IDOT Jobs

All dates · 4,218 jobs · $20,005,846,000
★ My Jobs

4,218 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Dec 13, 2024 62T04 WillDistrict 1 Bridge deck overlay, reconstruction of abutment deck joint, approach slab repairs and substructure repairs of The proposed improvement consists of bridge deck overlay, reconstruction of abutment deck joint, approach slab repairs and substructure repairs of the bridge located on La Grange Road/US 45 at Hickory Creek in Will County. Gross length: 4854 Ft (0.919 Mi), Net length: 1327 Ft (0.252 Mi). — Executed Nov 25 New D. Construction, Inc. $1,407,207 ·
Dec 13, 2024 62T17 DuPageDistrict 1 (760-Ft) Bridge Deck Overlay, Bridge Joint Replacement / Repair at IL 38 (Roosevelt Rd) at IL 53. This project is located in the Village of Glen Ellyn in DuPage County. — Executed Nov 25 New D. Construction, Inc. $1,972,826 ·
Dec 13, 2024 62T30 DuPageDistrict 1 (307-Ft) Bridge preservation project: Deck overlay, Joints replacement/repair. Located on IL 53 / Rohlwing Road, at Canadian National (CN) Railroad (approximately 0.1-miles South of Fullerton Avenue) in the Village of Addison. — Executed Nov 25 New Martam Construction Incorporated $1,491,736 ·
Dec 13, 2024 64N05 HenryDistrict 2 5.795 miles of pavement patching, HMA resurfacing, HMA surface removal, the removal and replacement of concrete bridge decks for SNs 037-0023 and 037-0024 over Cleveland Road, deck replacements and deck repairs for SN-s 037-0021 and 037-0022 over the Rock River, deck repairs for SN-s 037-0027 and 037-0028 over the Iowa Interstate Railroad, and other necessary work to complete the proposed improvements along I-80 from the Rock River to US 6. — Executed Nov 25 New Civil Constructors d/b/a Helm Civil and Phoenix Corporation of the Quad Cities $24,521,613 ·
Dec 13, 2024 70D76 ChampaignDistrict 5 287' bridge repairs and bridge deck overlay at Saline Branch 0.8 mi west of US 45 and US 45 N of Urbana. SN's 010-0022 and 010-0023. — Executed Nov 25 New Stark Excavating, Inc. $4,119,981 ·
Dec 13, 2024 70E63 VermilionDistrict 5 Bridge deck overlay and other repairs to SN 092-0177. About 875'. — Executed Nov 25 New Sangamo Construction Company $1,957,706 ·
Dec 13, 2024 70H01 DouglasDistrict 5 113.2' bridge repairs and overlay at Scattering Fork River 1.5 mi south of US 36. — Executed Nov 25 New Sangamo Construction Company $2,185,889 ·
Dec 13, 2024 72122 SangamonDistrict 6 1.7 miles of reconstruction, milling and resurfacing, ADA improvements and accessible pedestrian traffic signals on Dirksen Parkway in Springfield, from 0.1 miles south of Peoria Road to north of Northfield Drive. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $5,572,391 ·
Dec 13, 2024 72426 ChristianDistrict 6 Intersection reconstruction on US 51 at Leafland Street (CH 6) in Assumption. — Executed Nov 25 New Truman L. Flatt & Sons Co., Inc. $2,733,196 ·
Dec 13, 2024 72M81 SangamonDistrict 6 Pavement patching, resurfacing, HMA shoulders, aggregate shoulders, grading and shaping ditches, rumble strips, and bridge repairs to SN 084-0111 on I-55 from 0.7 miles south of IL 104 to 0.5 miles north of Horse Farm Road/Old Route 66 at the Glenarm Interchange and on Horse Farm Road/Old Route 66 from 0.4 miles west to 1 mile east of I-55. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $17,664,190 ·
Dec 13, 2024 74B41 CumberlandDistrict 7 0.08 mile of bridge deck overlay, bridge joint replace/repair, bridge approach roadway, and bridge deck repairs at Cottonwood Creek, 0.1 mile east of CR 1125E (overhead). — Executed Nov 25 New Samron Midwest Contracting, Inc. $1,564,297 ·
