| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$450,000.00 |
$150,000.00 |
$29,237.57 |
$65,512.18 |
$750,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 476,487 | CY |
$4.50 |
$5.17 |
$6.50 |
$5.53 |
$7.65 |
$9.20 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 116,081 | CY |
$15.00 |
$6.45 |
$6.50 |
$13.80 |
$12.83 |
$17.22 |
| 4 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$15.00 |
$5.17 |
$0.2500 |
$10.60 |
$11.68 |
$2.65 |
| 5 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$200,000.00 |
$340,000.00 |
$170,000.00 |
$165,742.15 |
$233,798.35 |
$488,994.85 |
| 6 | 210 0121 |
OBLITERATING ABANDONED ROAD | 1,740 | LF |
$10.00 |
$12.43 |
$5.50 |
$7.11 |
$15.74 |
$37.82 |
| 7 | 221(C) 2801 |
TEMPORARY SILT FENCE | 11,656 | LF |
$1.75 |
$1.70 |
$2.53 |
$1.95 |
$1.79 |
$1.62 |
| 8 | 221(E) 2804 |
TEMPORARY SEDIMENT BASIN | 1 | EA |
$2,500.00 |
$6,390.00 |
$985.92 |
$20,500.00 |
$6,719.85 |
$6,091.37 |
| 9 | 221(F) 0100 |
TEMPORARY SILT DIKE | 8,085 | LF |
$7.75 |
$7.46 |
$7.66 |
$8.50 |
$8.40 |
$7.61 |
| 10 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 87 | CY |
$90.00 |
$106.50 |
$69.52 |
$290.00 |
$112.00 |
$101.52 |
| 11 | 230(A) 2806 |
SOLID SLAB SODDING | 402,845 | SY |
$1.40 |
$1.54 |
$1.86 |
$1.40 |
$1.90 |
$1.73 |
| 12 | 232(B) 2814 |
SEEDING METHOD B | 83.23 | AC |
$500.00 |
$852.00 |
$212.78 |
$100.00 |
$895.98 |
$812.18 |
| 13 | 233(A) 2817 |
VEGETATIVE MULCHING | 83.23 | AC |
$350.00 |
$479.25 |
$585.14 |
$100.00 |
$447.99 |
$406.09 |
| 14 | 241 2832 |
MOWING | 166.46 | AC |
$70.00 |
$53.25 |
$101.07 |
$150.00 |
$56.00 |
$50.76 |
| 15 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 16 | EA |
$2,500.00 |
$2,327.68 |
$2,053.25 |
$1,100.00 |
$3,919.91 |
$3,562.34 |
| 16 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 59,467 | CY |
$40.00 |
$33.00 |
$34.91 |
$59.00 |
$58.18 |
$65.00 |
| 17 | 307(K) 4300 |
STABILIZED SUBGRADE | 268,370 | SY |
$4.00 |
$4.00 |
$3.49 |
$5.00 |
$4.54 |
$5.00 |
| 18 | 310(B) 0149 |
SUBGRADE, METHOD B | 60,132 | SY |
$2.00 |
$1.00 |
$1.06 |
$0.8600 |
$2.09 |
$1.25 |
| 19 | 317 4270 |
CEMENT TREATED BASE | 239,595 | SY |
$10.50 |
$12.00 |
$11.95 |
$12.50 |
$10.32 |
$14.00 |
| 20 | 325 5271 |
SEPARATOR FABRIC | 330,395 | SY |
$1.50 |
$1.07 |
$1.13 |
$1.05 |
$0.9900 |
$0.9000 |
| 21 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 34,035 | TON |
$30.00 |
$26.00 |
$27.50 |
$22.00 |
$34.81 |
$26.61 |
| 22 | 407(B) 0250 |
TACK COAT | 73 | GAL |
$2.80 |
$3.00 |
$5.02 |
$4.85 |
$2.24 |
$4.90 |
| 23 | 408 5774 |
PRIME COAT | 188,921 | GAL |
$3.00 |
$0.5000 |
$0.2500 |
$1.50 |
$2.24 |
$0.0100 |
| 24 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 328 | TON |
$120.00 |
$81.60 |
$174.55 |
$210.00 |
$92.00 |
$172.22 |
| 25 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 1,000 | TON |
$135.00 |
$130.80 |
$101.55 |
$130.00 |
$136.00 |
$99.70 |
| 26 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 104,219 | SY |
$9.00 |
$6.00 |
$5.11 |
$10.80 |
$9.25 |
$9.82 |
| 27 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 165,480 | SY |
$13.00 |
$9.47 |
$9.97 |
$13.80 |
$13.60 |
$14.68 |
| 28 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 500 | SY |
$85.00 |
$164.34 |
$18.45 |
$125.00 |
$30.20 |
$119.03 |
| 29 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 79,090 | CY |
$100.00 |
$95.00 |
$98.25 |
$105.00 |
$115.00 |
$89.71 |
| 30 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 331 | CY |
$30.00 |
$26.63 |
$25.00 |
$30.00 |
$25.36 |
$20.32 |
| 31 | 504(E) 6190 |
42" F-SHAPED PARAPET | 2,319 | LF |
$125.00 |
$74.46 |
$78.64 |
$150.00 |
$69.78 |
$95.92 |
| 32 | 509(A) 0319 |
CLASS AA CONCRETE | 694 | CY |
$415.00 |
$422.01 |
$527.27 |
$305.00 |
$594.53 |
$600.00 |
| 33 | 509(D) 0325 |
CLASS C CONCRETE | 2,327 | CY |
$275.00 |
$207.68 |
$276.11 |
$195.00 |
$196.00 |
$500.00 |
| 34 | 511(A) 0332 |
REINFORCING STEEL | 165,002 | LB |
$0.9000 |
$1.01 |
$1.00 |
$0.8300 |
$0.4600 |
$1.00 |
| 35 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 248 | TON |
$50.00 |
$47.26 |
$40.91 |
$44.83 |
$66.02 |
$61.25 |
| 36 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 886 | TON |
$60.00 |
$47.26 |
$41.49 |
$44.83 |
$66.01 |
$54.13 |
| 37 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 193 | TON |
$55.00 |
$35.41 |
$31.70 |
$38.48 |
$55.33 |
$37.92 |
| 38 | 609(A) 0288 |
CONCRETE CURB (6" MNTBLE-INTEGRAL) | 3,939 | LF |
$6.00 |
$4.29 |
$1.37 |
$7.00 |
$3.64 |
$22.85 |
| 39 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 990 | LF |
$8.00 |
$4.29 |
$2.27 |
$9.00 |
$4.00 |
$18.86 |
| 40 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 6,306 | LF |
$9.00 |
$4.78 |
$2.62 |
$10.00 |
$4.54 |
$17.28 |
| 41 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 1,730 | SY |
$50.00 |
$30.35 |
$35.00 |
$40.00 |
$33.07 |
$58.67 |
| 42 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 318 | SY |
$65.00 |
$50.94 |
$53.00 |
$45.00 |
$71.10 |
$89.36 |
| 43 | 610(B) 5016 |
8" CONCRETE DRIVEWAY | 4,250 | SY |
$70.00 |
$57.35 |
$53.00 |
$60.00 |
$67.74 |
$96.94 |
| 44 | 610(C) 0608 |
4" CONCRETE DIVIDING STRIP | 2,152 | SY |
$55.00 |
$22.18 |
$37.00 |
$40.00 |
$39.97 |
$86.06 |
| 45 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 496 | SF |
$45.00 |
$17.47 |
$23.00 |
$45.00 |
$21.40 |
$76.53 |
| 46 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 9 | EA |
$2,100.00 |
$2,220.21 |
$2,200.00 |
$1,736.63 |
$1,771.32 |
$2,259.47 |
| 47 | 611(A) 2658 |
MANHOLE (5' DIAMETER) | 1 | EA |
$3,200.00 |
$3,303.10 |
$3,300.00 |
$2,583.39 |
$2,773.16 |
$3,088.85 |
| 48 | 611(A) 2659 |
MANHOLE (6' DIAMETER) | 1 | EA |
$7,000.00 |
$4,054.18 |
$4,400.00 |
$3,214.30 |
$3,704.74 |
$3,706.61 |
| 49 | 611(B) 2680 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | 5 | VF |
$180.00 |
$136.36 |
$97.00 |
$142.41 |
$223.27 |
$86.70 |
| 50 | 611(B) 2681 |
ADD'L.DEPTH IN MANHOLE (5' DIAMETER) | 2 | VF |
$300.00 |
$297.56 |
$150.00 |
$208.82 |
$301.79 |
$151.73 |
| 51 | 611(B) 2682 |
ADD'L.DEPTH IN MANHOLE (6' DIAMETER) | 4 | VF |
$550.00 |
$298.48 |
$23.00 |
$269.70 |
$374.02 |
$211.34 |
| 52 | 611(G) 5115 |
INLET CI DES. 2 (D) | 7 | EA |
$6,000.00 |
$5,089.88 |
$6,300.00 |
$4,227.08 |
$4,728.41 |
$4,503.11 |
| 53 | 611(G) 5121 |
INLET CI DES. 3 (B) | 3 | EA |
$6,300.00 |
$5,977.99 |
$7,800.00 |
$6,640.19 |
$7,190.20 |
$6,865.76 |
| 54 | 611(G) 5123 |
INLET CI DES. 3 (2B) | 2 | EA |
$7,500.00 |
$7,110.01 |
$8,400.00 |
$7,348.44 |
$4,754.18 |
$7,559.28 |
| 55 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 8 | EA |
$3,000.00 |
$1,997.25 |
$2,500.00 |
$2,234.72 |
$2,591.97 |
$2,552.20 |
| 56 | 611(G) 6006 |
INLET (SMD-TYPE 2B) | 1 | EA |
$4,000.00 |
$3,089.01 |
$3,200.00 |
$2,904.38 |
$3,384.00 |
$6,421.68 |
| 57 | 611(G) 7180 |
INLET GPI, TYPE 2 (DES.11A) | 1 | EA |
$4,500.00 |
$5,162.58 |
$6,000.00 |
$4,924.41 |
$5,300.99 |
$8,399.61 |
| 58 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 12 | VF |
$460.00 |
$855.49 |
$320.00 |
$242.03 |
$543.22 |
$184.25 |
| 59 | 611(H) 5330 |
ADD'L DEPTH IN INLET CI DES. 3 | 5 | VF |
$475.00 |
$1,438.32 |
$1,200.00 |
$585.16 |
$949.37 |
$520.22 |
| 60 | 611(H) 5375 |
ADD'L DEPTH IN INLET GPI TYPE 2 | 5 | VF |
$450.00 |
$394.21 |
$150.00 |
$419.13 |
$807.32 |
$357.65 |
| 61 | 611(L) 0487 |
JUNCTION BOXES | 192 | CF |
$60.00 |
$42.63 |
$23.00 |
$21.53 |
$28.21 |
$17.00 |
| 62 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 2,284 | LF |
$60.50 |
$70.00 |
$86.00 |
$47.59 |
$67.38 |
$59.55 |
| 63 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 385 | LF |
$76.00 |
$88.83 |
$140.00 |
$71.88 |
$81.86 |
$69.29 |
