IDOT Jobs

All dates · 10,653 jobs · $20,005,846,000 Sign up free
★ My Jobs

10,653 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Apr 26, 2024 62M37 DuPageDistrict 1 Bridge deck overlay and joint repair of the structure located at IL 83 (Kingery Highway) over I-88, Dupage Cou (1014-Ft) The proposed improvement consists of bridge deck overlay and joint repair of the structure located at IL 83 (Kingery Highway) over I-88, Dupage County. — Executed Nov 26 New Lorig Construction Company $2,360,619 ·
Apr 26, 2024 62P05 CookDistrict 1 Bridge deck overlay and joint repair of the structure located at Forest Avenue over Des Plaines River in the V The proposed improvement consists of bridge deck overlay and joint repair of the structure located at Forest Avenue over Des Plaines River in the Village of Riverside, Cook County. — Executed Nov 26 New D. Construction, Inc. $510,572 ·
Apr 26, 2024 62P06 DuPageDistrict 1 Culvert repair of the structure located at I-55 at stream (0 (1157-Ft) The proposed improvement consists of culvert repair of the structure located at I-55 at stream (0.9 Mi E. of Cass Ave) in Downers Grove Township, DuPage County. — Executed Nov 26 New Lorig Construction Company $1,281,947 ·
Apr 26, 2024 62P12 CookDistrict 1 A bridge deck overlay and joint replacement of IL59/ Sutton Road located over I-90 (2,500-FT) The proposed improvement consist of a bridge deck overlay and joint replacement of IL59/ Sutton Road located over I-90. The project is located in the Village of Hoffman Estates, Cook County. — Executed Nov 26 New Martam Construction Incorporated $2,534,342 ·
Apr 26, 2024 62P34 CookDistrict 1 (6,564-Ft) Standard Overlay project located on Cumberland Avenue from Belle Plaine Avenue to I-90 within the Village of Park Ridge and the City of Chicago in Cook County. — Executed Nov 26 New Plote Construction, Inc. $2,781,187 ·
Apr 26, 2024 62P50 CookDistrict 1 (4,470-Ft) Corridor improvement, traffic signal modernization/ replacement and ADA improvements project on IL Route 43 (Harlem Avenue) and includes the intersections of 78th St., 79th St., 83rd St., 84th St., 87th St., 88th St./ Southfield Shopping Center Dr., and 90th St. in the Village of Bridgeview in Cook County. — Executed Nov 26 New R. W. Dunteman Company $7,068,889 ·
Apr 26, 2024 62P69 CookDistrict 1 Bridge deck overlay and joint repair of the structure located at Foster Avenue over North branch Chicago River The proposed improvement consists of bridge deck overlay and joint repair of the structure located at Foster Avenue over North branch Chicago River in the of Chicago, Cook County. Gross and Net length: 2639 Ft (0.50 Mi), 1088 Ft (0.21 Mi) — Executed Nov 26 New Martam Construction Incorporated $2,061,184 ·
Apr 26, 2024 62P76 CookDistrict 1 Replace wooden noise abatement walls along IL 53 from Dundee Road to Lake Cook Road with precast concrete walls on both east and west sides for a total length of 2.1 miles. Located within Platine, Arlington Heights and Palatine Township. — Executed Nov 26 New Lorig Construction Company $14,991,712 ·
Apr 26, 2024 62R43 CookDistrict 1 (4,090-Ft) Standard Overlay, ADA Improvements. Project located on Kedzie Ave. from 71st St to 77th St within the City of Chicago in Cook County. — Executed Nov 26 New Gallagher Asphalt Corporation $871,931 ·
Apr 26, 2024 62R53 CookDistrict 1 A standard overlay of the existing FAU 2691 (Wolf Road) from IL 58 (Golf Road) to North of Touhy Avenue in the This improvement consists of a standard overlay of the existing FAU 2691 (Wolf Road) from IL 58 (Golf Road) to North of Touhy Avenue in the City of DES Plaines in Cook County approximately 13,627 ft in length. — Executed Nov 26 New Builders Paving, LLC $3,359,808 ·