Dec 13, 2024 76U07 MadisonDistrict 8 Bridge joint replacement/repairs and bridge deck overlay on SN 060-0014 and 060-0015 carrying I-55/70 over Beltline Road. — Executed Nov 25 New Keeley & Sons, Inc. $2,833,156 ·
Dec 13, 2024 78633 WilliamsonDistrict 9 7.8 miles of resurfacing, HMA shoulders, aggregate shoulders, earthwork, culvert replacement, tree removal, guardrail updates, addition of a right turn lane, and construction of a roundabout on IL 37, south of Marion, from Wildcat Road to IL 148. — Executed Nov 25 New E. T. Simonds Construction Company $16,365,141 ·
Dec 13, 2024 78798 WilliamsonDistrict 9 8 miles of earthwork, HMA pavement, HMA resurfacing, drainage and guardrail in order to add a lane in each direction of I-57 from Westminster Drive in Marion to just south of the I-24 interchange. — Executed Nov 25 New Samron Midwest Contracting, Inc. $41,665,230 ·
Dec 13, 2024 78A27 PerryDistrict 9 Joint reconstruction with strip seals, base course widening, bridge deck, approach slab and structure repair, deck scarification, microsilica concrete overlay and approach HMA mill and fill on SN 073-0025 carrying IL 127 over Swanwick Creek and SN 073-0026 carrying IL 127 over Swanwick Creek Overflow north of Pinckneyville. — Executed Nov 25 New E. T. Simonds Construction Company $888,874 ·
Dec 13, 2024 78A65 WilliamsonDistrict 9 7.8 miles of standard overlay on Crab Orchard Road from the IL 13 West Connector to the IL 13 East Connector. — Executed Nov 25 New Samron Midwest Contracting, Inc. $643,012 ·
Dec 13, 2024 78A67 GallatinDistrict 9 8.8 miles of HMA surface removal, HMA resurfacing, aggregate wedge shoulders, pavement patching and guardrail improvements on IL 13 from IL 1 to the Old Shawneetown Bridge. — Executed Nov 25 New E. T. Simonds Construction Company $3,871,637 ·
Dec 13, 2024 78A70 JohnsonDistrict 9 1.1 miles of pavement patching, HMA surface removal and HMA resurfacing on IL 37 from the Williamson County line to 0.2 miles south of I-24. — Executed Nov 25 New Samron Midwest Contracting, Inc. $659,172 ·
Dec 13, 2024 78A71 UnionDistrict 9 6 miles of overlay on IL 146 from 0.5 miles west of I-57 to the Johnson County line. — Executed Nov 25 New Samron Midwest Contracting, Inc. $2,148,210 ·
Dec 13, 2024 78A82 PerryDistrict 9 3 miles of resurfacing on IL 150 from IL 4 to Reeses Hill Road in Culter. — Executed Nov 25 New Samron Midwest Contracting, Inc. $974,236 ·
Dec 13, 2024 93671 SangamonDistrict 6 Construction of two structures: Iron Bridge Road over the Union Pacific Railroad, and the Union Pacific Railroad over Woodside Road. Work includes; pedestrian truss bridge over Woodside Road, reconstruction of the signalized intersection of Iron Bridge and Woodside, and the relocation of the Interurban Trail. — Executed Nov 25 New
Jan 17, 2025 46655 VariousDistrict 3 Repairing various widths of pavement marking including lines, letters, numbers, and symbols on various routes throughout District 3. — Executed Nov 25 New Varsity Striping & Construction Co. $1,718,445 ·
Jan 17, 2025 46656 VariousDistrict 0 Repair, maintenance, or replacement of damaged sign components, furnishing new overhead sign structures or repairs, installing new signs or supports at locations as described in a work order including all traffic control in Regions 4 and 5. — Executed Nov 25 New ROADSAFE TRAFFIC SYSTEMS, INC. $3,213,213 ·
