18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Feb 10, 2026 | 6496-91-001RMC - A00219495 | Freestone Bryan |
FY26 - Huntsville AO Sweeping - 02US0084 · Routine Maintenance Project | $124,640 | $397,142 | SWEEPING CORPORATION OF AMERICA, LLC | +218.6% | 1 |
| Feb 10, 2026 | 6496-90-001RMC - A00219491 | Gregg Tyler |
GREGG COUNTY ROW MOWING FY26US0080 · Routine Maintenance Project | $281,253 | $347,635 | SERNA CONTRACTORS, LLC | +23.6% | 4 |
| Feb 10, 2026 | 6487-26-001RMC - A00216549 | Chambers Beaumont |
FY 26 MBGFIH0010 · Routine Maintenance Project - Sealed | $484,870 | $342,306 | RHINO EQUITY, LLC | -29.4% | 6 |
| Feb 10, 2026 | 6497-42-001RMC - A00219622 | Pecos Odessa |
6497-42-001 Roadside MowingIH0010 · Routine Maintenance Project | $422,520 | $302,806 | LUKEDA SANDBLASTING & SERVICES LLC | -28.3% | 3 |
| Feb 10, 2026 | 6493-84-001RMC - A00218406 | Andrews Odessa |
6493-84-001 Roadside MowingUS0385 · Routine Maintenance Project | $335,370 | $261,399 | L&L COMPANY | -22.1% | 5 |
| Feb 10, 2026 | 6496-36-001RMC - A00219266 | Freestone Bryan |
FY26 - Freestone Mowing -02SH0075 · Routine Maintenance Project | $242,906 | $239,012 | SERNA CONTRACTORS, LLC | -1.6% | 4 |
| Feb 10, 2026 | 6496-33-001RMC - A00219243 | Brazos Bryan |
FY26 - District Illumination -02SH0006 · Routine Maintenance Project - Sealed | $264,890 | $216,800 | PROFESSIONAL TRAFFIC CONTROL LLC | -18.2% | 5 |
| Feb 10, 2026 | 6493-81-001RMC - A00218403 | Reeves Odessa |
6493-81-001 Roadside MowingIH0010 · Routine Maintenance Project | $319,680 | $201,576 | LUKEDA SANDBLASTING & SERVICES LLC | -36.9% | 4 |
| Feb 10, 2026 | 6492-82-001RMC - A00218221 | Fort Bend Houston |
RMC 6492-82-001US 59 · Routine Maintenance Project - Sealed | $333,150 | $200,387 | RELIANT SAND AND CONSTRUCTION, INC. | -39.9% | 8 |
| Feb 10, 2026 | 6485-41-001RMC - A00215948 | Liberty Beaumont |
FY 26 Liberty Tree and Brush RemovalUS0090 · Routine Maintenance Project | $275,545 | $171,570 | AUSTIN BARRICADE COMPANY, L.L.C. | -37.7% | 12 |
| Feb 10, 2026 | 6484-45-001RMC - A00215463 | Fort Bend Houston |
RMC 6484-45-001US0059 · Routine Maintenance Project - Sealed | $286,100 | $171,415 | XTREME PRO CLEANING LLC | -40.1% | 4 |
| Feb 10, 2026 | 6492-70-001RMC - A00218202 | Harris Houston |
6492-70-001 Drainage System CleaningSL0008 · Routine Maintenance Project - Sealed | $325,008 | $160,741 | PRO-PIPE SERVICES, LLC | -50.5% | 4 |
| Feb 10, 2026 | 6496-45-001RMC - A00219414 | Milam Bryan |
FY26 - Milam Tree Removal -02US0079 · Routine Maintenance Project | $85,500 | $64,878 | RHINO EQUITY, LLC | -24.1% | 9 |
| Feb 10, 2026 | 6494-76-001RMC - A00218646 | Walker Bryan |