| 64 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 152 | LF |
$96.00 |
$149.13 |
$160.00 |
$89.38 |
$121.31 |
$84.21 |
| 65 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 162 | LF |
$180.00 |
$178.36 |
$190.00 |
$116.23 |
$149.91 |
$177.57 |
| 66 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 250 | LF |
$35.00 |
$35.71 |
$55.00 |
$35.87 |
$41.38 |
$85.27 |
| 67 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 40 | LF |
$40.00 |
$40.51 |
$60.00 |
$39.79 |
$46.84 |
$88.66 |
| 68 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 1,973 | LF |
$12.00 |
$9.65 |
$14.00 |
$20.33 |
$14.99 |
$15.64 |
| 69 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 658 | LF |
$15.00 |
$8.35 |
$14.00 |
$20.33 |
$22.59 |
$15.64 |
| 70 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 6,520 | LF |
$8.00 |
$9.34 |
$10.66 |
$13.00 |
$8.62 |
$8.65 |
| 71 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 440 | LF |
$10.00 |
$8.66 |
$10.66 |
$17.00 |
$17.46 |
$15.06 |
| 72 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,000.00 |
$1,131.97 |
$760.00 |
$697.47 |
$866.61 |
$995.80 |
| 73 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,100.00 |
$1,288.48 |
$930.00 |
$825.87 |
$1,019.05 |
$1,384.29 |
| 74 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,500.00 |
$1,634.21 |
$1,300.00 |
$1,228.03 |
$1,353.35 |
$1,660.88 |
| 75 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 5 | EA |
$1,200.00 |
$943.59 |
$1,100.00 |
$1,300.00 |
$1,985.12 |
$2,228.27 |
| 76 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 5 | EA |
$1,600.00 |
$1,170.44 |
$1,700.00 |
$1,600.00 |
$2,092.80 |
$2,448.03 |
| 77 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 1 | EA |
$1,900.00 |
$1,380.24 |
$2,100.00 |
$1,800.00 |
$2,294.05 |
$2,571.58 |
| 78 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 30 | EA |
$440.00 |
$263.78 |
$330.00 |
$265.85 |
$333.58 |
$831.07 |
| 79 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$101,500.00 |
$80,000.00 |
$110,000.00 |
$125,931.73 |
$211,561.51 |
$74,596.11 |
| 80 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 96,888 | SY |
$6.25 |
$3.00 |
$3.17 |
$4.72 |
$7.53 |
$8.47 |
| 81 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 83,876 | SY |
$4.50 |
$5.70 |
$6.03 |
$4.60 |
$2.24 |
$3.06 |
| 82 | 620(C) 5910 |
CONTRACTOR HEALTH SAFETY PLAN | 1 | LSUM |
$10,000.00 |
$1,239.30 |
$10,000.00 |
$25,000.00 |
$2,239.95 |
$1,000.00 |
| 83 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 963 | LF |
$18.00 |
$17.04 |
$17.69 |
$16.00 |
$16.80 |
$15.11 |
| 84 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 6 | EA |
$2,300.00 |
$2,076.75 |
$2,155.79 |
$1,950.00 |
$2,402.35 |
$2,160.12 |
| 85 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 6 | EA |
$2,000.00 |
$1,517.63 |
$1,575.40 |
$1,425.00 |
$2,127.95 |
$1,913.39 |
| 86 | 624(A) 4281 |
FENCE-STYLE WWF | 17,915 | LF |
$6.00 |
$3.99 |
$6.36 |
$3.75 |
$6.05 |
$6.19 |
| 87 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 1,654 | LF |
$5.00 |
$2.66 |
$5.80 |
$2.50 |
$5.32 |
$5.65 |
| 88 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,792 | LF |
$6.25 |
$2.72 |
$5.91 |
$2.55 |
$5.43 |
$5.76 |
| 89 | 624(E) 4288 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 1,288 | LF |
$18.00 |
$10.65 |
$10.50 |
$10.00 |
$10.02 |
$10.22 |
| 90 | 624(E) 4292 |
FENCE-STYLE CLF (6'HIGH, CLASS A) | 569 | LF |
$20.00 |
$21.30 |
$12.71 |
$20.00 |
$11.14 |
$12.37 |
| 91 | 627(A) 4317 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 460 | LF |
$60.00 |
$36.36 |
$45.46 |
$100.00 |
$84.58 |
$64.66 |
| 92 | 627(B) 4410 |
CONCRETE LONGITUDINAL BARRIER END SECTIONS | 4 | EA |
$1,000.00 |
$1,892.51 |
$584.96 |
$4,700.00 |
$901.29 |
$1,835.50 |
| 93 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,070 | CY |
$8.00 |
$7.97 |
$8.46 |
$5.00 |
$13.35 |
$25.00 |
| 94 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 473 | CY |
$40.00 |
$21.30 |
$25.00 |
$30.00 |
$16.80 |
$25.00 |
| 95 | 509(A) 1326 |
CLASS AA CONCRETE | 1,075.7 | CY |
$415.00 |
$282.23 |
$527.27 |
$280.00 |
$295.67 |
$500.00 |
| 96 | 511(A) 1332 |
REINFORCING STEEL | 195,250 | LB |
$0.9000 |
$0.9400 |
$1.00 |
$0.8000 |
$1.08 |
$1.00 |
| 97 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$15,000.00 |
$19,250.01 |
$22,456.63 |
$20,000.00 |
$11,199.75 |
$25,000.00 |
| 98 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 355 | CY |
$30.00 |
$27.00 |
$23.00 |
$22.00 |
$28.25 |
$7.27 |
| 99 | 501(G) 6309 |
CLSM BACKFILL | 343.5 | CY |
$180.00 |
$145.00 |
$280.00 |
$155.00 |
$112.00 |
$115.73 |
| 100 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$88,000.00 |
$35,000.00 |
$48,000.00 |
$120,000.00 |
$130,991.05 |
$150,000.00 |
| 101 | 504(A) 1304 |
APPROACH SLAB | 596.2 | SY |
$190.00 |
$195.00 |
$190.00 |
$168.00 |
$170.56 |
$160.01 |
| 102 | 504(B) 1305 |
SAW-CUT GROOVING | 2,197 | SY |
$5.00 |
$4.26 |
$5.50 |
$4.40 |
$4.48 |
$4.44 |
| 103 | 504(C) 6250 |
SEALED EXPANSION JOINT | 64.27 | LF |
$280.00 |
$200.00 |
$173.99 |
$309.00 |
$286.64 |
$192.19 |
| 104 | 504(E) 6190 |
42" F-SHAPED PARAPET | 705 | LF |
$100.00 |
$120.00 |
$115.71 |
$95.00 |
$88.21 |
$129.48 |
| 105 | 506(A) 1322 |
STRUCTURAL STEEL | 503,970 | LB |
$1.80 |
$1.30 |
$1.20 |
$1.66 |
$2.07 |
$1.10 |
| 106 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$2,200.00 |
$2,500.00 |
$1,205.88 |
$2,000.00 |
$1,327.31 |
$1,351.67 |
| 107 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$2,200.00 |
$2,500.00 |
$1,189.52 |
$2,100.00 |
$1,327.31 |
$1,351.67 |
| 108 | 509(A) 1326 |
CLASS AA CONCRETE | 398.2 | CY |
$550.00 |
$650.00 |
$756.74 |
$745.00 |
$838.94 |
$605.29 |
| 109 | 509(B) 1328 |
CLASS A CONCRETE | 265.5 | CY |
$570.00 |
$780.00 |
$780.25 |
$657.00 |
$725.16 |
$608.52 |
| 110 | 509(D) 1331 |
CLASS C CONCRETE | 7 | CY |
$300.00 |
$1,500.00 |
$485.49 |
$780.00 |
$801.64 |
$770.00 |
| 111 | 510(C) 6135 |
SLOPE WALL (5") | 1,183 | SY |
$130.00 |
$130.00 |
$90.86 |
$70.00 |
$73.40 |
$61.81 |
| 112 | 511 6306 |
MECHANICAL SPLICES | 1,120 | EA |
$40.00 |
$30.00 |
$24.13 |
$23.00 |
$47.23 |
$30.63 |
| 113 | 511(A) 1332 |
REINFORCING STEEL | 1,020 | LB |
$1.00 |
$1.35 |
$0.7400 |
$0.9200 |
$0.8900 |
$1.00 |
| 114 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 146,360 | LB |
$1.05 |
$0.9500 |
$0.8800 |
$0.8600 |
$0.9900 |
$0.6800 |
| 115 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 206 | LF |
$40.00 |
$30.00 |
$49.10 |
$32.00 |
$24.25 |
$24.74 |
| 116 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,216 | LF |
$46.00 |
$35.00 |
$27.81 |
$39.00 |
$30.38 |
$31.19 |
| 117 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 206 | LF |
$18.00 |
$35.00 |
$23.32 |
$5.00 |
$25.45 |
$47.71 |
| 118 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,216 | LF |
$18.00 |
$35.00 |
$23.32 |
$5.00 |
$26.75 |
$22.73 |
| 119 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 120 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 902 | SY |
$4.00 |
$4.26 |
$5.50 |
$4.20 |
$4.48 |
$4.24 |
| 121 | 516(A) 6100 |
DRILLED SHAFTS 84" DIAMETER | 168 | LF |
$1,400.00 |
$1,300.00 |
$1,700.00 |
$1,700.00 |
$1,407.34 |
$1,500.00 |
| 122 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,500.00 |
$1,600.00 |
$2,000.00 |
$1,800.00 |
$14,747.93 |
$4,837.91 |
| 123 | 523(A) 6550 |
SEALER CRACK PREPARATION | 262 | LF |
$5.00 |
$5.33 |
$7.00 |
$6.00 |
$5.60 |
$4.04 |
| 124 | 523(B) 6560 |
SEALER RESIN | 3 | GAL |
$150.00 |
$213.00 |
$270.00 |
$200.00 |
$223.99 |
$121.21 |
| 125 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 298 | LF |
$36.00 |
$30.00 |
$23.00 |
$20.00 |
$31.91 |
$9.79 |