Jan 17, 2025 61J25 WillDistrict 1 Widening and reconstruction of Plainfield-Naperville Road at 127th Street and Reagan Boulevard in Plainfield. Includes addition of left turn lanes, curb and Gutter, HMA and Aggregate shoulders, concrete medians, guardrail, traffic signals and lighting. — Executed Nov 25 New P. T. Ferro Construction Co. $3,803,259 ·
Jan 17, 2025 61J63 CookDistrict 1 Construction of a multi-use path on Euclid Avenue from Vermon Street to Hicks Street and continuing on Hicks too Kirchoff Road in Rolling Meadows. — Executed Nov 25 New Martam Construction Incorporated $1,051,893 ·
Jan 17, 2025 61J91 KaneDistrict 1 Resurfacing and traffic signal modifications at various intersections on Indian Trail from Edgelawn Drive to Highland Avenue in Aurora — Executed Nov 25 New Geneva Construction Company $4,562,538 ·
Jan 17, 2025 61K01 DuPageDistrict 1 Sidewalk construction, traffic signals and street lights on York Street from WB I-290 ramps/Crestview Avenue to Lake Street in Elmhurst. — Rejected Nov 25 New Martam Construction Incorporated $2,649,349 ·
Jan 17, 2025 61K07 CookDistrict 1 Resurfacing and pavement widening at the IL 62/New Wilke Road intersection in Rolling Meadows. — Executed Nov 25 New Schroeder Asphalt Services, Inc. $2,851,746 ·
Jan 17, 2025 61K43 McHenryDistrict 1 HMA resurfacing, PCC sidewalks, curb and gutter, outdoor fireplace and shelter construction, and landscaping at the downtown Cary Gateway Plaza in Cary. — Executed Nov 25 New Sjostrom & Sons, Inc. $1,190,661 ·
Jan 17, 2025 61K53 CookDistrict 1 Install decorative street and pedestrian lighting on Des Plaines Avenue from Cermak Road to 26th Street in North Riverside. — Executed Nov 25 New Utility Dynamics Corporation $1,103,396 ·
Jan 17, 2025 61K68 KaneDistrict 1 HMA resurfacing, curb and gutter, sidewalks, ADA ramps, traffic signals, lighting and pavement markings on Dundee Avenue between Enterprise Street and Page Street in Elgin. — Executed Nov 25 New Martam Construction Incorporated $9,964,717 ·
Jan 17, 2025 61K81 WillDistrict 1 Widen and resurface Theodore Street from west of Staghorn Drive to Wesmere Parkway in Joliet. — Executed Nov 25 New Austin Tyler Construction, Inc. $2,764,372 ·
Jan 17, 2025 61K84 WillDistrict 1 Construction of an HMA multi-use path, PCC Sidewalk, storm sewer, box culvert extension, retaining wall, and landscaping along Bridge Street in Channahon. — Executed Nov 25 New D. Construction, Inc. $2,494,970 ·
Jan 17, 2025 61K86 CookDistrict 1 Resurfacing Grand Boulevard from Grant Avenue to Prairie; Brookfield Avenue from Prairie Avenue to Woodside Ave., and Woodside Avenue from Golf Road to Brookfield Avenue in Brookfield. — Executed Nov 25 New Schroeder Asphalt Services, Inc. $4,534,006 ·
Jan 17, 2025 61K87 CookDistrict 1 Reconstruction of 19th Avenue from Oak Street to Madison Street in Maywood. — Executed Nov 25 New Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $4,773,174 ·
Jan 17, 2025 61K90 DuPageDistrict 1 Resurfacing Indian Trail Road from the Kane/DuPage County line to Eola Road in Aurora. — Executed Nov 25 New Geneva Construction Company $1,102,489 ·
Jan 17, 2025 61K91 LakeDistrict 1 Resurfacing Washington Avenue from Western Avenue to Sheridan Road in Highland. — Executed Nov 25 New Peter Baker & Son Co. $464,636 ·
Jan 17, 2025 61K92 McHenryDistrict 1 Construct a single-cell, three-sided precast structure to carry Hunter Road over Little Beaver Creek west of Harvard. Work includes HMA paving, shoulder construction, and landscaping. — Executed Nov 25 New Dunnet Bay Construction Company $2,789,285 ·