FY26 - SH 19 SB Bridge RepairSH0019 · Routine Maintenance Project - Sealed | $101,567 | $57,501 | GARRET SHIELDS INFRASTRUCTURE | -43.4% | 7 |
| Feb 9, 2026 | 6495-96-001SUP - A00219014 | Harris Houston |
FY 26, Litter Removal, Harris CountySH0249 · State Use Project | $969,417 | — | 0 | ||
| Feb 9, 2026 | 6496-06-001SUP - A00219089 | Hays Austin |
San Marcos Maintenance Litter FY26FM2001 · State Use Project | $400,808 | — | 0 | ||
| Feb 9, 2026 | 6496-07-001SUP - A00219090 | Travis Austin |
Travis South Maintenance Litter FY26US0290 · State Use Project | $476,721 | — | 0 | ||
| Feb 9, 2026 | 6497-86-001SUP - A00219833 | Jasper Beaumont |
JASPER JANITORIAL MAINTENANCE FY26US0190 · State Use Project | $14,008 | — | 0 | ||
| Feb 8, 2026 | 6492-43-001SUP - A00218104 | Galveston Houston |
FY 26 JANITORIAL MAINTENANCEIH0045 · State Use Project | $69,064 | — | 0 | ||
| Feb 6, 2026 | 6490-96-001RMC - A00217717 | Harrison Atlanta |
ROW Mowing Tract 6 FY2026US0080 · Routine Maintenance Project | $324,574 | $325,368 | RML SERVICES | +0.2% | 6 |
| Feb 6, 2026 | 6490-97-001RMC - A00217718 | Titus Atlanta |
ROW Mowing Tract 7 FY2026US0271 · Routine Maintenance Project | $283,578 | $278,578 | RENEGADE SITE SOLUTIONS, LLC | -1.8% | 5 |
| Feb 6, 2026 | 6490-98-001RMC - A00217719 | Bowie Atlanta |
ROW Mowing Tract 8 FY2026US0259 · Routine Maintenance Project | $252,868 | $242,870 | PERRY WEST | -4.0% | 5 |
| Feb 6, 2026 | 6490-95-001RMC - A00217716 | Cass Atlanta |
ROW Mowing Tract 5 FY2026FM0251 · Routine Maintenance Project | $231,926 | $234,924 | RENEGADE SITE SOLUTIONS, LLC | +1.3% | 7 |
| Feb 6, 2026 | 6490-91-001RMC - A00217712 | Panola Atlanta |
ROW Mowing Tract 1 FY2026US0059 · Routine Maintenance Project | $211,058 | $207,726 | AABA MOWING CONTRACTORS, LIMITED LIABILITY COMPANY | -1.6% | 5 |
| Feb 6, 2026 | 6490-92-001RMC - A00217713 | Morris Atlanta |
ROW Mowing Tract 2 FY2026FM0161 · Routine Maintenance Project | $198,632 | $200,828 | AABA MOWING CONTRACTORS, LIMITED LIABILITY COMPANY | +1.1% | 6 |
| Feb 6, 2026 | 6490-93-001RMC - A00217714 | Upshur Atlanta |
ROW Mowing Tract 3 FY2026FM0556 · Routine Maintenance Project | $207,284 | $187,062 | AABA MOWING CONTRACTORS, LIMITED LIABILITY COMPANY | -9.8% | 7 |
| Feb 6, 2026 | 6490-94-001RMC - A00217715 | Marion Atlanta |
ROW Mowing Tract 4 FY2026SH0049 · Routine Maintenance Project | $172,467 | $180,033 | HX FARMS, INC. | +4.4% | 6 |
| Feb 6, 2026 | 6490-99-001RMC - A00217720 | Bowie Atlanta |
ROW Mowing Tract 9 FY2026IH0030 · Routine Maintenance Project | $169,354 | $155,270 | PERRY WEST | -8.3% | 5 |
| Feb 6, 2026 | 6496-00-001RMC - A00219076 | Wharton Yoakum |
Janitorial Wharton CountyFM0102 · Routine Maintenance Project | $18,380 | $14,880 | SNIP CLEAN | -19.0% | 3 |
