| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 5, 2021 | 78501 | SalineDistrict 9 | Replacement of box culvert carrying US 45 over a stream and replacement of a single span bridge with a double box culvert carrying Feazel Road, off of US 45, over Pankey Branch. This project is located near Harrisburg. | — | Executed | Samron Midwest Contracting, Inc. $896,261 · | ||
| Mar 5, 2021 | 78760 | SalineDistrict 9 | 12.8 miles of pavement patching and resurfacing on US 45 from IL 145 in Harrisburg to the Williamson County line in Stonefort. | — | Executed | Southern Illinois Asphalt Co., Inc. $4,208,512 · | ||
| Mar 5, 2021 | 78804 | HamiltonJeffersonDistrict 9 | Bridge deck overlay and joint repair on SN 041-0040 and bridge deck overlays on SN 041-0041, 041-0042 and 033-0012; all on IL 142 in Jefferson and Hamilton Counties. | — | Executed | Samron Midwest Contracting, Inc. $514,157 · | ||
| Mar 5, 2021 | 78836 | VariousDistrict 9 | Cleaning and painting of portions of 16 structures in various counties of District 9. | — | Executed | Venus Painting Co. $1,653,760 · | ||
| Mar 5, 2021 | 78858 | VariousDistrict 9 | Weed spraying for Johnson grass along I-57 at various locations in various counties. | — | Executed | Endrizzi Contracting, Inc $98,315 · | ||
| Mar 5, 2021 | 78859 | VariousDistrict 9 | Weed spraying for broadleaf weeds along I-57 at various locations in various counties. | — | Executed | ALLEN CHASE ENTERPRISES INC. $77,059 · | ||
| Mar 5, 2021 | 85658 | Rock IslandDistrict 2 | Construction of a shared-use path through East Moline and Silvis Improvement starts at the Grand Illinois Trail at the Mississppi River with route signing. Construction starts at 8th Street and 21st Avenue, then along 21st Avenue, Archer Drive and 30th Avenue/Crosstown, ending at 10th Street and Crosstown Avenue. | — | Executed | Miller Trucking & Excavating Company $3,627,048 · | ||
| Mar 5, 2021 | 85697 | Rock IslandDistrict 2 | Sidewalk construction, curb and gutter, storm swer, water main, segmental block retaining wall, intersection resurfacing and pavement markings on IL 84/High Street, from 11th street to south of Linn Street in Port Byron. | — | Executed | Miller Trucking & Excavating Company $3,461,241 · | ||
| Mar 5, 2021 | 85704 | WinnebagoDistrict 2 | Rehabilitate the bridge carrying Alpine Road over Forest Hills Road, 0.2 mile south of Windsor Road. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $4,678,451 · | ||
| Mar 5, 2021 | 85707 | OgleDistrict 2 | Resurface Meridian Road from IL 72 to IL 64. | — | Executed | William Charles Construction Company, LLC $892,032 · | ||
| Mar 5, 2021 | 85710 | LeeDistrict 2 | Cold-In-Place Recycling with HMA overlay on Shaw Road from Brooklyn to IL 251. | — | Executed | Rock Road Companies, Inc. $626,028 · | ||
| Mar 5, 2021 | 87735 | LivingstonDistrict 3 | Resurfcing CH 6/CH 1 from Chestnut Street in Fairbury (Livingston County) to north of the railroad in McLean County. | — | Executed | Kankakee Valley Construction Company, Inc. $2,589,198 · | ||
| Mar 5, 2021 | 87765 | DeKalbDistrict 3 | Resurfacing, sidewalks, curb and gutter, pavement markings on East Hill Street from Sycamore Street to IL 23 in Genoa. | — | Executed | Curran Contracting Company $408,408 · | ||
| Mar 5, 2021 | 89475 | KnoxDistrict 4 | Replace the bridge carrying CH 8 over Brush Creek, 5 miles east of Abingdon. | — | Executed | Curnyn Construction Co. $1,168,725 · | ||
