| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 15, 2021 | 46560 | VariousDistrict 3 | "On-Call" Pavement Marking with various materials including, thermoplastic, paint, preformed plastic, polyurea, modified urethane, pavement marking removal, hot-spray thermoplastic, grooving for pavement marking, and aerial mk. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,394,950 · | ||
| Jan 15, 2021 | 61F89 | LakeDistrict 1 | Construction of a pedestrian bridge over the Wisconsin Central Railroad at the Mundelein Metra Station in the Village of Mundelein. | — | Executed | Dunnet Bay Construction Company $3,915,764 · | ||
| Jan 15, 2021 | 61G19 | DuPageDistrict 1 | Pavement widening and reconstruction, sidewalks, multi-use path, storm sewer, traffic signals, lighting and pavement markings on North Aurora Road from Frontenanc Road to Fairwy Drive in Naperville. | — | Executed | Berger Excavating Contractors, Inc. $10,132,406 · | ||
| Jan 15, 2021 | 61G26 | DuPageDistrict 1 | Resurfacing, curb and gutter replacement, sidewalk replacement, and pavement markings on Prince Crossing Road from Geneva Road to IL 164 in West Chicago. | — | Executed | K-Five Construction Corporation $814,444 · | ||
| Jan 15, 2021 | 61G59 | DuPageDistrict 1 | Resurfacing Clarendon Hjills Road between 91st Street and 79th Street within Downers Grove Township in Dupage County. | — | Executed | K-Five Construction Corporation $552,568 · | ||
| Jan 15, 2021 | 61G66 | DuPageDistrict 1 | Resurfacing Abbeywood Drive and Green Trails Drive from Naper Boulevard to College Road in the Village of Lisle. | — | Executed | K-Five Construction Corporation $806,290 · | ||
| Jan 15, 2021 | 61G68 | CookDistrict 1 | Resurfacing, curb and gutter replacement, sidewalk replacement and pavement markings on Oak Park Avenue from Roosevelt Road to North Avenue in Oak Park. | — | Executed | Arrow Road Construction Co. $2,086,257 · | ||
| Jan 15, 2021 | 61G76 | CookDistrict 1 | Roadway reconstruction, box culvert replacement, and constructon of a soldier pile retaining wall under the I-294 bridge, on Franklin Avenue from east of the Canadian Pacific Bensenville Yard entrance to est of the I-294 bridge in Franklin Park. | — | Executed | Dunnet Bay Construction Company $1,671,760 · | ||
| Jan 15, 2021 | 61G78 | CookDistrict 1 | Traffic signal replacement and sidewalk construction on US 20 from Walnut Avenue to Center Avenue in Streamwood. | — | Executed | Triggi Construction, Inc. $296,311 · | ||
| Jan 15, 2021 | 61G83 | KaneDistrict 1 | Reconstruction of Bolz Road from Amarillo Drive to Kennedy Drive in the Village of Carpentersville. | — | Executed | A Lamp Concrete Contractors, Inc. $1,569,268 · | ||
| Jan 15, 2021 | 61G84 | LakeDistrict 1 | Replace the bridge carrying Clavey Road over Skokie Ditch, and the reconstruction of the roadway from east of US 41 to Green Bay Road in Highland. | — | Executed | Copenhaver Construction, Inc. $5,485,767 · | ||
| Jan 15, 2021 | 61G86 | CookDistrict 1 | Resurfacing, curb and gutter replacement, sidewalk replacement, pavement widening to accommodate bike lanes, and pavement markings on McCarthy Road from Illinois Street to Walker Road in Lemont. | — | Executed | P. T. Ferro Construction Co. $1,669,136 · | ||
| Jan 15, 2021 | 61G87 | CookDistrict 1 | Resurfacing Kenilworth Avenue from Green Bay Road to Sheridan Road in the Village of Kenilworth. | — | Executed | Peter Baker & Son Co. $678,334 · | ||
| Jan 15, 2021 | 61G88 | CookDistrict 1 | Replace the superstructure that carries Roy Avenue over Addison Creek, located south of Country Club Drive in Northlake. | — | Executed | Alliance Contractors, Inc. $576,447 · | ||
