| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2024 | 62T14 | CookDistrict 1 | (1300-Ft) Bridge deck overlay and joint repairs of Roosevelt Road at IHB Railroad and Gardner Road and resurfacing of Roosevelt Road from W. of 25th Avenue to E. of IHB Railroad located in the Village of Broadview and the Village of Westchester, Cook County. | — | Executed | Martam Construction Incorporated $1,864,923 · | ||
| Jan 19, 2024 | 62T44 | CookDistrict 1 | Bridge deck overlay and joint repairs of 31st Street over I-90/94 located in the City of Chicago, Cook County The proposed improvement consists of bridge deck overlay and joint repairs of 31st Street over I-90/94 located in the City of Chicago, Cook County. Total gross length= 860 FT (0.16 Mile) and net length= 630 FT (0.11 Mile). | — | Executed | Martam Construction Incorporated $1,458,158 · | ||
| Jan 19, 2024 | 62T58 | CookDistrict 1 | (3.0-Mile) SMART Overlay and ADA Improvements on US 6 / IL 83 Torrence Ave. This project is located in Calumet City and Lansing in Cook County. | — | Executed | Iroquois Paving Corporation $3,384,321 · | ||
| Jan 19, 2024 | 62T87 | CookDistrict 1 | (1.03-Mile) SMART Overlay, ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramp improvements, pavement markings, installation of APS FAP 368: Pulaski Rd, from Columbus Ave to US 12 (95th St) in the cities of Hometown and Chicago, and the Villages of Evergreen Park and Oaklawn in Cook Co | — | Executed | K-Five Construction Corporation $1,441,856 · | ||
| Jan 19, 2024 | 62U68 | KaneMcHenryDistrict 1 | Arterial routes sweeping in McHenry and Kane counties This contract consists of arterial routes sweeping in McHenry and Kane counties | — | Rejected | Central Sweeping of Illinois, LLC $1,476,500 · | ||
| Jan 19, 2024 | 62U69 | LakeDistrict 1 | Arterial routes sweeping in Lake County This contract consists of arterial routes sweeping in Lake County. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $2,640,000 · | ||
| Jan 19, 2024 | 62U75 | VariousDistrict 1 | Expressway daytime sweeping throughout District 1 The work to be completed under this contract consists of expressway daytime sweeping throughout District 1. | — | Active | |||
| Jan 19, 2024 | 62U80 | CookDistrict 1 | A standard overlay includes pavement resurfacing, Class D patching, pavement marking installation, and ADA imp This project consists of a standard overlay includes pavement resurfacing, Class D patching, pavement marking installation, and ADA improvements on Central St. from Ashland Ave. to Asbury Ave. in the City of Evanston in Cook County. | — | Executed | A Lamp Concrete Contractors, Inc. $591,675 · | ||
| Jan 19, 2024 | 62U97 | CookDistrict 1 | Debris and litter cleaning along I-290 and IL-110 (Eisenhower Expwy) from Austin Blvd This contract consists of debris and litter cleaning along I-290 and IL-110 (Eisenhower Expwy) from Austin Blvd. to Wells Street. | — | Rejected | William Dunbar Construction LLC. $245,302 · | ||
| Jan 19, 2024 | 62V01 | CookDistrict 1 | Debris and litter cleaning along I-190/90/94 (Kennedy Expwy) from US-12/45 (Mannheim Rd) to Congress Parkway i This contract consists of debris and litter cleaning along I-190/90/94 (Kennedy Expwy) from US-12/45 (Mannheim Rd) to Congress Parkway in Cook County. | — | Executed | Thor General Contracting LLC $277,027 · | ||