| Mar 5, 2021 | 89765 | FultonDistrict 4 | Processing modified soil, HMA resurfacing, aggregate shoulders, box culvert extension, and the construction of a box culvert, located on CH2 from CH 14 to Airport Road. | — | Executed | Gunther Construction, a div of UCM, Inc. $2,983,349 · | ||
| Mar 5, 2021 | 89788 | McDonoughDistrict 4 | Resurface CH 24 from CH 19 to CH 8. | — | Executed | Gunther Construction, a div of UCM, Inc. $1,083,880 · | ||
| Mar 5, 2021 | 93756 | MenardDistrict 6 | Remove existing three span concrete bridge over an abandoned railroad and then and fill area with earth, add curb and gutter, pipe culverts, sewer, HMA pavement with markings on the east edge of Peterburg. | — | Executed | Perry Broughton Trucking and Excavating, Inc. $620,888 · | ||
| Mar 5, 2021 | 93757 | SchuylerDistrict 6 | Replace the bridge carrying La Prairie Road over South Fork Cedar Creek, east of the Adams County line. | — | Executed | County Contractors, Inc. $537,820 · | ||
| Mar 5, 2021 | 93758 | AdamsDistrict 6 | Resurfcing, sidewalk replacement, curb and gutter replacement, and pavement markinghs on Maine Street from 24th Street to 30th Street in Quincy. | — | Executed | Rees Construction Company of Quincy $899,527 · | ||
| Mar 5, 2021 | 95883 | ClarkDistrict 7 | Construction of a reinforced concrete box culvert extension, aggregate surface course and shoulders, guardrail and pavement markings on CH 26, 1.0 mile southwest of Moriah at Mounts Branch. | — | Executed | Samron Midwest Contracting, Inc. $574,839 · | ||
| Mar 5, 2021 | 95888 | FayetteDistrict 7 | Replace the bridge carrying TR 312 over flat creek, 5.0 miles east of Shobonier . | — | Executed | Lake Contracting, Inc. $361,841 · | ||
| Mar 5, 2021 | 95889 | ShelbyDistrict 7 | Resurfacing CH 22 from the Fayett County line to IL 128. | — | Executed | Howell Paving, Inc. $912,824 · | ||
| Mar 5, 2021 | 95890 | MaconDistrict 7 | Replace the bridge carrying Center Street over Steven Creek and reconstruct the approach roadway. Project is located northwest of Hunt Street in Decatur. | — | Executed | Sangamo Construction Company $1,595,149 · | ||
| Mar 5, 2021 | 95892 | MaconDistrict 7 | Construction of the Stevens Creek Multi-Use Path from Cresthaven Park in Decatur to Timber Lane in Forsyth. | — | Executed | Kinney Contractors, Inc. $2,324,818 · | ||
| Mar 5, 2021 | 97749 | MarionDistrict 8 | Replace the bridge carrying TR 64 over Turkey Creek, 1.5 miles east of Junction . | — | Executed | Depew and Owen Builders, Inc. $236,788 · | ||
| Mar 5, 2021 | 97751 | St. ClairDistrict 8 | Resurfacing, sidewalk replacement, curb and gutter replacement and pavement markings on West Main street to 28th Street in Belleville. | — | Executed | Christ Bros. Asphalt, Inc. $898,021 · | ||
| Mar 5, 2021 | 99651 | JacksonDistrict 9 | Resurfacing and pavement markings on Brick Plant Road, from Randolph County line to IL 4. | — | Executed | E. T. Simonds Construction Company $570,281 · | ||
| Mar 5, 2021 | 99654 | WilliamsonDistrict 9 | Construct a multi-use path, a three-sided concrete structure and traffic signal improvements. Project begins at the southwest corner of IL 13 and Greenbriar Road to an existing path at John A Logan Community College. | — | Executed | Samron Midwest Contracting, Inc. $827,594 · | ||
| Mar 5, 2021 | 99657 | PopeDistrict 9 | Resurface New Liberty Road from the Massac County line to 0.1 mile northeast of New Liberty Road. | — | Executed | Southern Illinois Asphalt Co., Inc. $393,571 · | ||
