(64-3B)BP-1,BRR-1
- Let date
- Friday, September 20, 2024
- Contract
- 78972 · job page
- District
- District 9
- County
- Massac
- Highway
- Limits
- Construction of median crossovers for maintenance of traffic, structural steel repair, bridge painting, joint reconstruction, microsilica concrete overlay, parapet repair and center median barrier on SN 064-0035 carrying I-24 over the Ohio River.
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | E. T. Simonds Construction Company Low bidder | $38,551,533 | ||
| 2 | Samron Midwest Contracting, Inc. | $38,816,072 | +0.7% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 E. T. Simonds C… | #2 Samron Midwest … |
|---|---|---|---|---|---|---|---|
| 1 | X1200201 | STRP SL GLAND RPLCMNT | 330 | FOOT | $68.48 | $100.00 | |
| 2 | X4005553 | HOLES DRILLED | 129 | EACH | $660.00 | $60.00 | |
| 3 | X4404260 | PAVED SHLD REMOVAL SP | 1,324 | SQ YD | $37.08 | $42.00 | |
| 4 | X4406220 | PART DEP REM T2 2 | 134 | SQ YD | $172.70 | $80.00 | |
| 5 | X4406801 | PCC SURFACE REM (CM) | 134 | SQ YD | $32.01 | $80.00 | |
| 6 | X4421000 | PARTIAL DEPTH PATCH | 15 | TON | $1,172.39 | $450.00 | |
| 7 | X5030250 | BR DECK GROOVING LONG | 29,999 | SQ YD | $6.40 | $7.50 | |
| 8 | X5080530 | BAR TERMINATORS | 640 | EACH | $23.32 | $85.00 | |
| 9 | X6310214 | TRAF BAR TERM T6 SPL | 1 | EACH | $7,700.00 | $5,800.00 | |
| 10 | X6320100 | GUARDRAIL REMOV SPL | 775 | FOOT | $10.35 | $14.00 | |
| 11 | X6370050 | CONC BAR WALL SPL | 605 | FOOT | $125.58 | $275.00 | |
| 12 | X6380200 | REL MOD GLAR SCRN SYS | 40,613 | FOOT | $3.30 | $6.00 | |
| 13 | X7010239 | CHANGEABLE MSG SN SPL | 1,470 | CAL WK | $158.13 | $300.00 | |
| 14 | X7011858 | REAL-TIME TR CTRL SU | 840 | WEEK | $121.00 | $125.00 | |
| 15 | X7820008 | BARRIER WALL REFL SPL | 8 | EACH | $64.27 | $55.00 | |
| 16 | X8570002 | SMART TRAF MONIT SYS | 210 | CAL WK | $154.00 | $430.00 | |
| 17 | X8570004 | SMART TRAF MONIT DEV | 1,050 | CAL WK | $25.03 | $75.00 | |
| 18 | Z0001903 | STRUCT STEEL REMOV | 76,620 | POUND | $6.25 | $4.00 | |
| 19 | Z0001905 | STRUCT STEEL REPAIR | 7,500 | POUND | $141.22 | $95.00 | |
| 20 | Z0004556 | HMA SURFACE RM (DECK) | 40,843 | SQ YD | $3.64 | $3.00 | |
| 21 | Z0007101 | C&D LEAD PT CL RS N1 | 1 | L SUM | $4,291,430.00 | $4,500,000.00 | |
| 22 | Z0010501 | CLEAN & PT STL BR N1 | 1 | L SUM | $10,013,355.00 | $10,375,000.00 | |
| 23 | Z0012130 | BR DECK SCAR 3/4 | 36,837 | SQ YD | $53.29 | $52.00 | |
| 24 | Z0012146 | BR DECK SCAR 2 3/4 | 302 | SQ YD | $77.02 | $52.00 | |
| 25 | Z0012168 | BR DK MIC C OVL 3 | 37,140 | SQ YD | $125.00 | $65.00 | |
