Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Sep 20, 2024 62T38 CookDistrict 1 (231-Ft) Bridge Deck Overlay, Bridge Joint Replacement / Repair at Devon Ave over North Branch Chicago River. This project is in the City of Chicago in Cook County. — Executed Nov 26 New Martam Construction Incorporated $668,421 ·
Sep 20, 2024 62T94 CookDistrict 1 Culvert replacement at two locations, construction of a retaining wall, guardrail replacement, and constructio The proposed improvement consists of culvert replacement at two locations, construction of a retaining wall, guardrail replacement, and construction of paved shoulder located at 123rd Street over Mill Creek and West Branch of Mill Creek, Cook County. Gross length: 1130 Ft (0.214 Mi), Net length: 385 Ft (0.073 Mi) — Executed Nov 26 New D. Construction, Inc. $1,450,818 ·
Sep 20, 2024 62V17 CookLakeDistrict 1 Project covers 14 miles along I-94 from Montrose Ave to Lake Cook Rd and 3 mile along US Route 41 from Lake Cook Rd to Park Ave. Improvements are within 8 separate cities and villages within Cook and Lake counties from Chicago to Highland Park. Project involves replacing the surveillance vehicle detection system, ramp metering system, 6 sign structures and installing wrong way detection system. Connection to fiberoptic system and network integration is also included. — Executed Nov 26 New Meade Inc. $9,281,773 ·
Sep 20, 2024 62V99 CookDistrict 1 Maintenance Yard Resurfacing, Reconstruction, Curb and Gutter Replacement, and Parking Improvement in the Rodenburg Maintenance Yard located at 1480 Rodenburg Rd , Schaumburg IL in Cook County. — Executed Nov 26 New R. W. Dunteman Company $1,427,900 ·
Sep 20, 2024 62W79 VariousDistrict 1 Annual maintenance of electrical systems including traffic signals; lighting; pump stations; surveillance; other pertinent electrical systems; subsystems and components; mechanical systems; and buildings, structures, and grounds located within District 1. — Executed Nov 26 New Meade Inc. $49,297,581 ·
Sep 20, 2024 62W80 DuPageDistrict 1 Reconstruction of the northeast wingwall at US 20 (Lake St) over I-290, pavement patching, removing and re-ere Scope of work consists of reconstruction of the northeast wingwall at US 20 (Lake St) over I-290, pavement patching, removing and re-erecting the existing guardrail terminal, maintenance of traffic, and pavement markings. Improvement is located in the City of Elmhurst in DuPage County. Gross Length= 2628 FT (0.5 Miles); Net Length= 12 FT (0.002 Miles). — Executed Nov 26 New Alliance Contractors, Inc. $221,327 ·
Sep 20, 2024 62W88 CookDistrict 1 A intersection improvement with pavement widening and resurfacing The length of the project is 2,203 ft (0.417 miles). This project consists of a intersection improvement with pavement widening and resurfacing. The project is in Unincorporated Cook County, Orland Park, Oak Forest and Palos Heights. — Executed Nov 26 New D. Construction, Inc. $743,320 ·
Sep 20, 2024 62W94 VariousDistrict 1 Tree removal on Various Routes at Various locations within Cook and Will Counties This project consists of tree removal on Various Routes at Various locations within Cook and Will Counties. — Executed Nov 26 New Clean Cut Tree Service, Inc. $604,120 ·
Sep 20, 2024 62X07 VariousDistrict 1 Dead tree removal work is located within the right-of-way limits of state- maintained routes located in District One counties of Cook, DuPage, Kane, Lake, McHenry, and Will. — Executed Nov 26 New McGinty Bros., Inc. $475,351 ·
Sep 20, 2024 62X16 VariousDistrict 1 Temporary traffic control setup on various State maintained expressway and arterial routes district-wide on a This improvement consists of temporary traffic control setup on various State maintained expressway and arterial routes district-wide on a work order basis. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $1,837,925 ·