| Jan 15, 2021 | 62D60 | CookDistrict 1 | (3.40-mile) Standard overlay, ADA improvements and channelization on Kedzie Ave. from n/o 871h St. to 103rd St. and 115th St. to n/o 131 St. and at 87th St. Located within the City of Blue Island, Villages of Alsip, Evergreen Park, and Merrionette Park. | — | Executed | D. Construction, Inc. $3,133,576 · | ||
| Jan 15, 2021 | 62H50 | CookDistrict 1 | Bridge Deck Overlay, Joint Repairs and Substructure Repairs (672.28 FT) The improvement on IL Rte. 50 over BRC Railroad consist of Bridge Deck Overlay, Joint Repairs and Substructure Repairs. Located in the City of Chicago and Village of Bedford Park. | — | Executed | D. Construction, Inc. $3,336,549 · | ||
| Jan 15, 2021 | 62J73 | CookDistrict 1 | (1.46-Mile) Standard overlay project consisting of hot-mix asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, ADA sidewalk repair and thermoplastic pavement marking on US 34 from 1-294 to Edgewood Avenue within the Villages of Western Springs and LaGrange. | — | Executed | K-Five Construction Corporation $1,608,307 · | ||
| Jan 15, 2021 | 62K93 | LakeMcHenryDistrict 1 | ADA improvement project along various State maintained routes. Located in the City of Zion and Villages of Richmond, Winthrop Harbor, Fox Lake, Lake Villa and Grayslake. | — | Executed | Triggi Construction, Inc. $414,718 · | ||
| Jan 15, 2021 | 62K96 | DuPageDistrict 1 | Bridge Deck Overlay, Approach Slab Overlay, Joint Repairs and Substructure Repairs The improvement on 1-55 over Madison Street consist of Bridge Deck Overlay, Approach Slab Overlay, Joint Repairs and Substructure Repairs. Located in the Village of Burr Ridge in DuPage County. LT=392 FT(0.10-Mile) | — | Executed | Martam Construction Incorporated $1,919,305 · | ||
| Jan 15, 2021 | 62L03 | LakeDistrict 1 | Pavement patching, micro-surfacing, sidewalk ramps improvements, curb Gutter replacement in the village of Ant (5.660-Mile) Improvement on IL-173 (Rosecrans Road) from Mc Henry Co. Line to west of Lake Ave. and Orchard Street to Madison Ave. consists of pavement patching, micro-surfacing, sidewalk ramps improvements, curb Gutter replacement in the village of Antioch, Antioch Township. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $2,665,776 · | ||
| Jan 15, 2021 | 62L25 | WillDistrict 1 | (1.988-Mile) SMART overlay on Governor's Hwy. From IL-50 to Cook County Line. Located in the Village of University Park in Will County. | — | Executed | P. T. Ferro Construction Co. $970,197 · | ||
| Jan 15, 2021 | 62L26 | CookDistrict 1 | (2.27 4-Mile) Standard overlay project on 47th Street from east of Plainfield Road to west of IL Rte. 43 (Harlem Avenue) that includes ADA sidewalk improvements. Located in Villages of Brookfield, McCook, and Lyons. | — | Executed | R. W. Dunteman Company $1,944,316 · | ||
| Jan 15, 2021 | 62L37 | WillDistrict 1 | County-wide ADA improvements of curb ramps for sidewalks on IL 7 from Hamilton Street to Madison Street and on IL 171 from 19th St to Maryknoll Dr in the City of Lockport in Will County. | — | Executed | Davis Concrete Construction Co. $378,925 · | ||
| Jan 15, 2021 | 62L38 | LakeMcHenryDistrict 1 | ADA improvements on IL 171 from 19th St to Maryknoll Dr in the City of Lockport in Will, Southern Lake and McHenry Counties. Located in the City of Crystal Lake and Villages of Barrington and Wauconda. | — | Executed | Triggi Construction, Inc. $315,664 · | ||
| Jan 15, 2021 | 62L39 | LakeDistrict 1 | ADA improvement project along various State maintained routes within Eastern Lake County. Located in the Cities of Waukegan, Park City, North Chicago and Villages of Mundelein and Libertyville. | — | Executed | Triggi Construction, Inc. $555,908 · | ||