Apr 26, 2024 62R65 CookDistrict 1 Cleaning and painting existing steel on various structures located in Villages of Hodgkins and Summit in Cook The improvement consists of cleaning and painting existing steel on various structures located in Villages of Hodgkins and Summit in Cook County. Location 1 (SN: 016-0004, 0005, 0006, and 0007) in Village of Hodgkins, Location 2 (016-0012 and 0013) in Village of Summit, and Location 3 (SN: 016-0014 and 0015) Village of Summit. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $1,693,659 ·
Apr 26, 2024 62R69 CookDistrict 1 (2.07-Mile) SMART Overlay on 183rd Street from Oak Park Ave to IL 50 (Cicero Ave). This project is located in the City of Country Club Hills, the Village of Tinley Park and unincorporated Cook County. — Executed Nov 26 New Gallagher Asphalt Corporation $1,015,841 ·
Apr 26, 2024 62R75 CookDistrict 1 Bridge deck overlay and joint replacement of IL 83/Sibley Blvd located over UPRR (0 (1,770-Ft) Improvement consists of bridge deck overlay and joint replacement of IL 83/Sibley Blvd located over UPRR (0.2-mile east of the State Street/Indiana Avenue). The project is in the Village of Dolton, Cook County. — Executed Nov 26 New D. Construction, Inc. $1,984,514 ·
Apr 26, 2024 62R91 DuPageDistrict 1 Bridge Deck Overlay, Bridge Joint Replacement / Repair at US 20 (Lake Street) over IL 390 (Elgin O'Hare Expressway). This project is located in the Village of Hanover Park in DuPage County. — Executed Nov 26 New Martam Construction Incorporated $1,888,608 ·
Apr 26, 2024 62T00 McHenryDistrict 1 (200-Ft) Bridge Preservation project including bridge deck overlay, bridge joint replace/repair of SN 056-0052 carrying US 14 (Division Street) over Rush Creek, 0.1-miles North of IL 23 located within the City of Harvard in McHenry County. — Executed Nov 26 New Martam Construction Incorporated $637,548 ·
Apr 26, 2024 62T33 WillDistrict 1 This is a bridge preservation project of SN 099-0282; US 6 (Maple Road) over CN Railroad. Scope of work includes bridge deck scarification and overlay, joint repair, approach slab repair and sidewalk and guardrail replacement. The project is located within the City of Joliet in Will County. — Executed Nov 26 New D. Construction, Inc. $1,303,768 ·
Apr 26, 2024 62T42 CookDistrict 1 (5.626-Mile) Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course and sidewalk ramps improvements. Located in the Villages of Oak Brook, Westchester, Broadview, North Riverside, and Forest Park in Cook County. — Executed Nov 26 New Builders Paving, LLC $8,297,082 ·
Apr 26, 2024 62T45 KaneDistrict 1 This is a bridge preservation project of (SN 045-2015); Galena Blvd. over Blackberry Creek. Scope of work includes bridge deck scarification and latex overlay, full depth deck patching, approach slab repair and drainage adjustments. The project is located within the City of Aurora in Kane County. — Executed Nov 26 New Lorig Construction Company $256,821 ·
Apr 26, 2024 62T69 LakeDistrict 1 (4.65-Mile) SMART Resurfacing and ADA Ramp improvements from County Line Road to West of US 12 and includes road surface removal, HMA paving, sidewalk removal, installation of PCC sidewalk, detectable warnings, and placement of pavement markings. Improvements is in the Villages of Lake Zurich, North Barrington, Lake Barrington, and in Cuba and ELA Townships in Lake County. — Executed Nov 26 New Peter Baker & Son Co. $1,732,377 ·
Apr 26, 2024 62T85 CookDistrict 1 Bridge deck overlay and joint repair of the structure located at the Dundee Road Bridge (SN 016-0940) on FAU 1 The proposed improvement consists of bridge deck overlay and joint repair of the structure located at the Dundee Road Bridge (SN 016-0940) on FAU 1273 (IL- 68 Dundee Road) 0.2 miles east of I-94 in Northfield Township and New Trier Township in Cook County. — Executed Nov 26 New Lorig Construction Company $1,150,113 ·
Apr 26, 2024 62U73 DuPageDistrict 1 (2,000-Ft) Traffic Signal Modernization and Intersection Improvements located at IL 83 (Kingery Highway) and Bluff Rd. in the Downers Grove Township, DuPage County. — Active Nov 26 New R. W. Dunteman Company $1,457,500 ·