Sep 20, 2024 62X17 VariousDistrict 1 Installing guardrail at new locations and repairing existing damaged guardrail and traffic barrier terminals o The work to be completed under this contract consists of installing guardrail at new locations and repairing existing damaged guardrail and traffic barrier terminals on a work order basis throughout District 1. — Executed Nov 26 New Kujo, Inc. $2,198,721 ·
Sep 20, 2024 62X41 VariousDistrict 1 Tree removal on various State routes at various within various Counties in District This project consists of tree removal on various State routes at various within various Counties in District. — Executed Nov 26 New Clean Cut Tree Service, Inc. $801,417 ·
Sep 20, 2024 64S29 LeeDistrict 2 Deck repair, joint replacement, deck overlay and other miscellaneous repairs on SN 052-0062 over UP RR at the the south edge of Dixon. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $1,009,879 ·
Sep 20, 2024 64S90 LeeDistrict 2 Partial cleaning and painting of structural steel on SN 052-0031 carrying US 30 over UPRR, 0.9 miles east of Whiteside County line. — Executed Nov 26 New Venus Painting Co. $106,609 ·
Sep 20, 2024 64T83 VariousDistrict 2 On-call maintenance of electrical facilities along state maintained routes in the eastern half of District 2. — Executed Nov 26 New Helm Electric Facility Solutions, Inc. d/b/a Helm Electric $469,796 ·
Sep 20, 2024 64T84 VariousDistrict 2 On-call maintenance of electrical facilities along state maintained routes in the western half of District 2. — Executed Nov 26 New Davenport Electric Contract Company $431,837 ·
Sep 20, 2024 64U01 HenryDistrict 2 0.5 mile of partial depth patching on IL 78 from 10th Street to north side of BNSF RR. — Executed Nov 26 New Valley Construction Co. $182,485 ·
Sep 20, 2024 66E54 LivingstonDistrict 3 About 2.32 miles of milling and resurfacing designed overlay of IL 116 and OR 66 with intersection improvements, drainage and ADA improvements. Along IL-116 from the west leg of Ewing Drive to Old Rt. 66 and along Old Rt. 66 from IL-116 to the south approach slab of the bridge over the Vermilion River in Pontiac. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $7,271,812 ·
Sep 20, 2024 66P11 KendallLaSalleDistrict 3 5.62 miles of milling and resurfacing on US 52 from east of the IL-71 intersection to the north leg of Townhouse Road. — Executed Nov 26 New D. Construction, Inc. $2,515,676 ·
Sep 20, 2024 66P19 FordDistrict 3 11.01 miles of milling and resurfacing on IL 115 from south of E 1600N RD to IL 9 in Roberts City. — Executed Nov 26 New Iroquois Paving Corporation $7,755,834 ·
Sep 20, 2024 66P42 LaSalleLivingstonDistrict 3 16.21 miles of HMA milling and resurfacing on IL 170 from 0.2 mile south of River Road in Seneca to the intersection with IL 17. — Executed Nov 26 New D. Construction, Inc. $6,376,242 ·
Sep 20, 2024 66P50 LaSalleDistrict 3 35.55 miles gross of On-Call Class A pavement patching, pavement striping, and other related items to complete the work as described herein on I-39 from the Marshall County Line to the Lee County Line including interchange ramps. — Executed Nov 26 New G. M. Sipes Construction, Inc. $2,186,049 ·
Sep 20, 2024 66P58 LaSalleDistrict 3 Removal of HMA shoulders and replacing with PCC shoulders, striping, and traffic control at SN 050-0195 carrying US Route 6 over I-39 and SN 050-0181 carrying CH 19 over I-39. — Executed Nov 26 New G. M. Sipes Construction, Inc. $1,146,789 ·
Sep 20, 2024 66P72 VariousDistrict 3 Tree removal in Bureau, Ford, Iroquois, Kankakee, Kendall, LaSalle, and Grundy Counties. — Executed Nov 26 New Thor General Contracting LLC $266,375 ·
Sep 20, 2024 66P80 LaSalleDistrict 3 2,596 gross ft of intermittent milling and resurfacing the mainline, merge lanes, and gore areas as show on plan details on F.A.I. Route 80 (I-80) from 0.5 miles west of the I-80/I-39 Interchange (just east of SN 050-0093) to west of SN 050-0178 in LaSalle County. — Executed Nov 26 New Advanced Asphalt Company $148,365 ·
