‹ Nov 2024 results
2023 DB YARD PARKING
Let date Friday, November 8, 2024
Contract 62W03 · job page
District District 1
County Cook
Highway
Limits Parking Improvement, work includes existing HMA removal, installation of aggregate base, installation of new HMA surface course and minor collateral and incidental work. Location: Located at the District Bridge Maintenance Yard (1101 Biesterfield Rd), Elk Grove Village, in Cook County.
Bidders 9
# Contractor Total bid vs estimate vs low
EE Engineer's estimate —
1
A Lamp Concrete Contractors, Inc. Low bidder
$1,055,604
2
R. W. Dunteman Company
$1,068,950
+1.3%
3
K-Five Construction Corporation
$1,158,040
+9.7%
4
Schroeder Asphalt Services, Inc.
$1,174,649
+11.3%
5
Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc.
$1,284,326
+21.7%
6
Alliance Contractors, Inc.
$1,304,879
+23.6%
7
Builders Paving, LLC
$1,370,455
+29.8%
8
Lenny Hoffman Excavating, Inc.
$1,730,294
+63.9%
9
MYS, Incorporated
$1,734,127
+64.3%
Bid tab: unit prices 40 items ExcelCSV Print
Seq Bid code Description Qty Unit Estimate
#1 A Lamp Concrete… #2 R. W. Dunteman … #3 K-Five Construc… #4 Schroeder Aspha… #5 Berger Excavati… #6 Alliance Contra… #7 Builders Paving… #8 Lenny Hoffman E…
1 X4400501
CC&G RMVL REPL < = 10 50 FOOT
$60.00
$113.50
$54.35
$80.00
$88.00
$130.00
$132.00
$180.00
2 X4400503
CC&G RMVL REPL > 10FT 50 FOOT
$38.00
$102.00
$54.35
$78.00
$80.00
$160.00
$132.00
$224.00
3 X5537800
SS CLEANED 12 100 FOOT
$5.00
$5.00
$7.50
$10.00
$12.50
$7.50
$7.50
$5.50
4 X6030205
FR & GRATES ADJUST SP 1 EACH
$3,850.00
$3,850.00
$1,900.00
$4,300.00
$2,300.00
$1,000.00
$2,500.00
$1,145.00
5 X6700407
ENGRS FLD OFC TY A D1 6 CAL MO
$1,500.00
$3,000.00
$3,300.00
$3,000.00
$1,200.00
$1,000.00
$4,000.00
$6,400.00
6 Z0013798
CONSTRUCTION LAYOUT 1 L SUM
$6,000.00
$6,000.00
$7,000.00
$9,000.00
$93,000.00
$6,000.00
$6,000.00
$30,000.00
7 Z0018500
DRAINAGE STR CLEANED 7 EACH
$650.00
$650.00
$395.00
$450.00
$425.00
$395.00
$395.00
$745.00
8 20101400
NITROGEN FERT NUTR 4 POUND
$1.00
$5.00
$17.50
$10.00
$5.00
$18.00
$5.00
$5.50
9 20101600
POTASSIUM FERT NUTR 4 POUND
$1.00
$5.00
$17.50
$10.00
$5.00
$18.00
$5.00
$5.50
10 20200100
EARTH EXCAVATION 2,413 CU YD
$43.50
$33.15
$58.91
$43.00
$42.00
$25.40
$70.00
$37.00
11 20201200
REM & DISP UNS MATL 1,206 CU YD
$20.00
$15.35
$49.90
$45.00
$42.00
$30.00
$70.00
$47.00
12 21001000
GEOTECH FAB F/GR STAB 3,620 SQ YD
$1.50
$3.50
$3.55
$4.00
$2.80
$1.00
$2.50
$4.25
13 21101615
TOPSOIL F & P 4 259 SQ YD
$6.50
$0.1000
$11.00
$14.00
$9.00
$11.00
$0.1000
$20.00
14 25200110
SODDING SALT TOLERANT 259 SQ YD
$14.50
$38.25
$19.00
$26.00
$25.00
$19.00
$38.25
$35.00
15 28000510
