173Let jobs
$439,693,399Total low bids
$484,358,586Total estimates
-9.2%Low bids vs estimates
Nov 2020 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Nov 5, 2020 | 6369-29-001RMC - 636929001 | McLennan Waco |
URBAN & RURUAL MOWING AND LITTERUS 84 · | $738,074 | $747,415 | T&L CLEANING SERVICES LLC | +1.3% | 2 |
| Nov 5, 2020 | 1603-03-041STP 2021(100)HES | Tarrant Fort Worth |
INSTALL TRAFFIC SIGNALFM 1709 · | $890,266 | $741,663 | SELECT MAINTENANCE, L.L.C. | -16.7% | 5 |
| Nov 5, 2020 | 6370-05-001MMC - 637005001 | Howard Abilene |
MATERIALS ONLY AGGREGATESIH 20 · | $747,925 | $707,000 | ZACK BURKETT CO. | -5.5% | 3 |
| Nov 5, 2020 | 6365-28-001BPM - 636528001 | Moore Amarillo |
FY 2021 BPM PROJECTUS 87 · | $747,038 | $666,090 | PBX BRIDGE COMPANY | -10.8% | 6 |
| Nov 5, 2020 | 6369-27-001MMC - 636927001 | Hamilton Waco |
HOT MIX - MATERIAL ONLYUS 281 · | $688,000 | $591,000 | BIG CREEK CONSTRUCTION, LTD. | -14.1% | 2 |
| Nov 5, 2020 | 6369-28-001MMC - 636928001 | Coryell Waco |
HOT MIX - MATERIAL ONLYUS 84 · | $630,000 | $555,000 | BIG CREEK CONSTRUCTION, LTD. | -11.9% | 3 |
| Nov 5, 2020 | 0177-07-113C 177-7-113 | Harris Houston |
HIGHWAY IMPROVEMENTIH 69 · | $502,655 | $520,925 | B & MS CONSTRUCTION, INC. | +3.6% | 3 |
| Nov 5, 2020 | 6363-90-001RMC - 636390001 | Jefferson Beaumont |
CONCRETE PAVEMENT REHABILITATIONSH 347 · | $779,561 | $497,692 | SELECT MAINTENANCE, L.L.C. | -36.2% | 6 |
| Nov 5, 2020 | 3256-04-076STP 2021(098)HES | Harris Houston |
INSTALL ADVANCE WARNING SIGNALS AND SIGNSSL 8 · | $469,022 | $415,823 | CITYLYNX, INC. | -11.3% | 5 |
| Nov 5, 2020 | 6370-00-001MMC - 637000001 | Taylor Abilene |
MATERIALS ONLY SUPERPAVE MIXTURESIH 20 · | $439,070 | $408,950 | J. H. STRAIN & SONS, INC. | -6.9% | 2 |
| Nov 5, 2020 | 0914-00-432STP 2021(112) | Travis Austin |
HAZARD ELIMINATION & SAFETYVA · | $430,147 | $393,903 | TRP CONSTRUCTION GROUP, LLC | -8.4% | 3 |
| Nov 5, 2020 | 6366-86-001RMC - 636686001 | Harris Houston |
BRIDGE REPAIRSSL 8 · | $498,634 | $392,082 | SCR CIVIL CONSTRUCTION, LLC | -21.4% | 7 |
| Nov 5, 2020 | 6369-98-001MMC - 636998001 | Taylor Abilene |
MATERIALS ONLY AC20-5TRIH 20 · | $359,280 | $340,608 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -5.2% | 2 |
| Nov 5, 2020 | 6369-32-001RMC - 636932001 | Falls Waco |
MOWING AND LITTERSH 6 · | $303,729 | $315,648 | P-VILLE, INCORPORATED | +3.9% | 1 |
| Nov 5, 2020 | 6370-04-001MMC - 637004001 | Taylor Abilene |