| Jan 19, 2024 | 62V04 | WillDistrict 1 | The pickup, removal and disposal of debris/litter on a work order basis on I-80 from I-355 to the Kendall Coun The work to be completed under this contract consists of the pickup, removal and disposal of debris/litter on a work order basis on I-80 from I-355 to the Kendall County Line. | — | Executed | Interstate Business Solutions, LLC $143,366 · | ||
| Jan 19, 2024 | 62V05 | CookDistrict 1 | Debris and litter cleaning along I-90/94 (Dan Ryan Expwy) from Congress Pkwy to I-57/I-94 (Bishop Ford Expwy) This contract consists of debris and litter cleaning along I-90/94 (Dan Ryan Expwy) from Congress Pkwy to I-57/I-94 (Bishop Ford Expwy). | — | Executed | Thor General Contracting LLC $344,234 · | ||
| Jan 19, 2024 | 62V10 | WillDistrict 1 | Hot-Mix Asphalt Resurfacing, Class D Pavement Patching, Grading and Shaping Ditches, Curb and Gutter Removal a (1.68-Mile) Designed Overlay consist of Hot-Mix Asphalt Resurfacing, Class D Pavement Patching, Grading and Shaping Ditches, Curb and Gutter Removal and Replacement on New Avenue from IL 171 (State Street) to Long Run Creek. This project is located in the City of Lockport in Will County. | — | Executed | P. T. Ferro Construction Co. $1,559,449 · | ||
| Jan 19, 2024 | 62V26 | CookDistrict 1 | Cleaning and painting existing steel structures (016-0364) at US 14 (Caldwell Ave This improvement consists of cleaning and painting existing steel structures (016-0364) at US 14 (Caldwell Ave.) Over I-94 (Edens Expwy) in the City of Chicago in Cook County. | — | Executed | ERA-Valdivia Contractors, Inc. $486,011 · | ||
| Jan 19, 2024 | 62V27 | WillDistrict 1 | A full bridge painting of the structure (099-0139) carrying US 52 (Jefferson St This project consists of a full bridge painting of the structure (099-0139) carrying US 52 (Jefferson St.) over I-55 in the Village of Shorewood and City of Joliet in Will County and zone painting of structure (099-0274) carrying IL 7 (West 9th St.) over EJandE Railroad in the City of Lockport in Will County. | — | Executed | ERA-Valdivia Contractors, Inc. $545,765 · | ||
| Jan 19, 2024 | 62W08 | CookDistrict 1 | Debris and litter cleaning along I-55 (Stevenson Expwy) from Lake Shore Dr to IL-43 (Harlem Ave) This contract consists of debris and litter cleaning along I-55 (Stevenson Expwy) from Lake Shore Dr to IL-43 (Harlem Ave) | — | Executed | Thor General Contracting LLC $208,500 · | ||
| Jan 19, 2024 | 62W19 | DuPageDistrict 1 | Arterial road sweeping in DuPage County This contract consists of arterial road sweeping in DuPage County. | — | Rejected | Central Sweeping of Illinois, LLC $1,601,000 · | ||
| Jan 19, 2024 | 62W35 | WillDistrict 1 | Arterial road sweeping in Will County This contract consists of arterial road sweeping in Will County. | — | Active | Central Sweeping of Illinois, LLC $1,326,875 · | ||
| Jan 19, 2024 | 62W36 | CookDistrict 1 | Arterial road sweeping in north Cook County This contract consists of arterial road sweeping in north Cook County. | — | Executed | Central Sweeping of Illinois, LLC $2,653,175 · | ||
| Jan 19, 2024 | 62W37 | CookDistrict 1 | Arterial road sweeping in south Cook County This contract consists of arterial road sweeping in south Cook County. | — | Executed | Central Sweeping of Illinois, LLC $2,240,150 · | ||
