18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Apr 20, 2026 | 6501-73-001SUP - A00221543 | Rains Paris |
PICNIC AREA MAINTENANCE - RAINS FY26US0069 · State Use Project | $34,460 | — | 0 | ||
| Apr 16, 2026 | 6487-86-001RMC - A00216847 | Tom Green San Angelo |
RM 584 TRANSITION SLABSRM0584 · Routine Maintenance Project - Sealed | $588,345 | $762,302 | O. TREVINO CONSTRUCTION, LLC | +29.6% | 2 |
| Apr 16, 2026 | 6499-97-001MMC - A00220558 | Fannin Paris |
Hot Mix - Fannin COUS0069 · Material Maintenance Project - Sealed | $747,200 | $697,240 | RK HALL, LLC | -6.7% | 5 |
| Apr 16, 2026 | 6500-00-001MMC - A00220583 | Franklin Paris |
Hot Mix - Franklin CO FY26US0067 · Material Maintenance Project - Sealed | $792,000 | $689,440 | RK HALL, LLC | -12.9% | 3 |
| Apr 16, 2026 | 6500-12-001MMC - A00220620 | Hopkins Paris |
Hot Mix - Hopkins CO FY26IH0030 · Material Maintenance Project - Sealed | $742,500 | $627,760 | RK HALL, LLC | -15.5% | 4 |
| Apr 16, 2026 | 6500-13-001MMC - A00220625 | Hunt Paris |
Hot Mix - Hunt 26IH0030 · Material Maintenance Project - Sealed | $649,750 | $617,190 | RK HALL, LLC | -5.0% | 6 |
| Apr 16, 2026 | 6499-98-001MMC - A00220566 | Rains Paris |
Hot Mix - Rains CO FY26US0069 · Material Maintenance Project - Sealed | $637,000 | $609,315 | RK HALL, LLC | -4.3% | 4 |
| Apr 16, 2026 | 6500-03-001MMC - A00220588 | Lamar Paris |
Hot Mix - Lamar CO FY26US0082 · Material Maintenance Project - Sealed | $720,500 | $603,160 | RK HALL, LLC | -16.3% | 2 |
| Apr 16, 2026 | 6500-11-001MMC - A00220619 | Delta Paris |
Asphalt Oil & Emulsion - Delta 26SH0154 · Material Maintenance Project - Sealed | $720,500 | $603,160 | RK HALL, LLC | -16.3% | 3 |
| Apr 16, 2026 | 6500-01-001MMC - A00220585 | Red River Paris |
Hot Mix - Red River CO FY26SH0037 · Material Maintenance Project - Sealed | $659,500 | $550,240 | RK HALL, LLC | -16.6% | 2 |
| Apr 16, 2026 | 6497-30-001RMC - A00219572 | Lamar Paris |
Signal Maint. FY26US0082 · Routine Maintenance Project - Sealed | $659,279 | $549,355 | NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION | -16.7% | 3 |
| Apr 16, 2026 | 6499-73-001MMC - A00220458 | Franklin Paris |
Hydraulic Cement - Franklin DW FY26IH0030 · Material Maintenance Project - Sealed | $549,128 | $538,931 | AKA-MATERIALS | -1.9% | 3 |
| Apr 16, 2026 | 6481-24-001BPM - A00214351 | Grayson Paris |
BPM Grayson FY26 #2US0082 · Bridge Preventative Maintenance - Sealed | $544,062 | $418,851 | SCR CIVIL CONSTRUCTION, LLC | -23.0% | 7 |
| Apr 16, 2026 | 6474-39-001RMC - A00212377 | Kimble San Angelo |
MBGF Repair South FY 26US0377 · Routine Maintenance Project | $523,020 | $403,154 | T&L CLEANING SERVICES LLC | -22.9% | 4 |
| Apr 16, 2026 | 6498-80-001RMC - A00220064 | Franklin Paris |
Culvert Repair Franklin Co.SH0037 · Routine Maintenance Project - Sealed | $253,524 | $121,450 | RB CONTRACTING, LLC | -52.1% | 8 |
| Apr 15, 2026 | 6496-17-001RMC - A00219122 | Wise Fort Worth |
FY2026 - Roadside Mowing - Wise/JackUS0380 · Routine Maintenance Project - Sealed | $814,245 | $720,414 | COASCAPE GROUP, LLC | -11.5% | 7 |