Jan 17, 2025 61K94 CookDistrict 1 Traffic signal modernization, sidewalk replacemnt, curb and gutter replacement, and pavement markings at the intersection of Wolf Road and Wiltse Drive in Northlake. — Executed Nov 25 New R. W. Dunteman Company $711,000 ·
Jan 17, 2025 61K97 McHenryDistrict 1 HMA resurfcing, curb and gutter, sidewalks, drainage improvements, and parkway restoration on First Street from US 14 to Three Oaks Road in Cary. — Rejected Nov 25 New
Jan 17, 2025 61K98 KaneDistrict 1 Construciton of PPC Sidewalks, ADA Ramps, pavement markings and landscaping at various locations in Batavia. — Executed Nov 25 New Triggi Construction, Inc. $414,112 ·
Jan 17, 2025 61L00 McHenryDistrict 1 HMA resurfacing and aggregate shoulders on Wonder Lake Road, from Thompson Road to White Oaks Road in Wonder Lake. — Executed Nov 25 New Curran Contracting Company $619,752 ·
Jan 17, 2025 61L03 KaneDistrict 1 Installation of Recessed Reflective Pavement Markers and pavement marking at various locations in Kane County. — Executed Nov 25 New Precision Pavement Markings Inc. $545,288 ·
Jan 17, 2025 61L04 DuPageDistrict 1 Roadway reconstruction on Woodridge Drive from Hobson Road to Center Drive in Woodridge. — Executed Nov 25 New K-Five Construction Corporation $2,756,923 ·
Jan 17, 2025 61L07 CookDistrict 1 HMA Resurfacing, pavement patching, curb and gutter, sidewalk, pedestrian signals , ADA improvements, and pavement markings on Devon Avenue between Bristol Lane and Arthur Avenue in Elk Grove Village. — Executed Nov 25 New Plote Construction, Inc. $1,405,063 ·
Jan 17, 2025 61L08 CookDistrict 1 HMA resurfacing, pavement patching, ADA Ramps, traffic signal modifications, street lightin, pavement markings, and signage on Devon Avenue and Arlington Heights Road in Elk Grove Village. — Executed Nov 25 New Plote Construction, Inc. $1,585,102 ·
Jan 17, 2025 62R95 McHenryDistrict 1 (3.47-Mile) SMART Overlay, curb ramps (ADA) improvements, HMA shoulder additions located on IL 173 from Boone County Line to Flat Iron Road in Unincorporated McHenry County. — Executed Nov 25 New Peter Baker & Son Co. $2,149,178 ·
Jan 17, 2025 62R99 CookDistrict 1 Bridge deck overlay, joint replacement, approach slab repairs and substructure repairs of the bridge located o (1576.49-Ft) The proposed improvement consists of bridge deck overlay, joint replacement, approach slab repairs and substructure repairs of the bridge located on US/ Ogden Avenue over IHB RR in the Village of LaGrange, Cook County — Executed Nov 25 New Martam Construction Incorporated $1,945,196 ·
Jan 17, 2025 62T21 DuPageDistrict 1 (6.15-Mile) Smart Overlay and ADA Ramp improvements, hot-mix asphalt surface removal and replacement, pedestrian ramp, pavement patching, pavement markings. Project location at IL 56 (Butterfield Road) from 0.4 mile west of IL 59 to East of Naperville Road within Cities of Warrenville, Wheaton and Aurora in Dupage Co. — Executed Nov 25 New R. W. Dunteman Company $6,615,450 ·
Jan 17, 2025 62T41 CookDistrict 1 Bridge deck overlay and joint repair of the structure located on Addison Street over I-90/94 and CTA in Cook C (921-Ft) The proposed improvement consists of bridge deck overlay and joint repair of the structure located on Addison Street over I-90/94 and CTA in Cook County. (SN-016-0669) — Executed Nov 25 New Martam Construction Incorporated $1,234,765 ·