| 126 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 46 | LF |
$36.00 |
$35.00 |
$11.00 |
$22.00 |
$20.86 |
$12.28 |
| 127 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$100,000.00 |
$100,000.00 |
$71,000.00 |
$90,000.00 |
$71,342.32 |
$150,000.00 |
| 128 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 355 | CY |
$30.00 |
$27.00 |
$23.00 |
$22.00 |
$28.25 |
$10.50 |
| 129 | 501(G) 6309 |
CLSM BACKFILL | 332 | CY |
$160.00 |
$145.00 |
$280.00 |
$155.00 |
$112.00 |
$115.73 |
| 130 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$88,000.00 |
$35,000.00 |
$96,000.00 |
$100,000.00 |
$130,991.05 |
$60,000.00 |
| 131 | 504(A) 1304 |
APPROACH SLAB | 596.2 | SY |
$190.00 |
$195.00 |
$190.00 |
$168.00 |
$170.56 |
$160.01 |
| 132 | 504(B) 1305 |
SAW-CUT GROOVING | 2,197 | SY |
$5.00 |
$4.26 |
$5.50 |
$4.40 |
$4.48 |
$4.44 |
| 133 | 504(C) 6250 |
SEALED EXPANSION JOINT | 64.27 | LF |
$280.00 |
$200.00 |
$220.00 |
$309.00 |
$286.64 |
$192.19 |
| 134 | 504(E) 6190 |
42" F-SHAPED PARAPET | 705 | LF |
$100.00 |
$120.00 |
$140.00 |
$95.00 |
$88.21 |
$79.49 |
| 135 | 506(A) 1322 |
STRUCTURAL STEEL | 503,970 | LB |
$1.80 |
$1.30 |
$2.50 |
$1.66 |
$2.07 |
$1.11 |
| 136 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$2,200.00 |
$2,500.00 |
$1,500.00 |
$2,000.00 |
$1,327.31 |
$1,351.67 |
| 137 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$2,200.00 |
$2,500.00 |
$1,500.00 |
$2,100.00 |
$1,327.31 |
$1,351.67 |
| 138 | 509(A) 1326 |
CLASS AA CONCRETE | 398.2 | CY |
$575.00 |
$650.00 |
$790.00 |
$745.00 |
$838.94 |
$545.39 |
| 139 | 509(B) 1328 |
CLASS A CONCRETE | 262.2 | CY |
$570.00 |
$780.00 |
$840.00 |
$665.00 |
$725.16 |
$549.61 |
| 140 | 509(D) 1331 |
CLASS C CONCRETE | 9.6 | CY |
$550.00 |
$1,500.00 |
$580.00 |
$770.00 |
$801.61 |
$118.23 |
| 141 | 510(C) 6135 |
SLOPE WALL (5") | 1,183 | SY |
$130.00 |
$130.00 |
$100.00 |
$70.00 |
$77.20 |
$62.86 |
| 142 | 511 6306 |
MECHANICAL SPLICES | 1,120 | EA |
$40.00 |
$30.00 |
$31.00 |
$23.00 |
$47.23 |
$30.63 |
| 143 | 511(A) 1332 |
REINFORCING STEEL | 1,020 | LB |
$1.00 |
$1.35 |
$0.9500 |
$1.37 |
$0.8900 |
$1.00 |
| 144 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 146,200 | LB |
$1.05 |
$0.9500 |
$1.00 |
$0.8600 |
$1.60 |
$1.20 |
| 145 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 204 | LF |
$40.00 |
$30.00 |
$43.00 |
$32.00 |
$24.49 |
$24.76 |
| 146 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,223 | LF |
$46.00 |
$35.00 |
$36.00 |
$39.00 |
$30.99 |
$31.18 |
| 147 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 204 | LF |
$18.00 |
$35.00 |
$28.00 |
$5.00 |
$25.53 |
$48.18 |
| 148 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,223 | LF |
$18.00 |
$35.00 |
$28.00 |
$5.00 |
$26.70 |
$22.60 |
| 149 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 150 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 894 | SY |
$4.00 |
$4.26 |
$5.50 |
$4.20 |
$4.48 |
$4.24 |
| 151 | 516(A) 6100 |
DRILLED SHAFTS 84" DIAMETER | 168 | LF |
$1,400.00 |
$1,300.00 |
$1,700.00 |
$1,700.00 |
$1,407.34 |
$1,500.00 |
| 152 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,500.00 |
$1,600.00 |
$2,000.00 |
$1,800.00 |
$14,747.93 |
$4,837.91 |
| 153 | 523(A) 6550 |
SEALER CRACK PREPARATION | 262 | LF |
$5.00 |
$5.33 |
$7.00 |
$6.00 |
$5.60 |
$4.04 |
| 154 | 523(B) 6560 |
SEALER RESIN | 3 | GAL |
$150.00 |
$213.00 |
$270.00 |
$200.00 |
$223.99 |
$121.21 |
| 155 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 300 | LF |
$36.00 |
$55.00 |
$23.00 |
$20.00 |
$32.25 |
$9.79 |
| 156 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 68 | LF |
$36.00 |
$35.00 |
$11.00 |
$22.00 |
$20.86 |
$10.17 |
| 157 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 2 | EA |
$1,000.00 |
$1,200.00 |
$350.00 |
$1,000.00 |
$424.94 |
$855.19 |
| 158 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$100,000.00 |
$100,000.00 |
$71,000.00 |
$90,000.00 |
$71,342.32 |
$150,000.00 |
| 159 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 9,755 | CY |
$8.00 |
$5.55 |
$7.00 |
$7.50 |
$12.15 |
$14.56 |
| 160 | 202(C) 0182 |
ROCK EXCAVATION | 2,440 | CY |
$15.00 |
$8.11 |
$13.00 |
$15.00 |
$24.40 |
$14.81 |
| 161 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 746 | CY |
$40.00 |
$12.57 |
$23.00 |
$40.00 |
$27.84 |
$19.16 |
| 162 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$50.00 |
$500.00 |
$68,000.00 |
$500.00 |
$405,752.87 |
$361,800.00 |
| 163 | 509(D) 1331 |
CLASS C CONCRETE | 83.1 | CY |
$300.00 |
$257.75 |
$480.00 |
$195.00 |
$613.43 |
$770.00 |
| 164 | 510(A) 6334 |
RETAINING WALL | 1,072 | SY |
$600.00 |
$426.16 |
$710.00 |
$440.00 |
$626.57 |
$505.34 |
| 165 | 602(C) 4205 |
FILTER FABRIC | 365 | SY |
$3.00 |
$6.80 |
$0.6900 |
$2.00 |
$1.43 |
$0.9600 |
| 166 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 13 | LF |
$80.00 |
$76.57 |
$75.00 |
$65.00 |
$39.19 |
$34.97 |
| 167 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 656 | LF |
$36.00 |
$22.17 |
$14.00 |
$16.00 |
$12.71 |
$9.25 |
| 168 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 58 | LF |
$36.00 |
$26.00 |
$14.00 |
$16.00 |
$24.07 |
$10.93 |
| 169 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 1 | EA |
$1,200.00 |
$1,278.70 |
$850.00 |
$775.00 |
$1,225.42 |
$4,536.17 |
| 170 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$1,000.00 |
$45.95 |
$330.00 |
$325.00 |
$424.62 |
$855.40 |
| 171 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 183 | CY |
$60.00 |
$45.95 |
$70.00 |
$60.00 |
$55.73 |
$48.22 |
| 172 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 668 | CY |
$60.00 |
$55.00 |
$86.00 |
$48.00 |
$46.77 |
$28.16 |
| 173 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 196,064 | LF |
$0.1500 |
$0.1100 |
$0.1100 |
$0.1000 |
$0.1100 |
$0.1000 |
| 174 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 549,576 | LF |
$2.50 |
$0.2700 |
$0.2600 |
$0.2500 |
$1.31 |
$1.18 |
| 175 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 89,321 | LF |
$0.6000 |
$0.3000 |
$0.3000 |
$0.2800 |
$0.3000 |
$0.2700 |
| 176 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 4,350 | SD |
$9.50 |
$5.33 |
$5.29 |
$5.00 |
$4.48 |
$4.03 |
| 177 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 24,875 | LF |
$15.00 |
$11.00 |
$25.75 |
$30.00 |
$32.23 |
$60.00 |
| 178 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 62,538 | LF |
$6.00 |
$2.21 |
$3.03 |
$5.50 |
$5.97 |
$10.00 |
| 179 | 880(A) 8800 |
ARROW DISPLAY(TYPE A) | 660 | SD |
$3.00 |
$1.07 |
$1.06 |
$1.00 |
$0.5600 |
$0.5000 |
| 180 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 136,061 | SD |
$0.0500 |
$0.0300 |
$0.0300 |
$0.0300 |
$0.0300 |
$0.0300 |
| 181 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 52,718 | SD |
$0.1000 |
$2.00 |
$2.12 |
$2.00 |
$0.0300 |
$0.0300 |
| 182 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 46,804 | SD |
$0.5000 |
$3.50 |
$3.70 |
$3.50 |
$0.0300 |
$0.0300 |
| 183 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 77,670 | SD |
$6.00 |
$0.1100 |
$0.1100 |
$0.1000 |
$0.0300 |
$0.0300 |
| 184 | 880(C) 8848 |
WING BARRICADES | 5,448 | SD |
$0.5000 |
$0.2700 |
$0.2600 |
$0.2500 |
$8.96 |
$8.06 |
| 185 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 166,862 | SD |
$0.3000 |
$0.2500 |
$0.2600 |
$0.2500 |
$0.0600 |
$0.0500 |
| 186 | 880(F) 8878 |
DRUMS | 223,703 | SD |
$0.2000 |
$0.2500 |
$0.2600 |
$0.2500 |
$0.5600 |
$0.5000 |
| 187 | 880(G) 8890 |
CHANNELIZER CONES | 20,761 | SD |
$0.2000 |
$1.07 |
$1.06 |
$1.00 |
$1.12 |
$1.01 |
| 188 | 880(I) 8902 |
FLAGGER | 60 | SD |
$150.00 |
$446.70 |
$174.55 |
$700.00 |
$897.26 |
$100.00 |
| 189 | 880(K) 8908 |
SURVEILLANCE TRAFFIC CONTROL | 700 | SD |