| 26 | Z0012754 | STR REP CON DP = < 5 | 6,894 | SQ FT | $109.53 | $115.00 | |
| 27 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $38,275.40 | $330,000.00 | |
| 28 | Z0016001 | DECK SLAB REP (FD-T1) | 2 | SQ YD | $5,000.00 | $3,500.00 | |
| 29 | Z0016002 | DECK SLAB REP (FD-T2) | 329 | SQ YD | $1,052.43 | $3,000.00 | |
| 30 | Z0023500 | FILL EXIST CULVERTS | 17.2 | CU YD | $260.12 | $400.00 | |
| 31 | Z0029090 | DIAMOND GRIND BR SEC | 32,499 | SQ YD | $7.75 | $10.00 | |
| 32 | Z0032400 | JOINT REPAIR | 1 | EACH | $15,627.27 | $10,000.00 | |
| 33 | Z0034390 | MODULAR EXPAN JT 6 | 66 | FOOT | $2,450.08 | $2,900.00 | |
| 34 | Z0034393 | MODULAR EXPAN JT 9 | 66 | FOOT | $3,232.02 | $3,600.00 | |
| 35 | Z0034398 | MODULAR EXPAN JT 15 | 66 | FOOT | $4,484.59 | $4,700.00 | |
| 36 | Z0034500 | MODULAR EXPAN JT 18 | 66 | FOOT | $5,237.26 | $5,500.00 | |
| 37 | Z0034605 | MODULAR EXPAN JT 21 | 66 | FOOT | $6,072.82 | $6,100.00 | |
| 38 | Z0053750 | RETROFIT CONC PARAPET | 11,162 | FOOT | $134.67 | $115.00 | |
| 39 | Z0076600 | TRAINEES | 2,000 | HOUR | $0.8000 | $0.8000 | |
| 40 | Z0076604 | TRAINEES TPG | 2,000 | HOUR | $15.00 | $15.00 | |
| 41 | 31100600 | SUB GRAN MAT A 7 | 1,478 | SQ YD | $18.99 | $23.00 | |
| 42 | 31100910 | SUB GRAN MAT A 12 | 1,324 | SQ YD | $27.35 | $30.00 | |
| 43 | 40600290 | BIT MATLS TACK CT | 60 | POUND | $0.0100 | $0.0100 | |
| 44 | 40600295 | P BIT MATLS TACK CT | 1,641 | POUND | $0.0100 | $0.0100 | |
| 45 | 40604174 | P HMA SC IL-9.5 E N90 | 409 | TON | $694.30 | $400.00 | |
| 46 | 42000060 | WELDED WIRE REINF | 2,802 | SQ YD | $9.75 | $20.00 | |
| 47 | 42000506 | PCC PVT 10 1/4 JOINTD | 2,802 | SQ YD | $108.39 | $130.00 | |
| 48 | 44001980 | CONC BARRIER REMOV | 665 | FOOT | $27.52 | $30.00 | |
| 49 | 44004250 | PAVED SHLD REMOVAL | 1,543 | SQ YD | $27.63 | $40.00 | |
| 50 | 48300400 | PCC SHOULDERS 9 | 65 | SQ YD | $120.98 | $125.00 | |
| 51 | 50102400 | CONC REM | 118.7 | CU YD | $3,732.99 | $5,300.00 | |
| 52 | 50157300 | PROTECTIVE SHIELD | 1,176 | SQ YD | $209.91 | $0.0100 | |
| 53 | 50300255 | CONC SUP-STR | 208.2 | CU YD | $3,875.00 | $6,500.00 | |
| 54 | 50300300 | PROTECTIVE COAT | 50,014 | SQ YD | $1.01 | $2.50 | |
| 55 | 50500405 | F & E STRUCT STEEL | 27,900 | POUND | $8.76 | $12.50 | |
| 56 | 50800205 | REINF BARS, EPOXY CTD | 45,120 | POUND | $2.77 | $2.70 | |
| 57 | 50800515 | BAR SPLICERS | 552 | EACH | $82.28 | $80.00 | |
| 58 | 50800530 | MECHANICAL SPLICERS | 1,356 | EACH | $78.64 | $80.00 | |
| 59 | 54244405 | FL INLT BX MED 542546 | 1 | EACH | $14,381.56 | $5,500.00 | |
| 60 | 54248510 | CONCRETE COLLAR | 0.4 | CU YD | $3,041.50 | $5,000.00 | |