| Mar 5, 2021 | 99658 | PopeDistrict 9 | Resurface Eddyville Blacktop from Ragen Road south for 1.0 mile. | — | Executed | Southern Illinois Asphalt Co., Inc. $254,976 · | ||
| Mar 5, 2021 | 99659 | WilliamsonDistrict 9 | Intersection improvements including replacement of sidewalks, enhancement of crosswalks and warning signs on Monroe Street from North 20th Street to North 16th Street in the City of Herrin. | — | Executed | Samron Midwest Contracting, Inc. $73,890 · | ||
| Apr 23, 2021 | 46562 | WillDistrict 1 | (11.40-Mile) Pavement marking installation project on Interstate 80 (I-80) between IL 43 (Harlem Ave.) and US 30 (Lincoln Hwy located within the Village of New Lenox and Makena in Will County. | — | Executed | Maintenance Coatings Co. $896,240 · | ||
| Apr 23, 2021 | 46563 | VariousDistrict 2 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown on the plans. | — | Rejected | ROADSAFE TRAFFIC SYSTEMS, INC. $674,883 · | ||
| Apr 23, 2021 | 46565 | VariousDistrict 2 | Placing various widths of modified urethane and thermoplastic pavement marking lines, letters and symbols within the limits specified on each individual work order. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,237,600 · | ||
| Apr 23, 2021 | 46566 | VariousDistrict 2 | Removing existing guardrail delineators and installing new guardrail delineators within the limits specified on each individual work order. | — | Executed | O'Brien Civil Works, Inc. $144,784 · | ||
| Apr 23, 2021 | 46928 | LawrenceDistrict 7 | Resurfacing internal park roads and parking lots, aggregate resurfacing of camp sites, drainage improvements, box culvert installation and lighting at the IDNR Red Fills State Park. | — | Executed | Ambraw Asphalt Materials, Inc. $2,721,190 · | ||
| Apr 23, 2021 | 60T06 | CookDistrict 1 | Replace bridge structure carrying northbound IL Route 43 over the Metropolitan Water Reclamation District of Greater Chicago Railroad in the Village of Lyons. SN 016-0314 , Replace bridge structure carrying northbound IL Route 43 over the Metropolitan Water Reclamation District of Greater Chicago Railroad in the Village of Lyons. SN 016-0314 | — | Executed | ICC Group Inc. $5,307,000 · | ||
| Apr 23, 2021 | 60T11 | LakeDistrict 1 | Intersection Reconstruction, Channelization, Traffic Signal Modernization, Location: FAP 344: US 45 (Lake Street) at IL 173 (Rosecrans Road) within unincorporated Antioch Township in Lake County. | — | Executed | Lake County Grading Company, LLC $3,097,393 · | ||
| Apr 23, 2021 | 60T17 | CookDistrict 1 | Intersection Reconstruction (traffic signal installation), ADA Improvements at the intersection of FAU 2710: Des Plaines River Road and Robinson. Location: Village of Franklin Park in Cook County. | — | Executed | Plote Construction, Inc. $1,311,636 · | ||
| Apr 23, 2021 | 60T30 | WillDistrict 1 | Intersection Reconstruction (Channelization, Widening, Traffic Signal Modernization, Drainage Improvements); Location: FAU 381: IL Route 129 at Coal City Road, in the City of Braidwood, City of Wilmington, and Unincorporated areas in Will County. | — | Executed | D. Construction, Inc. $2,643,645 · | ||