$500.00 |
$426.00 |
$423.14 |
$400.00 |
$805.61 |
$453.17 |
| 190 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 13,500 | HOUR |
$80.00 |
$40.00 |
$69.82 |
$76.00 |
$89.60 |
$74.97 |
| 191 | 882 8360 |
(SP)SMART WORK ZONE SYSTEM | 700 | SD |
$20.00 |
$21.30 |
$21.15 |
$20.00 |
$8.96 |
$8.06 |
| 192 | 882 8370 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | 16,100 | SD |
$13.00 |
$10.65 |
$10.58 |
$10.00 |
$8.96 |
$8.06 |
| 193 | 882 8372 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) | 14,700 | SD |
$7.00 |
$5.33 |
$5.29 |
$5.00 |
$5.04 |
$4.53 |
| 194 | 882 8374 |
(SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) | 1,400 | SD |
$30.00 |
$10.65 |
$10.58 |
$10.00 |
$11.20 |
$10.07 |
| 195 | 882 8376 |
(SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM | 700 | SD |
$15.00 |
$21.30 |
$21.15 |
$20.00 |
$8.96 |
$8.06 |
| 196 | 882 8378 |
(PL)SMART WORK ZONE SYSTEM SETUP | 1 | EA |
$150,000.00 |
$228,975.00 |
$227,439.66 |
$215,000.00 |
$167,996.19 |
$151,057.40 |
| 197 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 7,424 | SD |
$10.00 |
$10.65 |
$10.58 |
$10.00 |
$6.72 |
$6.04 |
| 198 | 890 7700 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$40,000.00 |
$21,300.00 |
$21,157.18 |
$20,000.00 |
$26,922.46 |
$24,208.46 |
| 199 | 413(C) 4868 |
RUMBLE STRIP-METHOD PCC-CON | 50,265 | LF |
$0.7000 |
$0.2300 |
$0.1700 |
$0.2200 |
$0.1800 |
$0.1600 |
| 200 | 509(A) 0319 |
CLASS AA CONCRETE | 144.99 | CY |
$510.00 |
$372.75 |
$185.12 |
$350.00 |
$196.00 |
$176.23 |
| 201 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 324 | LF |
$800.00 |
$931.88 |
$925.63 |
$875.00 |
$876.38 |
$788.02 |
| 202 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 13,608 | LF |
$8.00 |
$2.13 |
$2.12 |
$2.00 |
$1.30 |
$3.37 |
| 203 | 628 5180 |
INSTALLATION OF CABLE BARRIER SYSTEM | 13,550 | LF |
$18.00 |
$6.39 |
$6.35 |
$6.00 |
$11.76 |
$10.57 |
| 204 | 628(C) 5110 |
END ANCHORS | 8 | EA |
$4,500.00 |
$1,065.00 |
$1,057.85 |
$1,000.00 |
$2,239.95 |
$2,014.10 |
| 205 | 804(A) 2915 |
STRUCTURAL CONCRETE | 12 | CY |
$400.00 |
$532.50 |
$528.93 |
$500.00 |
$419.99 |
$377.64 |
| 206 | 804(B) 2916 |
REINFORCING STEEL | 3,074 | LB |
$1.00 |
$2.13 |
$1.06 |
$2.00 |
$1.68 |
$1.75 |
| 207 | 805(A) 8716 |
(PL)REMOVAL OF OVERHEAD SIGN STRUCTURE | 3 | EA |
$4,000.00 |
$2,130.00 |
$2,115.72 |
$2,000.00 |
$11,345.34 |
$10,201.41 |
| 208 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 105 | EA |
$100.00 |
$106.50 |
$105.78 |
$100.00 |
$89.60 |
$80.56 |
| 209 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 8 | EA |
$250.00 |
$1,065.00 |
$1,057.85 |
$1,000.00 |
$279.99 |
$251.76 |
| 210 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 761 | SF |
$20.00 |
$13.85 |
$13.75 |
$13.00 |
$17.92 |
$16.11 |
| 211 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 522 | SF |
$28.00 |
$23.43 |
$23.27 |
$22.00 |
$21.28 |
$19.13 |
| 212 | 850(B) 8114 |
EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 2,502 | SF |
$30.00 |
$23.43 |
$23.27 |
$22.00 |
$22.40 |
$20.14 |
| 213 | 851(A) 3207 |
6"@15 GALV.STEEL WIDE FLANGE BEAM POST | 84 | LF |
$25.00 |
$24.50 |
$24.33 |
$23.00 |
$17.92 |
$16.11 |
| 214 | 851(A) 3209 |
6"@25 GALV.STEEL WIDE FLANGE BEAM POST | 134 | LF |
$35.00 |
$26.63 |
$26.44 |
$25.00 |
$29.12 |
$26.18 |
| 215 | 851(A) 3212 |
8"@40 GALV.STEEL WIDE FLANGE BEAM POST | 46 | LF |
$45.00 |
$42.60 |
$42.31 |
$40.00 |
$47.04 |
$42.30 |
| 216 | 851(C) 8324 |
2" SQUARE TUBE POST | 830 | LF |
$10.00 |
$9.59 |
$9.52 |
$9.00 |
$5.60 |
$5.04 |
| 217 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 84 | LF |
$12.00 |
$10.65 |
$10.58 |
$10.00 |
$7.84 |
$7.05 |
| 218 | 852(D) 0310 |
OVHD.SN.STR., MONOTUBE TYPE B 80' | 1 | EA |
$140,000.00 |
$85,200.00 |
$84,628.72 |
$80,000.00 |
$89,597.97 |
$80,563.95 |
| 219 | 852(D) 0315 |
OVHD.SN.STR., MONOTUBE TYPE B 85' | 1 | EA |
$150,000.00 |
$106,500.00 |
$105,785.89 |
$100,000.00 |
$100,797.71 |
$90,634.44 |
| 220 | 852(D) 0325 |
OVHD.SN.STR., MONOTUBE TYPE B 95' | 1 | EA |
$175,000.00 |
$127,800.00 |
$126,943.07 |
$120,000.00 |
$113,117.43 |
$101,711.98 |
| 221 | 852(E) 0500 |
OVHD.SN.STR., MONOTUBE TYPE C | 3 | EA |
$90,000.00 |
$58,575.00 |
$58,182.24 |
$55,000.00 |
$51,798.83 |
$46,576.03 |
| 222 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 40 | EA |
$30.00 |
$21.30 |
$21.15 |
$20.00 |
$20.16 |
$18.13 |
| 223 | 853 9027 |
DELINEATORS(TYPE 1, CODE 2) | 6 | EA |
$30.00 |
$23.43 |
$23.27 |
$22.00 |
$22.40 |
$20.14 |
| 224 | 853 9036 |
DELINEATORS(TYPE 2, CODE 2) | 14 | EA |
$20.00 |
$26.63 |
$26.44 |
$25.00 |
$26.88 |
$24.17 |
| 225 | 853 9063 |
BARRIER DELINEATORS(TYPE 2, CODE 1) | 59 | EA |
$13.00 |
$10.65 |
$10.58 |
$10.00 |
$15.23 |
$13.70 |
| 226 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 29 | EA |
$15.00 |
$15.98 |
$13.75 |
$12.50 |
$14.39 |
$12.94 |
| 227 | 855(B) 8824 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 10 | EA |
$700.00 |
$2,662.50 |
$2,644.65 |
$2,500.00 |
$1,511.97 |
$1,359.52 |
| 228 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 14,852 | LF |
$0.5000 |
$0.5300 |
$0.5300 |
$0.5000 |
$0.3800 |
$0.3400 |
| 229 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 95,720 | LF |
$0.8000 |
$0.7500 |
$0.7400 |
$0.7000 |
$0.6500 |
$0.5800 |
| 230 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 4,930 | LF |
$1.25 |
$1.60 |
$1.59 |
$1.50 |
$2.02 |
$1.81 |
| 231 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 3,040 | LF |
$3.00 |
$2.13 |
$2.12 |
$2.00 |
$3.19 |
$2.87 |
| 232 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 229 | LF |
$9.00 |
$5.33 |
$5.29 |
$5.00 |
$5.60 |
$5.04 |
| 233 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 79 | EA |
$250.00 |
$213.00 |
$211.57 |
$200.00 |
$223.99 |
$201.41 |
| 234 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 9 | EA |
$25,000.00 |
$19,170.00 |
$19,041.46 |
$18,000.00 |
$19,711.55 |
$17,724.07 |
| 235 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 40 | LF |
$5.75 |
$5.33 |
$5.29 |
$5.00 |
$9.91 |
$8.90 |
| 236 | 802(B) 8346 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 2,433 | LF |
$11.25 |
$8.52 |
$8.46 |
$8.00 |
$16.46 |
$14.78 |
| 237 | 803(A) 8065 |
PULL BOX(SIZE I) | 6 | EA |
$400.00 |
$426.00 |
$423.14 |
$400.00 |
$526.39 |
$472.51 |
| 238 | 803(A) 8066 |
PULL BOX(SIZE II) | 2 | EA |
$450.00 |
$479.25 |
$476.04 |
$450.00 |
$649.59 |
$583.09 |
| 239 | 804(A) 2915 |
STRUCTURAL CONCRETE | 41 | CY |
$450.00 |
$532.50 |
$528.93 |
$500.00 |
$862.38 |
$774.10 |
| 240 | 804(B) 2916 |
REINFORCING STEEL | 2,914 | LB |
$0.9000 |
$1.07 |
$1.06 |
$1.00 |
$1.96 |
$2.00 |
| 241 | 806(A) 8313 |
32'MH POLE 45'TS & 10'LMA(G.STL.) | 1 | EA |
$16,000.00 |
$13,264.58 |
$13,175.63 |
$12,455.00 |
$1,791.96 |
$16,085.25 |
| 242 | 806(A) 8349 |
32' MH POLE, 65' TS & 10' LMA (G.STL.) | 1 | EA |
$25,000.00 |
$15,514.92 |
$15,410.88 |
$14,568.00 |
$25,759.42 |
$23,122.55 |
| 243 | 806(A) 8353 |
32'MH POLE,55'TS & 10'LMA(G.STL.) | 1 | EA |
$20,000.00 |
$14,929.17 |
$14,829.07 |
$14,018.00 |
$20,439.54 |
$18,347.24 |
| 244 | 806(A) 8730 |
POLE & 35' TS MST.ARM(G.STL.) | 1 | EA |
$7,000.00 |
$8,775.60 |
$8,716.76 |
$8,240.00 |
$13,355.70 |
$11,988.54 |
| 245 | 806(A) 8732 |
POLE & 40' TS MST.ARM(G.STL.) | 1 | EA |
$16,000.00 |
$9,510.45 |
$9,446.68 |
$8,930.00 |
$13,971.69 |
$12,541.47 |
| 246 | 806(A) 8736 |
POLE & 50' TS MST.ARM(G.STL.) | 1 | EA |
$13,000.00 |
$14,509.56 |
$14,412.27 |
$13,624.00 |
$19,582.76 |
$17,578.16 |
| 247 | 806(B) 8894 |
10' MTG.HT.TS PED.POLE(G.STL.) | 2 | EA |
$650.00 |
$745.50 |
$740.50 |
$700.00 |
$705.59 |
$633.36 |
| 248 | 811 8040 |