Apr 26, 2024 62U81 CookDistrict 1 Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course and sidewalk ra (1.14-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course and sidewalk ramps improvements. Located in the Villages of Winnetka in Cook County. — Executed Nov 26 New Peter Baker & Son Co. $678,134 ·
Apr 26, 2024 62U84 KaneDistrict 1 (4,485-Ft) Pavement rehabilitation and widening, drainage, intersection channelization, signing, lighting, traffic signals and safety improvements of US 20 from west of Nesler Road to east of Weld Road/Longcommon Parkway in the City of Elgin within Kane County. — Executed Nov 26 New Martam Construction Incorporated $2,186,382 ·
Apr 26, 2024 62U87 CookDistrict 1 Scope of work includes pavement removal, Drainage Improvement, Concrete Barrier removal and construction of new Concrete Barrier, retaining wall repair, placement of subbase granular material, HMA asphalt pavement and thermoplastic pavement markings. Located at the IDOT Northbrook Maintenance yard at 1916 Techny Rd., Northbrook, IL. — Executed Nov 26 New Schroeder Asphalt Services, Inc. $1,375,038 ·
Apr 26, 2024 62V18 VariousDistrict 1 Repairing damaged concrete barrier wall, bridge parapet, retaining walls and wooden sound wall in various Town This improvement consists of repairing damaged concrete barrier wall, bridge parapet, retaining walls and wooden sound wall in various Townships in various Counties throughout District 1. — Executed Nov 26 New D. Construction, Inc. $932,635 ·
Apr 26, 2024 62V97 DuPageDistrict 1 This improvement is located at the IDOT Oakbrook Maintenance yard at 17W125 Butterfield Road, Villa Park, IL. Scope of work includes pavement removal, Catch Basins PCC reconstruction, placement of subbase granular material, HMA asphalt pavement, PCC pavement, and thermoplastic pavement marking. — Executed Nov 26 New K-Five Construction Corporation $780,422 ·
Apr 26, 2024 62W01 CookDistrict 1 2 lots, adjacent to each other This is a parking lot improvement project for the District 1 Landscape Maintenance Yard. The Yard consists of 2 lots, adjacent to each other. Both lots are located at 1260 West Augusta Boulevard within the City of Chicago. — Executed Nov 26 New M.Q. Sewer Water Contractors, Inc. d/b/a M. Q. Construction Company $1,029,731 ·
Apr 26, 2024 62W06 CookDistrict 1 Full depth removal of existing HMA pavement and replacement, PCC pavement replacement/patching, drainage, ligh Parking lot improvement project consists of full depth removal of existing HMA pavement and replacement, PCC pavement replacement/patching, drainage, lighting relocation. Location of Work: IDOT District 1 Emergency Traffic Patrol (ETP) facility at 3501 South Normal Avenue within the City of Chicago in Cook County. — Executed Nov 26 New M.Q. Sewer Water Contractors, Inc. d/b/a M. Q. Construction Company $456,692 ·
Apr 26, 2024 62W09 CookDuPageDistrict 1 Debris cleaning and litter picking located on I-55 - Stevenson expressway from IL 43 (Harlem Ave) to I-355 in This project consists of debris cleaning and litter picking located on I-55 - Stevenson expressway from IL 43 (Harlem Ave) to I-355 in Cook and DuPage Co. — Executed Nov 26 New The Final Connection, Inc. $140,400 ·
Apr 26, 2024 62W10 WillDistrict 1 Debris cleaning and litter picking This work is located on I-55 expressway from I-355 to Reed Rd in Will County. It consists of debris cleaning and litter picking. — Executed Nov 26 New The Final Connection, Inc. $168,480 ·
Apr 26, 2024 62W42 WillDistrict 1 (231.5-Ft) This project includes overlay of Gougar Road Bridge over I-80 (SN 099-0 203) and replacement of permanent protective shield, in the Village of New Lenox within Will County. — Executed Nov 26 New D. Construction, Inc. $128,211 ·