| Jan 19, 2024 | 62W43 | VariousDistrict 1 | Installing signs at new locations and repairing existing damaged signs on a work order basis throughout Distri The work to be completed under this contract consists of installing signs at new locations and repairing existing damaged signs on a work order basis throughout District 1. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $563,560 · | ||
| Jan 19, 2024 | 64P11 | Jo DaviessDistrict 2 | Patching,Resurf. and ADA improvements on IL 84 from Duke Creek North of Hanover to Southeast of Garfield Street in Hanover. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $3,414,665 · | ||
| Jan 19, 2024 | 64P41 | BureauWhitesideDistrict 2 | Cold Milling, Pavement Patching, and Hot-Mix Asphalt Resurfacing on IL 40 from 0.4 mile north of I-88 to IL 92. | — | Rejected | Martin & Company Excavating $6,978,085 · | ||
| Jan 19, 2024 | 64R56 | OgleDistrict 2 | Lighting at I-88 SE of Rochelle. | — | Executed | Helm Electric Facility Solutions, Inc. d/b/a Helm Electric $609,204 · | ||
| Jan 19, 2024 | 64R71 | WinnebagoDistrict 2 | 2.504 Miles, Reconstruction, I-39: Harrison Ave to 0.4 miles north of Harrison Ave (Including interchange ramps) and US 20: I-39 to Mill Road; and Harrison Ave: Bell School Road to I-39. | — | Executed | Plote Construction, Inc. $44,321,000 · | ||
| Jan 19, 2024 | 64S31 | WhitesideDistrict 2 | Deck repair, joint replacement, deck overlay and other miscellaneous repairs carrying SN's 098-0092, 098-0093 and 098-0094 over Elkhorn Creek, 0.3 mile south of Moline Road and SN's 098-0077 and 098-0078 over I-88, 5.1 miles west of IL 40. | — | Executed | Martin & Company Excavating $1,822,997 · | ||
| Jan 19, 2024 | 64S42 | VariousDistrict 2 | Bridge washing of 6 structures over the Rock River in various Counties. | — | Executed | All States Painting, Inc. $63,880 · | ||
| Jan 19, 2024 | 64S46 | HenryRock IslandDistrict 2 | Bridge washing of 5 structures over the Rock River in Henry and Rock Island Counties. | — | Executed | Interstate Maintenance, Incorporated $59,200 · | ||
| Jan 19, 2024 | 64S47 | VariousDistrict 2 | Bridge washing of 8 structures in various counties. | — | Executed | Interstate Maintenance, Incorporated $74,800 · | ||
| Jan 19, 2024 | 64S52 | VariousDistrict 2 | Bridge deck sealer applied to 36 structures in various Counties. | — | Executed | M & M Concrete, Inc. $39,339 · | ||
| Jan 19, 2024 | 64S53 | Rock IslandDistrict 2 | Bridge deck sealer applied to 18 structures in Rock Island County. | — | Executed | M & M Concrete, Inc. $21,142 · | ||
| Jan 19, 2024 | 64S54 | VariousDistrict 2 | Bridge deck sealer applied to 45 structures in JoDaviess, Stephenson and Whiteside Counties. | — | Executed | M & M Concrete, Inc. $79,085 · | ||
| Jan 19, 2024 | 64S57 | StephensonDistrict 2 | 1.5 Miles of inlet repairs along IL 26 in Freeport. | — | Executed | N-Trak Group LLC $195,045 · | ||
| Jan 19, 2024 | 64S84 | WinnebagoDistrict 2 | 270' OF CULVERT LINING. US 20 UNDER MERIDIAN RD. | — | Executed | Hoerr Construction, Inc. $101,460 · | ||
| Jan 19, 2024 | 64S91 | Rock IslandDistrict 2 | Cleaning and painting of structural steel on 3 structures, SN 081-0125 carrying IL 92 over I-88, 8.0 miles east of Silvis, SN 081-0131 carrying 94th Avenue over I-88, 0.1 mile west of Hillsdale and SN 098-0065 carrying IL 78 over I-88, 2.0 miles west of Lyndon. | — | Executed | Three Star Painting, Inc. $765,000 · | ||
| Jan 19, 2024 | 64S96 | VariousDistrict 2 | Various routes on-call guardrail. | — | Executed | Northern Contracting, Inc. $920,949 · | ||