Sep 20, 2024 68C94 TazewellDistrict 4 5.42 miles of resurfacing on IL 122 from IL 29 to just east of Oak St in Delavan in Tazewell County. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $7,973,993 ·
Sep 20, 2024 68J30 TazewellDistrict 4 Building demolition at four locations along Main Street between Cedar and Ravine Streets in East Peoria. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $169,021 ·
Sep 20, 2024 68J41 TazewellDistrict 4 2.746 miles of resurfacing, patching, and ADA improvements on Illinois Route 8 and Business US Route 24 (Washington Rd) in Tazewell County. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $4,448,444 ·
Sep 20, 2024 70H41 VariousDistrict 5 SMART WORK ZONE TECHNOLOGY in the District 5 counties of Champaign, DeWitt, Douglas, Edgar, McLean, Piatt, and Vermilion. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $298,888 ·
Sep 20, 2024 72627 PikeDistrict 6 Pipe culvert removal and replacement on IL 106, 1 mile north of US 54. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $61,515 ·
Sep 20, 2024 72740 LoganDistrict 6 Bridge bearing replacement on SN 054-0062 carrying TR 65A over I-55, I-55 West Frontage Road and the UP Railroad at the Lawndale overhead. — Executed Nov 26 New William Charles Construction Company, LLC $114,000 ·
Sep 20, 2024 72750 SangamonDistrict 6 Pipe culvert removal and replacement on I-55 West Frontage Road, 0.3 miles north of Toronto Road. — Executed Nov 26 New Earth Worx Solutions LLC $69,738 ·
Sep 20, 2024 72788 VariousDistrict 6 On-call repair of guardrail and impact attenuators at locations throughout District 6. — Executed Nov 26 New COLLINS & HERMANN, INC. $2,204,694 ·
Sep 20, 2024 72994 ChristianDistrict 6 Replacement of SN 011-0012 carrying IL 29 over Locust Creek Tributary, 0.3 miles southeast of 700N Road, southeast of Millersville. — Executed Nov 26 New William Charles Construction Company, LLC $1,478,000 ·
Sep 20, 2024 74858 LawrenceDistrict 7 Bridge replacement (SN 051-0001) with a cast-in place box culvert carrying IL 1 over a stream, 0.3 miles north of Birds Road. — Executed Nov 26 New McCarthy Improvement Company $1,057,796 ·
Sep 20, 2024 74B52 CumberlandDistrict 7 1.8 miles of resurfacing on I-70 from the Effingham County line to 1.8 miles east of the Effingham County line. — Executed Nov 26 New Howell Paving, Inc. $1,500,379 ·
Sep 20, 2024 74C53 EffinghamDistrict 7 Bridge deck overlay on SN 025-0031 carrying IL 33 over Morris Creek, 0.3 miles west of 500th Street. — Executed Nov 26 New C-Hill Civil Contractors, Inc. $369,369 ·
Sep 20, 2024 74C54 MaconDistrict 7 Bridge repairs on SN 058-0066 and 058-0067 carrying eastbound I-72 over the westbound spur and southbound US 51 in Decatur. — Executed Nov 26 New Freesen, a div of UCM, Inc. $1,794,628 ·
Sep 20, 2024 74C55 CumberlandDistrict 7 Expansion joint repairs, bridge deck scarification, deck patching, deck overlay, diamond grinding and deck grooving, and scupper modifications on SN 018-0019 carrying IL 121 over the Embarras River, 0.1 miles south of I-70. — Executed Nov 26 New C-Hill Civil Contractors, Inc. $678,888 ·
Sep 20, 2024 74C57 JasperDistrict 7 Expansion joint repairs, bridge deck scarification, concrete deck overlay, deck grooving and approach slab patching on SN 040-0019 carrying IL 33 over a stream, 0.1 miles south of IL 33. — Executed Nov 26 New C-Hill Civil Contractors, Inc. $555,555 ·
Sep 20, 2024 74C58 ClarkDistrict 7 Bridge deck overlay on SN 012-0064 carrying IL 49 over a stream, 0.4 miles east of the Cumberland County line. — Executed Nov 26 New Samron Midwest Contracting, Inc. $314,021 ·
Sep 20, 2024 74C59 ClayDistrict 7 Bridge deck overlay and slope wall repair on SN 013-0036 carrying the IC Railroad over US 50 at the Marion County line. — Executed Nov 26 New Samron Midwest Contracting, Inc. $989,186 ·
Sep 20, 2024 74C60 FayetteDistrict 7 Bridge deck overlay and deck repairs on SN 026-0090 carrying IL 37 over Dismal Creek, 0.5 miles south of the Clay County line. — Executed Nov 26 New C-Hill Civil Contractors, Inc. $655,555 ·
