| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 26, 2024 | 62M37 | DuPageDistrict 1 | Bridge deck overlay and joint repair of the structure located at IL 83 (Kingery Highway) over I-88, Dupage Cou (1014-Ft) The proposed improvement consists of bridge deck overlay and joint repair of the structure located at IL 83 (Kingery Highway) over I-88, Dupage County. | — | Executed | Lorig Construction Company $2,360,619 · | ||
| Apr 26, 2024 | 62P05 | CookDistrict 1 | Bridge deck overlay and joint repair of the structure located at Forest Avenue over Des Plaines River in the V The proposed improvement consists of bridge deck overlay and joint repair of the structure located at Forest Avenue over Des Plaines River in the Village of Riverside, Cook County. | — | Executed | D. Construction, Inc. $510,572 · | ||
| Apr 26, 2024 | 62P06 | DuPageDistrict 1 | Culvert repair of the structure located at I-55 at stream (0 (1157-Ft) The proposed improvement consists of culvert repair of the structure located at I-55 at stream (0.9 Mi E. of Cass Ave) in Downers Grove Township, DuPage County. | — | Executed | Lorig Construction Company $1,281,947 · | ||
| Apr 26, 2024 | 62P12 | CookDistrict 1 | A bridge deck overlay and joint replacement of IL59/ Sutton Road located over I-90 (2,500-FT) The proposed improvement consist of a bridge deck overlay and joint replacement of IL59/ Sutton Road located over I-90. The project is located in the Village of Hoffman Estates, Cook County. | — | Executed | Martam Construction Incorporated $2,534,342 · | ||
| Apr 26, 2024 | 62P34 | CookDistrict 1 | (6,564-Ft) Standard Overlay project located on Cumberland Avenue from Belle Plaine Avenue to I-90 within the Village of Park Ridge and the City of Chicago in Cook County. | — | Executed | Plote Construction, Inc. $2,781,187 · | ||
| Apr 26, 2024 | 62P50 | CookDistrict 1 | (4,470-Ft) Corridor improvement, traffic signal modernization/ replacement and ADA improvements project on IL Route 43 (Harlem Avenue) and includes the intersections of 78th St., 79th St., 83rd St., 84th St., 87th St., 88th St./ Southfield Shopping Center Dr., and 90th St. in the Village of Bridgeview in Cook County. | — | Executed | R. W. Dunteman Company $7,068,889 · | ||
| Apr 26, 2024 | 62P69 | CookDistrict 1 | Bridge deck overlay and joint repair of the structure located at Foster Avenue over North branch Chicago River The proposed improvement consists of bridge deck overlay and joint repair of the structure located at Foster Avenue over North branch Chicago River in the of Chicago, Cook County. Gross and Net length: 2639 Ft (0.50 Mi), 1088 Ft (0.21 Mi) | — | Executed | Martam Construction Incorporated $2,061,184 · | ||
| Apr 26, 2024 | 62P76 | CookDistrict 1 | Replace wooden noise abatement walls along IL 53 from Dundee Road to Lake Cook Road with precast concrete walls on both east and west sides for a total length of 2.1 miles. Located within Platine, Arlington Heights and Palatine Township. | — | Executed | Lorig Construction Company $14,991,712 · | ||
| Apr 26, 2024 | 62R43 | CookDistrict 1 | (4,090-Ft) Standard Overlay, ADA Improvements. Project located on Kedzie Ave. from 71st St to 77th St within the City of Chicago in Cook County. | — | Executed | Gallagher Asphalt Corporation $871,931 · | ||