Jan 17, 2025 62U88 WillDistrict 1 (4.32-Mile) Patching (full depth, class D patches) work includes: Earth excavation, aggregate subgrade improvement, subbase granular material, full depth Class D (HMA) patches, special, detector loops, pavement markings and and incidental and collateral work. Located on IL 53, from South of Arsenal Road to Hoff Road within the City of Wilmington and the Village of Elwood in Will County. — Executed Nov 25 New K-Five Construction Corporation $9,653,442 ·
Jan 17, 2025 62V90 CookDistrict 1 HMA overlay, ADA sidewalk and curb ramp improvements, drainage improvements, APS improvements, HMA surface rem (1.88-Mile) Standard Overlay, Drainage and ADA Improvements: HMA surface removal and replacement, Class D patches, detector loops replacement, pavement markings, sidewalk and curb removal and replacement, drainage structures adjustments, minor traffic signal (APS) improvements. The project also includes - Pavement markings/ striping improvements at 17th Avenue and Salt Creek Trail crossing. - New sidewalk and curb ramps for sidewalks (ADA) improvements on Roosevelt Road and Frontage Road, just W — Rejected Nov 25 New K-Five Construction Corporation $2,943,344 ·
Jan 17, 2025 62W32 LakeDistrict 1 The installing scour countermeasures such as riprap erosion control and landscaping The improvement consists of the installing scour countermeasures such as riprap erosion control and landscaping. The project is located approximately 0.1 miles west of the Tri-State Tollway (I-94) and 1,100 ft east of Illinois Route 21 at SN 049-0046 and SN 049-0047 along Illinois Route 120 in the Village of Gurnee in Lake County. — Executed Nov 25 New Martam Construction Incorporated $617,286 ·
Jan 17, 2025 62W49 DuPageDistrict 1 (1.40-Mile) Standard Overlay, ADA Improvements: Hot-mix asphalt surface removal earth excavation, new shoulders, pavement patching, hot-mix asphalt surface course, hot-mix asphalt binder course, curb and gutter removal and replacement, longitudinal joint sealing, thermoplastic pavement markings, raised reflective pavement markers, detector loops replacement and incidental and collateral work Project is located on I-55 (North) Frontage Road, from Clarendon Hills Road to Cass Avenue, within the Ci — Executed Nov 25 New K-Five Construction Corporation $1,066,333 ·
Jan 17, 2025 62W52 WillDistrict 1 Furnishing the structural steel and bearings for the I-80 bridges over the Des Plaines River The proposed scope of work consists of furnishing the structural steel and bearings for the I-80 bridges over the Des Plaines River. Steel will also need to be stored until it can arrive on-site as part of the Contract (62R23). Steel will be for WB and EB of I-80 (SN 099-8309 WB and 099-8325 EB) over the Des Plain River, CSX Railroad, US-6, as well as several existing and proposed local roads The project is in the City of Joliet in Will County. — Executed Nov 25 New Veritas Steel LLC $28,658,382 ·
Jan 17, 2025 62W71 CookDistrict 1 (3139.11-Ft) This project is a Standard Overlay and ADA Improvements. Located on Addison Street from IL. Route 171 (Cumberland Avenue) to Forest Preserve Drive within the City of Chicago. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $1,098,089 ·
Jan 17, 2025 62X15 CookDistrict 1 (4,921-Ft) Designed Overlay, SMART Overlay, Curb Ramps (ADA) and Pedestrian Signals (APS) improvements on 5th Avenue from North River Road to IL 64 (North Avenue). This project is in the Villages of River Grove and Melrose Park in Cook County. — Executed Nov 25 New K-Five Construction Corporation $1,483,000 ·
