| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Howell Paving, Inc. Low bidder | $6,459,330 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Howell Paving, … |
|---|---|---|---|---|---|---|
| 1 | X0326440 | SURF REM VAR DP (SPL) | 4,008 | SQ YD | $13.78 | |
| 2 | X2600011 | REM & REL SIGN PANEL | 3 | EACH | $1,346.81 | |
| 3 | X4060995 | TEMPORARY RAMP SPL | 1,632 | SQ YD | $27.51 | |
| 4 | X5810103 | MEMB WTRPRF SYS B STR | 208 | SQ YD | $28.23 | |
| 5 | X6061700 | COMB CC&G TB SPL | 17 | FOOT | $220.98 | |
| 6 | X7011800 | TRAF CONT-PROT BLR 21 | 1 | L SUM | $2,600.00 | |
| 7 | Z0005010 | HMA F PATCH (C M) | 40 | TON | $528.17 | |
| 8 | Z0016702 | DETOUR SIGNING | 1 | L SUM | $2,800.00 | |
| 9 | Z0049799 | PROT RESET SURVEY MRK | 17 | EACH | $764.82 | |
| 10 | Z0054505 | ROCK FILL - REPLACE | 84 | TON | $40.89 | |
| 11 | 20200100 | EARTH EXCAVATION | 26 | CU YD | $131.62 | |
| 12 | 20201200 | REM & DISP UNS MATL | 84 | CU YD | $40.61 | |
| 13 | 20700220 | POROUS GRAN EMBANK | 303 | CU YD | $83.35 | |
| 14 | 21400100 | GRADING & SHAP DITCH | 167 | FOOT | $14.39 | |
| 15 | 28100107 | STONE RIPRAP CL A4 | 109 | SQ YD | $56.03 | |
| 16 | 28200200 | FILTER FABRIC | 109 | SQ YD | $8.30 | |
| 17 | 40200800 | AGG SURF COURSE TY B | 94 | TON | $49.60 | |
| 18 | 40600290 | BIT MATLS TACK CT | 78,739 | POUND | $1.34 | |
| 19 | 40600370 | LONG JOINT SEALANT | 36,102 | FOOT | $2.95 | |
| 20 | 40600982 | HMA SURF REM BUTT JT | 955 | SQ YD | $10.38 | |
| 21 | 40600990 | TEMPORARY RAMP | 343 | SQ YD | $16.45 | |
| 22 | 40603219 | P HMA BC IL-9.5FG N90 | 11,192 | TON | $145.87 | |
| 23 | 40604164 | P HMA SC IL-9.5 D N90 | 13,049 | TON | $144.16 | |
| 24 | 40800050 | INCIDENTAL HMA SURF | 437 | TON | $291.30 | |
| 25 | 42000300 | PCC PVT 8 | 43 | SQ YD | $184.05 | |
| 26 | 42400300 | PC CONC SIDEWALK 6 | 1,290 | SQ FT | $43.52 | |
| 27 | 42400800 | DETECTABLE WARNINGS | 119 | SQ FT | $40.64 | |
| 28 | 44000100 | PAVEMENT REM | 43 | SQ YD | $81.14 | |
| 29 | 44000155 | HMA SURF REM 1 1/2 | 105,805 | SQ YD | $3.94 | |
| 30 | 44000164 | HMA SURF REM 3 3/4 | 12,940 | SQ YD | $10.50 | |
| 31 | 44000500 | COMB CURB GUTTER REM | 229 | FOOT | $42.33 | |
| 32 | 44000600 | SIDEWALK REM | 1,020 | SQ FT | $10.73 | |
| 33 | 44201019 | CL B PATCH T2 14 | 32 | SQ YD | $295.00 | |
| 34 | 44201299 | DOWEL BARS 1 1/2 | 80 | EACH | $35.00 | |
| 35 | 44201815 | CL D PATCH T2 14 | 1,158 | SQ YD | $244.40 | |
| 36 | 44201819 | CL D PATCH T3 14 | 248 | SQ YD | $244.39 | |
| 37 | 44201821 | CL D PATCH T4 14 | 34 | SQ YD | $244.44 | |
| 38 | 44213200 | SAW CUTS | 303 | FOOT | $4.95 | |
| 39 | 48102100 | AGG WEDGE SHLD TYPE B | 3,784 | TON | $49.60 | |