| Apr 15, 2026 | 6496-04-001RMC - A00219085 | Denton Dallas |
MBGF Repairs Denton FY 27IH0035W · Routine Maintenance Project - Sealed | $762,895 | $618,454 | ROSS SA ENTERPRISE LLC | -18.9% | 2 |
| Apr 15, 2026 | 6495-68-001MMC - A00218929 | Collin Dallas |
Hot Mix FY27SH0005 · Material Maintenance Project | $576,000 | $558,250 | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | -3.1% | 2 |
| Apr 15, 2026 | 6495-79-001RMC - A00218953 | Collin Dallas |
Mowing HW ROW W 07 04.26US0075 · Routine Maintenance Project - Sealed | $453,640 | $353,193 | ANTHONY SERVICES | -22.1% | 6 |
| Apr 15, 2026 | 6495-33-001RMC - A00218746 | Navarro Dallas |
01 On-Call Reflect Pvment Marks 0426SH0031 · Routine Maintenance Project - Sealed | $417,029 | $334,438 | TRP INFRASTRUCTURE SERVICES, LLC | -19.8% | 3 |
| Apr 15, 2026 | 6495-78-001RMC - A00218952 | Collin Dallas |
Mowing HW ROW E 07 04.26US0380 · Routine Maintenance Project - Sealed | $308,325 | $239,770 | ANTHONY SERVICES | -22.2% | 6 |
| Apr 15, 2026 | 6495-80-001RMC - A00218954 | Collin Dallas |
Herbicide 07 04.25US0075 · Routine Maintenance Project - Sealed | $89,700 | $82,065 | ANTHONY SERVICES | -8.5% | 1 |
| Apr 15, 2026 | 6495-82-001RMC - A00218956 | Collin Dallas |
Drain and Slotted Inlet Cleaning 07 0426US0075 · Routine Maintenance Project - Sealed | $72,320 | $56,020 | JACKSON EXCAVATION, LLC | -22.5% | 3 |
| Apr 15, 2026 | 6495-67-001MMC - A00218928 | Collin Dallas |
Emulsion FY27SH0005 · Material Maintenance Project | $40,000 | $43,850 | ERGON ASPHALT & EMULSIONS, INC. | +9.6% | 1 |
| Apr 15, 2026 | 6501-17-001SUP - A00221337 | Lee Austin |
Giddings Maintenance Litter FY26US0290 · State Use Project | $317,137 | — | 0 | ||
| Apr 15, 2026 | 6501-18-001SUP - A00221338 | Bastrop Austin |
Bastrop Maintenance Litter FY26FM3000 · State Use Project | $451,032 | — | 0 | ||
| Apr 14, 2026 | 6493-67-001RMC - A00218366 | Montgomery Houston |
Reflective Pavement Mrk RMC 6493-67-001IH0045 · Routine Maintenance Project - Sealed | $755,901 | $693,268 | TRP INFRASTRUCTURE SERVICES, LLC | -8.3% | 4 |
| Apr 14, 2026 | 6498-23-001RMC - A00219960 | Harris Houston |
Pavement Markings MetroIH0069 · Routine Maintenance Project - Sealed | $879,642 | $687,170 | BATTERSON, LLP | -21.9% | 3 |
| Apr 14, 2026 | 6499-65-001BPM - A00220441 | Live Oak Corpus Christi |
6499-65-001 BPMUS0281 · Bridge Preventative Maintenance - Sealed | $850,025 | $639,738 | ROY JORGENSEN ASSOCIATES, INC. | -24.7% | 10 |
| Apr 14, 2026 | 6500-30-001MMC - A00220727 | Bee Corpus Christi |
6500-30-001 Hot Mix BeevilleUS0181 · Material Maintenance Project | $630,000 | $607,250 | BOBCAT MATERIALS LLC | -3.6% | 4 |
| Apr 14, 2026 | 6500-63-001MMC - A00220865 | Kleberg Corpus Christi |
6500-63-001 Hot Mix KingsvilleUS0077 · Material Maintenance Project | $466,000 | $509,350 | ANDERSON COLUMBIA CO., INC. | +9.3% | 1 |
| Apr 14, 2026 | 6495-46-001RMC - A00218811 | Waller Houston |
