62-(3B-1;3B;3HB-2)BRR
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | ICC Group Inc. Low bidder | $2,310,000 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 ICC Group Inc. |
|---|---|---|---|---|---|---|
| 1 | X0325748 | ACRYLIC COATING | 10.7 | SQ YD | $23.40 | |
| 2 | X0325749 | FIBER WRAP | 64.3 | SQ FT | $270.97 | |
| 3 | X4404260 | PAVED SHLD REMOVAL SP | 350 | SQ YD | $200.00 | |
| 4 | X4421763 | CL D PATCH T2 10 SPL | 214 | SQ YD | $540.00 | |
| 5 | X5015225 | PIPE CULVERT REM SPL | 206 | FOOT | $138.00 | |
| 6 | X5030250 | BR DECK GROOVING LONG | 2,096 | SQ YD | $10.00 | |
| 7 | X6050310 | FILL INLETS SPL | 5 | EACH | $4,500.00 | |
| 8 | X6650208 | WOV W FENCE REM & RPL | 96 | FOOT | $50.00 | |
| 9 | Z0001002 | GDRL AGG EROS CONT | 59 | TON | $311.00 | |
| 10 | Z0012130 | BR DECK SCAR 3/4 | 3,493 | SQ YD | $60.00 | |
| 11 | Z0012162 | BR DK MIC C OVL 2 1/4 | 3,493 | SQ YD | $213.00 | |
| 12 | Z0029090 | DIAMOND GRIND BR SEC | 4,186 | SQ YD | $12.00 | |
| 13 | Z0034105 | MATL TRANSFER DEVICE | 180 | TON | $69.00 | |
| 14 | Z0043800 | P P CONC I-BM REPAIR | 15.5 | SQ FT | $517.32 | |
| 15 | 28100725 | STONE DUMP RIP CL B3 | 205 | SQ YD | $100.00 | |
| 16 | 31100100 | SUB GRAN MAT A | 122 | TON | $100.00 | |
| 17 | 31102000 | SUB GRAN MAT C | 1 | CU YD | $300.00 | |
| 18 | 40600295 | P BIT MATLS TACK CT | 1,536 | POUND | $3.00 | |
| 19 | 40600982 | HMA SURF REM BUTT JT | 2,134 | SQ YD | $24.00 | |
| 20 | 40604172 | P HMA SC IL-9.5 E N70 | 108 | TON | $695.00 | |
| 21 | 44200549 | CL A PATCH T1 10 | 4 | SQ YD | $920.00 | |
| 22 | 44200553 | CL A PATCH T2 10 | 21 | SQ YD | $375.00 | |
| 23 | 44200557 | CL A PATCH T3 10 | 24 | SQ YD | $300.00 | |
| 24 | 44200559 | CL A PATCH T4 10 | 27 | SQ YD | $250.00 | |
| 25 | 44200630 | CL A PATCH T2 15 | 77 | SQ YD | $500.00 | |
| 26 | 44213000 | PATCH REINFORCEMENT | 153 | SQ YD | $120.00 | |
| 27 | 44213200 | SAW CUTS | 906 | FOOT | $7.00 | |
| 28 | 44213204 | TIE BARS 3/4 | 6 | EACH | $30.00 | |
| 29 | 48101200 | AGGREGATE SHLDS B | 32 | TON | $230.00 | |
| 30 | 48203100 | HMA SHOULDERS | 72 | TON | $555.00 | |
| 31 | 48300500 | PCC SHOULDERS 10 | 350 | SQ YD | $600.00 | |
| 32 | 59000200 | EPOXY CRACK INJECTION | 8 | FOOT | $110.85 | |
| 33 | 60260100 | INLETS ADJUST | 4 | EACH | $7,400.00 | |
| 34 | 60500060 | REMOV INLETS | 1 | EACH | $3,500.00 | |
| 35 | 64200116 | SHOULDER RUM STRIP 16 | 960 | FOOT | $7.00 | |
| 36 | 67100100 | MOBILIZATION | 1 | L SUM | $113,140.99 | |
| 37 | 70100207 | TRAF CONT-PROT 701402 | 4 | EACH | $19,750.00 | |
| 38 | 70100700 | TRAF CONT-PROT 701406 | 1 | L SUM | $54,600.00 | |
| 39 | 70100800 | TRAF CONT-PROT 701401 | 1 | L SUM | $17,500.00 | |
| 40 | 70107007 | PAVT MK BLKOUT TAPE 7 | 6,820 | FOOT | $2.75 | |
| 41 | 70107025 | CHANGEABLE MESSAGE SN | 14 | CAL DA | $340.00 | |
| 42 | 70300150 | SHRT TRM PAVT MK REM | 3,979 | SQ FT | $3.00 | |
| 43 | 70400100 | TEMP CONC BARRIER | 2,000 | FOOT | $35.00 | |
| 44 | 70400200 | REL TEMP CONC BARRIER | 2,000 | FOOT | $6.50 | |
| 45 | 70600250 | IMP ATTN TEMP NRD TL3 | 4 | EACH | $2,850.00 | |
| 46 | 70600350 | IMP ATTN REL NRD TL3 | 4 | EACH | $1,650.00 | |
| 47 | 78009006 | MOD URETH PM LINE 6 | 8,620 | FOOT | $1.55 | |
| 48 | 78011035 | GRV RCSD PVT MRKG 7 | 8,620 | FOOT | $1.30 | |
| 49 | 78100100 | RAISED REFL PAVT MKR | 40 | EACH | $220.00 | |
| 50 | 78200011 | BARR WALL REF TYPE C | 36 | EACH | $17.00 | |
| 51 | 78300200 | RAISED REF PVT MK REM | 40 | EACH | $50.00 |