| Apr 23, 2021 | 60V39 | LakeDistrict 1 | This traffic signal installation and channelization project begins about 652.5 feet (0.12 miles) west of the intersection of IL 173 (FAP 303) and North Lake Avenue and proceeds in a southerly/easterly direction for 1462.3 feet (0.28 miles). This project also begins at the center of the intersection of IL 173 (FAP 303) and North Lake Avenue. | — | Executed | Dunnet Bay Construction Company $3,128,974 · | ||
| Apr 23, 2021 | 60X72 | CookDistrict 1 | The construction of a parking lot, storm sewer removal and replacement of existing frame and lid with bolted f The improvement consists of the construction of a parking lot, storm sewer removal and replacement of existing frame and lid with bolted frame and ltd. The work is located on IL 64 (North Ave.) at pump station #12 in Melrose Park. | — | Executed | Martam Construction Incorporated $361,804 · | ||
| Apr 23, 2021 | 61G09 | CookDistrict 1 | Resurfacing Park Boulevard from Irving Park Road to Schaumburg Road in Streamwood. | — | Executed | A Lamp Concrete Contractors, Inc. $1,304,037 · | ||
| Apr 23, 2021 | 61G58 | KaneDistrict 1 | Roadway reconstruction, lighting, water main, landscaping, pavement markings, on East New York Street from Farnsworth Avenue to Welsh Drive in Aurora. | — | Executed | Martam Construction Incorporated $7,777,000 · | ||
| Apr 23, 2021 | 61G91 | KaneDistrict 1 | Traffic Signal modernization at three intersections, sidewalk improvements, and pavement markings at Fabyan Parkway and IL 131, Orchard Road at Acutt Road and Rochester Drive, and Orchard Road from US 30 to Jericho Road in Batavia, Montgomery and unincorporated Kane County. | — | Executed | H & H Electric Co. $645,740 · | ||
| Apr 23, 2021 | 61G94 | McHenryDistrict 1 | Remove existing box culvert, construct single-span CIP slab bridge, and reconstruct approach pavement on Kishwaukee Valley Road over a tributary of Rush Creek, 0.2 miles east of Root Road. | — | Executed | Lorig Construction Company $1,545,703 · | ||
| Apr 23, 2021 | 61G95 | WillDistrict 1 | Resurfacing, curb and gutter, sidewalk replacement, ornamental lighting, brick paver sidewalk, landscaping and pavement markings on IL 171 from 11th Street to 10th Street and on IL 7 from IL 171 to Hamilton Street in Lockport. | — | Executed | R. W. Dunteman Company $1,793,189 · | ||
| Apr 23, 2021 | 61G96 | WillDistrict 1 | Resurfacing, curb and gutter replacement, sidewalk replacement, and pavement markings on West Street from Corning Avenue to Joliet Road in Peotone. | — | Executed | P. T. Ferro Construction Co. $321,841 · | ||
| Apr 23, 2021 | 61G97 | DuPageDistrict 1 | Resurfacing Eola Road from Oakhurst Drive to US 34 in Aurora. | — | Executed | K-Five Construction Corporation $1,046,723 · | ||
| Apr 23, 2021 | 61G99 | CookDistrict 1 | Concrete Sidewalk, curb and gutter replacement, tree removal, and landscaping on US 30 from Orchard Drive to the east village limits on Rockwell Street in Park Forest. | — | Executed | Copenhaver Construction, Inc. $243,209 · | ||
| Apr 23, 2021 | 61H00 | WillDistrict 1 | Resurfacing, curb and gutter replacement, sidewalk replacement, and pavement markings on Court Street from Elder Lane to Eastgate Avenue in Monee. | — | Executed | Iroquois Paving Corporation $256,749 · | ||
| Apr 23, 2021 | 61H01 | CookDistrict 1 | Resurfacing, HMA pavement patching, curb and gutter repairs on Old Willow Road from South Wolf Road to US 45 in Prospect Heights. | — | Executed | Arrow Road Construction Co. $510,388 · | ||
