairDistrict 8 Sidewalk construction on various streets in Millstadt. — Executed Nov 25 New Baxmeyer Construction, Inc. $833,138 ·
Apr 24, 2026 97887 St. ClairDistrict 8 Construction of sidewalks and three curb bump-outs along North County Road and W. Madison Street in Mascoutah. Includes; drainage improvements, pavement markings, and seeding. — Executed Nov 25 New KRB Excavating, Inc. $191,388 ·
Apr 24, 2026 99761 WilliamsonDistrict 9 Reconstruction of South Market Street from Boyton Street to 0.1 mile south of Texas Avenue in Marion. — Executed Nov 25 New Samron Midwest Contracting, Inc. $979,828 ·
Apr 24, 2026 99764 PulaskiDistrict 9 HMA overlay and shoulders on Shawnee College Road from Old US 51 to IL 37. — Executed Nov 25 New E. T. Simonds Construction Company $3,887,941 ·
Apr 24, 2026 99767 FranklinDistrict 9 Resurfacing on North Thompsonville Road from Akin Blacktop to IL 34, north of Thompsonville. — Executed Nov 25 New E. T. Simonds Construction Company $1,090,460 ·
Apr 24, 2026 99768 PerryDistrict 9 Hot-In-PLace recycling, HMA surface, and aggregate shoulders on East Park Street Road from the DuQuoin City limits to the Franklin County line. — Executed Nov 25 New E. T. Simonds Construction Company $1,139,387 ·
Jun 12, 2026 46678 VariousDistrict 4 Installation of pavement marking on various routes in various counties throughout District 4. — Executed Nov 25 New ROADSAFE TRAFFIC SYSTEMS, INC. $3,083,382 ·
Jun 12, 2026 46679 VariousDistrict 4 Replaecment of raised reflective pavement markers on various routes in various counties throughout District 4. — Executed Nov 25 New Precision Pavement Markings Inc. $1,560,696 ·
Jun 12, 2026 46918 MarshallWoodfordDistrict 4 Reconstruction of SFWA roads with a Bituminous Surface Treatment_with Fog Seal Surface, the excavation and reconstruction at sinkhole locations in the Woodford State Fish and Wildlife Area (SFWA). Placement of a Bituminous Surface Treatment with Fog Seal Surface on the parking lot and camp road are proposed at the Marshall SFWA. Other necessary work at the two locations is included. 0.9 mile gross length. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $923,507 ·
Jun 12, 2026 46952 CookDistrict 1 Resurfacing William Powers State Park roadways, parking lots, pull-off parking areas, and cul-de-sacs (2.69-Mile) Project consists of resurfacing William Powers State Park roadways, parking lots, pull-off parking areas, and cul-de-sacs. The work includes hot- mix asphalt resurfacing of roadway and parking areas, striping of park roadways and parking lots, bridge construction, pipe culvert replacements, sign replacements, multi-use path improvements, sidewalk and ADA improvements, and other miscellaneous improvement items. Project is in William Powers State Park, located in the City of Chicago in — Executed Nov 25 New K-Five Construction Corporation $3,153,771 ·
Jun 12, 2026 61L30 KaneDistrict 1 Full-depth reclamation and HMA surfacing of Brown Road, Campton Hills Road, Denker Road and Town Hall Road in the village of Campton Hills. — Executed Nov 25 New Builders Paving, LLC $2,893,888 ·
Jun 12, 2026 61M10 KaneDistrict 1 Traffic signal modernization along Indian Trail Road between Ohio Street and Pennsbury Lane in the city of Aurora. — Rejected Nov 25 New K-Five Construction Corporation $5,028,975 ·
Jun 12, 2026 61M42 KaneDistrict 1 Resurfacing Wheeler Road from Esker Drive to IL 47 in the village of Sugar Grove. — Executed Nov 25 New D. Construction, Inc. $654,874 ·
Jun 12, 2026 61M43 KaneDistrict 1 Resurfacing Dugan Road from North Wheeler Road to south of Fays Lane in the village of Sugar Grove. — Executed Nov 25 New D. Construction, Inc. $692,262 ·
Jun 12, 2026 61M44 KaneDistrict 1 Resurfacing 1st Street from IL 72 to Dunning Avenue in the village of West Dundee. — Executed Nov 25 New Geske and Sons, Inc. $754,807 ·
1,401–1,500 of 4,218‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.