1/C NO.6 ELECTRICAL CONDUCTOR | 200 | LF |
$1.75 |
$2.13 |
$2.12 |
$2.00 |
$4.14 |
$3.72 |
| 249 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 3,044 | LF |
$1.00 |
$0.5300 |
$0.5300 |
$0.5000 |
$1.23 |
$1.11 |
| 250 | 825 8550 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY | 1 | EA |
$30,000.00 |
$39,713.85 |
$39,447.56 |
$37,290.00 |
$23,905.86 |
$21,458.73 |
| 251 | 828 8132 |
(PL)DETECTION SYSTEM (VIDEO) | 1 | LSUM |
$40,000.00 |
$69,225.00 |
$68,760.83 |
$65,000.00 |
$36,141.58 |
$32,441.94 |
| 252 | 830 8000 |
PEDESTRIAN PUSH BUTTON | 4 | EA |
$1,000.00 |
$1,741.28 |
$1,729.60 |
$1,635.00 |
$823.18 |
$738.92 |
| 253 | 831 8231 |
1WAY 3SEC. ADJ. SIG. HD. S-6 | 7 | EA |
$600.00 |
$532.50 |
$528.93 |
$500.00 |
$733.58 |
$658.49 |
| 254 | 831 8244 |
1WAY 4SEC. ADJ. SIG. HD. S-7 | 3 | EA |
$675.00 |
$660.30 |
$655.88 |
$620.00 |
$873.58 |
$784.16 |
| 255 | 831 8252 |
1WAY 3SEC. ADJ. SIG. HD. S-9 | 4 | EA |
$600.00 |
$532.50 |
$528.93 |
$500.00 |
$744.78 |
$668.54 |
| 256 | 831 8262 |
1WAY 3SEC. ADJ. SIG. HD. S-10 | 3 | EA |
$615.00 |
$532.50 |
$528.93 |
$500.00 |
$744.78 |
$668.54 |
| 257 | 831 8295 |
1WAY 2SEC. ADJ. PED. SIG. HD. S-20 | 4 | EA |
$500.00 |
$452.63 |
$449.59 |
$425.00 |
$621.59 |
$557.96 |
| 258 | 833 3030 |
BACKPLATE | 17 | EA |
$105.00 |
$127.80 |
$126.94 |
$120.00 |
$184.80 |
$165.88 |
| 259 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 4,019 | LF |
$2.00 |
$2.13 |
$2.12 |
$2.00 |
$1.79 |
$1.61 |
| 260 | 834(A) 8208 |
7/C TRAFFIC SIGNAL ELECTRICAL CABLE | 1,774 | LF |
$2.25 |
$2.66 |
$2.64 |
$2.50 |
$2.18 |
$1.96 |
| 261 | 834(A) 8210 |
12/C TRAFFIC SIGNAL ELECTRICAL CABLE | 454 | LF |
$3.50 |
$3.20 |
$3.17 |
$3.00 |
$3.70 |
$3.32 |
| 262 | 834(B) 8220 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 48 | LF |
$1.00 |
$1.07 |
$1.06 |
$1.00 |
$2.24 |
$2.01 |
| 263 | 850(C) 8118 |
MAST ARM MOUNTED SIGNS(ALUMINUM) | 151 | SF |
$45.00 |
$53.25 |
$52.90 |
$50.00 |
$38.08 |
$34.18 |
| 264 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$640,891.00 |
$190,000.00 |
$133,448.90 |
$500,000.00 |
$531,035.96 |
$500,000.00 |
| 265 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$20,000.00 |
$1,400.00 |
$2,644.65 |
$25,000.00 |
$46,408.93 |
$25,000.00 |
| 266 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$15,000.00 |
$44,896.12 |
$12,694.30 |
$50,000.00 |
$61,613.84 |
$40,000.00 |
| 267 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$3,299,200.00 |
|
|
|
|
|
| 268 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$575,000.00 |
$150,000.00 |
$23,390.05 |
$44,821.05 |
$800,000.00 |
| 269 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 295,079 | CY |
$4.50 |
$4.10 |
$6.50 |
$5.53 |
$7.54 |
$9.40 |
| 270 | 202(B) 0105 |
MUCK EXCAVATION | 1,615 | CY |
$13.00 |
$11.24 |
$15.00 |
$10.34 |
$25.23 |
$10.42 |
| 271 | 202(D) 0184 |
UNCLASSIFIED BORROW | 24,613 | CY |
$8.00 |
$4.10 |
$0.2500 |
$12.14 |
$11.68 |
$2.63 |
| 272 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$439,200.00 |
$245,000.00 |
$170,000.00 |
$163,717.61 |
$226,819.32 |
$479,190.40 |
| 273 | 221(C) 2801 |
TEMPORARY SILT FENCE | 35,795 | LF |
$1.50 |
$1.70 |
$2.53 |
$1.95 |
$1.79 |
$1.62 |
| 274 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 20 | EA |
$150.00 |
$266.25 |
$126.12 |
$150.00 |
$279.99 |
$253.81 |
| 275 | 221(E) 2804 |
TEMPORARY SEDIMENT BASIN | 1 | EA |
$5,000.00 |
$6,390.00 |
$985.92 |
$24,000.00 |
$6,719.85 |
$6,091.37 |
| 276 | 221(F) 0100 |
TEMPORARY SILT DIKE | 13,342 | LF |
$5.00 |
$7.46 |
$15.32 |
$8.50 |
$7.84 |
$7.11 |
| 277 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 100 | CY |
$90.00 |
$85.20 |
$69.52 |
$290.00 |
$89.60 |
$81.22 |
| 278 | 230(A) 2806 |
SOLID SLAB SODDING | 405,600 | SY |
$1.50 |
$1.54 |
$1.86 |
$1.40 |
$1.90 |
$2.33 |
| 279 | 232(B) 2814 |
SEEDING METHOD B | 164.4 | AC |
$500.00 |
$852.00 |
$212.78 |
$100.00 |
$895.98 |
$812.18 |
| 280 | 233(A) 2817 |
VEGETATIVE MULCHING | 164.4 | AC |
$200.00 |
$426.00 |
$585.14 |
$100.00 |
$447.99 |
$406.09 |
| 281 | 241 2832 |
MOWING | 164.4 | AC |
$60.00 |
$53.25 |
$101.07 |
$170.00 |
$56.00 |
$50.76 |
| 282 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 12 | EA |
$2,500.00 |
$2,327.59 |
$2,053.25 |
$1,100.00 |
$2,799.94 |
$2,544.53 |
| 283 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 54,710 | CY |
$40.00 |
$27.00 |
$28.56 |
$59.00 |
$58.22 |
$65.00 |
| 284 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 1,615 | CY |
$85.00 |
$46.84 |
$49.55 |
$65.00 |
$68.17 |
$65.00 |
| 285 | 307(K) 4300 |
STABILIZED SUBGRADE | 284,628 | SY |
$4.00 |
$4.00 |
$3.49 |
$5.00 |
$4.54 |
$5.00 |
| 286 | 310(B) 0149 |
SUBGRADE, METHOD B | 58,918 | SY |
$1.15 |
$1.00 |
$1.06 |
$0.8600 |
$2.09 |
$1.25 |
| 287 | 317 4270 |
CEMENT TREATED BASE | 236,114 | SY |
$10.00 |
$12.00 |
$11.95 |
$12.50 |
$10.19 |
$14.00 |
| 288 | 325 5271 |
SEPARATOR FABRIC | 296,454 | SY |
$1.50 |
$1.07 |
$1.13 |
$1.05 |
$0.9900 |
$0.8900 |
| 289 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 35,352 | TON |
$35.00 |
$26.00 |
$20.10 |
$22.00 |
$34.81 |
$26.61 |
| 290 | 407(B) 0250 |
TACK COAT | 1,921 | GAL |
$3.00 |
$3.00 |
$5.02 |
$4.85 |
$2.24 |
$4.90 |
| 291 | 408 5774 |
PRIME COAT | 162,343 | GAL |
$4.00 |
$0.5000 |
$0.2500 |
$1.50 |
$2.24 |
$0.0100 |
| 292 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 1,271 | TON |
$82.00 |
$63.75 |
$84.21 |
$102.00 |
$69.30 |
$82.73 |
| 293 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,704 | TON |
$75.00 |
$66.95 |
$64.21 |
$83.00 |
$61.07 |
$63.03 |
| 294 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 839 | TON |
$90.00 |
$75.30 |
$107.90 |
$125.00 |
$79.52 |
$105.56 |
| 295 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 427 | TON |
$90.00 |
$100.70 |
$196.23 |
$210.00 |
$71.45 |
$192.93 |
| 296 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 1,000 | TON |
$120.00 |
$130.80 |
$101.55 |
$130.00 |
$140.00 |
$99.70 |
| 297 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 116,835 | SY |
$10.00 |
$6.00 |
$5.23 |
$10.80 |
$9.25 |
$7.80 |
| 298 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 151,183 | SY |
$15.00 |
$9.36 |
$8.65 |
$13.80 |
$13.60 |
$13.45 |
| 299 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 500 | SY |
$60.00 |
$164.35 |
$18.45 |
$125.00 |
$30.20 |
$145.97 |
| 300 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 81,231 | CY |
$100.00 |
$95.00 |
$98.22 |
$105.00 |
$115.00 |
$89.72 |
| 301 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 154 | CY |
$10.00 |
$26.63 |
$25.00 |
$25.00 |
$25.36 |
$20.31 |
| 302 | 509(A) 0319 |
CLASS AA CONCRETE | 504 | CY |
$400.00 |
$452.63 |
$527.27 |
$300.00 |
$536.34 |
$345.66 |
| 303 | 509(D) 0325 |
CLASS C CONCRETE | 2,517 | CY |
$280.00 |
$207.68 |
$276.11 |
$195.00 |
$196.00 |
$357.00 |
| 304 | 511(A) 0332 |
REINFORCING STEEL | 76,532 | LB |
$0.9000 |
$1.07 |
$1.00 |
$0.8300 |
$0.4200 |
$1.00 |
| 305 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 270 | TON |
$45.00 |
$47.26 |
$68.00 |
$54.39 |
$66.01 |
$53.87 |
| 306 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 86 | TON |
$35.00 |
$36.49 |
$61.00 |
$48.04 |
$55.33 |
$43.00 |
| 307 | 611(G) 5388 |
INLET CDI RCB DES. 2 | 1 | EA |
$1,100.00 |
$3,488.76 |
$2,300.00 |
$2,279.00 |
$2,643.10 |
$2,595.86 |
| 308 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 5 | EA |
$2,200.00 |
$1,997.31 |
$2,500.00 |
$2,234.72 |
$2,591.88 |
$2,552.19 |
| 309 | 612(C) 0645 |
INLET ADJUST TO GRADE | 3 | EA |
$2,000.00 |
$1,130.51 |
$450.00 |
$945.22 |
$1,345.61 |
$4,131.08 |
| 310 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 98 | LF |
$60.00 |
$73.57 |
$75.00 |