Sep 20, 2024 74D15 ClarkJasperDistrict 7 Pedestrian signal upgrades at 3 intersections: IL 1 and Archer Avenue in Marshal, IL 33 and Jackson Street in Newton, and IL 33/130 and Van Buren Street in Newton. — Executed Nov 26 New Pals Electric, Inc. $48,713 ·
Sep 20, 2024 76N04 St. ClairDistrict 8 3.5 miles of resurfacing on IL 4 from Center Street in Lebanon to the Madison County line. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $3,774,113 ·
Sep 20, 2024 76R46 MadisonDistrict 8 Addition of left turn lane and traffic signal modernization at the intersection of IL 111/IL 140 and Fosterburg Road. — Executed Nov 26 New Stutz Excavating, Inc. $1,956,212 ·
Sep 20, 2024 76T31 BondDistrict 8 Bridge demolition of SN 003-0041 carrying Old IL 127 over Beaver Creek in Greenville. — Executed Nov 26 New DMS Contracting, Inc. $140,906 ·
Sep 20, 2024 76T67 VariousDistrict 8 Construction of GPS base stations at various maintenance yards in District 8. — Executed Nov 26 New Wissehr Electric, Inc. $481,602 ·
Sep 20, 2024 76T69 RandolphDistrict 8 10.4 miles of resurfacing on IL 3 from IL 150 in Chester to the Jackson County line. — Executed Nov 26 New Samron Midwest Contracting, Inc. $6,414,514 ·
Sep 20, 2024 76T71 St. ClairDistrict 8 Well treatment at 5 locations in East St. Louis. — Executed Nov 26 New Davinroy Mechanical Contractor, Inc. $818,160 ·
Sep 20, 2024 76T72 VariousDistrict 8 Repair and maintenance of electrical equipment at pump stations in various counties of District 8. — Executed Nov 26 New Electrico, Inc. $183,003 ·
Sep 20, 2024 76T73 MadisonDistrict 8 Tree removal at IL 162 and IL 157 in Glen Carbon. — Executed Nov 26 New Baxmeyer Construction, Inc. $97,978 ·
Sep 20, 2024 78942 WilliamsonDistrict 9 5 miles of resurfacing, patching and shoulder work on IL 37 from 4th Street in Johnson City to IL 13 in Marion. — Executed Nov 26 New E. T. Simonds Construction Company $2,232,933 ·
Sep 20, 2024 78972 MassacDistrict 9 Construction of median crossovers for maintenance of traffic, structural steel repair, bridge painting, joint reconstruction, microsilica concrete overlay, parapet repair and center median barrier on SN 064-0035 carrying I-24 over the Ohio River. — Executed Nov 26 New E. T. Simonds Construction Company $38,551,533 ·
Sep 20, 2024 78A32 SalineDistrict 9 5.4 miles of resurfacing and guardrail repair and replacement on Old IL 13 from Harco Road to Barrett Lane in Harrisburg. — Executed Nov 26 New E. T. Simonds Construction Company $1,736,324 ·
Sep 20, 2024 78A66 JacksonDistrict 9 2.3 miles of milling and resurfacing on Makanda Road from US 51 to the Giant City State Park entrance. — Executed Nov 26 New E. T. Simonds Construction Company $940,374 ·
Sep 20, 2024 85762 LeeDistrict 2 Construction of a pedestrian bridge, shared--use path, lighting, HMA pavement, sidewalk, drainage improvements and modular block retaining wall along Page Drive, Lincoln Statue Drive, and through Page Park in Dixon. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $14,126,560 ·
Sep 20, 2024 89803 TazewellDistrict 4 Resurface Washington Street from Main Street to the I-74 Interchange in the City of East Peoria. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $940,411 ·
Sep 20, 2024 93822 HancockDistrict 6 Replace existing structure with a double-barrel box culvert to carry 1900 E. Road over Big Meadow Ditch, 2.5 miles south of Carthage. — Executed Nov 26 New Laverdiere Construction, Inc. $299,659 ·
Sep 20, 2024 95911 FayetteDistrict 7 Construct ADA compliant sidewalks with drainage improvements and a pedestrian railroad crossing along Filmore Street, Railroad Drive, and Fletcher Street in Vandalia. — Executed Nov 26 New Kinney Contractors, Inc. $587,112 ·
Sep 20, 2024 97838 MadisonDistrict 8 HMA resurfacing, curb and gutter, sidewalks, ADA ramps, driveways, drainage improvements, pavement markings, traffic signal modifications, and other work on Troy Road from Franklin Avenue to 4th Avenue in Edwardsville. — Executed Nov 26 New Stutz Excavating, Inc. $909,557 ·