Apr 26, 2024 62W46 VariousDistrict 1 Impact attenuators removal and replacement, sand modules replacement and any collateral work necessary to comp The work to be completed under this contract consist of impact attenuators removal and replacement, sand modules replacement and any collateral work necessary to complete the improvement as shown on the plans and as described herein on a work order basis and per the Department-s request. — Executed Nov 26 New Traffic Control and Protection LLC dba High Star Traffic $2,614,163 ·
Apr 26, 2024 64L95 WinnebagoDistrict 2 Patching, milling, and resurfacing on IL 75 from 0.2 mile East of Moate Rd to 0.4 mile East of Meridian Rd. — Executed Nov 26 New Rock Road Companies, Inc. $1,979,788 ·
Apr 26, 2024 64N90 Rock IslandDistrict 2 5.98 mile, HMA resurfacing on IL 92 from 115th St West in Andalusia to 0.4 mile East of IL 92 (N). — Executed Nov 26 New Langman Construction, Inc. $2,106,327 ·
Apr 26, 2024 64P27 WinnebagoDistrict 2 0.55 miles of cold milling, patching, and HMA resurfacing from 0.4 miles East of Lyford Rd to 0.1 mile West of Winnebago County Line. — Executed Nov 26 New Curran Contracting Company $800,800 ·
Apr 26, 2024 64P58 OgleDistrict 2 1.08 miles of cold milling, pavement patching, hot-mix asphalt resurfacing from West of Illinois St to 1st St in Oregon. — Executed Nov 26 New Martin & Company Excavating $1,070,501 ·
Apr 26, 2024 64S27 WhitesideDistrict 2 Deck repair, joint replacement, deck overlay and other miscellaneous repairs on the existing bridges carrying I-88 over Rock Creek, BNSF RR Barstow Sub., Henry Road and Deer Creek. — Executed Nov 26 New Martin & Company Excavating $4,099,617 ·
Apr 26, 2024 64S30 LeeDistrict 2 Deck repair, joint replacement, deck overlay, and other miscellaneous repairs on SN 052-0061 over Coon Creek, 3.2 miles South of Amboy. — Executed Nov 26 New Martin & Company Excavating $585,814 ·
Apr 26, 2024 64S38 OgleDistrict 2 0.15 mile milling and standard overlay; tollway ramp (EB) to Steward Rd south of Rochelle. — Executed Nov 26 New Curran Contracting Company $201,632 ·
Apr 26, 2024 64S55 Jo DaviessDistrict 2 1.3 miles of patching through Elizabeth. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $442,965 ·
Apr 26, 2024 64S61 StephensonDistrict 2 Bridge deck repair on SN's 089-0058 and 089-0059, carrying US 20 over Silver Creek, 0.5 miles east of Springfield Rd. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $449,840 ·
Apr 26, 2024 64S65 WhitesideDistrict 2 Bridge repair, deck repair, joint replacement on SN 098-0033, carrying US 30 over Elkhorn Creek. — Executed Nov 26 New Martin & Company Excavating $402,242 ·
Apr 26, 2024 64S68 HenryDistrict 2 3.39 miles of HMA resurfacing and pavement patching, IL 82 frokm IL 81 in Camridge to N 70th Ave. — Executed Nov 26 New Advanced Asphalt Company $1,798,693 ·
Apr 26, 2024 64S95 HenryDistrict 2 Pavement patching on I-74 from the I-74/I-80/I-280 interchange to IL 81. — Executed Nov 26 New G. M. Sipes Construction, Inc. $553,125 ·
Apr 26, 2024 64T03 VariousDistrict 2 Various routes on-call guardrail. — Executed Nov 26 New Northern Contracting, Inc. $319,684 ·
Apr 26, 2024 64T08 VariousDistrict 2 Maintain and service all Intelligent Transportation System equipment located in the Department's Districts 2 and 3 to ensure the safety of the motoring public. — Rejected Nov 26 New Laser Electric, Inc. $155,725 ·
Apr 26, 2024 64T14 Rock IslandDistrict 2 7.26 miles of patching, milling, widening, and resurfacing along 104th St from US 150 south of Coal Valley to Mercer County Line north of Sherrard. — Executed Nov 26 New Advanced Asphalt Company $4,786,212 ·
Apr 26, 2024 64T15 OgleWhitesideDistrict 2 8.8 miles of patching, milling, and resurfacing on Freeport Rd from West Sterling Rd to East Lynn Blvd in Sterling. — Executed Nov 26 New Martin & Company Excavating $3,350,526 ·
Apr 26, 2024 64T22 Rock IslandDistrict 2 31.1 miles of aggregate shoulder improvement. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $539,770 ·