| Apr 26, 2024 | 62R53 | CookDistrict 1 | A standard overlay of the existing FAU 2691 (Wolf Road) from IL 58 (Golf Road) to North of Touhy Avenue in the This improvement consists of a standard overlay of the existing FAU 2691 (Wolf Road) from IL 58 (Golf Road) to North of Touhy Avenue in the City of DES Plaines in Cook County approximately 13,627 ft in length. | — | Executed | Builders Paving, LLC $3,359,808 · | ||
| Apr 26, 2024 | 62R65 | CookDistrict 1 | Cleaning and painting existing steel on various structures located in Villages of Hodgkins and Summit in Cook The improvement consists of cleaning and painting existing steel on various structures located in Villages of Hodgkins and Summit in Cook County. Location 1 (SN: 016-0004, 0005, 0006, and 0007) in Village of Hodgkins, Location 2 (016-0012 and 0013) in Village of Summit, and Location 3 (SN: 016-0014 and 0015) Village of Summit. | — | Executed | ERA-Valdivia Contractors, Inc. $1,693,659 · | ||
| Apr 26, 2024 | 62R69 | CookDistrict 1 | (2.07-Mile) SMART Overlay on 183rd Street from Oak Park Ave to IL 50 (Cicero Ave). This project is located in the City of Country Club Hills, the Village of Tinley Park and unincorporated Cook County. | — | Executed | Gallagher Asphalt Corporation $1,015,841 · | ||
| Apr 26, 2024 | 62R75 | CookDistrict 1 | Bridge deck overlay and joint replacement of IL 83/Sibley Blvd located over UPRR (0 (1,770-Ft) Improvement consists of bridge deck overlay and joint replacement of IL 83/Sibley Blvd located over UPRR (0.2-mile east of the State Street/Indiana Avenue). The project is in the Village of Dolton, Cook County. | — | Executed | D. Construction, Inc. $1,984,514 · | ||
| Apr 26, 2024 | 62R91 | DuPageDistrict 1 | Bridge Deck Overlay, Bridge Joint Replacement / Repair at US 20 (Lake Street) over IL 390 (Elgin O'Hare Expressway). This project is located in the Village of Hanover Park in DuPage County. | — | Executed | Martam Construction Incorporated $1,888,608 · | ||
| Apr 26, 2024 | 62T00 | McHenryDistrict 1 | (200-Ft) Bridge Preservation project including bridge deck overlay, bridge joint replace/repair of SN 056-0052 carrying US 14 (Division Street) over Rush Creek, 0.1-miles North of IL 23 located within the City of Harvard in McHenry County. | — | Executed | Martam Construction Incorporated $637,548 · | ||
| Apr 26, 2024 | 62T33 | WillDistrict 1 | This is a bridge preservation project of SN 099-0282; US 6 (Maple Road) over CN Railroad. Scope of work includes bridge deck scarification and overlay, joint repair, approach slab repair and sidewalk and guardrail replacement. The project is located within the City of Joliet in Will County. | — | Executed | D. Construction, Inc. $1,303,768 · | ||
| Apr 26, 2024 | 62T42 | CookDistrict 1 | (5.626-Mile) Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course and sidewalk ramps improvements. Located in the Villages of Oak Brook, Westchester, Broadview, North Riverside, and Forest Park in Cook County. | — | Executed | Builders Paving, LLC $8,297,082 · | ||
| Apr 26, 2024 | 62T45 | KaneDistrict 1 | This is a bridge preservation project of (SN 045-2015); Galena Blvd. over Blackberry Creek. Scope of work includes bridge deck scarification and latex overlay, full depth deck patching, approach slab repair and drainage adjustments. The project is located within the City of Aurora in Kane County. | — | Executed | Lorig Construction Company $256,821 · | ||
| Apr 26, 2024 | 62T69 | LakeDistrict 1 | (4.65-Mile) SMART Resurfacing and ADA Ramp improvements from County Line Road to West of US 12 and includes road surface removal, HMA paving, sidewalk removal, installation of PCC sidewalk, detectable warnings, and placement of pavement markings. Improvements is in the Villages of Lake Zurich, North Barrington, Lake Barrington, and in Cuba and ELA Townships in Lake County. | — | Executed | Peter Baker & Son Co. $1,732,377 · | ||