| Jan 15, 2021 | 62L44 | LakeDistrict 1 | Cleaning and sealing longitudinal joints and cracks of the existing concrete pavement from Riverwoods Blvd to US 41 (Skokie Hwy) pavement markings restriping in the Villages of Mettawa and Lake Forest, Libertyville, Shields, Vernon and Deerfield Townships. | — | Executed | SKC Construction, Inc. $132,327 · | ||
| Jan 15, 2021 | 62L45 | CookDistrict 1 | Smart Overlay, Class D patching and ADA improvement. Project begins 50 ft south of 31st St. and proceeds approximately 4637.9 ft in a northerly direction to 23rd St. in the Villages of Brookfield and Berwyn Township. | — | Executed | Humir Construction, Inc. $1,088,461 · | ||
| Jan 15, 2021 | 62L46 | CookDistrict 1 | Sealing cracks and joints in the existing HMA pavement, restriping with modified urethane pavement marking in (6.69-Mile) Improvement on 1-290 from 1-88 to East of Austin Blvd consist of sealing cracks and joints in the existing HMA pavement, restriping with modified urethane pavement marking in the village of Hillside, Bellwood, Maywood, Forest Park, Broadview, and Oak Park, Provisio and Oak Park Townships. | — | Executed | Freehill Asphalt, Inc. $628,759 · | ||
| Jan 15, 2021 | 62L47 | CookDuPageDistrict 1 | Cleaning and sealing cracks and joints in the existing concrete pavement, new pavement marking in the village (2.80-Mile) Improvement on 1-290 from Grand Ave to Cook County Line Rd consists of cleaning and sealing cracks and joints in the existing concrete pavement, new pavement marking in the village of Elmhurst, York and Addison Townships. | — | Executed | Freehill Asphalt, Inc. $206,128 · | ||
| Jan 15, 2021 | 62L48 | KaneDistrict 1 | Crack cleaning and sealing in the existing concrete pavement between traffic lanes, curb and gutter, restripin (1.937-Mile) Improvement consists of crack cleaning and sealing in the existing concrete pavement between traffic lanes, curb and gutter, restriping pavement marking in Villages of East and West Dundee, Dundee Township. | — | Executed | Freehill Asphalt, Inc. $121,357 · | ||
| Jan 15, 2021 | 62L49 | LakeDistrict 1 | Sealing cracks and joints in the existing concrete pavement, restriping pavement marking in Villages of Lakemo (2.578-Mile) Improvement on IL-120 (Belvidere Road) from McHenry Co. Line to East of IL-60 consist of sealing cracks and joints in the existing concrete pavement, restriping pavement marking in Villages of Lakemoor, Round Lake, and Volo, Wauconda Township. | — | Executed | Freehill Asphalt, Inc. $117,389 · | ||
| Jan 15, 2021 | 62L50 | CookDistrict 1 | (1,945-Mile) Pavement Patching and Crack and Joint Sealing project from South Indiana Ave to East of 1-94 (Bishop Ford Expy.) in Hyde Park Township, in Cook County. | — | Executed | K-Five Construction Corporation $902,975 · | ||
| Jan 15, 2021 | 62L55 | WillDistrict 1 | (9.65-Mile) SMART Overlay, pedestrian ramps. rumble -strips. Location: IL-102, from 26-ft northwest of Ryan 73 feet east of Kankakee County Line Road in the City of Wilmington, Wilmington and Wesley Townships. | — | Executed | Iroquois Paving Corporation $2,338,876 · | ||
| Jan 15, 2021 | 62L74 | CookDistrict 1 | (1,444-Ft.) SMART Overlay and ADA Ramp Improvement. Location: IL 64 (North Ave.) Sheffield Ave to Halsted St. in The City of Chicago in Cook County. | — | Executed | MAT Construction Leasing, Inc. $242,011 · | ||
| Jan 15, 2021 | 62L75 | CookDistrict 1 | (2.9-Mile) Crack and Joint Sealing on existing HMA pavement. Location: IL 64 (North Ave.) Damen Ave to US 41 within the City of Chicago in Cook County. | — | Executed | SKC Construction, Inc. $133,565 · | ||