Sep 20, 2024 97841 MadisonDistrict 8 Pavement widening, storm sewers, curb and guter and pavement markings at the intersection of Troy O'Fallon Road and Country lane in Troy. — Executed Nov 26 New The Kilian Corporation $1,151,288 ·
Sep 20, 2024 99735 WilliamsonDistrict 9 Resurface TR 298 from Stotar Road to Crenshaw Road. — Executed Nov 26 New E. T. Simonds Construction Company $496,850 ·
Sep 20, 2024 99737 WilliamsonDistrict 9 Resurface Rocky Comfort Road from Grassy Road to West Devils Kitchen Road. — Executed Nov 26 New E. T. Simonds Construction Company $567,540 ·
Sep 20, 2024 99738 MassacDistrict 9 Construct a single-span PPC deck beam bridge with HMA approaches, guardrail, and aggregatre shoulders to carry Crestwood Road over Barnes Creek, 5.5 miles northeast of Metropolis. — Executed Nov 26 New Samron Midwest Contracting, Inc. $461,545 ·
Sep 20, 2024 99739 MassacDistrict 9 Resurface New Columbia Road from Benton Road to 2.3 miles south of Benton Road. — Executed Nov 26 New E. T. Simonds Construction Company $513,793 ·
Nov 8, 2024 46651 VariousDistrict 7 Removal and replacement of damaged raised reflective pavement marker reflectors and castings as needed throughout various counties of District 7. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $3,213,213 ·
Nov 8, 2024 46654 VariousDistrict 7 Repairing various widths and types of pavement markings through District 7. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $825,998 ·
Nov 8, 2024 60R50 CookDistrict 1 5,158-Ft. (0.98 miles), This project includes intersection improvements, ADA improvements, pavement widening and resurfacing, drainage improvements, traffic signal work, lighting, street scape improvements, and sidewalk and shared-use path construction, at the intersection with US 12/20/45 (La Grange Road), City of Countryside, Cook County, IL. — Executed Nov 26 New
Nov 8, 2024 60T22 DuPageDistrict 1 (2,439 Ft) Channelization, Traffic Signal Installation: Median improvement, new HMA shoulders, HMA resurfacing, pavement widening, pavement patching, grading and shaping ditches, curb ramps (ADA) improvements, pavement markings, installation of new traffic signal and APS. FAP 870: IL 53 (Columbine Ave), from Bryant Avenue to Surrey Drive in the Villages of Lombard and Glen Ellyn in DuPage County. — Rejected Nov 26 New
Nov 8, 2024 61H32 WillDistrict 1 Replace the bridge carrying TR 181 over Jackson Creek, 0.4 mile east of US 52. — Executed Nov 26 New D. Construction, Inc. $2,994,900 ·
Nov 8, 2024 61J87 LakeDistrict 1 Construction of a grade separation structure to carry the CN/WCL Railroad over US 14; Pavement reconstruction of US 14, construction of a pump station, relocation of the Flint Creek Tributary, box culvert construction, retaining and noise walls, watermain, sanitary sewer, traffic signals and roadway lighting between IL 59 and Valencia Avenue in Barrington. — Executed Nov 26 New IHC Construction Companies LLC and Curran Contracting Company JV $69,424,887 ·
Nov 8, 2024 61J90 CookDistrict 1 Pavement widening, resurfacing and traffic signal improvements on Irving Park Road at Old River Road in Schiller Park. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $4,279,092 ·
Nov 8, 2024 61K21 CookDistrict 1 Replace existing culverts with two three-side precast concrete structures with HMA resurfacing, patching, curb and gutter, sidewalks, ADA improvements, and storm sewers on Wellington Avenue and Leicester Road over Lake Cosman in Elk Grove Village. — Executed Nov 26 New Martam Construction Incorporated $4,310,271 ·
Nov 8, 2024 61K48 CookDistrict 1 Full Depth HMA pavement with aggregate subgrade improvement, median construction, driveways, curb and gutter, sidewalks, ADA Ramps, drainage improvements, and traffic signal installation on 187th Streeyt from Science Road to Pleasant Drive in Glenwood. — Executed Nov 26 New D. Construction, Inc. $3,094,447 ·