| Apr 26, 2024 | 62T85 | CookDistrict 1 | Bridge deck overlay and joint repair of the structure located at the Dundee Road Bridge (SN 016-0940) on FAU 1 The proposed improvement consists of bridge deck overlay and joint repair of the structure located at the Dundee Road Bridge (SN 016-0940) on FAU 1273 (IL- 68 Dundee Road) 0.2 miles east of I-94 in Northfield Township and New Trier Township in Cook County. | — | Executed | Lorig Construction Company $1,150,113 · | ||
| Apr 26, 2024 | 62U73 | DuPageDistrict 1 | (2,000-Ft) Traffic Signal Modernization and Intersection Improvements located at IL 83 (Kingery Highway) and Bluff Rd. in the Downers Grove Township, DuPage County. | — | Active | R. W. Dunteman Company $1,457,500 · | ||
| Apr 26, 2024 | 62U81 | CookDistrict 1 | Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course and sidewalk ra (1.14-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course and sidewalk ramps improvements. Located in the Villages of Winnetka in Cook County. | — | Executed | Peter Baker & Son Co. $678,134 · | ||
| Apr 26, 2024 | 62U84 | KaneDistrict 1 | (4,485-Ft) Pavement rehabilitation and widening, drainage, intersection channelization, signing, lighting, traffic signals and safety improvements of US 20 from west of Nesler Road to east of Weld Road/Longcommon Parkway in the City of Elgin within Kane County. | — | Executed | Martam Construction Incorporated $2,186,382 · | ||
| Apr 26, 2024 | 62U87 | CookDistrict 1 | Scope of work includes pavement removal, Drainage Improvement, Concrete Barrier removal and construction of new Concrete Barrier, retaining wall repair, placement of subbase granular material, HMA asphalt pavement and thermoplastic pavement markings. Located at the IDOT Northbrook Maintenance yard at 1916 Techny Rd., Northbrook, IL. | — | Executed | Schroeder Asphalt Services, Inc. $1,375,038 · | ||
| Apr 26, 2024 | 62V18 | VariousDistrict 1 | Repairing damaged concrete barrier wall, bridge parapet, retaining walls and wooden sound wall in various Town This improvement consists of repairing damaged concrete barrier wall, bridge parapet, retaining walls and wooden sound wall in various Townships in various Counties throughout District 1. | — | Executed | D. Construction, Inc. $932,635 · | ||
| Apr 26, 2024 | 62V97 | DuPageDistrict 1 | This improvement is located at the IDOT Oakbrook Maintenance yard at 17W125 Butterfield Road, Villa Park, IL. Scope of work includes pavement removal, Catch Basins PCC reconstruction, placement of subbase granular material, HMA asphalt pavement, PCC pavement, and thermoplastic pavement marking. | — | Executed | K-Five Construction Corporation $780,422 · | ||
| Apr 26, 2024 | 62W01 | CookDistrict 1 | 2 lots, adjacent to each other This is a parking lot improvement project for the District 1 Landscape Maintenance Yard. The Yard consists of 2 lots, adjacent to each other. Both lots are located at 1260 West Augusta Boulevard within the City of Chicago. | — | Executed | M.Q. Sewer Water Contractors, Inc. d/b/a M. Q. Construction Company $1,029,731 · | ||