$40.32 |
$50.29 |
$34.91 |
| 311 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 402 | LF |
$75.00 |
$93.66 |
$86.00 |
$48.13 |
$62.63 |
$46.61 |
| 312 | 613(A) 0497 |
54" R.C.PIPE CLASS III | 170 | LF |
$180.00 |
$279.66 |
$350.00 |
$139.14 |
$229.14 |
$151.75 |
| 313 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 794 | LF |
$25.00 |
$31.41 |
$58.00 |
$36.70 |
$51.53 |
$83.70 |
| 314 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 11,880 | LF |
$20.00 |
$11.05 |
$14.00 |
$23.49 |
$14.82 |
$15.64 |
| 315 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 3,960 | LF |
$15.00 |
$9.67 |
$14.00 |
$23.49 |
$22.91 |
$15.64 |
| 316 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 35,400 | LF |
$14.00 |
$9.40 |
$14.00 |
$10.00 |
$8.62 |
$8.65 |
| 317 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 6,372 | LF |
$20.00 |
$8.66 |
$14.00 |
$12.00 |
$18.73 |
$15.06 |
| 318 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$900.00 |
$1,131.33 |
$760.00 |
$697.47 |
$867.09 |
$1,258.57 |
| 319 | 613(L) 5740 |
54" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$2,500.00 |
$2,920.12 |
$2,500.00 |
$2,184.13 |
$2,568.68 |
$2,518.48 |
| 320 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$858.39 |
$720.00 |
$1,500.00 |
$1,436.80 |
$2,287.97 |
| 321 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 3 | EA |
$2,000.00 |
$943.59 |
$1,100.00 |
$1,300.00 |
$1,984.99 |
$2,222.93 |
| 322 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 1 | EA |
$1,800.00 |
$1,060.74 |
$1,300.00 |
$2,000.00 |
$1,865.89 |
$2,283.14 |
| 323 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 74 | EA |
$200.00 |
$297.90 |
$330.00 |
$265.85 |
$333.58 |
$854.96 |
| 324 | 613(W) 4498 |
18" JACKED CONDUIT | 214 | LF |
$400.00 |
$531.18 |
$505.40 |
$464.63 |
$431.77 |
$480.18 |
| 325 | 613(W) 4500 |
24" JACKED CONDUIT | 102 | LF |
$500.00 |
$645.54 |
$486.18 |
$458.21 |
$571.71 |
$471.79 |
| 326 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$185,000.00 |
$100,000.00 |
$110,000.00 |
$183,816.45 |
$243,128.22 |
$189,150.67 |
| 327 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 156,367 | SY |
$4.00 |
$5.70 |
$6.03 |
$5.04 |
$8.65 |
$8.44 |
| 328 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 55,743 | SY |
$2.00 |
$3.00 |
$3.17 |
$4.92 |
$2.24 |
$4.96 |
| 329 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 575 | LF |
$16.00 |
$17.04 |
$17.69 |
$16.00 |
$15.68 |
$14.10 |
| 330 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,450.00 |
$2,032.55 |
$2,109.92 |
$1,908.50 |
$2,195.15 |
$1,973.82 |
| 331 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,000.00 |
$2,369.63 |
$2,459.82 |
$2,225.00 |
$2,463.95 |
$2,215.51 |
| 332 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$1,000.00 |
$2,076.75 |
$2,155.79 |
$1,950.00 |
$2,217.55 |
$1,993.96 |
| 333 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,500.00 |
$1,517.63 |
$1,575.40 |
$1,425.00 |
$1,887.16 |
$1,696.88 |
| 334 | 624(A) 4281 |
FENCE-STYLE WWF | 38,859 | LF |
$6.00 |
$3.99 |
$6.36 |
$3.75 |
$5.94 |
$6.19 |
| 335 | 627(A) 4317 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 1,480 | LF |
$60.00 |
$36.99 |
$45.46 |
$100.00 |
$84.58 |
$56.07 |
| 336 | 627(B) 4410 |
CONCRETE LONGITUDINAL BARRIER END SECTIONS | 8 | EA |
$2,000.00 |
$1,892.50 |
$584.96 |
$4,700.00 |
$901.48 |
$1,710.10 |
| 337 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 27,110 | CY |
$5.00 |
$11.01 |
$9.43 |
$5.43 |
$13.35 |
$14.56 |
| 338 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 905 | CY |
$14.00 |
$21.30 |
$25.00 |
$20.00 |
$14.00 |
$103.43 |
| 339 | 509(A) 1326 |
CLASS AA CONCRETE | 2,187.7 | CY |
$380.00 |
$282.44 |
$560.01 |
$300.00 |
$262.07 |
$345.66 |
| 340 | 511(A) 1332 |
REINFORCING STEEL | 405,880 | LB |
$0.9000 |
$0.9400 |
$1.00 |
$0.8200 |
$1.06 |
$1.00 |
| 341 | 619(B) 2510 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$10,000.00 |
$29,872.90 |
$43,549.47 |
$20,000.00 |
$60,250.49 |
$75,000.00 |
| 342 | 619(B) 2520 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 1 | LSUM |
$10,000.00 |
$24,872.90 |
$0.00 |
$20,000.00 |
$60,250.49 |
$75,000.00 |
| 343 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 120 | CY |
$18.00 |
$42.00 |
$44.43 |
$45.00 |
$28.25 |
$20.35 |
| 344 | 501(F) 6352 |
GRANULAR BACKFILL | 48 | CY |
$53.00 |
$90.00 |
$95.21 |
$55.00 |
$112.01 |
$41.66 |
| 345 | 504(A) 1304 |
APPROACH SLAB | 141.6 | SY |
$180.00 |
$195.00 |
$211.57 |
$160.00 |
$170.56 |
$174.37 |
| 346 | 504(B) 1305 |
SAW-CUT GROOVING | 910 | SY |
$5.80 |
$4.26 |
$4.23 |
$4.40 |
$4.48 |
$4.44 |
| 347 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 571.4 | LF |
$75.00 |
$75.00 |
$79.34 |
$58.00 |
$92.98 |
$136.70 |
| 348 | 506(A) 1322 |
STRUCTURAL STEEL | 231,340 | LB |
$1.80 |
$1.75 |
$1.90 |
$1.48 |
$2.07 |
$1.19 |
| 349 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$900.00 |
$500.00 |
$528.93 |
$405.00 |
$220.55 |
$457.53 |
| 350 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 24 | EA |
$1,050.00 |
$1,500.00 |
$1,586.79 |
$1,200.00 |
$823.00 |
$1,173.93 |
| 351 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 24 | EA |
$460.00 |
$300.00 |
$317.36 |
$340.00 |
$860.35 |
$2,005.03 |
| 352 | 509(A) 1326 |
CLASS AA CONCRETE | 248 | CY |
$550.00 |
$700.00 |
$740.50 |
$600.00 |
$823.22 |
$508.97 |
| 353 | 509(B) 1328 |
CLASS A CONCRETE | 146.4 | CY |
$560.00 |
$980.00 |
$1,057.85 |
$850.00 |
$516.13 |
$974.82 |
| 354 | 510(C) 6138 |
SLOPE WALL (5") | 584 | SY |
$85.00 |
$130.00 |
$137.53 |
$85.00 |
$79.69 |
$60.68 |
| 355 | 511(A) 1332 |
REINFORCING STEEL | 87,580 | LB |
$0.9000 |
$0.9500 |
$1.00 |
$1.00 |
$0.8900 |
$1.00 |
| 356 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 260 | LF |
$31.00 |
$30.00 |
$31.73 |
$40.00 |
$27.12 |
$26.46 |
| 357 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 260 | LF |
$16.00 |
$40.00 |
$42.31 |
$18.00 |
$29.80 |
$43.67 |
| 358 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 359 | 516(A) 6093 |
DRILLED SHAFTS 42" DIAMETER | 74 | LF |
$780.00 |
$1,250.00 |
$1,322.33 |
$1,500.00 |
$741.41 |
$800.00 |
| 360 | 516(A) 6100 |
DRILLED SHAFTS 84" DIAMETER | 40 | LF |
$1,700.00 |
$2,200.00 |
$2,433.08 |
$3,000.00 |
$1,293.24 |
$1,500.00 |
| 361 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,750.00 |
$1,600.00 |
$1,586.79 |
$2,200.00 |
$7,315.97 |
$3,115.50 |
| 362 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 64 | LF |
$23.00 |
$30.00 |
$31.73 |
$16.00 |
$17.36 |
$8.04 |
| 363 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 16 | LF |
$20.00 |
$35.00 |
$37.02 |
$16.00 |
$20.88 |
$24.50 |
| 364 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$125,000.00 |
$132,232.36 |
$60,000.00 |
$123,824.23 |
$125,000.00 |
| 365 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 420 | CY |
$18.00 |
$42.00 |
$23.00 |
$22.00 |
$159.45 |
$27.94 |
| 366 | 501(G) 6309 |
CLSM BACKFILL | 580 | CY |
$110.00 |
$145.00 |
$280.00 |
$150.00 |
$112.00 |
$115.73 |
| 367 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$200,000.00 |
$45,000.00 |
$39,000.00 |
$55,000.00 |
$135,583.89 |
$60,000.00 |
| 368 | 504(A) 1304 |
APPROACH SLAB | 941 | SY |
$170.00 |
$195.00 |
$190.00 |
$158.00 |
$170.56 |
$137.10 |
| 369 | 504(B) 1305 |
SAW-CUT GROOVING | 3,518 | SY |
$4.25 |
$4.26 |
$5.50 |
$4.40 |
$4.48 |
$4.44 |
| 370 | 504(C) 6250 |
SEALED EXPANSION JOINT | 139.1 | LF |
$260.00 |
$200.00 |
$220.00 |
$305.00 |
$286.63 |
$192.20 |
| 371 | 504(E) 1381 |
CONCRETE PARAPET | 230 | LF |
$150.00 |
$90.37 |
$120.00 |
$89.00 |
$229.13 |
$156.76 |
| 372 | 504(E) 6190 |
42" F-SHAPED PARAPET | 460 | LF |
$80.00 |