| 61 | 550A0120 | STORM SEW CL A 1 24 | 3 | FOOT | $759.55 | $700.00 | |
| 62 | 550A0340 | STORM SEW CL A 2 12 | 11 | FOOT | $198.82 | $195.00 | |
| 63 | 55101200 | STORM SEWER REM 24 | 5 | FOOT | $170.72 | $350.00 | |
| 64 | 60240215 | INLETS TB T1F CL | 2 | EACH | $4,249.77 | $4,000.00 | |
| 65 | 60500060 | REMOV INLETS | 1 | EACH | $1,327.40 | $1,780.00 | |
| 66 | 63000017 | SPBGR TY D 6FT POSTS | 738 | FOOT | $52.80 | $50.00 | |
| 67 | 63700805 | CONC BAR TRANS | 60 | FOOT | $511.20 | $300.00 | |
| 68 | 63800920 | MOD GLAR SCR SYS TEMP | 28,800 | FOOT | $6.60 | $16.00 | |
| 69 | 63801000 | CONC GLARE SCREEN | 5,562 | FOOT | $76.69 | $20.00 | |
| 70 | 64200116 | SHOULDER RUM STRIP 16 | 5,968 | FOOT | $3.05 | $5.00 | |
| 71 | 67000400 | ENGR FIELD OFFICE A | 36 | CAL MO | $2,000.00 | $2,000.00 | |
| 72 | 67100100 | MOBILIZATION | 1 | L SUM | $3,139,762.65 | $2,360,000.00 | |
| 73 | 70100205 | TRAF CONT-PROT 701401 | 4 | EACH | $26,718.97 | $250,000.00 | |
| 74 | 70100207 | TRAF CONT-PROT 701402 | 10 | EACH | $45,977.81 | $1,150.00 | |
| 75 | 70100410 | TRAF CONT-PROT 701416 | 2 | EACH | $192,512.86 | $300,000.00 | |
| 76 | 70100701 | TRAF CONT-PROT 701406 | 2 | EACH | $0.0100 | $0.0100 | |
| 77 | 70106700 | TEMP RUMBLE STRIPS | 48 | EACH | $1,133.95 | $1,200.00 | |
| 78 | 70107007 | PAVT MK BLKOUT TAPE 7 | 50,608 | FOOT | $3.36 | $5.00 | |
| 79 | 70107025 | CHANGEABLE MESSAGE SN | 1,940 | CAL DA | $55.00 | $60.00 | |
| 80 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $125,709.80 | $750,000.00 | |
| 81 | 70300100 | SHORT TERM PAVT MKING | 1,112 | FOOT | $5.00 | $3.00 | |
| 82 | 70300150 | SHRT TRM PAVT MK REM | 371 | SQ FT | $5.00 | $4.00 | |
| 83 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 25,038 | FOOT | $2.32 | $2.50 | |
| 84 | 70400100 | TEMP CONC BARRIER | 28,800 | FOOT | $47.98 | $58.00 | |
| 85 | 70400125 | PIN TEMP CONC BARRIER | 2,166 | EACH | $29.25 | $35.00 | |
| 86 | 70400200 | REL TEMP CONC BARRIER | 40,613 | FOOT | $11.38 | $3.50 | |
| 87 | 70600251 | IMP ATTN TEMP NRN TL3 | 7 | EACH | $6,800.00 | $4,500.00 | |
| 88 | 70600352 | IMP ATTN REL NRN TL3 | 7 | EACH | $3,000.00 | $500.00 | |
| 89 | 78008330 | POLYUREA PM T2 LN 6 | 32,779 | FOOT | $3.19 | $3.00 | |
| 90 | 78011035 | GRV RCSD PVT MRKG 7 | 32,779 | FOOT | $2.03 | $2.00 | |
| 91 | 78100100 | RAISED REFL PAVT MKR | 140 | EACH | $289.59 | $80.00 | |
| 92 | 78200005 | GRDRAIL REF TYPE A | 22 | EACH | $11.00 | $12.00 | |
| 93 | 78200011 | BARR WALL REF TYPE C | 3,675 | EACH | $11.25 | $7.00 | |
| 94 | 78300200 | RAISED REF PVT MK REM | 140 | EACH | $33.67 | $18.00 | |
| 95 | 78300201 | PVT MKG REM GRINDING | 12,519 | SQ FT | $4.63 | $4.50 |