FAU 2831 22 RS
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Gallagher Asphalt Corporation Low bidder | $871,931 | ||
| 2 | K-Five Construction Corporation | $978,393 | +12.2% | |
| 3 | MAT Construction Leasing, Inc. | $991,985 | +13.8% | |
| 4 | Bigane Paving Company | $1,220,078 | +39.9% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Gallagher Aspha… | #2 K-Five Construc… | #3 MAT Constructio… | #4 Bigane Paving C… |
|---|---|---|---|---|---|---|---|---|---|
| 1 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $6,500.00 | $1,400.00 | $3,500.00 | $11,000.00 | |
| 2 | X4240800 | DETECTABLE WARN SPL | 180 | SQ FT | $86.00 | $80.00 | $45.00 | $38.00 | |
| 3 | X4400501 | CC&G RMVL REPL < = 10 | 60 | FOOT | $51.00 | $47.00 | $75.00 | $58.00 | |
| 4 | X4400503 | CC&G RMVL REPL > 10FT | 1,156 | FOOT | $42.00 | $39.00 | $46.00 | $58.00 | |
| 5 | X5537800 | SS CLEANED 12 | 300 | FOOT | $4.30 | $4.25 | $8.00 | $5.00 | |
| 6 | X6030310 | FR & LIDS ADJUST SPL | 20 | EACH | $1,400.00 | $1,000.00 | $1,200.00 | $1,000.00 | |
| 7 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $500.00 | $3,300.00 | $3,000.00 | $3,300.00 | |
| 8 | Z0018500 | DRAINAGE STR CLEANED | 20 | EACH | $375.00 | $335.00 | $390.00 | $335.00 | |
| 9 | Z0030850 | TEMP INFO SIGNING | 228 | SQ FT | $16.20 | $2.00 | $15.00 | $15.00 | |
| 10 | 20200100 | EARTH EXCAVATION | 15 | CU YD | $70.00 | $65.00 | $75.00 | $90.00 | |
| 11 | 21101615 | TOPSOIL F & P 4 | 77 | SQ YD | $1.00 | $25.00 | $8.00 | $5.00 | |
| 12 | 25200110 | SODDING SALT TOLERANT | 77 | SQ YD | $118.00 | $25.00 | $17.00 | $110.00 | |
| 13 | 25200200 | SUPPLE WATERING | 0.1 | UNIT | $107.00 | $1.00 | $100.00 | $1,000.00 | |
| 14 | 35501316 | HMA BASE CSE 8 | 18 | SQ YD | $115.00 | $105.50 | $100.00 | $15.00 | |
| 15 | 40600290 | BIT MATLS TACK CT | 12,906 | POUND | $0.0100 | $0.0100 | $0.9000 | $2.00 | |
| 16 | 40600370 | LONG JOINT SEALANT | 11,603 | FOOT | $3.00 | $2.63 | $2.34 | $3.00 | |
| 17 | 40600400 | MIX CR JTS FLANGEWYS | 58 | TON | $50.00 | $50.00 | $150.00 | $500.00 | |
| 18 | 40600982 | HMA SURF REM BUTT JT | 247 | SQ YD | $18.00 | $0.0100 | $3.95 | $70.00 | |
| 19 | 40603200 | P HMA BC IL-4.75 N50 | 794 | TON | $142.00 | $130.24 | $141.00 | $170.00 | |
| 20 | 40604060 | HMA SC IL-9.5 D N50 | 2 | TON | $305.00 | $240.00 | $100.00 | $170.00 | |
| 21 | 40605026 | P HMA SC SMA 9.5 F N80 | 1,886 | TON | $138.00 | $132.00 | $134.00 | $170.00 | |
| 22 | 42001300 | PROTECTIVE COAT | 629 | SQ YD | $3.20 | $3.00 | $2.00 | $5.00 | |
| 23 | 42300200 | PCC DRIVEWAY PAVT 6 | 5 | SQ YD | $178.00 | $165.00 | $150.00 | $135.00 | |
| 24 | 42300400 | PCC DRIVEWAY PAVT 8 | 23 | SQ YD | $178.00 | $165.00 | $150.00 | $145.00 | |
| 25 | 42400200 | PC CONC SIDEWALK 5 | 1,182 | SQ FT | $15.00 | $14.00 | $16.00 | $16.00 | |
| 26 | 42400410 | PC CONC SIDEWALK 8 | 869 | SQ FT | $19.00 | $18.00 | $21.00 | $17.00 | |
| 27 | 44000159 | HMA SURF REM 2 1/2 | 19,243 | SQ YD | $3.25 | $4.00 | $3.95 | $5.00 | |
| 28 | 44000200 | DRIVE PAVEMENT REM | 45 | SQ YD | $44.50 | $105.00 | $45.00 | $30.00 | |
| 29 | 44000600 | SIDEWALK REM | 2,050 | SQ FT | $3.25 | $3.00 | $4.00 | $3.00 | |
| 30 | 44201803 | CL D PATCH T2 13 | 306 | SQ YD | $70.00 | $50.00 | $129.00 | $120.00 | |
| 31 | 44201807 | CL D PATCH T3 13 | 409 | SQ YD | $60.00 | $50.00 | $129.00 | $120.00 | |