| 40 | 48203012 | HMA SHOULDERS 3 3/4 | 1,764 | SQ YD | $50.07 | |
| 41 | 50100300 | REM EXIST STRUCT N1 | 1 | EACH | $12,147.31 | |
| 42 | 50100400 | REM EXIST STRUCT N2 | 1 | EACH | $12,147.31 | |
| 43 | 50200100 | STRUCTURE EXCAVATION | 474 | CU YD | $12.73 | |
| 44 | 52200020 | TEMP SOIL RETEN SYSTM | 97 | SQ FT | $0.0100 | |
| 45 | 54001001 | BOX CUL END SEC C1 | 2 | EACH | $29,498.59 | |
| 46 | 54001002 | BOX CUL END SEC C2 | 2 | EACH | $26,851.20 | |
| 47 | 54011203 | PCBC 12X3 | 60 | FOOT | $1,192.87 | |
| 48 | 54011204 | PCBC 12X4 | 62 | FOOT | $1,236.45 | |
| 49 | 59100100 | GEOCOMPOSITE WALL DR | 132 | SQ YD | $26.88 | |
| 50 | 60605000 | COMB CC&G TY B-6.24 | 211 | FOOT | $125.11 | |
| 51 | 64200108 | SHOULDER RUM STRIP 8 | 59,687 | FOOT | $0.2200 | |
| 52 | 66900200 | NON SPL WASTE DISPOSL | 40 | CU YD | $321.31 | |
| 53 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $1,700.00 | |
| 54 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,200.00 | |
| 55 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,200.00 | |
| 56 | 66901006 | REG SUB MON | 2 | CAL DA | $1,250.00 | |
| 57 | 67000400 | ENGR FIELD OFFICE A | 5 | CAL MO | $3,269.79 | |
| 58 | 67000600 | ENGR FIELD LAB | 5 | CAL MO | $3,269.79 | |
| 59 | 67100100 | MOBILIZATION | 1 | L SUM | $375,000.00 | |
| 60 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $10,050.55 | |
| 61 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $139,110.12 | |
| 62 | 70100500 | TRAF CONT-PROT 701326 | 1 | L SUM | $0.0100 | |
| 63 | 70100600 | TRAF CONT-PROT 701336 | 1 | L SUM | $20,000.00 | |
| 64 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $28,869.31 | |
| 65 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $5,541.96 | |
| 66 | 70107025 | CHANGEABLE MESSAGE SN | 56 | CAL DA | $150.00 | |
| 67 | 70300100 | SHORT TERM PAVT MKING | 11,075 | FOOT | $2.30 | |
| 68 | 70300150 | SHRT TRM PAVT MK REM | 3,692 | SQ FT | $3.13 | |
| 69 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 76,314 | FOOT | $0.1200 | |
| 70 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 120 | FOOT | $0.3000 | |
| 71 | 72800100 | TELES STL SIN SUPPORT | 48 | FOOT | $51.17 | |
| 72 | 78000200 | THPL PVT MK LINE 4 | 1,171 | FOOT | $4.94 | |
| 73 | 78000400 | THPL PVT MK LINE 6 | 120 | FOOT | $7.45 | |
| 74 | 78001110 | PAINT PVT MK LINE 4 | 75,143 | FOOT | $0.1200 | |
| 75 | 78011025 | GRV RCSD PVT MRKG 5 | 1,171 | FOOT | $27.00 | |
| 76 | 78011035 | GRV RCSD PVT MRKG 7 | 120 | FOOT | $28.50 | |
| 77 | 78100100 | RAISED REFL PAVT MKR | 452 | EACH | $36.21 | |
| 78 | 78300200 | RAISED REF PVT MK REM | 452 | EACH | $9.70 | |
| 79 | 78300202 | PVT MKG REM WTR BLAST | 132 | SQ FT | $36.00 |