| Jan 19, 2024 | 64S97 | BooneDistrict 2 | 4 Miles of aggregate shoulder improvement. | — | Executed | Phoenix Corporation of the Quad Cities $79,978 · | ||
| Jan 19, 2024 | 64S98 | VariousDistrict 2 | Various routes, turf repair. | — | Executed | O'Brien Civil Works, Inc. $98,300 · | ||
| Jan 19, 2024 | 66967 | BureauDistrict 3 | HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors This job is located on FAP 587 (IL 92) from 0.1 mile east of IL 40 to WCL Walnut City, for a length of 4.36 miles. The work consists of HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $2,548,799 · | ||
| Jan 19, 2024 | 66E40 | IroquoisDistrict 3 | Replacing the bridge deck on SN 038-0076, HMA milling and resurfacing, interchange lighting replacement, pavem This project is located on FAI 57 (I-57) at SN 038-0076 (Onarga Interchange). The work consists of replacing the bridge deck on SN 038-0076, HMA milling and resurfacing, interchange lighting replacement, pavement marking, and raised reflective markers. | — | Executed | Iroquois Paving Corporation $4,148,759 · | ||
| Jan 19, 2024 | 66K67 | GrundyDistrict 3 | This project includes milling and resurfacing (design overlay), structure repairs, pavement marking and minor drainage improvements on I-55 from 1.2 miles northeast of IL 47 near Dwight to the Gardner interchange. | — | Executed | D. Construction, Inc. $12,150,715 · | ||
| Jan 19, 2024 | 66L53 | DeKalbDistrict 3 | Removing and replacing SN 019-2538 with SN 019-2562, HMA milling and resurfacing, pavement marking, and raised This project is located on FAP 68 (IL 23) 0.6 mile south of US 30 at SN 019-2538. The work consists of removing and replacing SN 019-2538 with SN 019-2562, HMA milling and resurfacing, pavement marking, and raised reflective markers. | — | Executed | Sjostrom & Sons, Inc. $854,727 · | ||
| Jan 19, 2024 | 66M09 | FordDistrict 3 | This job is located on FAP 798 (IL-115), approximately 5.6 miles south of US-24 in Ford County, (SN 027-2507); box culvert replacement. | — | Executed | Iroquois Paving Corporation $568,073 · | ||
| Jan 19, 2024 | 66N34 | LaSalleLivingstonDistrict 3 | This project consists of 5.8 miles of shoulder widening and rumble strip installation on IL 17 from E 11th Rd in LaSalle County to IL 23 in Livingston County. | — | Executed | Kankakee Valley Construction Company, Inc. $1,328,740 · | ||
| Jan 19, 2024 | 66N48 | GrundyDistrict 3 | Pavement patching and related construction work This work is located on the I-80 and IL 47 Interchange Ramps in Morris. This work consists of pavement patching and related construction work. | — | Executed | D. Construction, Inc. $664,134 · | ||
| Jan 19, 2024 | 66N59 | LaSalleDistrict 3 | Pavement removal and replacement, PCC shoulder removal and replacement, drainage inlet box removal and replace This work is located on the I-80 and IL 178 interchange Structure No. 050-0248 at the north abutment bridge approach pavement connectors, northbound and southbound lanes. This work consists of pavement removal and replacement, PCC shoulder removal and replacement, drainage inlet box removal and replacement, concrete median removal and replacement, approach slab repair and other related construction work. | — | Executed | D. Construction, Inc. $156,145 · | ||