Apr 26, 2024 66C45 IroquoisDistrict 3 Work beings at the Iroquois/Ford county line on IL 116 extending 8.22 miles, ending at the interchange limits of IL 116 and I 57. The project is a milling and resurfacing designed overlay of IL 116 including drainage improvements. — Executed Nov 26 New Iroquois Paving Corporation $5,775,587 ·
Apr 26, 2024 66M98 IroquoisKankakeeDistrict 3 Work beings at 0.1 Mi N of Ambrose St in St Anne to 1.8 Mi S of Papineau Rd. 6.22 Miles of smart overlay with ADA and drainage repairs. — Executed Nov 26 New Iroquois Paving Corporation $2,586,271 ·
Apr 26, 2024 66N40 LivingstonDistrict 3 Micro surfacing Joint Repair, Located on FAI 55 in Livingston County, from McLean County Line to 1.7 miles South of IL 116. — Executed Nov 26 New A. C. Pavement Striping Co. $577,571 ·
Apr 26, 2024 66N44 IroquoisDistrict 3 Milling and resurfacing the Illinois Department of Transportation Ashkum Maintenance facility. — Executed Nov 26 New H. J. Eppel & Co. $781,331 ·
Apr 26, 2024 66N50 GrundyDistrict 3 Raising existing concrete pavement adjacent to approach pavement IL 47 at the north abutment, southbound lanes of structure No. 032-0099; the work consists of raising existing concrete pavement adjacent to approach pavement. — Executed Nov 26 New D. Construction, Inc. $59,606 ·
Apr 26, 2024 66N53 BureauDistrict 3 Bridge repairs at Structure No. 006-0083 carrying FAS 1252 (IL 26/29) over Bureau Creek Overflow, 0.3 mi. northeast of IL 26 and IL 29 junction. — Executed Nov 26 New Gensini Excavating, Inc. $431,733 ·
Apr 26, 2024 66N54 IroquoisDistrict 3 Remove concrete slope wall, install stone riprap, filter fabric, stone bedding, replace expansion joint seal, and structural repair of concrete (pier) on SN 038-0174. — Executed Nov 26 New Iroquois Paving Corporation $313,415 ·
Apr 26, 2024 66N92 LaSalleDistrict 3 Cleaning and painting all structural steel on Structure No. 050-0019 carrying IL 351 over the Lone Star Cement Railroad, 2.0 miles south of US Route 6 (Oglesby). — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $186,186 ·
Apr 26, 2024 66N93 BureauDistrict 3 Cleaning and painting all structural steel on Structure No. 006-0083 carrying IL 29/26 over Big Bureau Creek Overflow, 0.3 mi. north of the south junction of IL 26 and Structure No. 006-0084 carrying IL 29 over over Big Bureau Creek, 0.3 mi. south of the south junction of IL 26. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $548,417 ·
Apr 26, 2024 66N96 KankakeeDistrict 3 SN 046-0108, riprap replacement, controlled low-strength material, riprap removal, grout for use with riprap. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $33,295 ·
Apr 26, 2024 66N97 IroquoisDistrict 3 Traffic Signal Mast Arm Replacement. This project is located in Iroquois County, at the west intersection of US-24 and IL-1 in Watseka. — Executed Nov 26 New Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $299,323 ·
Apr 26, 2024 68880 PeoriaDistrict 4 Bridge deck replacement and rehabilitation on SN 072-0114 and SN 072-0115 over Kickapoo Creek/BNSF RR. — Executed Nov 26 New Stark Excavating, Inc. $22,989,697 ·
Apr 26, 2024 68F84 HendersonDistrict 4 Bridge preservation to SN 036-0036 including: bridge joint replacement, hydroscarification, and MSC overlay on the bridge deck and roadway aproaches, slope wall repair, plating a beam end and other related collateral work to complete the work. — Executed Nov 26 New Brandt Construction Co. $1,768,094 ·
Apr 26, 2024 68H22 MarshallDistrict 4 NB and SN I-39 over TR 39, Sandy Creek and North Fork Sandy Creek in Marshall County. — Active Nov 26 New ICC Group Inc. $2,310,000 ·
Apr 26, 2024 68H26 VariousDistrict 4 Crack and joint sealing on various routes in various counties in District Four. — Executed Nov 26 New SKC Construction, Inc. $973,284 ·