| Apr 23, 2021 | 61H02 | DuPageDistrict 1 | Resurfacing, curb and gutter, traffic signals, sidewalks and pavement markings on Grand Avenue, from US 20 to County Line Road in Elmhurst and Bensenville. | — | Executed | K-Five Construction Corporation $3,916,382 · | ||
| Apr 23, 2021 | 61H03 | McHenryDistrict 1 | Resurfacing Haligus Road from north of Ballard Road to Lakewood Road in Lakewood. | — | Executed | Geske and Sons, Inc. $510,590 · | ||
| Apr 23, 2021 | 61H04 | McHenryDistrict 1 | Resurfacing Valley View Road from Nish Road to south of IL 176 in Prairie Grove | — | Executed | Geske and Sons, Inc. $367,518 · | ||
| Apr 23, 2021 | 61H06 | CookDistrict 1 | Streetscape improvements on St. Charles Road from Mannheim Road to 25th Avenue in Bellwood. | — | Executed | Landmark Contractors, Inc. $964,551 · | ||
| Apr 23, 2021 | 61H08 | CookDistrict 1 | Resurfcing, curb and gutter, sidewalk replacement, detector loops and pavement markings on Kensington Road from Dryden Place to Regency Drive West in Arlington Heights. | — | Executed | Arrow Road Construction Co. $1,282,651 · | ||
| Apr 23, 2021 | 61H09 | CookDistrict 1 | Resurfacing Salem Drive from the village limits to Bode Road, Jones Road from Highland Boulevard to Hassel Road, and Hassell Road from Rosedale to Jones Road in Hoffman Estates. | — | Executed | Schroeder Asphalt Services, Inc. $651,585 · | ||
| Apr 23, 2021 | 62633 | CookDistrict 1 | (4,391-Ft) Intersection improvement including channelization, traffic signal modernization and resurfacing of IL 58 at Niles Center Rd. and at US 41 (Skokie Blvd.) in the Village of Skokie. | — | Executed | Alliance Contractors, Inc. $4,496,491 · | ||
| Apr 23, 2021 | 62K80 | CookWillDistrict 1 | Demolition and reconstruction of the existing bridge deck and concrete approaches, resurfacing to meet the bridge approaches, reconstruction and expansion of outside shoulders, removal and replacement of existing guar guardrail, and various drainage and grading improvements. | — | Executed | D. Construction, Inc. $2,056,069 · | ||
| Apr 23, 2021 | 62L52 | CookDistrict 1 | (1.762-Mile) Cleaning and sealing longitudinal joints in the existing HMA pavement between traffic lanes and curb and gutter, restriping pavement marking in the City of Chicago, Lake and North Chicago Townships. | — | Executed | SKC Construction, Inc. $183,344 · | ||
| Apr 23, 2021 | 62L82 | DuPageDistrict 1 | (3.9-Mile) Crack and joint sealing on US 20 (Lake Street) from I-355 to IL 83 (Kingery Highway) within the Village of Addison. | — | Executed | Freehill Asphalt, Inc. $335,213 · | ||
| Apr 23, 2021 | 62L89 | CookDistrict 1 | (1.73-Mile) SMART overlay (resurfacing) and ADA improvement project on Dempster St. from east of Skokie Blvd. to McCormick Ave. within the Village of Skokie in Cook County. | — | Executed | Builders Paving, LLC $2,092,030 · | ||
| Apr 23, 2021 | 62M04 | CookDistrict 1 | (3.553-Mile) Crack and Joint Sealing pavement preservation project. Includes renewal of pavement markings. Location: FAP 344: IL 83 from S. of Weiland Rd to Palatine Rd in the City of Prospect Heights and the Village | — | Executed | SKC Construction, Inc. $179,385 · | ||
| Apr 23, 2021 | 62M13 | CookDistrict 1 | SMART Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAU 3520: Gross Point Road from N of Oakton St to Howard St in the Village of Morton Grove and Skokie. | — | Executed | Peter Baker & Son Co. $545,253 · | ||