| Jan 15, 2021 | 62L77 | DuPageDistrict 1 | (3.157-Mile) Crack and joint sealing project on IL 64 (North Avenue) from IL 53 (Rohlwing Road) to Villa Ave. within the Villages of Lombard, Addison and Villa Ave. within the Villages of Lombard, Addison and Villa Park in DuPage County. | — | Executed | Freehill Asphalt, Inc. $261,467 · | ||
| Jan 15, 2021 | 62L78 | CookDistrict 1 | (1.71-Mile) Crack and joint sealing improvements on IL 171 from Forest Preserve Dr. to south of Des Plaines River Rd. Located within the Village of River Grove in Cook County. | — | Executed | SKC Construction, Inc. $117,128 · | ||
| Jan 15, 2021 | 62L79 | CookDistrict 1 | (5.98-Mile) SMART Overlay and ADA Pedestrian Ramps project on IL-43 (FAP 348) from north of US 6 (159th St) to north of 111th St. Located within the Villages of Orland Park, Worth and Palos Heights in Cook County. | — | Executed | Gallagher Asphalt Corporation $4,409,859 · | ||
| Jan 15, 2021 | 62M01 | CookDistrict 1 | (1.373-Mile) HMA SMART Overlay of IL-1 (Halsted St), approx. 600' north of the intersection of 159th St, and extends to the north through Harvey and Phoenix in Cook County to a point approx. 200' north of East 149th St. | — | Executed | K-Five Construction Corporation $787,084 · | ||
| Jan 15, 2021 | 62M06 | WillDistrict 1 | 8.5 miles SMART overlay project consisting of milling and resurfacing, and the installation of shoulder rumble strips on I-55 from north of River Road to north of IandM Canal. | — | Executed | D. Construction, Inc. $8,161,702 · | ||
| Jan 15, 2021 | 62M07 | LakeDistrict 1 | (4.176-Mile) Resurfacing (SMART Overlay), ADA Improvements; Location: FAU 2711: IL 131 from North of ILL 120 to CN (fmr EJandE) Railroad in the Cities of Waukegan and North Chicago in Lake County. | — | Executed | Peter Baker & Son Co. $3,117,568 · | ||
| Jan 15, 2021 | 62M22 | CookDistrict 1 | Bridge deck overlay and joint repair (426.26-FT) Improvement of 31st street over Des Plaines River consists of bridge deck overlay and joint repair. Located in the Village of Riverside, in Cook County, IL. SN=016-0870 | — | Executed | D. Construction, Inc. $614,303 · | ||
| Jan 15, 2021 | 62M38 | CookDistrict 1 | Bridge deck overlay and joint repairs (522-FT) Improvement of Illinois 171 over Des Plaines River consists of bridge deck overlay and joint repairs. Located in the Village of River Grove, in Cook County, IL. SN=016-0697 | — | Executed | Copenhaver Construction, Inc. $777,979 · | ||
| Jan 15, 2021 | 62M39 | LakeDistrict 1 | A bridge deck overlay and joint repair located in the Village of Libertyville The improvement of IL 176 (Park Avenue) over Des Plaines River consists of a bridge deck overlay and joint repair located in the Village of Libertyville. | — | Executed | Martam Construction Incorporated $484,734 · | ||
| Jan 15, 2021 | 62M49 | CookDistrict 1 | Bridge Deck Overlay, Approach Slab Reconstruction, Joint Repairs and Substructure Repairs (793-FT) Improvement on 3151 Street over Salt Creek consist of Bridge Deck Overlay, Approach Slab Reconstruction, Joint Repairs and Substructure Repairs. Located in the Village of Westchester and Village of La Grange Park SN=016-0868 | — | Executed | Martam Construction Incorporated $1,166,915 · | ||
| Jan 15, 2021 | 62M60 | DuPageDistrict 1 | Interconnecting various traffic signals in order to mitigate congestion and improve traffic flow along various Work consists of interconnecting various traffic signals in order to mitigate congestion and improve traffic flow along various arterial routes. | — | Executed | H & H Electric Co. $911,409 · | ||
| Jan 15, 2021 | 62M61 | CookDistrict 1 | Interconnecting various traffic signals in order to mitigate congestion and improve traffic flow along various Work consists of interconnecting various traffic signals in order to mitigate congestion and improve traffic flow along various arterial routes. , Work consists of interconnecting various traffic signals in order to mitigate congestion and improve traffic flow along various arterial routes. | — | Executed | H & H Electric Co. $877,057 · | ||