Apr 26, 2024 68H27 VariousDistrict 4 D4 bridge deck sealing 2024 at various locations within District 4. — Executed Nov 26 New M & M Concrete, Inc. $175,287 ·
Apr 26, 2024 68H71 TazewellDistrict 4 D4 Bridge Joint Repair 2024 at SN's 090-0130, 090-0132, 090-0133, 090-0137, 090-0138 and 090-0139 in Tazewell County. — Active Nov 26 New Otto Baum Company, Inc. $5,662,800 ·
Apr 26, 2024 68H81 TazewellDistrict 4 Bridge deck patching on SN 090-0141 on Morton Ave (FAU 6729) over I-74 in Morton in Tazewell County. — Executed Nov 26 New Path Construction Company, Inc. $211,896 ·
Apr 26, 2024 68H83 PeoriaDistrict 4 Paving the invert of the culvert under IL Rt 6 between Knoxville Ave and Allen Rd. — Executed Nov 26 New Illinois Civil Contractors, Inc. $138,627 ·
Apr 26, 2024 68H84 MercerDistrict 4 Culvert wingwall and slope repairs along IL 17, 3.8 miles east of US 67 in Mercer County. — Executed Nov 26 New Miller Trucking & Excavating Company $243,778 ·
Apr 26, 2024 68H85 PeoriaDistrict 4 Culvert wing wall repair (remove and replace) along IL 78, north of IL 116 near Farmington in Peoria County. — Executed Nov 26 New Otto Baum Company, Inc. $324,600 ·
Apr 26, 2024 68H86 KnoxPeoriaDistrict 4 Pavement and drainage under RR viaducts on IL 90 and IL 78 in Peoria and Knox Counties. — Executed Nov 26 New Stark Excavating, Inc. $834,893 ·
Apr 26, 2024 68H91 VariousDistrict 4 D4 District-wide pavement markings. — Executed Nov 26 New Varsity Striping & Construction Co. $385,631 ·
Apr 26, 2024 68I01 WoodfordDistrict 4 Rehabilitation to existing lagoon at the eastbound I-74 Mackinaw Dells Rest Area. — Executed Nov 26 New Gensini Excavating, Inc. $3,190,549 ·
Apr 26, 2024 68I05 TazewellDistrict 4 Traffic signal mast arm replacement at IL 98 (Birchwood St.) and I-155 NB ramps in Morton. — Executed Nov 26 New Laser Electric, Inc. $243,063 ·
Apr 26, 2024 68J05 PeoriaDistrict 4 Traffic signal mast arm replacement at IL 29/Cedar Hills Drive in Peoria County. — Executed Nov 26 New Oberlander Electric Co. $291,000 ·
Apr 26, 2024 70254 ChampaignDistrict 5 0.34 mi Bridge Replacement over I-57 west of Champaign. — Executed Nov 26 New ICC Group Inc. $17,670,000 ·
Apr 26, 2024 70753 ChampaignDistrict 5 165' culvert replacement at ditch 0.6 and 2.2 miles east of Gifford ECL. — Executed Nov 26 New Stark Excavating, Inc. $683,695 ·
Apr 26, 2024 70B07 VermilionDistrict 5 6.16 miles of designed overlay and culvert repair; Georgetown/Indianola Rd to south of Catlin. — Executed Nov 26 New Open Road Paving Company LLC $4,479,683 ·
Apr 26, 2024 70C24 DouglasDistrict 5 Designed Overlay Resurfacing from Coles Co Line to 0.3 mi north of US 36. — Executed Nov 26 New Howell Paving, Inc. $37,020,452 ·
Apr 26, 2024 70D26 EdgarDistrict 5 Culvert replacement field entrance east of Hume Station 1185+00. — Executed Nov 26 New Cross Construction, Inc. $500,000 ·
Apr 26, 2024 70E12 McLeanDistrict 5 14.93 miles of SMART Overlay - Standard Overlay ADA Improvements. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $6,488,552 ·
Apr 26, 2024 70G75 McLeanDistrict 5 7.544 miles of SMART resurfacing form West of Cooksville to East of Colfax. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $1,818,351 ·
Apr 26, 2024 70G81 VermilionDistrict 5 Bridge repair structure 092-0050 bearing replacement at piers. — Executed Nov 26 New William Charles Construction Company, LLC $430,000 ·
Apr 26, 2024 70H06 ChampaignPiattDistrict 5 Piatt/Champaign Co Line to I-57 west of Champaign and Dewitt/Piatt Co Line to 1 mi east of 900E Rd west of Mansfield. — Executed Nov 26 New Complete Asphalt Service Co. $66,944 ·
Apr 26, 2024 70H14 McLeanDistrict 5 Bridge painting of 6 structures on various routes in McLean County. — Executed Nov 26 New Three Star Painting, Inc. $707,507 ·
Apr 26, 2024 72189 SangamonDistrict 6 Bridge deck overlay, bridge joint repair/replacement, bridge deck painting and bridge repairs on SN 084-0109 and SN 084-0110 carrying I-55 over IL 104 at the Auburn interchange. — Executed Nov 26 New Sangamo Construction Company $5,085,109 ·