| Apr 23, 2021 | 62M15 | WillDistrict 1 | (1.06-Mile) SMART Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAP 112: IL 53 from South of I-55 to Joliet Road, in the Village of Bolingbrook and Romeoville. | — | Executed | K-Five Construction Corporation $1,563,017 · | ||
| Apr 23, 2021 | 62M16 | WillDistrict 1 | (2.78-Mile) Smart Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAP 607: US 52/ 6/ 30 Jefferson St. from Joyce Rd.to Bluff St., within the City of Joliet. | — | Executed | D. Construction, Inc. $2,573,421 · | ||
| Apr 23, 2021 | 62M26 | CookDistrict 1 | Bridge deck overlay and joint repair The improvement of McHenry Road over Wheeling Drainage Ditch consists of bridge deck overlay and joint repair. The improvement is located in the Village of Wheeling in Cook County, IL. | — | Executed | Lorig Construction Company $446,325 · | ||
| Apr 23, 2021 | 62M27 | WillDistrict 1 | Bridge Deck and Approach repairs This improvement consists of Bridge Deck and Approach repairs. Structural repair of Concrete, deck scarification, deck latex concrete overlay, approach HMA overlay, bridge deck grooving in Green Garden Township. | — | Executed | P. T. Ferro Construction Co. $128,281 · | ||
| Apr 23, 2021 | 62M31 | CookDistrict 1 | This is a bridge repair project that includes bridge deck overlay, partial depth approach reconstruction, joint reconstruction, concrete bridge deck repair, full depth bridge deck repair. Located: IL Route 7 at 86th Ave. within within the Village of Palos Park. | — | Executed | Lorig Construction Company $298,774 · | ||
| Apr 23, 2021 | 62M36 | DuPageDistrict 1 | A full and partial depth deck and approach slab repairs, bridge deck scarification, a new latex concrete overl This project is located on IL.83 over the Salt Creek within the Village of Villa Park in DuPage County. This work consists of a full and partial depth deck and approach slab repairs, bridge deck scarification, a new latex concrete overlay, deck drain adjustments and pavement marking. | — | Executed | Martam Construction Incorporated $741,297 · | ||
| Apr 23, 2021 | 62M40 | CookDistrict 1 | Bridge Preservation Project, including bridge deck overlay (scarification and latex concrete overlay), deck repairs, reconstructing transverse joints. Location: Bridge carrying Roosevelt Rd over Des Plaines River, East of IL 171 in the Village of Forest Park in Cook County. | — | Executed | MYS, Incorporated $512,616 · | ||
| Apr 23, 2021 | 62N30 | CookDistrict 1 | A Bridge Substructure Repair in the City of Chicago, and the Village of Skokie and Wilmette in the Townships o (0.102-Mile) Improvement on I-94 at IL 50 (Cicero Ave.), II 58 (Dempster Ave.) and Lake Ave. consist of a Bridge Substructure Repair in the City of Chicago, and the Village of Skokie and Wilmette in the Townships of New Trier, Jefferson and Niles. | — | Executed | Rausch Infrastructure, LLC $830,616 · | ||
| Apr 23, 2021 | 62N92 | CookDuPageDistrict 1 | Litter/Debris removal from edge of pavement to the Pedestrian Barrier on I-55 - Stevenson expressway from IL 4 (150-Mile) Improvement consists of Litter/Debris removal from edge of pavement to the Pedestrian Barrier on I-55 - Stevenson expressway from IL 43 (Harlem Ave.) to I-355. | — | Executed | Western Remac, Inc. $207,720 · | ||
| Apr 23, 2021 | 64G99 | OgleDistrict 2 | Cold milling, Cold In-Place (CIP) Recycling, HMA resurfacing on IL Route 64 from 0.1 mile East of US 52 to 0.04 mile West of IL 26. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,497,763 · | ||