| Feb 5, 2026 | 0140-03-052F 2025(312) | Pecos Odessa |
IH10_W_OF_WFM11_TO_FM2886IH 10 · Rehabilitation of Existing Road | $18,879,654 | $14,714,263 | FNF CONSTRUCTION, INC. | -22.1% | 7 |
| Feb 5, 2026 | 0450-02-014F 2026(331) | Rusk Tyler |
SH204,RUSKC/CHEROKEEC/L,WDNSH 204 · Super-2 Highway | $12,659,927 | $10,286,588 | PINTO CONSTRUCTION CO., INC. | -18.7% | 8 |
| Feb 5, 2026 | 2398-01-064F 2026(342) | Taylor Abilene |
SL 322 OVERLAY IH 20 TO US 83SL 322 · Overlay | $10,040,719 | $8,968,076 | J. H. STRAIN & SONS, INC. | -10.7% | 6 |
| Feb 5, 2026 | 0098-03-037F 2026(310) | Foard Childress |
SH 6 US 70 TO Knox C/L OverlaySH 6 · Overlay | $6,482,786 | $6,793,699 | ZACK BURKETT CO. | +4.8% | 7 |
| Feb 5, 2026 | 0134-11-034C 134-11-34 | Wise Fort Worth |
US 380; SH 101/SH 114 to W. of Lake BridUS 380 · Overlay | $8,171,003 | $6,714,726 | JAGOE-PUBLIC COMPANY | -17.8% | 6 |
| Feb 5, 2026 | 0905-00-127F 2026(314) | Lubbock Lubbock |
FY 2026 Striping-LonglineVarious · Traffic Control Devices | $8,192,558 | $6,490,125 | CENTERLINE TECHNOLOGIES, LLC | -20.8% | 10 |
| Feb 5, 2026 | 0048-03-099F 2024(968) | Ellis Dallas |
US 77 from US 287 to IH 35EUS 77 · Rehabilitation of Existing Road | $6,141,865 | $5,401,081 | PEACHTREE CONSTRUCTION, LTD. | -12.1% | 7 |
| Feb 5, 2026 | 0446-06-018BR 2026(339) | Austin Yoakum |
FM 1093 BRIDGE REPLACEMENT 2610FM 1093 · Bridge Replacement | $6,432,146 | $4,981,962 | R CONSTRUCTION CIVIL, LLC | -22.5% | 12 |
| Feb 5, 2026 | 0361-01-038C 361-1-38 | Throckmorton Wichita Falls |
US 380, US 183 to Young CLUS 380 · Overlay | $5,305,913 | $4,679,213 | ZACK BURKETT CO. | -11.8% | 4 |
| Feb 5, 2026 | 0366-02-096F 2026(379) | Guadalupe San Antonio |
SH 123: 0366-02-096: RERSH 123 · Overlay | $4,974,110 | $4,323,419 | CLARK CONSTRUCTION OF TEXAS, INC. | -13.1% | 7 |
| Feb 5, 2026 | 0976-01-047F 2026(301) | Harris Houston |
FM 865, IH 610 to Almeda Genoa RdFM 865 · Overlay | $3,786,658 | $4,112,543 | ENVIRONMENTAL ALLIES, INC. | +8.6% | 5 |
| Feb 5, 2026 | 0026-06-033BR 2026(338) | Colorado Yoakum |
US 90 BRIDGE REPLACEMENT 2304-1US 90 · Bridge Replacement | $5,159,024 | $3,715,521 | R CONSTRUCTION CIVIL, LLC | -28.0% | 14 |
| Feb 5, 2026 | 1201-02-026F 2026(327) | Williamson Austin |
FM 487 from College Ave to SH195 BypassFM 487 · Rehabilitation of Existing Road | $4,222,092 | $3,649,316 | Rucoba & Maya Construction, LLC | -13.6% | 10 |
| Feb 5, 2026 | 0054-07-094BR 2026(293) | Brown Brownwood |
US 67 at Pecan BayouUS 67 · Bridge Maintenance | $3,190,794 | $3,023,121 | STRUCTURAL INTEGRITY GROUP LLC | -5.3% | 9 |
| Feb 5, 2026 | 0338-12-011STP 2026(337)MM | Liberty Beaumont |