MATERIALS ONLY AGGREGATESIH 20 · | $350,413 | $311,125 | ZACK BURKETT CO. | -11.2% | 3 |
| Nov 5, 2020 | 6359-84-001RMC - 635984001 | Llano Austin |
BRIDGE DEBRIS REMOVALRM 2900 · | $387,950 | $288,980 | T.F.R. ENTERPRISES, INC. | -25.5% | 3 |
| Nov 5, 2020 | 6369-31-001RMC - 636931001 | Limestone Waco |
MOWING AND LITTTERSH 7 · | $305,681 | $260,742 | P-VILLE, INCORPORATED | -14.7% | 1 |
| Nov 5, 2020 | 6367-05-001RMC - 636705001 | Harris Houston |
ASPHALT AND POTHOLE REPAIRIH 10 · | $314,000 | $252,725 | MAIN LANE INDUSTRIES LTD. | -19.5% | 3 |
| Nov 5, 2020 | 6365-63-001RMC - 636563001 | Chambers Beaumont |
BASE REPAIR & OVERLAYFM 1405 · | $419,509 | $235,487 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -43.9% | 5 |
| Nov 5, 2020 | 6370-22-001BPM - 637022001 | Ector Odessa |
BRIDGE JOINT REPAIRIH 20 · | $297,425 | $173,811 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | -41.6% | 14 |
| Nov 5, 2020 | 6371-13-001MMC - 637113001 | Guadalupe San Antonio |
RDC (MATERIALS ONLY) DRIFT CONTROL & ANTI-FOAMER)SH 46 · | $100,666 | $33,437 | HELENA AGRI-ENTERPRISES, LLC | -66.8% | 5 |
| Nov 4, 2020 | 2451-02-013C 2451-2-13 | Culberson El Paso |
FULL DEPTH REHABRM 652 · | $49,437,215 | $49,745,889 | DAN WILLIAMS COMPANY | +0.6% | 2 |
| Nov 4, 2020 | 0912-72-360STP 1702(818)MM | Harris Houston |
RECONSTRUCT ROADWAYCS · | $28,023,255 | $23,186,629 | SER CONSTRUCTION PARTNERS, LLC | -17.3% | 9 |
| Nov 4, 2020 | 0397-01-045STP 2021(130) | Gray Amarillo |
HIGHWAY IMPROVEMENTSH 152 · | $16,937,610 | $15,464,360 | RK HALL, LLC | -8.7% | 6 |
| Nov 4, 2020 | 0030-06-064STP 2021(129) | Hemphill Amarillo |
SEALCOATUS 83 · | $16,878,230 | $14,748,007 | MISSOURI PETROLEUM PRODUCTS COMPANY LLC | -12.6% | 3 |
| Nov 4, 2020 | 0079-02-052NH 2B20(309) | Comanche Brownwood |
SEAL COATUS 67 · | $13,115,131 | $11,314,209 | BRANNAN PAVING CO., LTD. | -13.7% | 4 |
| Nov 4, 2020 | 0109-07-053STP 2021(095) | Trinity Lufkin |
RESURFACE WITH SEAL COATSH 19 · | $13,500,374 | $10,402,423 | CLARK CONSTRUCTION OF TEXAS, INC. | -22.9% | 3 |
| Nov 4, 2020 | 0535-07-050NH 2021(119) | Fayette Yoakum |
ACP OVERLAYIH 10 · | $13,026,398 | $10,399,532 | HUNTER INDUSTRIES, LTD. | -20.2% | 4 |
| Nov 4, 2020 | 0280-03-004STP 2021(107) | Collin Dallas |
RESTORE EXIST PAV, ADD SHLDR, BASE REPAIR AND OVBS 78-D · | $9,948,672 | $9,596,783 | A. K. GILLIS & SONS, LLC | -3.5% | 4 |