$120.00 |
$140.00 |
$198.00 |
$88.21 |
$80.84 |
| 373 | 506(A) 1322 |
STRUCTURAL STEEL | 512,520 | LB |
$1.80 |
$1.62 |
$2.50 |
$1.67 |
$2.07 |
$1.21 |
| 374 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 28 | EA |
$2,600.00 |
$2,500.00 |
$1,500.00 |
$2,000.00 |
$2,755.19 |
$1,351.67 |
| 375 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 56 | EA |
$2,600.00 |
$2,500.00 |
$1,500.00 |
$2,100.00 |
$2,761.74 |
$1,351.67 |
| 376 | 509(A) 1326 |
CLASS AA CONCRETE | 616.4 | CY |
$550.00 |
$600.00 |
$790.00 |
$835.00 |
$865.16 |
$509.95 |
| 377 | 509(B) 1328 |
CLASS A CONCRETE | 494.2 | CY |
$560.00 |
$780.00 |
$840.00 |
$765.00 |
$725.16 |
$857.24 |
| 378 | 509(D) 1331 |
CLASS C CONCRETE | 20 | CY |
$300.00 |
$1,500.00 |
$580.00 |
$778.00 |
$801.64 |
$118.25 |
| 379 | 510(A) 6334 |
RETAINING WALL | 264.2 | SY |
$600.00 |
$670.00 |
$750.00 |
$332.00 |
$491.66 |
$785.77 |
| 380 | 510(C) 6138 |
SLOPE WALL (5") | 1,546 | SY |
$85.00 |
$130.00 |
$100.00 |
$70.00 |
$79.73 |
$49.57 |
| 381 | 511 6306 |
MECHANICAL SPLICES | 40 | EA |
$35.00 |
$90.00 |
$31.00 |
$100.00 |
$47.24 |
$30.63 |
| 382 | 511(A) 1332 |
REINFORCING STEEL | 2,460 | LB |
$0.9000 |
$1.35 |
$0.9500 |
$1.37 |
$0.8900 |
$1.00 |
| 383 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 180,910 | LB |
$1.00 |
$0.9500 |
$1.00 |
$0.8600 |
$0.9900 |
$1.20 |
| 384 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 136 | LF |
$32.00 |
$30.00 |
$43.00 |
$31.00 |
$27.14 |
$24.17 |
| 385 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,398 | LF |
$35.00 |
$35.00 |
$36.00 |
$39.00 |
$32.96 |
$31.96 |
| 386 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 136 | LF |
$16.00 |
$38.00 |
$28.00 |
$5.00 |
$26.96 |
$174.95 |
| 387 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,398 | LF |
$17.50 |
$38.00 |
$28.00 |
$5.00 |
$28.37 |
$22.05 |
| 388 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 389 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,346 | SY |
$4.00 |
$4.26 |
$5.50 |
$4.20 |
$4.48 |
$4.24 |
| 390 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 436 | LF |
$500.00 |
$890.00 |
$930.00 |
$1,075.00 |
$725.82 |
$900.00 |
| 391 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,750.00 |
$1,600.00 |
$2,000.00 |
$1,800.00 |
$12,694.14 |
$4,035.69 |
| 392 | 523(A) 6550 |
SEALER CRACK PREPARATION | 139 | LF |
$4.50 |
$5.33 |
$7.00 |
$6.00 |
$5.60 |
$4.04 |
| 393 | 523(B) 6560 |
SEALER RESIN | 3 | GAL |
$150.00 |
$213.00 |
$270.00 |
$200.00 |
$223.99 |
$121.21 |
| 394 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 284 | LF |
$17.00 |
$30.00 |
$23.00 |
$20.00 |
$17.36 |
$9.79 |
| 395 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 88 | LF |
$19.00 |
$35.00 |
$11.00 |
$22.00 |
$20.88 |
$10.87 |
| 396 | 619(B) 2510 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$20,000.00 |
$65,000.00 |
$54,000.00 |
$50,000.00 |
$21,402.70 |
$50,000.00 |
| 397 | 619(B) 2520 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 1 | LSUM |
$25,000.00 |
$80,000.00 |
$40,000.00 |
$46,000.00 |
$28,536.92 |
$75,000.00 |
| 398 | 619(B) 2530 |
REMOVAL OF BRIDGE ITEM (TYPE C) | 1 | LSUM |
$25,000.00 |
$80,000.00 |
$40,000.00 |
$46,000.00 |
$28,536.92 |
$75,000.00 |
| 399 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 152,235 | LF |
$0.1000 |
$0.1100 |
$0.1200 |
$0.1100 |
$0.1000 |
$0.0900 |
| 400 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 142,995 | LF |
$1.00 |
$0.8000 |
$0.8500 |
$0.8000 |
$1.31 |
$1.18 |
| 401 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 30,000 | EA |
$1.00 |
$0.4000 |
$0.4200 |
$0.4000 |
$0.4900 |
$0.4400 |
| 402 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 200,700 | LF |
$0.6000 |
$0.2100 |
$0.2100 |
$0.2000 |
$0.2400 |
$0.2100 |
| 403 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,460 | SD |
$4.00 |
$10.65 |
$10.58 |
$10.00 |
$4.48 |
$4.03 |
| 404 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 32,205 | LF |
$15.50 |
$11.00 |
$25.75 |
$30.00 |
$33.00 |
$60.00 |
| 405 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 74,540 | LF |
$4.00 |
$1.89 |
$3.03 |
$5.50 |
$5.97 |
$10.00 |
| 406 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 770 | SD |
$8.00 |
$1.07 |
$1.06 |
$1.00 |
$2.24 |
$2.01 |
| 407 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 39,450 | SD |
$0.1500 |
$0.1600 |
$0.1600 |
$0.1500 |
$0.0900 |
$0.0800 |
| 408 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 24,800 | SD |
$0.2000 |
$0.1600 |
$0.1600 |
$0.1500 |
$0.0900 |
$0.0800 |
| 409 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 52,670 | SD |
$0.2500 |
$0.2700 |
$0.2600 |
$0.2500 |
$0.0900 |
$0.0800 |
| 410 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 5,670 | SD |
$0.7500 |
$4.26 |
$4.23 |
$4.00 |
$3.36 |
$3.02 |
| 411 | 880(C) 8848 |
WING BARRICADES | 4,000 | SD |
$1.25 |
$4.26 |
$4.23 |
$4.00 |
$0.1100 |
$0.1000 |
| 412 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 31,000 | SD |
$0.3000 |
$3.20 |
$3.17 |
$3.00 |
$0.5600 |
$0.5000 |
| 413 | 880(F) 8878 |
DRUMS | 150,260 | SD |
$0.3000 |
$0.1100 |
$0.1100 |
$0.1000 |
$0.4800 |
$0.4300 |
| 414 | 880(G) 8890 |
CHANNELIZER CONES | 104,720 | SD |
$0.3000 |
$0.5300 |
$0.5300 |
$0.5000 |
$0.2200 |
$0.2000 |
| 415 | 413(C) 4868 |
RUMBLE STRIP-METHOD PCC-CON | 66,000 | LF |
$0.4000 |
$0.2300 |
$0.3000 |
$0.2200 |
$0.3100 |
$0.2800 |
| 416 | 509(A) 0319 |
CLASS AA CONCRETE | 124 | CY |
$500.00 |
$372.75 |
$426.56 |
$350.00 |
$335.99 |
$302.11 |
| 417 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 216 | LF |
$800.00 |
$931.88 |
$925.63 |
$875.00 |
$876.66 |
$788.27 |
| 418 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 14,119 | LF |
$2.00 |
$2.13 |
$2.12 |
$2.00 |
$1.23 |
$3.31 |
| 419 | 628 5180 |
INSTALLATION OF CABLE BARRIER SYSTEM | 12,038 | LF |
$13.00 |
$6.39 |
$6.35 |
$6.00 |
$11.22 |
$10.09 |
| 420 | 628(C) 5110 |
END ANCHORS | 6 | EA |
$2,300.00 |
$1,065.00 |
$1,057.85 |
$1,000.00 |
$4,367.90 |
$3,927.49 |
| 421 | 804(A) 2915 |
STRUCTURAL CONCRETE | 13.4 | CY |
$500.00 |
$532.50 |
$528.93 |
$500.00 |
$391.99 |
$352.47 |
| 422 | 804(B) 2916 |
REINFORCING STEEL | 4,064 | LB |
$1.00 |
$2.13 |
$1.06 |
$2.00 |
$1.40 |
$1.26 |
| 423 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 42 | EA |
$50.00 |
$79.88 |
$79.34 |
$75.00 |
$106.40 |
$95.67 |
| 424 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 5 | EA |
$200.00 |
$1,065.00 |
$1,057.85 |
$1,000.00 |
$335.99 |
$302.11 |
| 425 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 404.8 | SF |
$15.00 |
$13.85 |
$13.75 |
$13.00 |
$17.92 |
$16.11 |
| 426 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 236 | SF |
$18.00 |
$23.43 |
$23.27 |
$22.00 |
$23.52 |
$21.15 |
| 427 | 850(B) 8114 |
EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 534 | SF |
$20.00 |
$23.43 |
$23.27 |
$22.00 |
$25.76 |
$23.16 |
| 428 | 851(A) 3207 |
6"@15 GALV.STEEL WIDE FLANGE BEAM POST | 70 | LF |
$25.00 |
$24.50 |
$24.33 |
$23.00 |
$20.16 |
$18.13 |
| 429 | 851(A) 3211 |
8"@35 GALV.STEEL WIDE FLANGE BEAM POST | 25.4 | LF |
$35.00 |
$42.60 |
$42.31 |
$40.00 |
$20.16 |
$18.13 |
| 430 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 35 | LF |
$30.00 |
$19.17 |
$19.04 |
$18.00 |
$10.08 |
$9.06 |
| 431 | 851(B) 3219 |
3 1/2"@9.11 GALV.STEEL PIPE POST | 84 | LF |
$35.00 |
$21.30 |
$21.15 |
$20.00 |
$11.20 |
$10.07 |
| 432 | 851(C) 8324 |
2" SQUARE TUBE POST | 550 | LF |
$12.00 |
$9.59 |
$9.52 |
$9.00 |
$7.84 |
$7.05 |
| 433 | 852(D) 0310 |
OVHD.SN.STR., MONOTUBE TYPE B 80' | 2 | EA |
$125,000.00 |
$90,525.00 |
$89,918.01 |
$85,000.00 |
$95,197.84 |
$85,599.20 |
| 434 | 852(E) 0500 |