| Apr 26, 2024 | 62W06 | CookDistrict 1 | Full depth removal of existing HMA pavement and replacement, PCC pavement replacement/patching, drainage, ligh Parking lot improvement project consists of full depth removal of existing HMA pavement and replacement, PCC pavement replacement/patching, drainage, lighting relocation. Location of Work: IDOT District 1 Emergency Traffic Patrol (ETP) facility at 3501 South Normal Avenue within the City of Chicago in Cook County. | — | Executed | M.Q. Sewer Water Contractors, Inc. d/b/a M. Q. Construction Company $456,692 · | ||
| Apr 26, 2024 | 62W09 | CookDuPageDistrict 1 | Debris cleaning and litter picking located on I-55 - Stevenson expressway from IL 43 (Harlem Ave) to I-355 in This project consists of debris cleaning and litter picking located on I-55 - Stevenson expressway from IL 43 (Harlem Ave) to I-355 in Cook and DuPage Co. | — | Executed | The Final Connection, Inc. $140,400 · | ||
| Apr 26, 2024 | 62W10 | WillDistrict 1 | Debris cleaning and litter picking This work is located on I-55 expressway from I-355 to Reed Rd in Will County. It consists of debris cleaning and litter picking. | — | Executed | The Final Connection, Inc. $168,480 · | ||
| Apr 26, 2024 | 62W42 | WillDistrict 1 | (231.5-Ft) This project includes overlay of Gougar Road Bridge over I-80 (SN 099-0 203) and replacement of permanent protective shield, in the Village of New Lenox within Will County. | — | Executed | D. Construction, Inc. $128,211 · | ||
| Apr 26, 2024 | 62W46 | VariousDistrict 1 | Impact attenuators removal and replacement, sand modules replacement and any collateral work necessary to comp The work to be completed under this contract consist of impact attenuators removal and replacement, sand modules replacement and any collateral work necessary to complete the improvement as shown on the plans and as described herein on a work order basis and per the Department-s request. | — | Executed | Traffic Control and Protection LLC dba High Star Traffic $2,614,163 · | ||
| Apr 26, 2024 | 64L95 | WinnebagoDistrict 2 | Patching, milling, and resurfacing on IL 75 from 0.2 mile East of Moate Rd to 0.4 mile East of Meridian Rd. | — | Executed | Rock Road Companies, Inc. $1,979,788 · | ||
| Apr 26, 2024 | 64N90 | Rock IslandDistrict 2 | 5.98 mile, HMA resurfacing on IL 92 from 115th St West in Andalusia to 0.4 mile East of IL 92 (N). | — | Executed | Langman Construction, Inc. $2,106,327 · | ||
| Apr 26, 2024 | 64P27 | WinnebagoDistrict 2 | 0.55 miles of cold milling, patching, and HMA resurfacing from 0.4 miles East of Lyford Rd to 0.1 mile West of Winnebago County Line. | — | Executed | Curran Contracting Company $800,800 · | ||
| Apr 26, 2024 | 64P58 | OgleDistrict 2 | 1.08 miles of cold milling, pavement patching, hot-mix asphalt resurfacing from West of Illinois St to 1st St in Oregon. | — | Executed | Martin & Company Excavating $1,070,501 · | ||
| Apr 26, 2024 | 64S27 | WhitesideDistrict 2 | Deck repair, joint replacement, deck overlay and other miscellaneous repairs on the existing bridges carrying I-88 over Rock Creek, BNSF RR Barstow Sub., Henry Road and Deer Creek. | — | Executed | Martin & Company Excavating $4,099,617 · | ||
| Apr 26, 2024 | 64S30 | LeeDistrict 2 | Deck repair, joint replacement, deck overlay, and other miscellaneous repairs on SN 052-0061 over Coon Creek, 3.2 miles South of Amboy. | — | Executed | Martin & Company Excavating $585,814 · | ||
| Apr 26, 2024 | 64S38 | OgleDistrict 2 | 0.15 mile milling and standard overlay; tollway ramp (EB) to Steward Rd south of Rochelle. | — | Executed | Curran Contracting Company $201,632 · | ||