Nov 8, 2024 61K54 CookDistrict 1 Constrution of a shared-use path from the north side of Irvign Park Road to Lawrence Avenue in the City of Chicago and Schiller Park. — Executed Nov 26 New Martam Construction Incorporated $3,447,132 ·
Nov 8, 2024 61K56 CookDistrict 1 Resurface Burlington Avenue from Central Avenue to Wolf Rd. in Western Springs. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $554,455 ·
Nov 8, 2024 61K58 CookDistrict 1 Sidewalk construction on McDermott Drive from Wolf Road to the end of St. Charles road and on Morris Avenue from McDermott Dr. to St. Charles Rd. in Berkeley. — Executed Nov 26 New Triggi Construction, Inc. $341,626 ·
Nov 8, 2024 61K59 CookDistrict 1 Sidewalk construction at various locations in Berkeley. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $1,464,176 ·
Nov 8, 2024 61K64 KaneDistrict 1 HMA resurfacing, concrete curb and gutter, storm sewer, and erosion control on Indian Trail from Highland Avenue to IL 31 in Aurora. — Executed Nov 26 New Geneva Construction Company $1,369,171 ·
Nov 8, 2024 61K65 DuPageDistrict 1 Resurface Liberty Street from Eola Road to Commons Drive in Aurora. — Executed Nov 26 New K-Five Construction Corporation $734,188 ·
Nov 8, 2024 61K66 KaneDistrict 1 Resurface Ashland Avenue from IL 25 to Union Street in Aurora. — Executed Nov 26 New Geneva Construction Company $1,157,514 ·
Nov 8, 2024 61K67 KaneDistrict 1 Resurface Prairie Street from the west city limits to Randall Road in Aurora. — Rejected Nov 25 New Builders Paving, LLC $1,538,538 ·
Nov 8, 2024 61K69 CookDistrict 1 HMA resurfacing, patching, curb and gutter, sidewalks, ADA improvements, pavement striping, parkway restoration, on 46th Street from Harlem Avenue to Oak Park Avenue in Forest View. — Executed Nov 26 New K-Five Construction Corporation $670,114 ·
Nov 8, 2024 61K73 KaneDistrict 1 HMA resurfacing, patching, pavement markings, sidewalks, ADA improvements, at various locations in Elgin. — Rejected Nov 26 New
Nov 8, 2024 61K74 LakeDistrict 1 HMA reconstruction of Hazel Avenue from Wilmot Road to Waukegan Road in Deerfield. Includes curb and gutter, PCC Sidewalk, ADA improvements, bridge deck sealing and landscaping. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $10,184,632 ·
Nov 8, 2024 61K75 DuPageDistrict 1 Resurface Schick Road from the west corporate limits to County Farm Road in Hanover Park. — Executed Nov 26 New K-Five Construction Corporation $939,975 ·
Nov 8, 2024 61K76 McHenryDistrict 1 Replace the bridge carrying Flat Iron Road over Mokeler Creek, 0.4 mile south of IL 173. — Executed Nov 26 New Sjostrom & Sons, Inc. $1,739,696 ·
Nov 8, 2024 61K80 McHenryDistrict 1 Construct a single-span PPC IL-Beam structure with concrete deck to carry White Oaks Road over West Branch of Piscasaw Creek. Includes full-depth HMA resurfacing, pavement markings and storm sewer. — Executed Nov 26 New Sjostrom & Sons, Inc. $1,503,245 ·
Nov 8, 2024 61K83 CookDistrict 1 Reconstruct Salem Drive from Schaumburg road to Weathersfield Way in Schaumburg. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $2,379,003 ·
Nov 8, 2024 62B66 LakeDistrict 1 Decommissioning of existing Pump Station 37 located in the IL 176 over US 41 bridge abutment (SN 049-0131), an The project consists of decommissioning of existing Pump Station 37 located in the IL 176 over US 41 bridge abutment (SN 049-0131), and construction of the new pump station in the northeast quadrant of the US 41 and IL 176 intersection with a new outfall pipe to the Skokie River. — Executed Nov 26 New F. H. Paschen, S.N. Nielsen & Associates LLC $15,494,185 ·
Nov 8, 2024 62G18 CookDistrict 1 (3.11-Mile) Standard Overlay, ADA improvements, traffic signal modernization, shoulder widening, roadway pavement marking. The project is in the cities of Des Plaines and Park Ridge, Cook County. — Executed Nov 26 New K-Five Construction Corporation $5,291,877 ·