Jan 17, 2025 62X24 CookDistrict 1 Bridge repair to structures (016-1152 and 016-1153) under Garfield Blvd This improvement consists of bridge repair to structures (016-1152 and 016-1153) under Garfield Blvd. (55th St.) for project length of 546.8 ft (.103 miles) in the City of Chicago in Cook County. — Executed Nov 25 New Rausch Infrastructure, LLC $747,244 ·
Jan 17, 2025 62X49 LakeDistrict 1 A Bridge Painting of the existing structure (049-0171) carrying IL 59 over Rollins Road, the existing structur This improvement consists of a Bridge Painting of the existing structure (049-0171) carrying IL 59 over Rollins Road, the existing structure (049-0016) carrying Washington Road over US 41, and the existing structure (049-0097) carrying Washington Road over the UP RR in the Village of FOX Lake, and the Village of FOX Lake, and the City of Park City in Lake County for a total length of 749 feet. — Executed Nov 25 New Capital Industrial Services, LLC $893,330 ·
Jan 17, 2025 62X51 VariousDistrict 1 Restoring existing native landscapes at various roadside locations in D1. — Executed Nov 25 New McGinty Bros., Inc. $210,094 ·
Jan 17, 2025 62X54 McHenryDistrict 1 Demolition of (2) single family residences (1-two story wood frame with attached garage) and demolition of (2) The scope of work consists of demolition of (2) single family residences (1-two story wood frame with attached garage) and demolition of (2) two commercial properties (1-one story concrete building, 1-story concrete block and wood frame) including site cleanup and any incidental and collateral work necessary to complete the improvements as shown in the plans. The project is in the plans The project is in the City of Woodstock in McHenry County. — Executed Nov 25 New Veterans Vac Services LLC $199,014 ·
Jan 17, 2025 62X75 CookDuPageDistrict 1 Expressway Cleaning (Litter/Debris Removal) on various routes in D1. — Executed Nov 25 New Orlando Lawn Service, Inc. $276,000 ·
Jan 17, 2025 62X78 CookWillDistrict 1 Expressway Cleaning (Litter/Debris Removal), This work is located on I-57 expressway from I-90/94 (Dan Ryan Expressway) to Will / Kankakee County Line in Cook and Will Counties. — Executed Nov 25 New Orlando Lawn Service, Inc. $227,238 ·
Jan 17, 2025 62X80 VariousDistrict 1 Mowing the roadsides of expressways This work consists of mowing the roadsides of expressways. The project is located along various expressways at various locations in D1. — Executed Nov 25 New MYS, Incorporated $656,550 ·
Jan 17, 2025 62X81 CookWillDistrict 1 Expressway Cleaning (Litter/Debris Removal), This work is located on FAI 80, I-80 Expressway from I-294 (Tri-State Tollway) to Will / Kendall County Line in Cook and Will Counties. — Executed Nov 25 New Thor General Contracting LLC $210,330 ·
Jan 17, 2025 64M10 LeeDistrict 2 Removal and replacement of an existing box culvert carrying US 30 over a creek located 0.1 mile west of Atkinson Road. — Executed Nov 25 New Martin & Company Excavating $746,263 ·
Jan 17, 2025 64N06 Rock IslandDistrict 2 Smart Resurfacing and ADA improvements on IL 5 from 24th Street to 0.1 mile east of 34th Street in Rock Island. 4,332 ft net length. — Executed Nov 25 New Brandt Construction Co. $1,008,970 ·
Jan 17, 2025 64S59 Jo DaviessDistrict 2 1.13 miles of pavement patching and inlet repair along US 20 in Galena. — Executed Nov 25 New G. M. Sipes Construction, Inc. $460,622 ·