| Apr 26, 2024 | 64S55 | Jo DaviessDistrict 2 | 1.3 miles of patching through Elizabeth. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $442,965 · | ||
| Apr 26, 2024 | 64S61 | StephensonDistrict 2 | Bridge deck repair on SN's 089-0058 and 089-0059, carrying US 20 over Silver Creek, 0.5 miles east of Springfield Rd. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $449,840 · | ||
| Apr 26, 2024 | 64S65 | WhitesideDistrict 2 | Bridge repair, deck repair, joint replacement on SN 098-0033, carrying US 30 over Elkhorn Creek. | — | Executed | Martin & Company Excavating $402,242 · | ||
| Apr 26, 2024 | 64S68 | HenryDistrict 2 | 3.39 miles of HMA resurfacing and pavement patching, IL 82 frokm IL 81 in Camridge to N 70th Ave. | — | Executed | Advanced Asphalt Company $1,798,693 · | ||
| Apr 26, 2024 | 64S95 | HenryDistrict 2 | Pavement patching on I-74 from the I-74/I-80/I-280 interchange to IL 81. | — | Executed | G. M. Sipes Construction, Inc. $553,125 · | ||
| Apr 26, 2024 | 64T03 | VariousDistrict 2 | Various routes on-call guardrail. | — | Executed | Northern Contracting, Inc. $319,684 · | ||
| Apr 26, 2024 | 64T08 | VariousDistrict 2 | Maintain and service all Intelligent Transportation System equipment located in the Department's Districts 2 and 3 to ensure the safety of the motoring public. | — | Rejected | Laser Electric, Inc. $155,725 · | ||
| Apr 26, 2024 | 64T14 | Rock IslandDistrict 2 | 7.26 miles of patching, milling, widening, and resurfacing along 104th St from US 150 south of Coal Valley to Mercer County Line north of Sherrard. | — | Executed | Advanced Asphalt Company $4,786,212 · | ||
| Apr 26, 2024 | 64T15 | OgleWhitesideDistrict 2 | 8.8 miles of patching, milling, and resurfacing on Freeport Rd from West Sterling Rd to East Lynn Blvd in Sterling. | — | Executed | Martin & Company Excavating $3,350,526 · | ||
| Apr 26, 2024 | 64T22 | Rock IslandDistrict 2 | 31.1 miles of aggregate shoulder improvement. | — | Executed | Phoenix Corporation of the Quad Cities $539,770 · | ||
| Apr 26, 2024 | 66C45 | IroquoisDistrict 3 | Work beings at the Iroquois/Ford county line on IL 116 extending 8.22 miles, ending at the interchange limits of IL 116 and I 57. The project is a milling and resurfacing designed overlay of IL 116 including drainage improvements. | — | Executed | Iroquois Paving Corporation $5,775,587 · | ||
| Apr 26, 2024 | 66M98 | IroquoisKankakeeDistrict 3 | Work beings at 0.1 Mi N of Ambrose St in St Anne to 1.8 Mi S of Papineau Rd. 6.22 Miles of smart overlay with ADA and drainage repairs. | — | Executed | Iroquois Paving Corporation $2,586,271 · | ||
| Apr 26, 2024 | 66N40 | LivingstonDistrict 3 | Micro surfacing Joint Repair, Located on FAI 55 in Livingston County, from McLean County Line to 1.7 miles South of IL 116. | — | Executed | A. C. Pavement Striping Co. $577,571 · | ||
| Apr 26, 2024 | 66N44 | IroquoisDistrict 3 | Milling and resurfacing the Illinois Department of Transportation Ashkum Maintenance facility. | — | Executed | H. J. Eppel & Co. $781,331 · | ||
| Apr 26, 2024 | 66N50 | GrundyDistrict 3 | Raising existing concrete pavement adjacent to approach pavement IL 47 at the north abutment, southbound lanes of structure No. 032-0099; the work consists of raising existing concrete pavement adjacent to approach pavement. | — | Executed | D. Construction, Inc. $59,606 · | ||
| Apr 26, 2024 | 66N53 | BureauDistrict 3 | Bridge repairs at Structure No. 006-0083 carrying FAS 1252 (IL 26/29) over Bureau Creek Overflow, 0.3 mi. northeast of IL 26 and IL 29 junction. | — | Executed | Gensini Excavating, Inc. $431,733 · | ||