RMC 6495-46-001US0290 · Routine Maintenance Project - Sealed | $392,435 | $481,400 | MC2 CIVIL, LLC | +22.7% | 3 |
| Apr 14, 2026 | 6499-88-001RMC - A00220523 | Jim Wells Corpus Christi |
6499-88-001 Jim Wells MowingUS0281 · Routine Maintenance Project - Sealed | $480,192 | $455,362 | R&M INCORPORATED | -5.2% | 2 |
| Apr 14, 2026 | 6494-55-001RMC - A00218617 | Fort Bend Houston |
RMC 6494-55-001US0059 · Routine Maintenance Project - Sealed | $412,300 | $412,645 | HAZMAT INTERNATIONAL, INC. | +0.1% | 2 |
| Apr 14, 2026 | 6413-83-001RMC - A00190003 | Bee Corpus Christi |
6413-83-001 Spot Base RepairUS0181 · Routine Maintenance Project - Sealed | $491,500 | $407,828 | ANDERSON COLUMBIA CO., INC. | -17.0% | 3 |
| Apr 14, 2026 | 6495-93-001BPM - A00219003 | Harris Houston |
Bear Creek and Mayde Creek at HW6 BridgeSH0006 · Bridge Preventative Maintenance - Sealed | $517,099 | $393,900 | GARRET SHIELDS INFRASTRUCTURE | -23.8% | 5 |
| Apr 14, 2026 | 6494-56-001RMC - A00218618 | Fort Bend Houston |
RMC 6494-56-001US0059 · Routine Maintenance Project - Sealed | $303,181 | $344,733 | ROSS SA ENTERPRISE LLC | +13.7% | 3 |
| Apr 14, 2026 | 6498-64-001MMC - A00220034 | Washington Bryan |
FY26 Brenham AO LRA - 04SH0036 · Material Maintenance Project | $282,000 | $287,953 | MARTIN MARIETTA MATERIALS, INC. | +2.1% | 2 |
| Apr 14, 2026 | 6498-82-001RMC - A00220066 | Freestone Bryan |
FY26 - Huntsville AO Sweeping - 04US0084 · Routine Maintenance Project | $73,031 | $211,921 | SWEEPING CORPORATION OF AMERICA, LLC | +190.2% | 1 |
| Apr 14, 2026 | 6498-63-001MMC - A00220033 | Washington Bryan |
FY26 Brenham AO Hydraulic Cement - 04SH0036 · Material Maintenance Project | $208,008 | $197,551 | TOUCHSTONE RESOURCES, LLC | -5.0% | 2 |
| Apr 14, 2026 | 6495-73-001RMC - A00218942 | Harris Houston |
2025 DRAINAGE REPAIRSL0008 · Routine Maintenance Project - Sealed | $237,549 | $177,984 | GARRET SHIELDS INFRASTRUCTURE | -25.1% | 5 |
| Apr 13, 2026 | 6497-45-001RMC - A00219626 | Bastrop Austin |
FY 26 BAAO SH 71 MowingSH0071 · Routine Maintenance Project - Sealed | $449,236 | $404,146 | ABESCAPE LANDSCAPING, LLC | -10.0% | 4 |
| Apr 13, 2026 | 6484-35-001RMC - A00215436 | Llano Austin |
FY26 Llano Co. MowingSH0071 · Routine Maintenance Project - Sealed | $333,680 | $296,614 | ABESCAPE LANDSCAPING, LLC | -11.1% | 3 |
| Apr 13, 2026 | 6501-00-001SUP - A00221207 | Travis Austin |
Districtwide Pest Control - FY26IH0035 · State Use Project | $39,462 | — | 0 | ||
| Apr 13, 2026 | 6501-96-001SUP - A00221603 | Travis Austin |
South Austin Area Office Janitorial FY26IH0035 · State Use Project | $124,394 | — | 0 | ||
| Apr 9, 2026 | 6498-19-001RMC - A00219944 | San Augustine Lufkin |
2026-04 San Augustine TCPUS0096 · Routine Maintenance Project - Sealed | $957,125 | $818,501 | FC TRAFFIC CONTROL, LLC | -14.5% | 2 |
| Apr 9, 2026 | 6495-55-001RMC - A00218906 | Hudspeth El Paso |
VHO - Traffic Control ServicesIH0010 · Routine Maintenance Project | $525,850 | $471,795 | APACHE BARRICADE & SIGN | -10.3% | 2 |
| Apr 9, 2026 | 6490-69-001RMC - A00217682 | San Jacinto Lufkin |