Jan 17, 2025 64T04 OgleDistrict 2 Lighting at I-39 IL 64 interchange. — Executed Nov 25 New William Charles Construction Co, LLC $258,017 ·
Jan 17, 2025 64T35 VariousDistrict 2 Bridge washing of 8 structures over the Rock River in various Counties. — Executed Nov 25 New All States Painting, Inc. $68,748 ·
Jan 17, 2025 64T39 VariousDistrict 2 Bridge washing of 6 structures over the Rock River in various Counties. — Executed Nov 25 New Pressure Washing Unlimited Inc. $59,230 ·
Jan 17, 2025 64T40 HenryRock IslandDistrict 2 Bridge washing of 5 structures over the Rock River in various Counties. — Executed Nov 25 New Pressure Washing Unlimited Inc. $54,465 ·
Jan 17, 2025 64T75 VariousDistrict 2 Restoration of turf right-of-way caused by motorist damage on all State and and Interstate routes within the District. Work Orders include fertilizing, seeding, and installing soil retention blanket on disturbed areas. — Executed Nov 25 New O'Brien Civil Works, Inc. $94,200 ·
Jan 17, 2025 64T80 Rock IslandDistrict 2 Continuously reinforced concrete patching from 0.3 miles north of IL 92 to Whiteside County Line. 7.5 mile net length. — Executed Nov 25 New Centennial Contractors of the Quad Cities, Inc. $642,392 ·
Jan 17, 2025 64T90 HenryDistrict 2 Full bridge cleaning and painting at SN 037-0140, carrying Osco Rd over Mineral Creek, 2 miles east of I-74. — Executed Nov 25 New Eagle Painting & Maintenance Company, Inc. $124,250 ·
Jan 17, 2025 64T93 VariousDistrict 2 Concrete sealer applied to bridge decks at various locations within District 2. — Executed Nov 25 New M & M Concrete, Inc. $49,078 ·
Jan 17, 2025 64T94 Rock IslandDistrict 2 Concrete sealer applied to bridge decks at various locations in Rock Island County within District 2. — Executed Nov 25 New M & M Concrete, Inc. $82,974 ·
Jan 17, 2025 64T95 HenryDistrict 2 Concrete sealer applied to bridge decks at various locations within District 2. — Executed Nov 25 New M & M Concrete, Inc. $39,992 ·
Jan 17, 2025 66K94 IroquoisDistrict 3 0.2 mile bridge replacement at Little Beaver Creek. 1.2 miles north of Papineau Road. — Executed Nov 25 New Iroquois Paving Corporation $2,649,190 ·
Jan 17, 2025 66P33 BureauDistrict 3 Deck patching, approach pavement resurfacing, parapet repairs, expansion joint replacement, substructure repairs, and slope wall repairs at SN 006-0056. — Executed Nov 25 New D. Construction, Inc. $439,369 ·
Jan 17, 2025 66P34 BureauDistrict 3 bridge repairs including deck patching, expansion joint replacement, approach slab replacement, pavement and shoulder replacement at SN 006-0101 carrying IL 92 over the branch of Masters Creek 0.7 miles west of Van Orin. — Executed Nov 25 New D. Construction, Inc. $466,071 ·
Jan 17, 2025 66P36 LaSalleDistrict 3 Shoulder replacement, seeding, storm sewers, drainage repairs, bridge repairs including expansion joint replacement, PPC I-beam repairs structural repair of concrete, bridge washing and other related construction work at SN 050-0175 carrying CH 33 over I-39 3.0 miles north of the I-39 and I-80 interchange. — Executed Nov 25 New D. Construction, Inc. $425,002 ·
Jan 17, 2025 66P60 KendallDistrict 3 Approximately 6.1 miles of centerline joint repair, pavement marking improvements and intermediate resurfacing of approximately 22,000 sq yds on IL 126 from 80 ft east of Wing Street to 500 ft west of County Line Road in Kendall County. — Executed Nov 25 New Austin Tyler Construction, Inc. $776,365 ·