INLET FILTERS 7 EACH
$15.00
$250.00
$250.00
$275.00
$250.00
$25.00
$450.00
$220.00
16 30300001
AGG SUBGRADE IMPROVE 1,206 CU YD
$20.00
$53.45
$38.96
$63.00
$58.00
$26.20
$65.00
$61.25
17 31101400
SUB GRAN MAT B 6 14,477 SQ YD
$8.50
$5.60
$8.62
$9.25
$14.15
$7.95
$12.00
$18.00
18 40600275
BIT MATLS PR CT 32,452 POUND
$0.0100
$0.0100
$0.0100
$0.0100
$0.0100
$0.0100
$0.0100
$0.0100
19 40600290
BIT MATLS TACK CT 5,139 POUND
$0.0100
$0.0100
$0.0100
$0.0100
$0.0100
$0.0100
$0.0100
$0.0100
20 40603085
HMA BC IL-19.0 N70 2,506 TON
$92.00
$83.51
$79.40
$90.00
$82.00
$82.00
$80.00
$88.00
21 40604062
HMA SC IL-9.5 D N70 1,496 TON
$101.00
$90.75
$108.00
$94.50
$90.00
$90.00
$88.00
$136.00
22 42000060
WELDED WIRE REINF 506 SQ YD
$4.20
$15.95
$9.10
$9.00
$9.25
$11.00
$12.00
$12.00
23 42000300
PCC PVT 8 506 SQ YD
$105.00
$92.10
$107.00
$104.00
$103.75
$103.70
$144.00
$120.50
24 42001300
PROTECTIVE COAT 517 SQ YD
$2.00
$1.15
$1.00
$17.00
$4.75
$0.0100
$0.5000
$0.0100
25 42400200
PC CONC SIDEWALK 5 100 SQ FT
$13.50
$19.00
$9.00
$19.50
$10.35
$12.50
$25.00
$14.00
26 44000100
PAVEMENT REM 14,984 SQ YD
$6.30
$7.20
$4.95
$4.00
$6.25
$24.95
$9.00
$20.00
27 44000155
HMA SURF REM 1 1/2 1,579 SQ YD
$3.00
$2.25
$5.00
$4.00
$7.00
$7.00
$4.00
$5.50
28 44000158
HMA SURF REM 2 1/4 1,755 SQ YD
$3.25
$3.25
$8.00
$5.00
$7.00
$7.00
$4.25
$8.75
29 44000600
SIDEWALK REM 100 SQ FT
$3.65
$10.50
$1.89
$9.50
$10.00
$2.50
$20.00
$9.50
30 60250200
CB ADJUST 1 EACH
$650.00
$650.00
$500.00
$750.00
$1,050.00
$350.00
$1,000.00
$540.00
31 60252800
CB RECONST 1 EACH
$2,685.00
$2,685.00
$1,800.00
$3,050.00
$2,600.00
$2,500.00
$3,000.00
$1,445.00
32 60300305
FR & LIDS ADJUST 7 EACH
$880.00
$880.00
$500.00
$1,000.00
$1,050.00
$880.00
$900.00
$555.00
33 66900200
NON SPL WASTE DISPOSL 1,206 CU YD
$79.00
$105.50
$82.00
$105.00
$67.00
$77.00
$100.00
$101.00
34 66900530
SOIL DISPOSAL ANALY 4 EACH
$900.00
$900.00
$900.00
$1,711.60
$900.00
$1,200.00
$900.00
$1,525.00
35 66901001
REG SUB P-CONST PLAN 1 L SUM
$4,600.00
$4,600.00
$4,600.00
$3,300.00
$4,600.00
$3,000.00
$4,600.00
$5,525.00
36 66901003
REG SUB F CON REPORT 1 L SUM
$500.00
$500.00
$500.00
$2,750.00
$500.00
$1,500.00
$500.00
$553.00
37 66901005
ENGINEERED BARRIER 590 SQ YD
$15.25
$30.00
$18.03
$52.00
$22.00
$16.00
$40.00
$39.00
38 66901006
REG SUB MON 8 CAL DA
$700.00
$700.00
$700.00
$1,045.00
$700.00
$1,700.00
$700.00
$1,050.00
39 67100100
MOBILIZATION 1 L SUM
$63,300.00
$60,803.18
$70,997.06
$29,000.00
$74,000.00
$80,000.00
$56,999.89
$127,200.00
40 78000200
THPL PVT MK LINE 4 2,218 FOOT
$1.50
$2.95
$2.60
$3.15
$4.25
$2.95
$1.35
$3.25
Showing the first 8 bidders. The Excel and CSV downloads include all 9.