OVHD.SN.STR., MONOTUBE TYPE C | 2 | EA |
$90,000.00 |
$58,575.00 |
$58,182.24 |
$55,000.00 |
$50,678.85 |
$45,568.99 |
| 435 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 12,236 | LF |
$0.5000 |
$0.5300 |
$0.5300 |
$0.5000 |
$0.4800 |
$0.4300 |
| 436 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 91,849 | LF |
$0.8000 |
$0.7500 |
$0.7400 |
$0.7000 |
$0.6700 |
$0.6000 |
| 437 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 2,503 | LF |
$1.20 |
$1.60 |
$1.59 |
$1.50 |
$1.01 |
$0.9100 |
| 438 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 1,782 | LF |
$3.00 |
$2.13 |
$2.12 |
$2.00 |
$5.04 |
$4.53 |
| 439 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 149 | LF |
$9.00 |
$5.33 |
$5.29 |
$5.00 |
$5.60 |
$5.04 |
| 440 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 25 | EA |
$250.00 |
$213.00 |
$211.57 |
$200.00 |
$447.99 |
$402.82 |
| 441 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 6 | EA |
$25,000.00 |
$19,170.00 |
$19,041.46 |
$18,000.00 |
$19,935.55 |
$17,925.48 |
| 442 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 165 | LF |
$5.00 |
$5.33 |
$5.29 |
$5.00 |
$9.91 |
$8.90 |
| 443 | 802(B) 8344 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 461 | LF |
$20.00 |
$31.95 |
$31.73 |
$30.00 |
$26.88 |
$24.13 |
| 444 | 802(B) 8346 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 602 | LF |
$10.00 |
$8.52 |
$8.46 |
$8.00 |
$20.16 |
$18.10 |
| 445 | 803(A) 8065 |
PULL BOX(SIZE I) | 10 | EA |
$265.00 |
$426.00 |
$423.14 |
$400.00 |
$526.39 |
$472.50 |
| 446 | 803(A) 8066 |
PULL BOX(SIZE II) | 2 | EA |
$240.00 |
$479.25 |
$476.04 |
$450.00 |
$649.59 |
$583.09 |
| 447 | 804(A) 2915 |
STRUCTURAL CONCRETE | 16.3 | CY |
$525.00 |
$532.50 |
$528.93 |
$500.00 |
$862.38 |
$774.10 |
| 448 | 804(B) 2916 |
REINFORCING STEEL | 2,477.2 | LB |
$1.50 |
$1.07 |
$1.06 |
$1.00 |
$2.02 |
$1.81 |
| 449 | 806(A) 8311 |
32'MH POLE 35'TS & 10'LMA(G.STL.) | 4 | EA |
$10,000.00 |
$9,122.79 |
$9,061.62 |
$8,566.00 |
$11,138.15 |
$9,997.99 |
| 450 | 806(A) 8350 |
32'MH POLE,30'TS & 10'LMA(G.STL.) | 1 | EA |
$9,000.00 |
$8,871.45 |
$8,811.97 |
$8,330.00 |
$10,740.56 |
$9,641.10 |
| 451 | 806(A) 8351 |
32'MH POLE 25',TS & 10'LMA(G.STL.) | 1 | EA |
$8,000.00 |
$8,520.00 |
$8,462.87 |
$8,000.00 |
$10,208.57 |
$9,163.57 |
| 452 | 809(A) 8090 |
ROADWAY LUMINAIRE | 6 | EA |
$750.00 |
$426.00 |
$423.14 |
$400.00 |
$464.79 |
$417.21 |
| 453 | 810(A) 3118 |
SERVICE POLE | 1 | EA |
$5,000.00 |
$266.25 |
$264.46 |
$250.00 |
$733.59 |
$658.49 |
| 454 | 811 8040 |
1/C NO.6 ELECTRICAL CONDUCTOR | 100 | LF |
$2.50 |
$2.13 |
$2.12 |
$2.00 |
$4.14 |
$3.72 |
| 455 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 11,364 | LF |
$0.8000 |
$0.5300 |
$0.5300 |
$0.5000 |
$1.23 |
$1.11 |
| 456 | 825 8550 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY | 1 | EA |
$29,000.00 |
$39,713.85 |
$39,447.56 |
$37,290.00 |
$139,431.24 |
$125,158.34 |
| 457 | 831 8231 |
1WAY 3SEC. ADJ. SIG. HD. S-6 | 15 | EA |
$590.00 |
$532.50 |
$528.93 |
$500.00 |
$733.58 |
$658.49 |
| 458 | 831 8280 |
1WAY 4SEC. ADJ. SIG. HD.S-13 | 2 | EA |
$890.00 |
$670.95 |
$666.45 |
$630.00 |
$929.58 |
$834.42 |
| 459 | 833 3030 |
BACKPLATE | 17 | EA |
$68.00 |
$106.50 |
$105.78 |
$100.00 |
$184.80 |
$165.88 |
| 460 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 780 | LF |
$1.50 |
$2.66 |
$2.64 |
$2.50 |
$1.79 |
$1.61 |
| 461 | 834(A) 8210 |
12/C TRAFFIC SIGNAL ELECTRICAL CABLE | 745 | LF |
$3.00 |
$3.99 |
$3.97 |
$3.75 |
$3.70 |
$3.32 |
| 462 | 834(A) 8211 |
15/C TRAFFIC SIGNAL ELECTRICAL CABLE | 2,000 | LF |
$4.00 |
$4.26 |
$4.23 |
$4.00 |
$4.31 |
$3.87 |
| 463 | 840(B) 8593 |
E.P.S. OPTICAL DETECTOR | 6 | EA |
$460.00 |
$639.00 |
$634.71 |
$600.00 |
$660.79 |
$593.14 |
| 464 | 840(C) 8594 |
E.P.S. OPTICAL DETECTOR CABLE | 3,010 | LF |
$1.10 |
$1.07 |
$1.06 |
$1.00 |
$2.02 |
$1.81 |
| 465 | 850(C) 8118 |
MAST ARM MOUNTED SIGNS(ALUMINUM) | 78 | SF |
$45.00 |
$53.25 |
$52.90 |
$50.00 |
$38.08 |
$34.18 |
| 466 | 209 0120 |
MACHINE GRADING | 100 | LF |
$5.50 |
$21.30 |
$21.15 |
$20.00 |
$40.32 |
$153.49 |
| 467 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2 | TON |
$25.00 |
$213.00 |
$211.57 |
$200.00 |
$154.56 |
$50.00 |
| 468 | 509(B) 0321 |
CLASS A CONCRETE | 38 | CY |
$600.00 |
$532.50 |
$528.93 |
$500.00 |
$397.59 |
$600.00 |
| 469 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 43 | LF |
$525.00 |
$852.00 |
$846.29 |
$800.00 |
$750.38 |
$500.00 |
| 470 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 50 | LF |
$8.55 |
$2.13 |
$2.12 |
$2.00 |
$9.18 |
$3.02 |
| 471 | 619(C) 0924 |
SAWING PAVEMENT | 100 | LF |
$3.00 |
$2.13 |
$2.12 |
$2.00 |
$7.67 |
$10.00 |
| 472 | 628 5180 |
INSTALLATION OF CABLE BARRIER SYSTEM | 50 | LF |
$14.00 |
$6.39 |
$6.35 |
$6.00 |
$15.23 |
$20.14 |
| 473 | 628(C) 5110 |
END ANCHORS | 1 | EA |
$3,290.00 |
$1,065.00 |
$1,057.85 |
$1,000.00 |
$4,563.90 |
$4,028.20 |
| 474 | 628(F) 5185 |
(PL)HIGH TENSION CABLE BARRIER - RE-TENSIONING | 1 | EA |
$5,000.00 |
$1,065.00 |
$1,057.85 |
$1,000.00 |
$1,545.56 |
$1,812.69 |
| 475 | 802(C) 8551 |
1 1/2" HIGH DENSITY PE PIPE - BORED | 250 | LF |
$21.66 |
$26.63 |
$26.44 |
$25.00 |
$28.56 |
$25.64 |
| 476 | 802(C) 8553 |
3" HIGH DENSITY PE PIPE - BORED | 250 | LF |
$51.00 |
$31.95 |
$31.73 |
$30.00 |
$31.92 |
$28.65 |
| 477 | 802(C) 8556 |
1 1/2" HIGH DENSITY PE PIPE - TRENCHED | 315 | LF |
$4.93 |
$4.26 |
$4.23 |
$4.00 |
$8.12 |
$7.29 |
| 478 | 802(C) 8558 |
3" HIGH DENSITY PE PIPE - TRENCHED | 295 | LF |
$11.32 |
$8.52 |
$6.35 |
$8.00 |
$18.20 |
$16.34 |
| 479 | 803(A) 8066 |
PULL BOX(SIZE II) | 6 | EA |
$520.30 |
$479.25 |
$476.04 |
$450.00 |
$974.38 |
$874.64 |
| 480 | 803(B) 8105 |
GROUND BOX (R48) | 4 | EA |
$3,566.42 |
$3,195.00 |
$3,173.57 |
$3,000.00 |
$4,759.89 |
$4,272.65 |
| 481 | 804(B) 2916 |
REINFORCING STEEL | 24 | LB |
$0.9400 |
$1.07 |
$1.06 |
$1.00 |
$2.02 |
$1.81 |
| 482 | 805(A) 8700 |
REMOVAL OF SIGN FOOTING | 1 | EA |
$1,500.00 |
$4,260.00 |
$4,231.44 |
$4,000.00 |
$8,864.60 |
$7,957.17 |
| 483 | 805(D) 8746 |
(PL)REMOVE & RESET SERVICE POLE | 1 | EA |
$2,000.00 |
$532.50 |
$528.93 |
$500.00 |
$3,589.52 |
$3,222.08 |
| 484 | 805(D) 8758 |
(PL)REMOVE & RESET OVERHEAD SIGN STRUCTURE | 1 | EA |
$27,488.25 |
$21,300.00 |
$21,157.18 |
$20,000.00 |
$17,354.01 |
$15,577.56 |
| 485 | 805(D) 8764 |
(PL)REMOVE & RESET/RELOCATE ITS EQUIPMENT | 1 | EA |
$27,820.55 |
$21,300.00 |
$21,157.18 |
$20,000.00 |
$11,574.94 |
$10,390.07 |
| 486 | 811 8032 |
1/C NO.0 ELECTRICAL CONDUCTOR | 1,700 | LF |
$3.86 |
$3.20 |
$3.17 |
$3.00 |
$4.82 |
$4.32 |
| 487 | 818(A) 8715 |
(SP)FIBER OPTIC CABLE, 24 SMF | 580 | LF |
$3.50 |
$6.39 |
$6.35 |
$6.00 |
$4.48 |
$4.02 |
| 488 | 818(C) 8735 |
(SP)FIBER OPTIC CABLE SPLICE | 10 | EA |
$49.41 |
$133.13 |
$132.24 |
$125.00 |
$61.04 |
$54.79 |
| 489 | 818(D) 8740 |
(SP)FIBER OPTIC CABLE TERMINATION | 10 | EA |
$64.01 |
$133.13 |
$132.24 |
$125.00 |
$53.20 |
$47.75 |
| 490 | 818(F) 8370 |
(SP) SHIELD ISOLATION PEDESTAL | 1 | EA |
$558.48 |
$197.03 |
$195.70 |
$185.00 |
$103.60 |
$92.99 |
| 491 | 818(G) 5570 |
(SP)FIBER OPTIC ROUTE SIGN & INSTALLATION | 1 | EA |
$132.31 |
$165.08 |
$163.97 |
$155.00 |
$128.80 |
$115.61 |
| 492 | 819 8780 |
(PL)FIBER OPTIC & COMMUNICATION EQUIPMENT | 1 | LSUM |
$48,000.00 |
$12,178.28 |
$12,096.61 |
$11,435.00 |
$10,561.36 |
$9,480.25 |
| 493 | 887(A) 8540 |
(SP)LED DYNAMIC MESSAGE SIGN FIELD EQUIPMENT(18 INCH) | 1 | EA |
$80,000.00 |
$104,961.08 |
$104,257.29 |
$98,555.00 |
$96,317.82 |
$86,458.23 |
| 494 | 887(C) 8500 |
(SP)LED D.M.S SYSTEM SUPPORT EQUIPMENT | 1 | LSUM |
$20,000.00 |
$16,339.23 |
$16,229.67 |
$15,342.00 |
$112.00 |
$100.53 |