| Jan 15, 2021 | 62M62 | VariousDistrict 1 | Interconnecting various traffic signals in order to mitigate congestion and improve traffic flow along various Work consists of interconnecting various traffic signals in order to mitigate congestion and improve traffic flow along various arterial routes. | — | Executed | H & H Electric Co. $627,126 · | ||
| Jan 15, 2021 | 62M80 | CookDistrict 1 | Bridge Deck Overlay, Joint Repairs and Substructure Repairs (1,449-FT.) Improvement on 25th Avenue over IHB Railroad consist of Bridge Deck Overlay, Joint Repairs and Substructure Repairs. Located in the Village of Franklin Park and Melrose Park in Cook County. | — | Executed | Martam Construction Incorporated $2,587,526 · | ||
| Jan 15, 2021 | 62M90 | CookDistrict 1 | Cleaning and painting existing steel structures at 2 locations. 1st located on I-80 at Ridgeland Avenue (SN 016-0718) in the Village of Tinley Park. 2nd located on Torrence Avenue over CSXT and IHB Railroads (SN 016-0935) in the Village of Burnham, Cook. | — | Executed | ERA-Valdivia Contractors, Inc. $494,274 · | ||
| Jan 15, 2021 | 62M91 | LakeMcHenryDistrict 1 | Cleaning and painting existing steel structures at 5 locations. 1st location, US 12 over Pistakee Lake (SN 049-0019). 2nd location, IL 43 over IL 120 (SN 049-0111). 3rd location, Metra RR over Person Rd. (SN 049-0127). 4th location, US 12 over Nippersink Lake (SN 049-0167). 5th location, US 14 over UP RR and McComb St. (SN 056-0007). | — | Executed | ERA-Valdivia Contractors, Inc. $949,114 · | ||
| Jan 15, 2021 | 62N13 | VariousDistrict 1 | The repair and installation of guardrail along various expressway and arterial highways in various counties th This improvement consists of the repair and installation of guardrail along various expressway and arterial highways in various counties throughout District One. | — | Executed | Kujo, Inc. $1,980,021 · | ||
| Jan 15, 2021 | 62N15 | VariousDistrict 1 | Installation of new fence and repair of damaged fence at various locations on a work order basis. | — | Rejected | |||
| Jan 15, 2021 | 62N18 | VariousDistrict 1 | Expressway mowing north. | — | Rejected | Mosley Construction 1, LLC $511,245 · | ||
| Jan 15, 2021 | 62N19 | VariousDistrict 1 | Expressway mowing north. | — | Rejected | |||
| Jan 15, 2021 | 62N25 | VariousDistrict 1 | Cleaning (daytime sweeping) various expressways throughout District One in various counties The improvement consists of cleaning (daytime sweeping) various expressways throughout District One in various counties. | — | Rejected | Elgin Sweeping Services, Inc. $7,643,075 · | ||
| Jan 15, 2021 | 62N26 | VariousDistrict 1 | Cleaning (nighttime sweeping) various expressways throughout District One in various counties The improvement consists of cleaning (nighttime sweeping) various expressways throughout District One in various counties. | — | Active | Elgin Sweeping Services, Inc. $3,823,122 · | ||
| Jan 15, 2021 | 64G94 | HenryDistrict 2 | HMA Resurfacing on IL 81 from US 150 to 0.4 mile West of I-74. | — | Executed | Advanced Asphalt Company $931,757 · | ||
| Jan 15, 2021 | 64N02 | Jo DaviessDistrict 2 | Erosion repairs adjacent to US 20 from 0. 5 mile east to 1.3 miles east of Powder House Hill Road. | — | Executed | Law Excavating, Inc. $398,118 · | ||
| Jan 15, 2021 | 64P44 | VariousDistrict 2 | Guardrail and fence repairs along State maintained routes in Boone, Carroll, JoDaviess, Ogle, Stephenson and Winnebago Counties. | — | Executed | Northern Contracting, Inc. $374,726 · | ||