Apr 26, 2024 72219 ChristianDistrict 6 1.2 miles of overlay and bridge deck overlay on IL 48 from 0.9 miles southwest of Old IL 48 (Spresser Street), southwest of Taylorville, to 0.4 miles southwest of the South Fork Sangamon River. — Executed Nov 26 New Sangamo Construction Company $2,016,363 ·
Apr 26, 2024 72223 PikeDistrict 6 Bridge deck overlay, deck repairs, and joint replacement on SN 075-0036 carrying IL 96 over Hadley Creek, 0.7 miles south of the IL 106 Junction in Kinderhook. — Executed Nov 26 New County Contractors, Inc. $969,518 ·
Apr 26, 2024 72230 MacoupinDistrict 6 1.1 miles of patching, resurfacing, adding parking lanes and sidewalk ramp improvements on IL 4 from south of North Street in Girard to north of Cambridge Road, south of Girard. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $1,955,410 ·
Apr 26, 2024 72265 MacoupinDistrict 6 8.7 miles of cape seal and grinding on IL 108 and 111 from west of Carlinville to the northern IL 108 and111 intersection. — Executed Nov 26 New A. C. Pavement Striping Co. $1,319,116 ·
Apr 26, 2024 72282 SangamonDistrict 6 5 miles of resurfacing, curb and gutter replacement, guardrail replacement and bridge deck preservation (over Richland Creek) on IL 97 from the Menard County line to IL 125. SN 084-0068 — Executed Nov 26 New Truman L. Flatt & Sons Co., Inc. $5,162,775 ·
Apr 26, 2024 72304 MontgomeryDistrict 6 7.6 miles of resurfacing including interchange ramps on I-55 from 0.4 miles south of CH 17 (Mine Avenue) at the Farmersville interchange to just south of the Sangamon County line. Also includes fog seal of shoulders and culvert repairs. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $6,678,600 ·
Apr 26, 2024 72498 SangamonDistrict 6 Resurfacing on Old US 66 from 0.1 miles south of New City Road to 0.19 miles east of Burttle Lane, east of I-55. — Executed Nov 26 New Truman L. Flatt & Sons Co., Inc. $752,964 ·
Apr 26, 2024 72620 SchuylerDistrict 6 Painting portions of SN 085-0029 carrying IL 99 over Cedar Creek, 0.65 miles north of Camden. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $194,688 ·
Apr 26, 2024 72725 MontgomeryDistrict 6 Pipe culvert removal and replacement on Nokomis Blacktop, 0.08 miles east of E 15th Road. — Executed Nov 26 New Earth Worx Solutions LLC $88,537 ·
Apr 26, 2024 72735 VariousDistrict 6 Maintenance and repair of surveillance cameras, vehicle detectors, dynamic message signs, advanced traffic management systems, fiber optic communications, traffic signal interconnects, ethernet networks and peripheral equipment throughout District 6. — Executed Nov 26 New Capitol Construction Group, LLC d/b/a Egizii Electric $303,500 ·
Apr 26, 2024 72893 SangamonDistrict 6 Earthwork, drainage improvements, HMA shoulders, guardrail, high-tension cable median barrier, bridge deck repairs (SN 084-0018 and 084-0019), and bridge deck microsilica concrete overlay of SN 084-0019 on I-55 at the Sangamon River, 2.2 miles south of I-55 BUS at the Sherman Interchange. — Executed Nov 26 New Freesen, a div of UCM, Inc. $5,322,947 ·
Apr 26, 2024 72E35 VariousDistrict 6 Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the western half of District 6. — Executed Nov 26 New Bodine Electric of Decatur $394,130 ·
Apr 26, 2024 72E36 VariousDistrict 6 Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the eastern half of District 6. — Executed Nov 26 New Capitol Construction Group, LLC d/b/a Egizii Electric $510,682 ·
Apr 26, 2024 72M79 MenardDistrict 6 1.9 miles of resurfacing and culvert improvements on IL 97 south of Petersburg, from 0.1 miles north of North Shore Drive to 0.3 miles north of Boy Scout Road. — Executed Nov 26 New P. H. Broughton & Sons, Inc. $4,308,264 ·
5,801–5,900 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.