SH 105-(US 59-SH 321) FDBR, OVERLAYSH 105 · Restoration | $3,429,352 | $2,780,143 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -18.9% | 5 |
| Feb 5, 2026 | 1755-03-010STP 2026(347)HES | Williamson Austin |
FM 3405 from Ronald Reagan to GT HeightsFM 3405 · Safety Improvement Projects | $3,092,708 | $2,760,448 | AARON CONCRETE CONTRACTORS, LLC | -10.7% | 9 |
| Feb 5, 2026 | 0918-47-445STP 2026(323)HESG | Dallas Dallas |
Edgefield Ave at Illinois AveEDGEFIELD · Safety Improvement Projects | $2,849,511 | $2,755,215 | WG ENGINEERING & CONSTRUCTION, LLC | -3.3% | 8 |
| Feb 5, 2026 | 0043-08-090F 2026(345) | Wichita Wichita Falls |
US 287; BU 287H to Near Johnson RdUS 287 · Overlay | $2,965,920 | $2,689,049 | JAGOE-PUBLIC COMPANY | -9.3% | 5 |
| Feb 5, 2026 | 0912-34-213BR 2023(653) | Fort Bend Houston |
CR 234 (C Meyer Rd) at Bee CreekC MEYER RD · Bridge Replacement | $2,482,945 | $1,818,854 | TREVWAY, INC. | -26.7% | 9 |
| Feb 5, 2026 | 0101-04-130BR 2026(158) | San Patricio Corpus Christi |
US181 SanPat Mustang Mott SB BRGUS 181 · Bridge Replacement | $1,908,595 | $1,812,290 | LISKA CONSTRUCTION COMPANY, INC. | -5.0% | 12 |
| Feb 5, 2026 | 0057-05-033STP 2026(114)HES | Freestone Bryan |
US 84 at FM 489 - Turn Lanes FY 26US 84 · Safety Improvement Projects | $1,370,336 | $1,716,130 | BIG CREEK CONSTRUCTION, LTD. | +25.2% | 5 |
| Feb 5, 2026 | 0072-03-020F 2026(376) | Kerr San Antonio |
US 87; 0072-03-020; OVUS 87 · Overlay | $1,671,571 | $1,631,748 | INTERMOUNTAIN SLURRY SEAL, INC. | -2.4% | 3 |
| Feb 5, 2026 | 2642-02-029STP 2026(290)HES | Harrison Atlanta |
SL 281 from Gregg CL to IH 20SL 281 · Safety Improvement Projects | $1,614,403 | $1,619,890 | GRATIOT CONSTRUCTION, LTD. | +0.3% | 9 |
| Feb 5, 2026 | 0912-72-597CM 2026(351) | Harris Houston |
City of Bellaire ITS ProjectVarious · Corridor Traffic Management | $2,070,252 | $1,434,678 | CREACOM, INC. | -30.7% | 7 |
| Feb 5, 2026 | 0918-00-433F 2026(313) | Dallas Dallas |
Various Locations in DAL- FY 26PMVarious · Rehabilitation of Existing Road | $1,680,787 | $1,414,770 | STRIPE-A-ZONE, LLC | -15.8% | 6 |
| Feb 5, 2026 | 0905-00-128F 2026(315) | Lubbock Lubbock |
FY 2026 RPMsVarious · Traffic Control Devices | $1,452,115 | $1,239,060 | TRP INFRASTRUCTURE SERVICES, LLC | -14.7% | 5 |
| Feb 5, 2026 | 0918-18-142BR 2024(701) | Navarro Dallas |
NW CR 4340 at Frost BranchNW CR 4340 · Bridge Replacement | $1,539,580 | $1,223,665 | TUCAN CONTRACTING, LLC | -20.5% | 15 |
| Feb 5, 2026 | 0180-02-048F 2026(306) | Refugio Corpus Christi |
SH35 MILL, SEAL AND FILL ROADWAYSH 35 · Overlay | $1,500,213 | $1,219,239 | HUNTER INDUSTRIES, LTD. | -18.7% | 5 |
| Feb 5, 2026 | 0914-00-482F 2026(328) | Travis Austin |