| Nov 4, 2020 | 0228-02-051NH 2B20(218) | Gaines Lubbock |
INSTALL CABLE MEDIAN BARRIERUS 62 · | $11,055,057 | $8,857,058 | GRATIOT CONSTRUCTION, LTD. | -19.9% | 6 |
| Nov 4, 2020 | 1123-02-016C 1123-2-16 | Karnes Corpus Christi |
REHAB ROADWAY AND WIDENFM 81 · | $9,901,543 | $8,531,764 | HUNTER INDUSTRIES, LTD. | -13.8% | 7 |
| Nov 4, 2020 | 0011-10-027STP 2021(166) | Palo Pinto Fort Worth |
RESURFACE ROADWAYUS 180 · | $10,139,184 | $8,439,322 | NORTHEASTERN PAVERS, LLC | -16.8% | 9 |
| Nov 4, 2020 | 2150-04-076C 2150-4-76 | Webb Laredo |
GRADE, INLETS, CONC. PAV., SIGNS, & PAV. MRKGS.FM 1472 · | $6,897,420 | $6,359,706 | ANDERSON COLUMBIA CO., INC. | -7.8% | 4 |
| Nov 4, 2020 | 0172-01-056C 172-1-56 | Tarrant Fort Worth |
CONSTRUCT PEDESTRIAN INFRASTRUCTUREBU 287P · | $5,865,066 | $5,671,661 | RAGLE CONSTRUCTION, INC. | -3.3% | 8 |
| Nov 4, 2020 | 0062-04-050NH 2021(099) | Cass Atlanta |
INSTALL MEDIAN BARRIERUS 59 · | $7,472,559 | $4,434,953 | H. V. CAVER, INC. | -40.7% | 11 |
| Nov 4, 2020 | 0693-01-037STP 2021(097) | Howard Abilene |
MILL, SPOT REPAIR, OVERLAYSH 350 · | $3,411,024 | $3,221,957 | RK HALL, LLC | -5.5% | 4 |
| Nov 4, 2020 | 0269-03-036BR 2021(118) | Lavaca Yoakum |
REPLACE BRIDGE AND APPROACHESUA 77 · | $4,126,614 | $3,098,286 | HILL COUNTRY BRIDGE, INC. | -24.9% | 10 |
| Nov 4, 2020 | 0912-00-590C 912-00-590 | Harris Houston |
NEW TRAFFIC SIGNALSVA · | $2,035,137 | $2,193,801 | VACA UNDERGROUND UTILITIES INC | +7.8% | 6 |
| Nov 4, 2020 | 2296-01-056STP 2B20(122)HES | Ector Odessa |
INSTALL MEDIAN BARRIERSH 191 · | $2,129,944 | $2,056,073 | MIJELUM, L.L.C. | -3.5% | 8 |
| Nov 4, 2020 | 0700-01-044C 700-1-44 | Burnet Austin |
OVERLAYSH 71 · | $2,800,397 | $2,046,868 | LONE STAR PAVING COMPANY | -26.9% | 6 |
| Nov 4, 2020 | 0043-04-082NH 2021(103) | Hardeman Childress |
MILL/INLAYUS 287 · | $2,129,780 | $1,952,687 | A. L. HELMCAMP, INC. | -8.3% | 6 |
| Nov 4, 2020 | 6367-63-001TMC - 636763001 | Travis Austin |
WIM SCALE PARTSIH 35 · | $1,808,915 | $1,817,730 | INTERNATIONAL ROAD DYNAMICS CORPORATION | +0.5% | 1 |
| Nov 4, 2020 | 0511-03-012STP 2021(110) | Hays Austin |
RESURFACE ROADWAYRM 32 · | $1,892,370 | $1,671,960 | HUNTER INDUSTRIES, LTD. | -11.6% | 7 |
| Nov 4, 2020 | 6369-89-001MMC - 636989001 | Taylor Abilene |
MATERIALS ONLY: DENSE GRADED HMAIH 20 · | $1,617,670 | $1,558,815 | VULCAN CONSTRUCTION MATERIALS, LLC | -3.6% | 2 |
| Nov 4, 2020 | 6371-15-001RMC - 637115001 | Kaufman Dallas |