Nov 8, 2024 62G63 DuPageDistrict 1 (6.63-Mile) Standard and Designed Overlay, ADA Improvements, Patching, Signal Modifications, Landscape Medians. Project is located on IL-38 (Roosevelt Rd) from East of Technology Blvd to Pierce Ave. in the Cities of West Chicago, Wheaton and the Village of Winfield in Cook County. — Executed Nov 26 New R. W. Dunteman Company $8,631,060 ·
Nov 8, 2024 62P92 CookDistrict 1 Curb ramps (ADA) improvements consists of sidewalk removal, combination concrete curb and gutter removal and r This project consists of curb ramps (ADA) improvements consists of sidewalk removal, combination concrete curb and gutter removal and replacement, concrete sidewalk and detectable warnings, drainage structure adjustments, pavement markings on Various Routes, at Various Locations in North Cook County in the Villages of Elk Grove, Mount Prospect, Wheeling, Arlington Heights, and the City of Prospect Heights in Cook County. — Executed Nov 26 New Acura Inc. $1,217,181 ·
Nov 8, 2024 62P94 CookDistrict 1 Sidewalk removal, combination concrete curb and gutter removal and replacement, concrete sidewalk and detectab This is an ADA curb ramp installation project consists of sidewalk removal, combination concrete curb and gutter removal and replacement, concrete sidewalk and detectable warnings, accessible pedestrian signals and roadway signs, drainage structure adjustments, pavement markings. Located along various State routes in the City of Evanston and the Villages of Glencoe, Kenilworth, and Wilmette in Cook County. — Executed Nov 26 New Acura Inc. $979,267 ·
Nov 8, 2024 62P98 CookDistrict 1 ADA Improvements: Removal and replacement of sidewalk, curb and gutter, minor traffic signal (APS) improvements. Located in southeast Leyden Township within the City of Northlake and the Villages of Franklin Park, Melrose Park and Schiller Park. — Executed Nov 26 New Acura Inc. $1,498,868 ·
Nov 8, 2024 62R00 CookDistrict 1 Hot-mix asphalt surface removal and resurfacing, pavement patching, concrete curb and gutter removal and repla The project consists of hot-mix asphalt surface removal and resurfacing, pavement patching, concrete curb and gutter removal and replacement, ADA pedestrian ramp improvements, detector loop replacement and pavement marking. Improvements at various locations on IL 58 (Golf Rd.), Rand Rd., US 12 / 45 (Lee St. / Graceland Ave. / Mannheim Rd.) and Touhy Ave. in the city of Des Plaines. — Executed Nov 26 New Alliance Contractors, Inc. $1,688,085 ·
Nov 8, 2024 62R21 WillDistrict 1 The building demolition at various locations The proposed scope of work consists of the building demolition at various locations. Each building removal will include removing any structure above and below the ground, including the main building frames, attached and detached buildings, and facilities. It will also include the removal of fences, sidewalks and driveways, utilities, and trees within the parcels- limits. The project is in the City of Joliet in Will County. — Executed Nov 26 New P. T. Ferro Construction Co. $597,064 ·
Nov 8, 2024 62T10 DuPageDistrict 1 (5.78-Mile) SMART Overlay and ADA Improvements: HMA surface removal and replacement, Class D patches, detector loops replacement, pavement markings, sidewalk and curb removal and replacement, drainage structures adjustments, minor traffic signal (APS) improvements. Located along IL 59 (Neltnor Boulevard ) from South of Heritage Woods Drive to North of Batavia Road within the City of West Chicago and the Village of Warrenville. — Executed Nov 26 New Plote Construction, Inc. $5,630,000 ·
Nov 8, 2024 62W03 CookDistrict 1 Parking Improvement, work includes existing HMA removal, installation of aggregate base, installation of new HMA surface course and minor collateral and incidental work. Location: Located at the District Bridge Maintenance Yard (1101 Biesterfield Rd), Elk Grove Village, in Cook County. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $1,055,604 ·
801–900 of 994‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.