| Jan 19, 2024 | 66N91 | LivingstonDistrict 3 | Cleaning and painting all structural steel components of the bridges This project is located at 3 structures; SN 053-0119 carrying CH 26 over I-55, 0.5 miles north of Chenoa, SN's 053-0128 and 053-0129 carrying NB and SB I-55 over the Vermillion River 1.5 miles north of IL 116. This work consists of cleaning and painting all structural steel components of the bridges. | — | Executed | Venus Painting Co. $1,109,544 · | ||
| Jan 19, 2024 | 66N94 | FordDistrict 3 | Class B pavement Patching and other related work This work is located on US Route 45 beginning at the Champaign County Line (L.M. 0.00) and ending at Green Street in Paxton (L.M. 3.28). This project consists of Class B pavement Patching and other related work. | — | Executed | A&A Concrete LLC $126,426 · | ||
| Jan 19, 2024 | 66P05 | VariousDistrict 3 | Weed spraying to aid in weed control This project is located along various routes in Bureau, LaSalle, Grundy, Livingston, Kankakee, Iroquois, and Ford counties. The work consists of weed spraying to aid in weed control. | — | Executed | The Daltons Inc. $140,816 · | ||
| Jan 19, 2024 | 66P07 | GrundyKankakeeDistrict 3 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas hereinafter described as the areas to be cleaned in Grundy and Kankakee Counties. | — | Executed | The Final Connection, Inc. $105,464 · | ||
| Jan 19, 2024 | 68D48 | KnoxPeoriaDistrict 4 | New bridge deck on SN 072-0032 carrying IL 78 over I-74, 4.5 miles west of Brimfield, deck replacement and miscellaneous repairs to SN 048-0035 carrying CH 18 over I-74, 3 miles east of Spoon River. | — | Executed | Stark Excavating, Inc. $4,407,159 · | ||
| Jan 19, 2024 | 68D83 | KnoxDistrict 4 | Bridge Preservation to Structure Nos. 048-0007 and 048-0008 carrying 1-74 over the BNSF RR in Galesburg. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $2,637,099 · | ||
| Jan 19, 2024 | 68H68 | PeoriaDistrict 4 | 2.8 Miles of resurfacing and chip seal on Lincoln Ave. and Howett St. from Griswold St. to Adams St. in Peoria. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,098,547 · | ||
| Jan 19, 2024 | 68H78 | VariousDistrict 4 | Bridge washing of nine (9) bridges in District 4. | — | Executed | All States Painting, Inc. $533,130 · | ||
| Jan 19, 2024 | 68H90 | VariousDistrict 4 | REMOVAL AND REPLACEMENT OF GUARDRAION DAMAGED BY MOTORISTS THOUGHOUT DISTRICT 4. (MCHD) | — | Executed | Northern Contracting, Inc. $828,892 · | ||
| Jan 19, 2024 | 68H94 | FultonDistrict 4 | Bridge expansion joint replacement and installation of new steel diaphragms. IL 100; 0.1 mile south of Enion. | — | Executed | County Contractors, Inc. $407,324 · | ||
| Jan 19, 2024 | 68I04 | VariousDistrict 4 | TREE REMOVAL AS REQUIRED IN VARIOUS LOCATIONS THROUGHOUT DISTRICT 4. | — | Executed | JIMAX Landscape LLC $251,690 · | ||
| Jan 19, 2024 | 70871 | McLeanDistrict 5 | 0.17 Mi Complete structure replacement over Intermittent stream 0.5 miles East of Chenoa. | — | Executed | Stark Excavating, Inc. $1,987,717 · | ||
| Jan 19, 2024 | 70B89 | EdgarDistrict 5 | 5.174 MI, 3P Policy-Designed Overlay, New Shoulders Milled Rumble Strip, 1800th St. E of Paris to Indiana State Line / Culvert Replacement, at Vermilion Rd. INT 3.9 MI E of Paris ECL. | — | Executed | Open Road Paving Company LLC $9,851,467 · | ||
| Jan 19, 2024 | 70G87 | ChampaignDistrict 5 | Patching on US 136-At I 57 and ICRR for net length 171 ft. | — | Executed | G. M. Sipes Construction, Inc. $231,036 · | ||