| Apr 23, 2021 | 64J97 | HenryDistrict 2 | 6.27 MILES, Resurfacing from Galva - Atkinson Road to West Street in Kewanee. | — | Executed | Advanced Asphalt Company $2,403,550 · | ||
| Apr 23, 2021 | 64M91 | LeeDistrict 2 | 0.80 miles, Cold milling, pavement patching, HMA resurfacing, ADA improvement and traffic signal modernization from West of Page drive to US 52/IL 26 in Dixon. | — | Executed | Martin & Company Excavating $2,016,252 · | ||
| Apr 23, 2021 | 64P29 | WinnebagoDistrict 2 | Milling, patching, and hot-mix asphalt resurfacing on IL Route 70 from Pecatonica River to 0.1 mile west of Safford Road in Rockford. | — | Executed | Rock Road Companies, Inc. $4,379,698 · | ||
| Apr 23, 2021 | 64P30 | LeeDistrict 2 | Cold milling, pavement patching and hot-mix asphalt resurfacing along US 52 from Water Street in Amboy to North of Henkle Road. | — | Executed | Advanced Asphalt Company $4,129,760 · | ||
| Apr 23, 2021 | 64P65 | WhitesideDistrict 2 | Removal and replacement of existing expansion joints on SN 098-0032 carrying US 30 over Elkhorn Creek. | — | Executed | Martin & Company Excavating $147,606 · | ||
| Apr 23, 2021 | 64P66 | CarrollDistrict 2 | Removal and replacement of existing expansion joints, along with partial replacement of the South bridge approach slab and the adjacent sidewalk on SN 008-0041 carrying IL 84 over the SOO line RR. | — | Executed | Martin & Company Excavating $187,212 · | ||
| Apr 23, 2021 | 64P68 | VariousDistrict 2 | Installing signs and posts along State maintained routes. | — | Executed | Countryman, Inc. $235,534 · | ||
| Apr 23, 2021 | 64P69 | HenryDistrict 2 | Cleaning and painting structural steel on SN's 037-0029 and 037-0030 carrying 1-80 over Mineral Creek located 0.7 mile North of US 6, and SN 037-0079 carrying US 6 over 1-80. | — | Executed | Three Star Painting, Inc. $396,650 · | ||
| Apr 23, 2021 | 64P70 | HenryDistrict 2 | Cleaning and painting structural steel on SN 037-0112 carrying TR 196-D over 1-80 located 0.9 mile southeast of IL 82, SN 037-0113 carrying TR 216 over 1-80 located 2.0 miles southeast of IL 82 and SN 037-0118 carrying TR 468 over 1-80 located 1.5 miles east of IL 78. | — | Executed | Three Star Painting, Inc. $595,000 · | ||
| Apr 23, 2021 | 64P71 | Rock IslandDistrict 2 | Cleaning and painting structural steel SN's 081-0030 and 081-0031 carrying I-280 over Case Creek located 2.0 miles west of I-74. | — | Executed | Three Star Painting, Inc. $179,995 · | ||
| Apr 23, 2021 | 64P72 | LeeDistrict 2 | Cleaning and painting structural steel on SN 052-0059 carrying Welland Road over 1-39. | — | Executed | Three Star Painting, Inc. $190,000 · | ||
| Apr 23, 2021 | 64P74 | WhitesideDistrict 2 | Milling and resurfacing on US 30 from Jackson Street to French Creek East of Morrison. | — | Executed | Martin & Company Excavating $438,325 · | ||
| Apr 23, 2021 | 64P96 | VariousDistrict 2 | Removal of dead trees along state maintained routes. | — | Executed | Endrizzi Contracting, Inc $375,100 · | ||
| Apr 23, 2021 | 66B52 | LaSalleDistrict 3 | The reconstruction of the existing intersection into a PCC roundabout The project is located in the intersection of US 6 and IL 178, north of Utica in LaSalle county and consists of the reconstruction of the existing intersection into a PCC roundabout. The project also includes earthwork, seeding, drainage improvements, permanent lighting and removal of existing traffic equipment. The project length is 0.42 miles. | — | Executed | R. W. Dunteman Company $2,442,377 · | ||