Jan 17, 2025 66P81 LivingstonDistrict 3 Cleaning and painting structural steel on SN's 053-0116 and 053-0019. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $658,785 ·
Jan 17, 2025 66P82 DeKalbDistrict 3 Cleaning and painting all structural steel of SN's 019-0038 and 019-0040. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $167,056 ·
Jan 17, 2025 66P90 BureauLivingstonDistrict 3 Bridge deck sealing with the parapets/curbs on various routes at various locations throughout Bureau and Livingston Counties. — Executed Nov 25 New M & M Concrete, Inc. $159,932 ·
Jan 17, 2025 66P96 GrundyDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, speed display signs, and other electrical services within Grundy County. — Active Nov 25 New Meade Inc. $341,893 ·
Jan 17, 2025 66P97 VariousDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, speed display signs, and other electrical services along various routes in Bureau, LaSalle, DeKalb, and Kendall Counties. — Executed Nov 25 New Laser Electric, Inc. $2,232,605 ·
Jan 17, 2025 66P98 VariousDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, speed display signs, and other electrical services along various routes in Ford, Iroquois, and Livingston Counties. — Executed Nov 25 New Leo P. Kelly Electric, Incorporated $384,646 ·
Jan 17, 2025 66P99 KankakeeDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, speed display signs, and other electrical services within Kankakee County. — Active Nov 25 New Outsen Electric, Incorporated $193,820 ·
Jan 17, 2025 68H97 HendersonDistrict 4 Slope stabilization and culvert extension 1 mile south of 2600N in Henderson County. 895' gross. — Executed Nov 25 New J.C. Dillon, Inc. $519,574 ·
Jan 17, 2025 68J32 VariousDistrict 4 Districtwide tree removal on an on call basis. — Executed Nov 25 New JIMAX Landscape LLC $233,844 ·
Jan 17, 2025 68J35 VariousDistrict 4 Washing of nine bridges in District 4. — Executed Nov 25 New M & M Concrete, Inc. $492,999 ·
Jan 17, 2025 68J37 VariousDistrict 4 Districtwide repairs to guardrail and cable guardrail caused by motorists (MCHD) throughout District Four. — Executed Nov 25 New Northern Contracting, Inc. $748,731 ·
Jan 17, 2025 68J38 PeoriaDistrict 4 Landscaping maintenance and installation along I-74 from Ellis St. to Illinois River in Peoria. Net length 7,286 ft. — Executed Nov 25 New JIMAX Landscape LLC $307,381 ·
Jan 17, 2025 70571 McLeanDistrict 5 0.013 miles of bridge replacement at Intermittent Stream_0.9 miles west of I-55 west of Chenoa. — Executed Nov 25 New Stark Excavating, Inc. $2,190,999 ·
Jan 17, 2025 70A55 VermilionDistrict 5 5.312 miles of pavement rehab - designed overlay resurfacing and underdrains, ramp repair 0.4 mile east of US 150-IL 1 at Tilton to the Indiana State Line. — Executed Nov 25 New Open Road Paving Company LLC $32,255,503 ·
Jan 17, 2025 70D78 ChampaignDistrict 5 Bridge deck overlay and other repairs to SN 010-0208. — Executed Nov 25 New Stark Excavating, Inc. $894,984 ·
Jan 17, 2025 70G85 McLeanDistrict 5 Dynamic Message Signs at various locations in Bloomington/Normal. — Executed Nov 25 New Bodine Electric of Decatur $2,995,164 ·
Jan 17, 2025 70H37 VariousDistrict 5 567.5 miles of spraying; approximately 2004 acres on State ROW along US 51 and interstate routes including interchanges in Champaign, DeWitt, McLean, Piatt, and Vermilion Counties. — Executed Nov 25 New The Daltons Inc. $188,719 ·
1–100 of 4,218Next ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.