FY 2026 Site Specific SignalsVarious · Traffic Control Devices | $1,382,629 | $1,175,137 | THE LEVY COMPANY, LLC | -15.0% | 6 |
| Feb 5, 2026 | 6488-21-001RMC - A00217067 | Jefferson Beaumont |
FY 26 Districtwide Striping RMCIH0010 · Routine Maintenance Project | $1,416,538 | $1,147,970 | TRP INFRASTRUCTURE SERVICES, LLC | -19.0% | 5 |
| Feb 5, 2026 | 6494-87-001RMC - A00218660 | Brown Brownwood |
MILL AND INLAY (SOUTH)US0377 · Routine Maintenance Project - Sealed | $1,499,179 | $1,025,505 | ALLEN KELLER COMPANY | -31.6% | 6 |
| Feb 5, 2026 | 6492-36-001RMC - A00218080 | Lamar Paris |
Site Specific TY I Striping FY26US0082 · Routine Maintenance Project - Sealed | $1,127,302 | $770,226 | STRIPE LINES, INC. | -31.7% | 7 |
| Feb 5, 2026 | 0912-73-235C 912-73-235 | Galveston Houston |
TPW - Dickinson Marine LabVarious · Texas Park and Wildlife | $916,947 | $736,599 | CASTILLO ARANDA LLC | -19.7% | 8 |
| Feb 5, 2026 | 0902-49-074BR 2021(071) | Erath Fort Worth |
CR 351; at Bell BranchCOUNTY ROAD 351 · Bridge Replacement | $731,019 | $625,625 | DELGADO'S CONTRACTORS, LLC | -14.4% | 12 |
| Feb 5, 2026 | 0220-07-072F 2026(280) | Cameron Pharr |
FM 1015 - Safety Lighting (1)SH 48 · Safety Improvement Projects | $657,838 | $523,748 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC | -20.4% | 3 |
| Feb 5, 2026 | 0077-01-032F 2026(289) | Reagan San Angelo |
0077-01-032 US 67 Traffic Signal ImproveUS 67 · Safety Improvement Projects | $512,766 | $512,494 | E-Z BEL CONSTRUCTION, LLC | -0.1% | 4 |
| Feb 5, 2026 | 0913-27-094BR 2B24(199) | Victoria Yoakum |
CR 252 REMOVE BRIDGE 2610DUPONT RD · Bridge Maintenance | $610,270 | $497,178 | SHALOM SERVICES CORPORATION | -18.5% | 3 |
| Feb 5, 2026 | 0073-02-090STP 2026(377)HES | Bexar San Antonio |
0073-02-090; SFTUS 281 · Safety Improvement Projects | $476,458 | $368,658 | E-Z BEL CONSTRUCTION, LLC | -22.6% | 8 |
| Feb 5, 2026 | 0902-39-048C 902-39-48 | Palo Pinto Fort Worth |
TPWD VARIOUS; PK FISH HATCHERYSH 16 · Rehabilitation of Existing Road | $689,691 | $324,932 | JAGOE-PUBLIC COMPANY | -52.9% | 7 |
| Feb 5, 2026 | 0910-07-091STP 2026(335)HES | Gregg Tyler |
Longview BackplatesVarious · Safety Improvement Projects | $395,800 | $294,669 | STRUCTURAL INTEGRITY GROUP LLC | -25.6% | 8 |
| Feb 4, 2026 | 0050-06-092STP 2026(278)MM | Harris Houston |
US 290: AT SKINNER RDUS 290 · Rehabilitation of Existing Road | $78,925,854 | $74,036,475 | HARPER BROTHERS CONSTRUCTION LLC | -6.2% | 10 |
| Feb 4, 2026 | 1015-01-024CM 2026(312) | Rockwall Dallas |
FM 549 FROM SH 205 TO SH 276FM 549 · Widen Non-Freeway | $34,640,755 | $29,812,034 | URBAN INFRACONSTRUCTION LLC | -13.9% | 12 |
| Feb 4, 2026 | 2921-01-010CM 2026(320) | Ellis Dallas |