| Apr 23, 2021 | 66E14 | BureauDistrict 3 | 3P mill and resurface. | — | Executed | Advanced Asphalt Company $4,496,640 · | ||
| Apr 23, 2021 | 66K60 | BureauDistrict 3 | 7.3 miles of milling and resurfacing, ADA improvements. | — | Executed | Advanced Asphalt Company $2,816,475 · | ||
| Apr 23, 2021 | 66L01 | LaSalleDistrict 3 | 0.71 mile. Latex overlay, cleaning and painting of structural steel and expansion joint replacement. SN 050-0200 IL 251 over 1-39; 0.5 Miles north of IL 71. | — | Executed | D. Construction, Inc. $1,921,508 · | ||
| Apr 23, 2021 | 66L22 | IroquoisDistrict 3 | Bridge painting This work is located at Structure No. 038-0130, TR 95 over 1-57, approximately 3.48 miles South of IL 116 and Structure No. 038-0131 carrying TR 109 over 1-57, approximately 5.59 miles South of IL 116 in Iroquois. This work consists of bridge painting. | — | Executed | ERA-Valdivia Contractors, Inc. $384,278 · | ||
| Apr 23, 2021 | 66L28 | KankakeeDistrict 3 | Signal Mast Arm Removal and Replacement - at River St and Station St in Kankakee. | — | Executed | Van-Mack Electric Co. $210,000 · | ||
| Apr 23, 2021 | 66L30 | IroquoisKankakeeDistrict 3 | This project consists of 3.85 miles of shoulder widening and rumble strip installation on IL 1 from 150 feet west of W Circle Dr in St Anne in Kankakee County to E 3100N Rd in Iroquois County. | — | Executed | Iroquois Paving Corporation $1,088,767 · | ||
| Apr 23, 2021 | 66L32 | BureauDistrict 3 | The installation of approximately 5 This project consists of the installation of approximately 5.24 miles of high tension cable median barrier from the Henry/Bureau County Line to 0.42 miles West of 600E Rd. | — | Executed | Advanced Asphalt Company $1,112,433 · | ||
| Apr 23, 2021 | 66L33 | LaSalleDistrict 3 | The installation of approximately 5 This project consists of the installation of approximately 5.92 miles of high tension cable median barrier from 1.09 miles South of N 36th Rd to 0.88 miles South of N 42nd Rd in LaSalle County. | — | Executed | Advanced Asphalt Company $1,322,328 · | ||
| Apr 23, 2021 | 66L41 | IroquoisDistrict 3 | Removing existing HMA and aggregate subbase surfaces, repair and preparation of base course, and placing a pol This work is located at the Illinois Department of Transpiration, District 3, Buckley Maintenance Facility in Iroquois County. This work consists of removing existing HMA and aggregate subbase surfaces, repair and preparation of base course, and placing a polymer HMA asphalt binder cse. (2¼" lift) and a polymer HMA surface *See Remarks*. | — | Executed | Iroquois Paving Corporation $333,002 · | ||
| Apr 23, 2021 | 66L52 | GrundyDistrict 3 | This pollinator project is located at Three Rivers Rest Areas on I-80 west of Minooka. This work will include herbicide, seeding, planting, landscaping and maintenance. | — | Executed | Nettle Creek Nursery, Inc. $377,962 · | ||
| Apr 23, 2021 | 66L54 | DeKalbDistrict 3 | The removal and replacement of expansion joints and deck patching on SN 019-0036 This work is located at FAP 573 on US 30 on SN 019-0036 at Little Rock Creek 0.5 miles West of Hinckley in Dekalb County. This work consists of the removal and replacement of expansion joints and deck patching on SN 019-0036. | — | Executed | Martin & Company Excavating $250,265 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.