FAU 1301 23 OVERLAY
- Let date
- Friday, January 19, 2024
- Contract
- 62U80 · job page
- District
- District 1
- County
- Cook
- Highway
- Limits
- This project consists of a standard overlay includes pavement resurfacing, Class D patching, pavement marking installation, and ADA improvements on Central St. from Ashland Ave. to Asbury Ave. in the City of Evanston in Cook County.
- Classification
- A standard overlay includes pavement resurfacing, Class D patching, pavement marking installation, and ADA imp
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | A Lamp Concrete Contractors, Inc. Low bidder | $591,675 | ||
| 2 | Builders Paving, LLC | $598,000 | +1.1% | |
| 3 | J. A. Johnson Paving Company | $651,000 | +10.0% | |
| 4 | Peter Baker & Son Co. | $683,558 | +15.5% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 A Lamp Concrete… | #2 Builders Paving… | #3 J. A. Johnson P… | #4 Peter Baker & S… |
|---|---|---|---|---|---|---|---|---|---|
| 1 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $8,700.00 | $3,500.00 | $3,245.00 | $3,245.00 | |
| 2 | X1400367 | PED SIGNAL POST 10 FT | 3 | EACH | $2,425.00 | $2,200.80 | $2,200.80 | $2,200.80 | |
| 3 | X1400378 | PED SIGNAL POST 5 FT | 4 | EACH | $1,675.00 | $1,515.60 | $1,515.60 | $1,515.60 | |
| 4 | X4400501 | CC&G RMVL REPL < = 10 | 100 | FOOT | $69.00 | $90.00 | $85.00 | $85.00 | |
| 5 | X4400503 | CC&G RMVL REPL > 10FT | 872 | FOOT | $56.00 | $70.00 | $65.00 | $65.00 | |
| 6 | X5537800 | SS CLEANED 12 | 120 | FOOT | $3.85 | $7.00 | $9.00 | $9.00 | |
| 7 | X6030205 | FR & GRATES ADJUST SP | 6 | EACH | $550.00 | $1,550.00 | $1,150.00 | $1,550.00 | |
| 8 | X6030310 | FR & LIDS ADJUST SPL | 20 | EACH | $850.00 | $1,325.00 | $1,325.00 | $1,325.00 | |
| 9 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $1,500.00 | $2,850.00 | $3,000.00 | $3,500.00 | |
| 10 | X8760200 | ACCESSIBLE PED SIGNAL | 16 | EACH | $1,725.00 | $1,558.00 | $1,558.00 | $1,558.00 | |
| 11 | X8780012 | CONC FDN TY A 12D | 28 | FOOT | $275.00 | $250.00 | $250.00 | $250.00 | |
| 12 | Z0018500 | DRAINAGE STR CLEANED | 10 | EACH | $500.00 | $550.00 | $415.00 | $415.00 | |
| 13 | Z0018600 | DRAINAGE STR RECONST | 2 | EACH | $1,675.00 | $2,150.00 | $2,150.00 | $2,150.00 | |
| 14 | Z0030850 | TEMP INFO SIGNING | 51.4 | SQ FT | $25.00 | $16.00 | $12.00 | $16.00 | |
| 15 | 20101400 | NITROGEN FERT NUTR | 1.9 | POUND | $1.00 | $1.00 | $40.00 | $5.00 | |
| 16 | 20101500 | PHOSPHORUS FERT NUTR | 1.9 | POUND | $1.00 | $1.00 | $40.00 | $5.00 | |
| 17 | 20101600 | POTASSIUM FERT NUTR | 1.9 | POUND | $1.00 | $1.00 | $40.00 | $5.00 | |
| 18 | 20200100 | EARTH EXCAVATION | 20 | CU YD | $85.00 | $70.00 | $70.00 | $70.00 | |
| 19 | 21101615 | TOPSOIL F & P 4 | 122 | SQ YD | $6.75 | $10.00 | $20.00 | $17.00 | |