| Jan 15, 2021 | 64P45 | VariousDistrict 2 | Guardrail and fence repairs along State maintained routes in Henry. Lee, Rock Island, Whiteside, and portions of LaSalle Counties. | — | Executed | Northern Contracting, Inc. $429,116 · | ||
| Jan 15, 2021 | 64P46 | VariousDistrict 2 | Roadside restoration of Right-Of-Way turf damage caused by motorists along State maintained routes within District 2. | — | Executed | O'Brien Civil Works, Inc. $73,700 · | ||
| Jan 15, 2021 | 64P51 | HenryDistrict 2 | Expansion joint replacement, deck patching and concrete overlay on the structure (SN 037-0137) carrying IL 82 over the north branch of the Edwards River, located 2 miles South of IL 81. | — | Executed | General Constructors Inc. of the Quad Cities $601,848 · | ||
| Jan 15, 2021 | 64P52 | HenryDistrict 2 | Expansion joint replacement, deck patching and concrete overlay on the structure (SN 037-0141) carrying US 6 over the BN RR and Township Road 38 (TR 38), located 3 miles East of the Rock Island County line. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $853,036 · | ||
| Jan 15, 2021 | 64P55 | VariousDistrict 2 | Concrete sealer applied to bridge decks at various locations within District 2. | — | Executed | All States Painting, Inc. $56,441 · | ||
| Jan 15, 2021 | 64P56 | HenryDistrict 2 | Concrete sealer applied to bridge decks at various locations. | — | Executed | All States Painting, Inc. $45,900 · | ||
| Jan 15, 2021 | 64P57 | Rock IslandDistrict 2 | Concrete sealer applied to bridge decks at various locations. | — | Executed | All States Painting, Inc. $89,495 · | ||
| Jan 15, 2021 | 64P67 | LeeDistrict 2 | Cold milling and Hot Mix Asphalt Resurfacing from 0.1 mile west to 0.1 mile East of Franklin Creek located West of Franklin Grove. | — | Executed | Porter Brothers Asphalt & Sealing $57,761 · | ||
| Jan 15, 2021 | 66E45 | GrundyDistrict 3 | The replacement of bridge deck on SN 032-0075 carrying US 6 and over CSX Transportation Railroad The work consists of the replacement of bridge deck on SN 032-0075 carrying US 6 and over CSX Transportation Railroad. Additional work includes substructure repairs, structural steel painting, tree removal, landscaping,grading ditches, and resurfacing pavement. The project length is 0.4 miles and is located 5.3 miles East of Morris in Grundy Co. | — | Executed | P. T. Ferro Construction Co. $2,077,263 · | ||
| Jan 15, 2021 | 66K95 | BureauDistrict 3 | The removal of a quadruple (4) CMP 24" DIA culvert and replacement with a double (2) PPC 24" DIA pipe culvert This work is located on FAP 698 (IL 89) 0.3 miles north of E. Walnut St. in Ladd at station 564+45 in Bureau County. This work consists of the removal of a quadruple (4) CMP 24" DIA culvert and replacement with a double (2) PPC 24" DIA pipe culvert with guardrail removal. | — | Executed | R & R Landscaping & Irrigation $75,446 · | ||
| Jan 15, 2021 | 66L00 | LaSalleDistrict 3 | Latex overlay, cleaning and painting structural steel and expansion joint repair of SN 050-0171 carrying US 52 over 1-39 in Troy Grove. | — | Executed | D. Construction, Inc. $1,200,540 · | ||
| Jan 15, 2021 | 66L24 | BureauDistrict 3 | Bridge painting This work is located at Structure No. 006-0153, IL 92 over a stream, approximately 3.3 miles West of US 34 in Bureau County. This work consists of bridge painting. | — | Executed | Three Star Painting, Inc. $145,136 · | ||
| Jan 15, 2021 | 66L25 | BureauDistrict 3 | Bridge painting This work is located at Structure No. 006-0128, TR 333 over 1-180, approximately 3.3 miles West of US 34 in Bureau County. This work consists of bridge painting. | — | Executed | ERA-Valdivia Contractors, Inc. $208,017 · | ||