| Apr 26, 2024 | 66N54 | IroquoisDistrict 3 | Remove concrete slope wall, install stone riprap, filter fabric, stone bedding, replace expansion joint seal, and structural repair of concrete (pier) on SN 038-0174. | — | Executed | Iroquois Paving Corporation $313,415 · | ||
| Apr 26, 2024 | 66N92 | LaSalleDistrict 3 | Cleaning and painting all structural steel on Structure No. 050-0019 carrying IL 351 over the Lone Star Cement Railroad, 2.0 miles south of US Route 6 (Oglesby). | — | Executed | ERA-Valdivia Contractors, Inc. $186,186 · | ||
| Apr 26, 2024 | 66N93 | BureauDistrict 3 | Cleaning and painting all structural steel on Structure No. 006-0083 carrying IL 29/26 over Big Bureau Creek Overflow, 0.3 mi. north of the south junction of IL 26 and Structure No. 006-0084 carrying IL 29 over over Big Bureau Creek, 0.3 mi. south of the south junction of IL 26. | — | Executed | ERA-Valdivia Contractors, Inc. $548,417 · | ||
| Apr 26, 2024 | 66N96 | KankakeeDistrict 3 | SN 046-0108, riprap replacement, controlled low-strength material, riprap removal, grout for use with riprap. | — | Executed | Tobey's Construction & Cartage, Inc. $33,295 · | ||
| Apr 26, 2024 | 66N97 | IroquoisDistrict 3 | Traffic Signal Mast Arm Replacement. This project is located in Iroquois County, at the west intersection of US-24 and IL-1 in Watseka. | — | Executed | Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $299,323 · | ||
| Apr 26, 2024 | 68880 | PeoriaDistrict 4 | Bridge deck replacement and rehabilitation on SN 072-0114 and SN 072-0115 over Kickapoo Creek/BNSF RR. | — | Executed | Stark Excavating, Inc. $22,989,697 · | ||
| Apr 26, 2024 | 68F84 | HendersonDistrict 4 | Bridge preservation to SN 036-0036 including: bridge joint replacement, hydroscarification, and MSC overlay on the bridge deck and roadway aproaches, slope wall repair, plating a beam end and other related collateral work to complete the work. | — | Executed | Brandt Construction Co. $1,768,094 · | ||
| Apr 26, 2024 | 68H22 | MarshallDistrict 4 | NB and SN I-39 over TR 39, Sandy Creek and North Fork Sandy Creek in Marshall County. | — | Active | ICC Group Inc. $2,310,000 · | ||
| Apr 26, 2024 | 68H26 | VariousDistrict 4 | Crack and joint sealing on various routes in various counties in District Four. | — | Executed | SKC Construction, Inc. $973,284 · | ||
| Apr 26, 2024 | 68H27 | VariousDistrict 4 | D4 bridge deck sealing 2024 at various locations within District 4. | — | Executed | M & M Concrete, Inc. $175,287 · | ||
| Apr 26, 2024 | 68H71 | TazewellDistrict 4 | D4 Bridge Joint Repair 2024 at SN's 090-0130, 090-0132, 090-0133, 090-0137, 090-0138 and 090-0139 in Tazewell County. | — | Active | Otto Baum Company, Inc. $5,662,800 · | ||
| Apr 26, 2024 | 68H81 | TazewellDistrict 4 | Bridge deck patching on SN 090-0141 on Morton Ave (FAU 6729) over I-74 in Morton in Tazewell County. | — | Executed | Path Construction Company, Inc. $211,896 · | ||
| Apr 26, 2024 | 68H83 | PeoriaDistrict 4 | Paving the invert of the culvert under IL Rt 6 between Knoxville Ave and Allen Rd. | — | Executed | Illinois Civil Contractors, Inc. $138,627 · | ||
| Apr 26, 2024 | 68H84 | MercerDistrict 4 | Culvert wingwall and slope repairs along IL 17, 3.8 miles east of US 67 in Mercer County. | — | Executed | Miller Trucking & Excavating Company $243,778 · | ||