SS 394 From IH 35E to FM 877SS 394 · New Location Non-Freeway | $25,389,268 | $18,932,077 | MARIO SINACOLA & SONS EXCAVATING, INC. | -25.4% | 11 |
| Feb 4, 2026 | 2121-06-062STP 2026(326)TP | Hudspeth El Paso |
IH 10 HUDSPETH SAFETY REST AREA (VOL II)IH 10 · Safety Rest Area | $17,756,321 | $18,198,405 | RAGLE CONSTRUCTION, INC. | +2.5% | 2 |
| Feb 4, 2026 | 0017-09-106F 2026(375) | Bexar San Antonio |
IH 35: 0017-09-106; OVIH 35 · Overlay | $18,518,603 | $15,028,560 | LONE STAR PAVING COMPANY | -18.8% | 4 |
| Feb 4, 2026 | 0176-04-088C 176-4-88 | Polk Lufkin |
US 59_N of Piney Crk to Ang C/L - PFCUS 59 · Overlay | $11,528,512 | $8,993,704 | TEXAS MATERIALS GROUP, INC. | -22.0% | 3 |
| Feb 4, 2026 | 2374-03-100BR 2026(321) | Dallas Dallas |
IH 20 From Bonnie View road to IH 635IH 20 · Bridge Maintenance | $9,329,111 | $7,984,023 | RAGLE CONSTRUCTION, INC. | -14.4% | 4 |
| Feb 4, 2026 | 2552-04-059F 2026(120) | El Paso El Paso |
SL375 REHAB (E US54 | PARK ST)SL 375 · Rehabilitation of Existing Road | $7,749,233 | $7,195,638 | DAN WILLIAMS COMPANY | -7.1% | 2 |
| Feb 4, 2026 | 0073-02-095F 2026(378) | Bexar San Antonio |
US 281: 0073-02-095: OVUS 281 · Overlay | $8,071,108 | $7,153,062 | CACTUS TRANSPORT II, LLC | -11.4% | 3 |
| Feb 4, 2026 | 0495-03-068F 2026(334) | Van Zandt Tyler |
IH20,FM17-FM16IH 20 · Rehabilitation of Existing Road | $7,363,416 | $6,229,536 | AUSTIN BRIDGE & ROAD SERVICES, LP | -15.4% | 6 |
| Feb 4, 2026 | 0815-01-053STP 2026(344)HES | Cooke Wichita Falls |
FM 372, CR 294 to FM 3496FM 372 · Safety Improvement Projects | $5,976,727 | $5,255,697 | OVERLAND CORPORATION | -12.1% | 7 |
| Feb 4, 2026 | 3047-02-012F 2026(169) | Waller Houston |
FM 529, Brazos River to FM 362FM 529 · Overlay | $4,422,423 | $3,274,774 | DURWOOD GREENE CONSTRUCTION CO. | -26.0% | 7 |
| Feb 4, 2026 | 0138-08-033F 2026(336) | Gregg Tyler |
SS 63, US 80 - SL 281SS 63 · Rehabilitation of Existing Road | $3,513,305 | $3,172,923 | MADDEN CONTRACTING COMPANY, LLC. | -9.7% | 4 |
| Feb 4, 2026 | 0074-06-247F 2026(305) | Nueces Corpus Christi |
IH 37 Nueces SH 286 to SH 358 ITSIH 37 · Traffic Control Devices | $2,930,686 | $3,168,237 | TRAF-TEX, INC. | +8.1% | 6 |
| Feb 4, 2026 | 0250-02-051F 2026(354) | Palo Pinto Fort Worth |
US 281; IH 20 to UPRRUS 281 · Overlay | $4,727,315 | $2,945,709 | TEXAS MATERIALS GROUP, INC. | -37.7% | 8 |
| Feb 4, 2026 | 0150-05-051F 2026(153) | Burnet Austin |
SH 29 - E of PR 4 to W of RM 3509SH 29 · Overlay | $3,213,452 | $2,897,632 | LONE STAR PAVING COMPANY | -9.8% | 6 |
| Feb 4, 2026 | 0912-34-207BR 2023(649) | Fort Bend Houston |
CR 209 (Hopkins Rd) at Turkey CreekHOPKINS RD · Bridge Replacement | $3,404,519 | $2,787,245 | TREVWAY, INC. | -18.1% | 13 |