| Jan 19, 2024 | 70H00 | ChampaignDistrict 5 | The project is to replace Millerbernd light poles with new aluminum poles and LED lights on existing foundations at the interchanges of 1-74 with Lincoln Ave and US 45 (Cunningham Ave) in Champaign, IL in Champaign County. | — | Executed | Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $279,850 · | ||
| Jan 19, 2024 | 70H03 | VariousDistrict 5 | 567.5 miles of spraying, approx. 2004 acres on state ROW along US 51 and interstate routes including interchanges in Champaign, Dewitt, McLean, Piatt, and Vermilion Counties. | — | Executed | The Daltons Inc. $144,721 · | ||
| Jan 19, 2024 | 72036 | SangamonDistrict 6 | 6.7 miles of crack and joint sealing on I-55 / I-72 from 0.2 miles north of Southwind Road to 0.6 miles north of I-72, east of Springfield. | — | Executed | Kinney Contractors, Inc. $210,848 · | ||
| Jan 19, 2024 | 72272 | MasonDistrict 6 | 11.5 miles of cape seal on pavement, fog seal on shoulders, grinding, pavement markers and striping on US 136 from County Road 2800 East to 6th Street in San Jose. | — | Executed | A. C. Pavement Striping Co. $1,590,739 · | ||
| Jan 19, 2024 | 72283 | SchuylerDistrict 6 | 0.14 miles of landscaping on US 67 / Bluff Road northwest of Bluffs Ditch, 1.8 miles northwest of IL 100. | — | Executed | Central Landscaping, LP $229,957 · | ||
| Jan 19, 2024 | 72289 | AdamsDistrict 6 | 8.6 miles of microsurfacing with fog sealing of shoulders on I-172 from 0.2 miles north of the Pike County line to 0.4 miles north of the IL 96 interchange. | — | Executed | Beniach Construction Co., Inc. $2,199,312 · | ||
| Jan 19, 2024 | 72293 | SangamonDistrict 6 | 4.7 miles of cape seal with fog seal on shoulders on IL 124 from IL 123 to Andrew Road Junction, west of Sherman. | — | Executed | Beniach Construction Co., Inc. $587,838 · | ||
| Jan 19, 2024 | 72616 | VariousDistrict 6 | Washing six major river bridges on various routes in various counties in District 6. | — | Executed | All States Painting, Inc. $89,290 · | ||
| Jan 19, 2024 | 72720 | LoganDistrict 6 | Painting two bridges: 1) Emden Road over I-155, 1 mile south of US 136; 2) US 136 over West Fork of Sugar Creek, 6.5 miles east of I-155. (SN 054-0078 and SN 054-0026) | — | Executed | Three Star Painting, Inc. $501,200 · | ||
| Jan 19, 2024 | 72722 | SangamonDistrict 6 | Patching at various locations on I-55 and I-72 in Sangamon County. | — | Executed | Kinney Contractors, Inc. $952,289 · | ||
| Jan 19, 2024 | 72723 | MacoupinMontgomeryDistrict 6 | Patching at various location on I-55 in Macoupin and Montgomery Counties. | — | Executed | Kinney Contractors, Inc. $229,843 · | ||
| Jan 19, 2024 | 72728 | VariousDistrict 6 | Concrete beam end repairs and other miscellaneous bridge repairs on 8 bridges on various routes in various counties of District 6. | — | Executed | County Contractors, Inc. $433,493 · | ||
| Jan 19, 2024 | 72791 | LoganDistrict 6 | 6.6 miles of milling and resurfacing on I-55, from 1.7 miles north of Elkhart to 1.3 miles south of Business Loop 55. Also includes deck replacement of SN 054-0039 at Broadwell and resurfacing of 800th Avenue from Old US 66 to 1100th Street. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $31,024,268 · | ||