| Apr 26, 2024 | 68H85 | PeoriaDistrict 4 | Culvert wing wall repair (remove and replace) along IL 78, north of IL 116 near Farmington in Peoria County. | — | Executed | Otto Baum Company, Inc. $324,600 · | ||
| Apr 26, 2024 | 68H86 | KnoxPeoriaDistrict 4 | Pavement and drainage under RR viaducts on IL 90 and IL 78 in Peoria and Knox Counties. | — | Executed | Stark Excavating, Inc. $834,893 · | ||
| Apr 26, 2024 | 68H91 | VariousDistrict 4 | D4 District-wide pavement markings. | — | Executed | Varsity Striping & Construction Co. $385,631 · | ||
| Apr 26, 2024 | 68I01 | WoodfordDistrict 4 | Rehabilitation to existing lagoon at the eastbound I-74 Mackinaw Dells Rest Area. | — | Executed | Gensini Excavating, Inc. $3,190,549 · | ||
| Apr 26, 2024 | 68I05 | TazewellDistrict 4 | Traffic signal mast arm replacement at IL 98 (Birchwood St.) and I-155 NB ramps in Morton. | — | Executed | Laser Electric, Inc. $243,063 · | ||
| Apr 26, 2024 | 68J05 | PeoriaDistrict 4 | Traffic signal mast arm replacement at IL 29/Cedar Hills Drive in Peoria County. | — | Executed | Oberlander Electric Co. $291,000 · | ||
| Apr 26, 2024 | 70254 | ChampaignDistrict 5 | 0.34 mi Bridge Replacement over I-57 west of Champaign. | — | Executed | ICC Group Inc. $17,670,000 · | ||
| Apr 26, 2024 | 70753 | ChampaignDistrict 5 | 165' culvert replacement at ditch 0.6 and 2.2 miles east of Gifford ECL. | — | Executed | Stark Excavating, Inc. $683,695 · | ||
| Apr 26, 2024 | 70B07 | VermilionDistrict 5 | 6.16 miles of designed overlay and culvert repair; Georgetown/Indianola Rd to south of Catlin. | — | Executed | Open Road Paving Company LLC $4,479,683 · | ||
| Apr 26, 2024 | 70C24 | DouglasDistrict 5 | Designed Overlay Resurfacing from Coles Co Line to 0.3 mi north of US 36. | — | Executed | Howell Paving, Inc. $37,020,452 · | ||
| Apr 26, 2024 | 70D26 | EdgarDistrict 5 | Culvert replacement field entrance east of Hume Station 1185+00. | — | Executed | Cross Construction, Inc. $500,000 · | ||
| Apr 26, 2024 | 70E12 | McLeanDistrict 5 | 14.93 miles of SMART Overlay - Standard Overlay ADA Improvements. | — | Executed | Rowe Construction, a div of UCM, Inc. $6,488,552 · | ||
| Apr 26, 2024 | 70G75 | McLeanDistrict 5 | 7.544 miles of SMART resurfacing form West of Cooksville to East of Colfax. | — | Executed | Rowe Construction, a div of UCM, Inc. $1,818,351 · | ||
| Apr 26, 2024 | 70G81 | VermilionDistrict 5 | Bridge repair structure 092-0050 bearing replacement at piers. | — | Executed | William Charles Construction Company, LLC $430,000 · | ||
| Apr 26, 2024 | 70H06 | ChampaignPiattDistrict 5 | Piatt/Champaign Co Line to I-57 west of Champaign and Dewitt/Piatt Co Line to 1 mi east of 900E Rd west of Mansfield. | — | Executed | Complete Asphalt Service Co. $66,944 · | ||
| Apr 26, 2024 | 70H14 | McLeanDistrict 5 | Bridge painting of 6 structures on various routes in McLean County. | — | Executed | Three Star Painting, Inc. $707,507 · | ||
| Apr 26, 2024 | 72189 | SangamonDistrict 6 | Bridge deck overlay, bridge joint repair/replacement, bridge deck painting and bridge repairs on SN 084-0109 and SN 084-0110 carrying I-55 over IL 104 at the Auburn interchange. | — | Executed | Sangamo Construction Company $5,085,109 · | ||
| Apr 26, 2024 | 72219 | ChristianDistrict 6 | 1.2 miles of overlay and bridge deck overlay on IL 48 from 0.9 miles southwest of Old IL 48 (Spresser Street), southwest of Taylorville, to 0.4 miles southwest of the South Fork Sangamon River. | — | Executed | Sangamo Construction Company $2,016,363 · | ||