| 32 | 44201809 | CL D PATCH T4 13 | 310 | SQ YD | $50.00 | $50.00 | $129.00 | $120.00 | |
| 33 | 60252800 | CB RECONST | 1 | EACH | $1,995.00 | $1,850.00 | $3,500.00 | $1,500.00 | |
| 34 | 60257900 | MAN RECONST | 1 | EACH | $2,160.00 | $2,000.00 | $3,500.00 | $1,500.00 | |
| 35 | 60300105 | FR & GRATES ADJUST | 8 | EACH | $800.00 | $750.00 | $550.00 | $550.00 | |
| 36 | 60300305 | FR & LIDS ADJUST | 10 | EACH | $900.00 | $850.00 | $500.00 | $600.00 | |
| 37 | 60406000 | FR & LIDS T1 OL | 1 | EACH | $800.00 | $750.00 | $500.00 | $650.00 | |
| 38 | 60406100 | FR & LIDS T1 CL | 1 | EACH | $900.00 | $850.00 | $500.00 | $675.00 | |
| 39 | 66900200 | NON SPL WASTE DISPOSL | 15 | CU YD | $320.00 | $300.00 | $70.00 | $275.00 | |
| 40 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $1,925.00 | $1,785.00 | $1,785.00 | $1,800.00 | |
| 41 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $3,850.00 | $3,600.00 | $3,600.00 | $4,900.00 | |
| 42 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $540.00 | $500.00 | $500.00 | $500.00 | |
| 43 | 66901006 | REG SUB MON | 4 | CAL DA | $640.00 | $600.00 | $600.00 | $1,180.00 | |
| 44 | 67100100 | MOBILIZATION | 1 | L SUM | $52,300.00 | $59,370.00 | $40,000.00 | $72,000.00 | |
| 45 | 70102625 | TR CONT & PROT 701606 | 1 | L SUM | $17,500.00 | $115,426.32 | $1.00 | $9,000.00 | |
| 46 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $1.00 | $1.00 | $1.00 | $1,000.00 | |
| 47 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $1.00 | $1.00 | $9,500.00 | $1,000.00 | |
| 48 | 70300100 | SHORT TERM PAVT MKING | 16,725 | FOOT | $0.0100 | $1.00 | $1.35 | $1.00 | |
| 49 | 70300150 | SHRT TRM PAVT MK REM | 6,969 | SQ FT | $0.0100 | $2.00 | $1.00 | $2.00 | |
| 50 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 110 | SQ FT | $3.75 | $1.50 | $1.00 | $4.00 | |
| 51 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 8,891 | FOOT | $0.5000 | $0.3500 | $0.4500 | $0.5000 | |
| 52 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 1,287 | FOOT | $0.7500 | $0.4000 | $0.6000 | $1.00 | |
| 53 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 99 | FOOT | $1.50 | $1.00 | $1.00 | $1.50 | |
| 54 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 1,307 | FOOT | $3.00 | $1.50 | $2.00 | $3.00 | |
| 55 | 70307120 | TEMP PVT MK L4 T4 TAPE | 4,182 | FOOT | $1.30 | $1.25 | $1.35 | $1.50 | |
| 56 | 72000100 | SIGN PANEL T1 | 26 | SQ FT | $37.00 | $34.00 | $40.00 | $35.00 | |
| 57 | 72800100 | TELES STL SIN SUPPORT | 30 | FOOT | $18.50 | $15.00 | $20.00 | $20.00 | |
| 58 | 78000100 | THPL PVT MK LTR & SYM | 110 | SQ FT | $5.50 | $5.15 | $4.95 | $6.00 | |
| 59 | 78000200 | THPL PVT MK LINE 4 | 8,891 | FOOT | $0.7000 | $0.6500 | $0.6300 | $1.00 | |
| 60 | 78000400 | THPL PVT MK LINE 6 | 1,287 | FOOT | $0.8000 | $0.7500 | $1.25 | $1.50 | |
| 61 | 78000600 | THPL PVT MK LINE 12 | 99 | FOOT | $3.15 | $2.95 | $2.49 | $3.00 | |
| 62 | 78000650 | THPL PVT MK LINE 24 | 1,307 | FOOT | $5.50 | $5.15 | $4.95 | $6.00 | |
| 63 | 78009004 | MOD URETH PM LINE 4 | 1,283 | FOOT | $4.85 | $4.50 | $4.22 | $6.00 | |
| 64 | 78300200 | RAISED REF PVT MK REM | 1,435 | EACH | $0.0100 | $0.0100 | $5.00 | $2.00 | |
| 65 | 78300202 | PVT MKG REM WTR BLAST | 6,431 | SQ FT | $0.2500 | $0.1000 | $1.26 | $2.00 | |
| 66 | 88600600 | DET LOOP REPL | 200 | FOOT | $23.65 | $21.88 | $70.00 | $70.00 |