| Feb 4, 2026 | 1549-03-031F 2026(304) | San Patricio Corpus Christi |
FM 1069 San Pat overlay pt 2FM 1069 · Overlay | $2,494,844 | $2,477,701 | ANDERSON COLUMBIA CO., INC. | -0.7% | 4 |
| Feb 4, 2026 | 0910-00-125F 2026(333) | Smith Tyler |
VA,VATYLDISTR,2026THERMO2Various · Traffic Control Devices | $3,424,378 | $2,466,733 | STRIPE-A-ZONE, LLC | -28.0% | 3 |
| Feb 4, 2026 | 0913-00-128C 913-00-128 | De Witt Yoakum |
DW Spalling and Concrete Repairs 2609Various · Bridge Maintenance | $2,323,208 | $2,343,182 | BK FIELD OPERATIONS LLC | +0.9% | 12 |
| Feb 4, 2026 | 0445-02-068STP 2026(340)HES | Lavaca Yoakum |
US 90A 2022 HSIPUA 90 · Safety Improvement Projects | $2,279,413 | $2,212,469 | HUNTER INDUSTRIES, LTD. | -2.9% | 7 |
| Feb 4, 2026 | 0015-11-075F 2026(329) | Travis Austin |
SL 275 - Braker Ln to Morrow StSL 275 · Overlay | $2,158,947 | $2,185,903 | ALLEN KELLER COMPANY | +1.2% | 5 |
| Feb 4, 2026 | 0904-02-051BR 2024(904) | Potter Amarillo |
IRWIN RD @ E AMA CREEK OFF-SYSTEM BRIDGEIRWIN RD · Bridge Replacement | $2,472,867 | $1,996,761 | L A FULLER & SONS CONSTRUCTION, LTD. | -19.3% | 7 |
| Feb 4, 2026 | 0103-01-046F 2B24(005) | Reeves Odessa |
SH17_AT_COUNTY_ROAD_131SH 17 · Safety Improvement Projects | $1,728,243 | $1,752,100 | A. L. HELMCAMP, INC. | +1.4% | 4 |
| Feb 4, 2026 | 6491-95-001RMC - A00217976 | Hidalgo Pharr |
6491-95-001 FY26 PAVEMENT MARKINGSIH0002 · Routine Maintenance Project - Sealed | $2,181,454 | $1,685,138 | PAVEMENT MARKINGS INC. | -22.8% | 5 |
| Feb 4, 2026 | 0915-00-279F 2026(380) | Bexar San Antonio |
VA: 0915-00-279; TCDVarious · Traffic Control Devices | $1,498,662 | $1,489,271 | E-Z BEL CONSTRUCTION, LLC | -0.6% | 4 |
| Feb 4, 2026 | 6483-15-001MMC - A00214997 | Travis Austin |
FY 26 East Seal Coat AsphaltIH0035 · Material Maintenance Project | $1,942,160 | $1,478,920 | ERGON ASPHALT & EMULSIONS, INC. | -23.9% | 1 |
| Feb 4, 2026 | 0062-03-048STP 2026(291)HES | Cass Atlanta |
SH 8 at SH 11SH 8 · Safety Improvement Projects | $1,464,970 | $1,297,722 | STRIPING TECHNOLOGY, L.P. | -11.4% | 7 |
| Feb 4, 2026 | 1685-01-108CM 2026(300) | Harris Houston |
FM 1960: IH 45 TO SH 249FM 1960 · Corridor Traffic Management | $1,699,693 | $1,278,951 | THIRD COAST SERVICES LLC | -24.8% | 4 |
| Feb 4, 2026 | 6493-60-001BPM - A00218348 | Montgomery Houston |
BPMIH0045 · Bridge Preventative Maintenance - Sealed | $1,153,575 | $1,198,560 | BK FIELD OPERATIONS LLC | +3.9% | 10 |
| Feb 4, 2026 | 6492-05-001RMC - A00217990 | Fort Bend Houston |
RMC649205001US 59 · Routine Maintenance Project - Sealed | $1,492,738 | $1,096,900 | T & M LAWN-FENCE SERVICE, LLC | -26.5% | 4 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.