| Apr 26, 2024 | 72223 | PikeDistrict 6 | Bridge deck overlay, deck repairs, and joint replacement on SN 075-0036 carrying IL 96 over Hadley Creek, 0.7 miles south of the IL 106 Junction in Kinderhook. | — | Executed | County Contractors, Inc. $969,518 · | ||
| Apr 26, 2024 | 72230 | MacoupinDistrict 6 | 1.1 miles of patching, resurfacing, adding parking lanes and sidewalk ramp improvements on IL 4 from south of North Street in Girard to north of Cambridge Road, south of Girard. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,955,410 · | ||
| Apr 26, 2024 | 72265 | MacoupinDistrict 6 | 8.7 miles of cape seal and grinding on IL 108 and 111 from west of Carlinville to the northern IL 108 and111 intersection. | — | Executed | A. C. Pavement Striping Co. $1,319,116 · | ||
| Apr 26, 2024 | 72282 | SangamonDistrict 6 | 5 miles of resurfacing, curb and gutter replacement, guardrail replacement and bridge deck preservation (over Richland Creek) on IL 97 from the Menard County line to IL 125. SN 084-0068 | — | Executed | Truman L. Flatt & Sons Co., Inc. $5,162,775 · | ||
| Apr 26, 2024 | 72304 | MontgomeryDistrict 6 | 7.6 miles of resurfacing including interchange ramps on I-55 from 0.4 miles south of CH 17 (Mine Avenue) at the Farmersville interchange to just south of the Sangamon County line. Also includes fog seal of shoulders and culvert repairs. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $6,678,600 · | ||
| Apr 26, 2024 | 72498 | SangamonDistrict 6 | Resurfacing on Old US 66 from 0.1 miles south of New City Road to 0.19 miles east of Burttle Lane, east of I-55. | — | Executed | Truman L. Flatt & Sons Co., Inc. $752,964 · | ||
| Apr 26, 2024 | 72620 | SchuylerDistrict 6 | Painting portions of SN 085-0029 carrying IL 99 over Cedar Creek, 0.65 miles north of Camden. | — | Executed | ERA-Valdivia Contractors, Inc. $194,688 · | ||
| Apr 26, 2024 | 72725 | MontgomeryDistrict 6 | Pipe culvert removal and replacement on Nokomis Blacktop, 0.08 miles east of E 15th Road. | — | Executed | Earth Worx Solutions LLC $88,537 · | ||
| Apr 26, 2024 | 72735 | VariousDistrict 6 | Maintenance and repair of surveillance cameras, vehicle detectors, dynamic message signs, advanced traffic management systems, fiber optic communications, traffic signal interconnects, ethernet networks and peripheral equipment throughout District 6. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $303,500 · | ||
| Apr 26, 2024 | 72893 | SangamonDistrict 6 | Earthwork, drainage improvements, HMA shoulders, guardrail, high-tension cable median barrier, bridge deck repairs (SN 084-0018 and 084-0019), and bridge deck microsilica concrete overlay of SN 084-0019 on I-55 at the Sangamon River, 2.2 miles south of I-55 BUS at the Sherman Interchange. | — | Executed | Freesen, a div of UCM, Inc. $5,322,947 · | ||
| Apr 26, 2024 | 72E35 | VariousDistrict 6 | Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the western half of District 6. | — | Executed | Bodine Electric of Decatur $394,130 · | ||
| Apr 26, 2024 | 72E36 | VariousDistrict 6 | Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the eastern half of District 6. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $510,682 · | ||
| Apr 26, 2024 | 72M79 | MenardDistrict 6 | 1.9 miles of resurfacing and culvert improvements on IL 97 south of Petersburg, from 0.1 miles north of North Shore Drive to 0.3 miles north of Boy Scout Road. | — | Executed | P. H. Broughton & Sons, Inc. $4,308,264 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.