| Jan 15, 2021 | 66L26 | BureauDistrict 3 | Bridge painting This work is located at Structure No. 006-0041 (SB), 006-0042 (NB), approximately 2.54 miles North of IL 26 and Structure No. 006-0043 (NB), 006-0044 (SB), approximately 2.04 miles North of IL 26 in Bureau County. This work consists of bridge painting. | — | Executed | Three Star Painting, Inc. $651,622 · | ||
| Jan 15, 2021 | 66L40 | LivingstonDistrict 3 | Removing existing HMA and aggregate subbase surfaces, repair and preparation of base course and placing a poly This work is located at the Illinois Department of Transportation, District 3, Pontiac Maintenance Facility in Livingston County. This work consists of removing existing HMA and aggregate subbase surfaces, repair and preparation of base course and placing a polymer HMA binder cse (2¼" lift) and a polymer HMA surface cse (1 ¼" lift). | — | Executed | Kankakee Valley Construction Company, Inc. $427,351 · | ||
| Jan 15, 2021 | 66L44 | BureauLivingstonDistrict 3 | The work consists on performing Bridge Deck Concrete sealing at various bare concrete bridge decks in Bureau and Livingston counties. | — | Executed | All States Painting, Inc. $177,640 · | ||
| Jan 15, 2021 | 68F54 | TazewellDistrict 4 | Bridge painting, bridge deck scarification and overlay, joint replacement, bearing replacement, slopewall repa This project is 5.5 miles long and the structure repair work consists of bridge painting, bridge deck scarification and overlay, joint replacement, bearing replacement, slopewall repair, substructure repair, and other related work on various structures on 1-74 from 0.8 miles east of Morton Ave. to the Woodford County line. | — | Executed | Stark Excavating, Inc. $4,871,748 · | ||
| Jan 15, 2021 | 68F63 | MarshallMasonTazewellDistrict 4 | Bridge washing of eight (8) bridges over the Illinois River in Marshall, Tazewell and Mason counties. | — | Executed | Interstate Maintenance, Incorporated $239,996 · | ||
| Jan 15, 2021 | 68F97 | PeoriaDistrict 4 | Landscaping along 1-74 from Ellis Street in Peoria to the Illinois River in Peoria County. | — | Executed | JIMAX Landscape LLC $225,732 · | ||
| Jan 15, 2021 | 68F99 | KnoxDistrict 4 | Replace two steel girders on Bridge S.N. 048-0065 carrying Farnham Street over US Route 34, just west of the 1-74 interchange in Galesburg for a total length of 0.11 mile. | — | Executed | White Construction LLC $206,222 · | ||
| Jan 15, 2021 | 68G07 | FultonPeoriaWarrenDistrict 4 | Tree removal and other collateral work located along US 24 at Copperas Creek near Banner in Fulton County, alo This project consists of tree removal and other collateral work located along US 24 at Copperas Creek near Banner in Fulton County, along US 67 north of Monmouth in Warren County, and along IL 40 between Northmoor Road and Mt. Hawley in Peoria County. | — | Executed | Homer Tree Service, Inc. $146,325 · | ||
| Jan 15, 2021 | 68G08 | VariousDistrict 4 | District-wide weed spraying (off road) in various counties on various routes. | — | Rejected | The Daltons Inc. $111,920 · | ||
| Jan 15, 2021 | 70A65 | McLeanDistrict 5 | 3P Policy Standard Overlay ADA Improvements from W of Commerce Pkwy to 0.1 Mi N of E Washington St Gross Length = Net Length = 13,054.36 FT= 2.472 Mile. | — | Executed | Rowe Construction, a div of UCM, Inc. $6,473,808 · | ||
| Jan 15, 2021 | 70D16 | McLeanDistrict 5 | Bridge Deck Overlay at Funk's Grove Rest Area. | — | Executed | Stark Excavating, Inc. $3,668,318 · | ||
| Jan 15, 2021 | 70D96 | DouglasDistrict 5 | Six bridge deck overlays at various locations between Arcola and Hindsboro. | — | Executed | Sangamo Construction Company $1,348,258 · | ||