| Jan 19, 2024 | 72B88 | MasonDistrict 6 | 1.9 miles of resurfacing, pavement replacement, ADA improvements, drainage improvements, culvert replacements, parking lot improvements, tree removal and storm sewer reconstruction on IL 10, in Mason City, from 0.1 miles east of IL IL 29 to west of Price Street, east of Mason City. , 1.9 miles of resurfacing, pavement replacement, ADA improvements, drainage improvements, culvert replacements, parking lot improvements, tree removal and storm sewer reconstruction on IL 10, in Mason City, from 0.1 | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $15,206,887 · | ||
| Jan 19, 2024 | 72H58 | SchuylerDistrict 6 | 5.7 miles of standard overlay and ADA improvements on IL 101 from 0.2 miles west of Freeman Mine Road to US 67. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $2,900,266 · | ||
| Jan 19, 2024 | 74761 | ClayDistrict 7 | 6.8 miles of resurfacing, ADA upgrades, culvert replacement, aggregate shoulders and patching on US 45 from 0.1 miles north of Vandalia Road in Louisville to 0.3 miles south of US 50. | — | Executed | Howell Paving, Inc. $6,459,330 · | ||
| Jan 19, 2024 | 74A09 | LawrenceDistrict 7 | Superstructure and abutment replacement on SN 051-0022 and SN 051-0023 carrying US 50 over Township Road 262, 2.4 miles east of Airport Interchange. | — | Executed | Samron Midwest Contracting, Inc. $3,362,362 · | ||
| Jan 19, 2024 | 74B27 | CumberlandDistrict 7 | Bridge joint repairs, concrete deck overlay, HMA shoulders and resurfacing at SN 018-0058 carrying IL 130 over Hurricane Creek, approximately 3.5 miles north of Greenup. | — | Executed | Samron Midwest Contracting, Inc. $918,918 · | ||
| Jan 19, 2024 | 74B28 | MaconDistrict 7 | Bridge deck overlay, bridge joint replacement / repair and bridge approach work on SN 058-0113 and 058-0114 carrying US 51 over Stevens Creek, 0.2 miles north of Emery Road. | — | Executed | Freesen, a div of UCM, Inc. $1,145,239 · | ||
| Jan 19, 2024 | 74B32 | WabashDistrict 7 | Installation of strip seal expansion joints, bridge deck scarification, deck patching, bridge deck fly ash or ground granulated blast furnace slag concrete overlay and diamond grinding on SN 093-0001 carrying IL 1 over Raccoon Creek, south of the Lawrence County line. | — | Executed | Samron Midwest Contracting, Inc. $674,674 · | ||
| Jan 19, 2024 | 74B40 | WayneDistrict 7 | Bridge deck overlay and bridge joint replacement/repairs on SN 096-0011 carrying IL 15 over a stream, 1 mile west of County Highway 3. | — | Executed | Samron Midwest Contracting, Inc. $393,393 · | ||
| Jan 19, 2024 | 74B65 | RichlandDistrict 7 | Centerline milled rumble strips and pavement marking on IL 250 from US 50, west of Noble, to North Avenue in Olney. | — | Executed | Dunn Company $95,255 · | ||
| Jan 19, 2024 | 76F88 | MadisonDistrict 8 | Superstructure replacement on the north Southern Illinois University - Edwardsville entrance road over the Norfolk Southern Railroad (SN 060-0142 and SN 060-0143). | — | Rejected | Keller Construction, Inc. $4,559,532 · | ||
| Jan 19, 2024 | 76H49 | MadisonDistrict 8 | Replacement of SN 060-0347 carrying IL 111 southbound over Cahokia Canal, 0.24 miles north of I-55/70. Project also includes maintenance of the northbound structure, SN 060-0244. | — | Active | Plocher Construction Company, Inc. $8,868,716 · | ||
| Jan 19, 2024 | 76L82 | MadisonDistrict 8 | Bridge deck sealing on SN 060-0345 carrying I-270 over Chain of Rocks Canal. | — | Executed | All States Painting, Inc. $64,882 · | ||