| 20 | 25200110 | SODDING SALT TOLERANT | 122 | SQ YD | $18.25 | $30.00 | $25.00 | $39.50 | |
| 21 | 25200200 | SUPPLE WATERING | 1.3 | UNIT | $350.00 | $1.00 | $300.00 | $50.00 | |
| 22 | 40600290 | BIT MATLS TACK CT | 4,769 | POUND | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 23 | 40600370 | LONG JOINT SEALANT | 4,500 | FOOT | $3.05 | $3.25 | $2.77 | $3.97 | |
| 24 | 40600400 | MIX CR JTS FLANGEWYS | 11 | TON | $125.00 | $550.00 | $450.00 | $500.00 | |
| 25 | 40600982 | HMA SURF REM BUTT JT | 107 | SQ YD | $36.00 | $30.00 | $1.00 | $8.00 | |
| 26 | 40601005 | HMA REPL OVER PATCH | 40 | TON | $110.00 | $100.00 | $250.00 | $50.00 | |
| 27 | 40602985 | HMA BC IL-9.5 N70 | 297 | TON | $115.00 | $100.00 | $130.00 | $132.00 | |
| 28 | 40604062 | HMA SC IL-9.5 D N70 | 593 | TON | $115.00 | $100.00 | $120.00 | $129.00 | |
| 29 | 42101300 | PROTECTIVE COAT | 310 | SQ YD | $1.00 | $0.1000 | $0.0500 | $0.1000 | |
| 30 | 42300200 | PCC DRIVEWAY PAVT 6 | 13 | SQ YD | $180.00 | $150.00 | $150.00 | $150.00 | |
| 31 | 42400200 | PC CONC SIDEWALK 5 | 2,182 | SQ FT | $9.50 | $15.00 | $15.00 | $15.00 | |
| 32 | 42400800 | DETECTABLE WARNINGS | 217 | SQ FT | $25.00 | $42.00 | $45.00 | $42.00 | |
| 33 | 44000158 | HMA SURF REM 2 1/4 | 7,064 | SQ YD | $4.25 | $4.00 | $5.00 | $5.88 | |
| 34 | 44000200 | DRIVE PAVEMENT REM | 13 | SQ YD | $67.50 | $25.00 | $25.00 | $25.00 | |
| 35 | 44000600 | SIDEWALK REM | 2,216 | SQ FT | $1.50 | $4.00 | $5.00 | $4.00 | |
| 36 | 44201773 | CL D PATCH T1 11 | 16 | SQ YD | $135.00 | $100.00 | $55.00 | $150.00 | |
| 37 | 44201777 | CL D PATCH T2 11 | 128 | SQ YD | $103.00 | $100.00 | $55.00 | $150.00 | |
| 38 | 44201781 | CL D PATCH T3 11 | 96 | SQ YD | $101.00 | $100.00 | $55.00 | $150.00 | |
| 39 | 44201783 | CL D PATCH T4 11 | 80 | SQ YD | $94.00 | $100.00 | $55.00 | $150.00 | |
| 40 | 60266600 | VALVE BOX ADJ | 7 | EACH | $550.00 | $550.00 | $500.00 | $550.00 | |
| 41 | 66900200 | NON SPL WASTE DISPOSL | 20 | CU YD | $90.00 | $100.00 | $225.00 | $177.81 | |
| 42 | 66900530 | SOIL DISPOSAL ANALY | 2 | EACH | $1,600.00 | $1,450.00 | $1,380.00 | $1,450.00 | |
| 43 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $3,400.00 | $3,100.00 | $4,000.00 | $3,100.00 | |
| 44 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $1,325.00 | $1,200.00 | $900.00 | $1,200.00 | |
| 45 | 66901006 | REG SUB MON | 5 | CAL DA | $680.00 | $680.00 | $1,100.00 | $680.00 | |
| 46 | 67100100 | MOBILIZATION | 1 | L SUM | $35,450.00 | $49,462.70 | $34,588.54 | $40,849.10 | |
| 47 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $63,000.00 | $15,000.00 | $71,100.00 | $52,987.00 | |
| 48 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $1.00 | $100.00 | $1.00 | $1.00 | |
| 49 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $1.00 | $100.00 | $1.00 | $1.00 | |
