28BR-1
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Stark Excavating, Inc. Low bidder | $1,987,717 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Stark Excavatin… |
|---|---|---|---|---|---|---|
| 1 | X5030250 | BR DECK GROOVING LONG | 402 | SQ YD | $18.00 | |
| 2 | X6330725 | SPBGR (SHORT RADIUS) | 43 | FOOT | $75.00 | |
| 3 | X7200201 | WIDTH RESTRICT SIGN | 1 | L SUM | $1,250.00 | |
| 4 | Z0004552 | APPROACH SLAB REM | 214 | SQ YD | $60.00 | |
| 5 | Z0004556 | HMA SURFACE RM (DECK) | 100 | SQ YD | $45.00 | |
| 6 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $10,000.00 | |
| 7 | Z0016200 | DECK SLAB REP (PART) | 27.4 | SQ YD | $675.00 | |
| 8 | Z0029090 | DIAMOND GRIND BR SEC | 723 | SQ YD | $25.00 | |
| 9 | Z0038700 | PERMNT BENCH MARKS | 1 | EACH | $350.00 | |
| 10 | Z0073500 | TEMP SUPPORT SYSTEM | 1 | L SUM | $20,000.00 | |
| 11 | Z0076600 | TRAINEES | 1,000 | HOUR | $0.8000 | |
| 12 | Z0076604 | TRAINEES TPG | 1,000 | HOUR | $15.00 | |
| 13 | 20400800 | FURNISHED EXCAVATION | 350 | CU YD | $8.00 | |
| 14 | 25000210 | SEEDING CL 2A | 0.5 | ACRE | $4,500.00 | |
| 15 | 25000350 | SEEDING CL 7 | 0.5 | ACRE | $800.00 | |
| 16 | 25000400 | NITROGEN FERT NUTR | 45 | POUND | $2.00 | |
| 17 | 25000500 | PHOSPHORUS FERT NUTR | 45 | POUND | $2.00 | |
| 18 | 25000600 | POTASSIUM FERT NUTR | 45 | POUND | $2.00 | |
| 19 | 25100115 | MULCH METHOD 2 | 0.5 | ACRE | $2,200.00 | |
| 20 | 28000250 | TEMP EROS CONTR SEED | 50 | POUND | $5.50 | |
| 21 | 28000305 | TEMP DITCH CHECKS | 24 | FOOT | $12.75 | |
| 22 | 28000400 | PERIMETER EROS BAR | 807 | FOOT | $5.00 | |
| 23 | 28100107 | STONE RIPRAP CL A4 | 1,352 | SQ YD | $92.00 | |
| 24 | 28200200 | FILTER FABRIC | 1,352 | SQ YD | $4.25 | |
| 25 | 40600290 | BIT MATLS TACK CT | 45 | POUND | $15.00 | |
| 26 | 40604060 | HMA SC IL-9.5 D N50 | 13 | TON | $675.00 | |
| 27 | 44213200 | SAW CUTS | 72 | FOOT | $5.25 | |
| 28 | 48101500 | AGGREGATE SHLDS B 6 | 125 | SQ YD | $75.00 | |
| 29 | 48203037 | HMA SHOULDERS 10 | 285 | SQ YD | $155.00 | |
| 30 | 50100100 | REM EXIST STRUCT | 1 | EACH | $183,325.00 | |
| 31 | 50200100 | STRUCTURE EXCAVATION | 220 | CU YD | $24.00 | |
| 32 | 50300100 | FLOOR DRAINS | 10 | EACH | $415.00 | |
| 33 | 50300225 | CONC STRUCT | 76.3 | CU YD | $965.00 | |
| 34 | 50300255 | CONC SUP-STR | 172.1 | CU YD | $1,700.00 | |
| 35 | 50300300 | PROTECTIVE COAT | 786 | SQ YD | $5.50 | |
| 36 | 50301350 | CONC SUPSTR APP SLAB | 120 | CU YD | $575.00 | |
| 37 | 50401315 | F&E PP CON BEAM IL36N | 541 | FOOT | $695.00 | |
| 38 | 50800205 | REINF BARS, EPOXY CTD | 90,500 | POUND | $2.05 | |
| 39 | 50800515 | BAR SPLICERS | 615 | EACH | $54.00 | |
| 40 | 51200959 | FUR M S PILE 14X0.312 | 630 | FOOT | $115.00 | |
| 41 | 51202305 | DRIVING PILES | 630 | FOOT | $0.0100 | |
| 42 | 51203200 | TEST PILE MET SHELLS | 2 | EACH | $17,500.00 | |
| 43 | 51204650 | PILE SHOES | 12 | EACH | $525.00 | |
| 44 | 51500100 | NAME PLATES | 1 | EACH | $750.00 | |
| 45 | 52200020 | TEMP SOIL RETEN SYSTM | 193 | SQ FT | $180.00 | |
| 46 | 58600101 | GRANULAR BACKFILL STR | 126 | CU YD | $90.00 | |
| 47 | 59100100 | GEOCOMPOSITE WALL DR | 69 | SQ YD | $39.00 | |
| 48 | 60100060 | CONC HDWL FOR P DRAIN | 4 | EACH | $525.00 | |
| 49 | 60146304 | P UNDR FOR STRUCT 4 | 149 | FOOT | $30.00 | |
| 50 | 63000001 | SPBGR TY A 6FT POSTS | 167 | FOOT | $35.00 | |
| 51 | 63100085 | TRAF BAR TERM T6 | 4 | EACH | $4,250.00 | |
| 52 | 63100167 | TR BAR TRM T1 SPL TAN | 4 | EACH | $3,625.00 | |
| 53 | 63200310 | GUARDRAIL REMOV | 624 | FOOT | $7.00 | |
| 54 | 67000500 | ENGR FIELD OFFICE B | 8 | CAL MO | $1,750.00 | |
| 55 | 67100100 | MOBILIZATION | 1 | L SUM | $119,000.00 | |
| 56 | 70100405 | TRAF CONT-PROT 701321 | 1 | EACH | $23,000.00 | |
| 57 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $750.00 | |
| 58 | 70106500 | TEMP BR TRAF SIGNALS | 1 | EACH | $25,000.00 | |
| 59 | 70107025 | CHANGEABLE MESSAGE SN | 14 | CAL DA | $150.00 | |
| 60 | 70400100 | TEMP CONC BARRIER | 688 | FOOT | $43.50 | |
| 61 | 70400200 | REL TEMP CONC BARRIER | 688 | FOOT | $9.50 | |
| 62 | 70600250 | IMP ATTN TEMP NRD TL3 | 2 | EACH | $5,025.00 | |
| 63 | 70600350 | IMP ATTN REL NRD TL3 | 2 | EACH | $885.00 | |
| 64 | 72501000 | TERMINAL MARKER - DA | 4 | EACH | $35.00 | |
| 65 | 78200005 | GRDRAIL REF TYPE A | 8 | EACH | $20.00 |