| Jan 19, 2024 | 76M81 | RandolphDistrict 8 | 6.5 miles of designed overlay with ADA improvements on IL 13 / IL 153 from IL 4 to the Perry County line. | — | Executed | Samron Midwest Contracting, Inc. $6,738,441 · | ||
| Jan 19, 2024 | 76R91 | MadisonDistrict 8 | New platform scales and patching at the Maryville Weight Station on westbound I-55 / I-70 approximately 1 mile west of Maryville. | — | Executed | Stutz Excavating, Inc. $739,349 · | ||
| Jan 19, 2024 | 76T25 | MarionDistrict 8 | 24.2 miles of patching on I-57 / US 50 from 0.7 miles north of IL 161 to the Fayette County line. | — | Executed | Beniach Construction Co., Inc. $461,857 · | ||
| Jan 19, 2024 | 76T30 | GreeneDistrict 8 | 1.7 miles of patching on US 67 from Ponderosa Lane to 6th Street in Carrollton. | — | Executed | G. M. Sipes Construction, Inc. $189,044 · | ||
| Jan 19, 2024 | 78830 | HamiltonDistrict 9 | Replacement of SN 033-0004 with a triple reinforced concrete box culvert on IL 14 over Bear Creek, 9 miles east of the Franklin County line. | — | Executed | Samron Midwest Contracting, Inc. $1,034,009 · | ||
| Jan 19, 2024 | 78A04 | VariousDistrict 9 | Painting of 10 bridges in various counties of District 9. | — | Executed | ERA-Valdivia Contractors, Inc. $2,546,592 · | ||
| Jan 19, 2024 | 78A18 | WilliamsonDistrict 9 | 10.2 miles of resurfacing on IL 13 westbound lanes from the Saline County line to Crab Orchard Creek in Marion. | — | Executed | Samron Midwest Contracting, Inc. $2,696,596 · | ||
| Jan 19, 2024 | 78A23 | AlexanderPulaskiDistrict 9 | 20.2 miles of centerline joint repair and microsurfacing of a 2- wide strip along the centerline on the northbound and southbound lanes of I-57 from Perks Road, 1.2 miles south of the Union County line, to the Mississippi River. | — | Executed | Beniach Construction Co., Inc. $747,770 · | ||
| Jan 19, 2024 | 78A48 | VariousDistrict 9 | Weed spraying for broadleaf weeds along I-57 and I-24 at various locations in various counties. | — | Executed | Endrizzi Contracting, Inc $155,120 · | ||
| Jan 19, 2024 | 78A49 | VariousDistrict 9 | Weed spraying along I-57 and I-24 for Johnson Grass in various counties within District 9. | — | Executed | The Daltons Inc. $126,182 · | ||
| Jan 19, 2024 | 85746 | Rock IslandDistrict 2 | HMA resurfacing with aggregate and HMA shoulders on CH 14 from 99th Street to 190th Avenue. | — | Executed | Valley Construction Co. $338,593 · | ||
| Jan 19, 2024 | 85747 | Rock IslandDistrict 2 | Resurfacing 31st Avenue from IL 92 to US 67 in Rock Island. | — | Executed | Valley Construction Co. $1,389,515 · | ||
| Jan 19, 2024 | 85748 | StephensonDistrict 2 | Replace existing structure with single span PPC deck beam structure on concrete abutments, with reconstuction of aggregate approaches and riprap placement on Babler Road over a tributary to Brush Creek, 2 miles southeast of Orangeville. | — | Executed | Sjostrom & Sons, Inc. $474,974 · | ||
| Jan 19, 2024 | 85749 | StephensonDistrict 2 | Cold-In-Place Recycling on River Road from IL 75 to Rock City Road. | — | Executed | W K Construction Company, Inc. $796,419 · | ||
| Jan 19, 2024 | 87822 | LivingstonDistrict 3 | Replace the bridge carrying TR 24 over Mole Creek, 4 miles southeast of Long Point. | — | Executed | Riber Construction, Inc. $494,605 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.