| 50 | 70300100 | SHORT TERM PAVT MKING | 545 | FOOT | $0.0100 | $2.00 | $0.5000 | $1.00 | |
| 51 | 70300150 | SHRT TRM PAVT MK REM | 227 | SQ FT | $0.0100 | $5.00 | $0.2500 | $10.00 | |
| 52 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 375 | FOOT | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 53 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 64 | FOOT | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 54 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 564 | FOOT | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 55 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 136 | FOOT | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 56 | 70306120 | TEMP PVT MK L4 T3 TAPE | 136 | FOOT | $0.0100 | $2.00 | $0.0100 | $1.25 | |
| 57 | 78000200 | THPL PVT MK LINE 4 | 375 | FOOT | $3.50 | $1.85 | $3.00 | $3.00 | |
| 58 | 78000400 | THPL PVT MK LINE 6 | 64 | FOOT | $4.00 | $2.80 | $3.50 | $3.50 | |
| 59 | 78000600 | THPL PVT MK LINE 12 | 564 | FOOT | $6.50 | $8.10 | $5.80 | $5.80 | |
| 60 | 78000650 | THPL PVT MK LINE 24 | 136 | FOOT | $11.00 | $11.20 | $10.00 | $10.00 | |
| 61 | 78100100 | RAISED REFL PAVT MKR | 19 | EACH | $110.00 | $70.00 | $100.00 | $100.00 | |
| 62 | 78300200 | RAISED REF PVT MK REM | 15 | EACH | $25.00 | $28.00 | $10.00 | $10.00 | |
| 63 | 78300202 | PVT MKG REM WTR BLAST | 993 | SQ FT | $5.00 | $3.00 | $3.00 | $0.0100 | |
| 64 | 81028200 | UNDRGRD C GALVS 2 | 183 | FOOT | $66.50 | $60.37 | $60.37 | $60.37 | |
| 65 | 85000200 | MAIN EX TR SIG INSTAL | 2 | EACH | $1,650.00 | $1,500.00 | $1,500.00 | $1,500.00 | |
| 66 | 87301215 | ELCBL C SIGNAL 14 2C | 1,516 | FOOT | $2.50 | $2.26 | $2.26 | $2.26 | |
| 67 | 87301225 | ELCBL C SIGNAL 14 3C | 1,377 | FOOT | $2.75 | $2.53 | $2.53 | $2.53 | |
| 68 | 87301245 | ELCBL C SIGNAL 14 5C | 794 | FOOT | $3.50 | $3.19 | $3.19 | $3.19 | |
| 69 | 87301900 | ELCBL C EGRDC 6 1C | 281 | FOOT | $4.00 | $3.45 | $3.45 | $3.45 | |
| 70 | 87800100 | CONC FDN TY A | 24 | FOOT | $350.00 | $316.00 | $316.00 | $316.00 | |
| 71 | 87900200 | DRILL EX HANDHOLE | 13 | EACH | $575.00 | $527.00 | $527.00 | $527.00 | |
| 72 | 88600100 | DET LOOP T1 | 300 | FOOT | $28.25 | $25.69 | $25.69 | $25.69 | |
| 73 | 89500100 | RELOC EX SIG HEAD | 7 | EACH | $350.00 | $322.00 | $322.00 | $322.00 | |
| 74 | 89500200 | RELOC EX PED SIG HEAD | 12 | EACH | $400.00 | $352.00 | $352.00 | $352.00 | |
| 75 | 89501150 | RELOC EX TS POST | 6 | EACH | $450.00 | $402.00 | $402.00 | $402.00 | |
| 76 | 89502300 | REM ELCBL FR CON | 1,024 | FOOT | $2.75 | $2.52 | $2.52 | $2.52 | |
| 77 | 89502375 | REMOV EX TS EQUIP | 2 | EACH | $525.00 | $480.00 | $480.00 | $480.00 | |
| 78 | 89502376 | REBUILD EX HANDHOLE | 2 | EACH | $2,050.00 | $1,852.00 | $1,852.00 | $1,852.00 | |
| 79 | 89502385 | REMOV EX CONC FDN | 6 | EACH | $700.00 | $644.00 | $644.00 | $644.00 |