RETROREFLECTORIZED PAVEMENT MARKERS AND MARKINGSIH 20 · | $1,406,746 | $1,477,985 | STRIPING TECHNOLOGY, L.P. | +5.1% | 2 |
| Nov 4, 2020 | 0043-14-026NH 2B20(225) | Wichita Wichita Falls |
MILL AND OVERLAYSL 11 · | $1,691,633 | $1,360,148 | ZACK BURKETT CO. | -19.6% | 5 |
| Nov 4, 2020 | 6369-90-001MMC - 636990001 | Howard Abilene |
MATERIALS ONLY DENSE GRADED HMAIH 20 · | $1,411,500 | $1,307,000 | RK HALL, LLC | -7.4% | 2 |
| Nov 4, 2020 | 0047-02-154STP 2021(104)HES | Grayson Paris |
IMPROVE TRAFFIC SIGNALS; INTERCONNECT SIGNALSSS 503 · | $1,369,401 | $1,257,374 | NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION | -8.2% | 7 |
| Nov 4, 2020 | 0683-02-070STP 2021(111)HES | Travis Austin |
TRAFFIC SIGNAL IMPROVEMENTSRM 620 · | $1,441,564 | $1,229,141 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -14.7% | 3 |
| Nov 4, 2020 | 0354-06-031STP 2B20(119)HES | Andrews Odessa |
SAFETY LIGHTING AT INTERSECTIONSH 115 · | $1,302,733 | $1,156,358 | VACA UNDERGROUND UTILITIES INC | -11.2% | 6 |
| Nov 4, 2020 | 6369-92-001MMC - 636992001 | Taylor Abilene |
MATERIALS ONLY: HMCLIH 20 · | $1,260,000 | $1,110,300 | ZACK BURKETT CO. | -11.9% | 2 |
| Nov 4, 2020 | 6371-16-001RMC - 637116001 | Kaufman Dallas |
VEGETATION MANAGEMENT (NORTH SIDE)IH 20 · | $1,096,135 | $1,076,692 | CROSS PLUS CONSTRUCTION, LLC | -1.8% | 4 |
| Nov 4, 2020 | 6369-75-001RMC - 636975001 | Potter Amarillo |
DISTRICT WIDE ON CALL STRIPINGIH 40 · | $1,237,673 | $930,051 | PMI PAVEMENT MARKING, LLC | -24.9% | 4 |
| Nov 4, 2020 | 6366-79-001RMC - 636679001 | Navarro Dallas |
REMOVAL AND DISPOSAL OF DRIFTWOOD AND DEBRISFM 3041 · | $972,000 | $901,225 | CROSS PLUS CONSTRUCTION, LLC | -7.3% | 5 |
| Nov 4, 2020 | 6372-23-001RMC - 637223001 | El Paso El Paso |
MBGF, CHAINLINK FENCE & ROCK WALL REPAIRIH 10 · | $873,811 | $794,293 | SYNERGY PROJECT CONTRACTORS, INC. | -9.1% | 7 |
| Nov 4, 2020 | 0913-00-107STP 2B20(208) | De Witt Yoakum |
STRIPINGVA · | $1,007,314 | $783,592 | BATTERSON, LLP | -22.2% | 9 |
| Nov 4, 2020 | 6368-18-001RMC - 636818001 | Ellis Dallas |
CLEANING & SWEEPING HIGHWAYS & DEBRIS REMOVALIH 35E · | $1,000,120 | $750,478 | SWEEPING CORPORATION OF AMERICA, INC. | -25.0% | 3 |
| Nov 4, 2020 | 6366-80-001RMC - 636680001 | Navarro Dallas |
ON-CALL TRAFFIC CONTROL SERVICESSH 31 · | $724,300 | $693,000 | NIXON ENGINEERING | -4.3% | 3 |
| Nov 4, 2020 | 6370-07-001MMC - 637007001 | Taylor Abilene |