| Jan 15, 2021 | 70E36 | ChampaignDouglasVermilionDistrict 5 | Salt Containment Structures at Fithian, Leverett, and Tuscola facilities. | — | Executed | Stark Excavating, Inc. $347,926 · | ||
| Jan 15, 2021 | 70F23 | VariousDistrict 5 | 567.5 miles of spraying, approximately 2004 acres on state right of way along US 51 on interstate routes including interchanges in Champaign, Dewitt, McLean, Piatt, and Vermilion Counties. | — | Executed | The Daltons Inc. $116,455 · | ||
| Jan 15, 2021 | 72L84 | MontgomeryDistrict 6 | ADA improvements, traffic signal replacements, storm sewer work and sign replacements, storm sewer work and sign replacements on IL 16 and IL 127 in Hillsboro. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $691,607 · | ||
| Jan 15, 2021 | 72L92 | PikeDistrict 6 | 4.4 miles of crack and joint sealing on US 54 from 0.1 miles north of North Monroe Street in Pittsfield to I-72. | — | Executed | Complete Asphalt Service Co. $15,980 · | ||
| Jan 15, 2021 | 72L94 | SangamonDistrict 6 | 0.16 miles of milling and resurfacing on I-55 at the Lake Springfield Bridges, south of Springfield. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $951,059 · | ||
| Jan 15, 2021 | 72L96 | LoganDistrict 6 | Bridge deck overlay on SN 054-0104 carrying Lincoln Parkway over ICRR, 0.3 miles southeast of Union in Lincoln. | — | Executed | Freesen, a div of UCM, Inc. $434,690 · | ||
| Jan 15, 2021 | 72M13 | BrownDistrict 6 | Insertion culvert liners on IL 99 and IL 107 from the Pike County line to the Schuyler County line. | — | Executed | CSD Environmental Services, Inc. $98,564 · | ||
| Jan 15, 2021 | 72M38 | AdamsHancockDistrict 6 | Bridge washing and concrete sealing on the Quincy Bayview Bridge and the US US 136 / Mississippi River Bridge at Keokuk, Iowa. (SN 001-0068 and SN 034-0062) | — | Executed | All States Painting, Inc. $58,580 · | ||
| Jan 15, 2021 | 72M41 | CassMenardDistrict 6 | Bridge washing and concrete sealing on the Sangamon River bridges on IL 78 and Athens Blacktop. (SN 009-0510 and SN 065-0019) | — | Executed | All States Painting, Inc. $13,900 · | ||
| Jan 15, 2021 | 72M42 | PikeDistrict 6 | Bridge washing and concrete sealing on various bridges in Pike County and expansion joint replacement on the Valley City Eagle Bridges carrying I-72 over the Illinois River. (SN 069-0525, SN 075-0098, SN 075-0099, SN 075-0122, and SN 075-0123) | — | Executed | White Construction LLC $315,819 · | ||
| Jan 15, 2021 | 72M50 | BrownDistrict 6 | Replacing the concrete wearing surface on SN 005-0004 carrying IL 99 over a drainage ditch, 1.2 miles northwest of the Pike County line. | — | Executed | White Construction LLC $145,423 · | ||
| Jan 15, 2021 | 72M56 | MorganDistrict 6 | Painting portions of two bridges carrying I-72 over Mauvaise Terre Creek, 1.1 miles east of Old US 36 near Jacksonville. (SN 069-0048 and SN 069-0049) | — | Executed | ERA-Valdivia Contractors, Inc. $199,128 · | ||
| Jan 15, 2021 | 72M59 | SangamonDistrict 6 | Longitudinal joint repair on I-72 from just west of Chatham Road to 0.4 miles west of Second Street Overhead. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $161,632 · | ||
| Jan 15, 2021 | 74549 | MaconShelbyDistrict 7 | 4.25 miles of designed overlay on US 51 from 0.5 miles north of the Shelby County line to the Christian County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $6,831,241 · | ||
| Jan 15, 2021 | 74721 | FayetteDistrict 7 | 2.28 miles of standard overlay, tree removal, tree planting and aggregate shoulders on US 40 from the Bond County line to 2.28 miles east of Hurricane Creek. | — | Executed | Howell Paving, Inc. $1,077,874 · |
1–100 of 952Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.