MATERIALS ONLY ASPPMIH 20 · | $625,400 | $601,575 | ZACK BURKETT CO. | -3.8% | 2 |
| Nov 4, 2020 | 6369-96-001MMC - 636996001 | Howard Abilene |
MATERIALS ONLY EMULSIONSIH 20 · | $621,900 | $543,054 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -12.7% | 2 |
| Nov 4, 2020 | 6370-08-001MMC - 637008001 | Howard Abilene |
MATERIALS ONLY ASPPMIH 20 · | $556,500 | $523,250 | ZACK BURKETT CO. | -6.0% | 3 |
| Nov 4, 2020 | 6368-17-001RMC - 636817001 | Ellis Dallas |
REMOVAL AND DISPOSAL OF DRIFTWOOD AND DEBRISFM 813 · | $557,400 | $514,000 | FOWLER CONSTRUCTION | -7.8% | 4 |
| Nov 4, 2020 | 6369-95-001MMC - 636995001 | Taylor Abilene |
MATERIALS ONLY EMULSIONSIH 20 · | $562,680 | $485,580 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -13.7% | 2 |
| Nov 4, 2020 | 6368-56-001RMC - 636856001 | Bee Corpus Christi |
TRAFFIC SIGNAL UPGRADEUS 59 · | $905,894 | $472,245 | VACA UNDERGROUND UTILITIES INC | -47.9% | 6 |
| Nov 4, 2020 | 0081-02-073NH 2B20(016) | Tarrant Fort Worth |
TRANSPORTATION NON-ROADWAYUS 377 · | $353,840 | $451,589 | SELECT MAINTENANCE, L.L.C. | +27.6% | 5 |
| Nov 4, 2020 | 6367-56-001RMC - 636756001 | Bowie Atlanta |
CALLOUT PREFABRICATED PAVEMENT MARKINGSUS 59 · | $493,908 | $447,950 | STRIPING TECHNOLOGY, L.P. | -9.3% | 3 |
| Nov 4, 2020 | 6369-71-001RMC - 636971001 | Harrison Atlanta |
TREE & STUMP REMOVAL (S)US 59 · | $482,000 | $445,429 | H. V. CAVER, INC. | -7.6% | 3 |
| Nov 4, 2020 | 6368-16-001RMC - 636816001 | Ellis Dallas |
ROADSIDE MOWINGSH 34 · | $520,600 | $437,843 | CEN-TEX IRRIGATION SYSTEMS, INC. | -15.9% | 5 |
| Nov 4, 2020 | 6369-72-001RMC - 636972001 | Upshur Atlanta |
TREE & STUMP REMOVAL (WEST)US 259 · | $516,750 | $406,674 | CATOCON, INC. | -21.3% | 6 |
| Nov 4, 2020 | 6365-27-001RMC - 636527001 | Johnson Fort Worth |
REFLECTORIZED PAVEMENT MARKINGS_AND RUMBLE STRIPSIH 35W · | $433,779 | $354,566 | TRP CONSTRUCTION GROUP, LLC | -18.3% | 6 |
| Nov 4, 2020 | 6372-48-001RMC - 637248001 | El Paso El Paso |
BARRICADES, SIGNS AND TRAFFIC CONTROLIH 10 · | $427,500 | $342,860 | APACHE BARRICADE & SIGN | -19.8% | 5 |
| Nov 4, 2020 | 6369-70-001RMC - 636970001 | Bowie Atlanta |
TREE & STUMP REMOVAL (NORTH)IH 30 · | $360,500 | $296,454 | H. V. CAVER, INC. | -17.8% | 6 |
| Nov 4, 2020 | 0889-04-080STP 2021(126) | Smith Tyler |
FLASHING CHEVRONSFM 346 · | $126,660 | $103,274 | JASCO | -18.5% | 6 |
101–173 of 173‹ Prev
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.