2026-04 San Jacinto Tree & Brush RemovalUS0059 · Routine Maintenance Project - Sealed | $95,300 | $115,750 | K & R CONTRACTORS | +21.5% | 3 |
| Apr 9, 2026 | 6500-10-001MMC - A00220617 | Sutton San Angelo |
Emulsion-Anionic FY 26US0277 · Material Maintenance Project | $44,916 | $38,988 | MARTIN RESOURCE MANAGEMENT CORPORATION | -13.2% | 2 |
| Apr 9, 2026 | 6501-79-001SUP - A00221576 | Nueces Corpus Christi |
6501-79-001 Nueces MHMR Litter RemovalIH0037 · State Use Project | $378,817 | — | 0 | ||
| Apr 8, 2026 | 3510-05-047C 3510-5-47 | Harris Houston |
SH 99, IH 10W to West Rd (Seg E)SH 99 · Widen Freeway | $135,992,054 | $119,970,903 | SER CONSTRUCTION PARTNERS, LLC | -11.8% | 10 |
| Apr 8, 2026 | 2230-01-020STP 2026(537)MM | Bexar San Antonio |
FM 1560: 2230-01-020; WNFFM 1560 · Widen Non-Freeway | $108,472,352 | $96,535,030 | SER CONSTRUCTION PARTNERS, LLC | -11.0% | 5 |
| Apr 8, 2026 | 0017-10-294C 17-10-294 | Bexar San Antonio |
0017-10-294: IH 35 Downtown Pump StationIH 35 · Culvert & Storm Drainage Work | $34,738,196 | $32,786,223 | RELMCO, INC. | -5.6% | 2 |
| Apr 8, 2026 | 0179-09-041BR 2026(242) | Jackson Yoakum |
SH 35 BRIDGE REPLACEMENT 2712SH 35 · Bridge Replacement | $21,500,022 | $25,784,015 | RAGLE CONSTRUCTION, INC. | +19.9% | 4 |
| Apr 8, 2026 | 0916-35-251BR 2024(301) | Nueces Corpus Christi |
Yorktown Rd Nueces Cayo Del Oso BRGYORKTOWN BLVD · Bridge Replacement | $15,784,448 | $21,281,902 | RAGLE CONSTRUCTION, INC. | +34.8% | 5 |
| Apr 8, 2026 | 0341-04-074F 2026(497) | Tyler Beaumont |
US 287(RUSSELL CR BR-US 69)REHABUS 287 · Rehabilitation of Existing Road | $20,662,478 | $20,919,240 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | +1.2% | 5 |
| Apr 8, 2026 | 0905-06-096STP 2019(519)MM | Lubbock Lubbock |
Upland-82nd to 98th St. (MPO 40-9)UPLAND AVE · Widen Non-Freeway | $14,464,478 | $14,858,178 | L A FULLER & SONS CONSTRUCTION, LTD. | +2.7% | 5 |
| Apr 8, 2026 | 0005-08-109F 2026(624) | Mitchell Abilene |
IH 20 WESTBROOK TO COLORADO CITYIH 20 · Overlay | $12,515,643 | $12,796,839 | CK NEWBERRY, LLC | +2.2% | 5 |
| Apr 8, 2026 | 0683-05-017F 2026(517) | Hays Austin |
RM 12 - US 290 to Travis C/LRM 12 · Widen Non-Freeway | $10,113,847 | $10,020,820 | DEAN WORD COMPANY, LTD. | -0.9% | 6 |
| Apr 8, 2026 | 1823-01-011C 1823-1-11 | Martin Odessa |
FM1208_FM1212_MIDLAND_C/LFM 1208 · Rehabilitation of Existing Road | $9,927,435 | $9,373,792 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | -5.6% | 5 |
| Apr 8, 2026 | 1426-01-058F 2026(505) | Cameron Pharr |
FM 1419 - OverlayFM 1419 · Overlay | $7,236,974 | $7,826,503 | IOC COMPANY LLC | +8.1% | 5 |
| Apr 8, 2026 | 0114-10-108F 2025(700) | Washington Bryan |
US 290 F: FM 577 T: FM 1155 - FY 26US 290 · Overlay | $6,122,429 | $6,537,278 | DURWOOD GREENE CONSTRUCTION CO. | +6.8% | 7 |
| Apr 8, 2026 | 0094-02-147F 2026(494) | Tarrant Fort Worth |
SH 10 from West Park Dr to SH 183SH 10 · Overlay | $5,591,882 | $5,358,724 | EUROVIA ATLANTIC COAST LLC | -4.2% | 7 |
| Apr 8, 2026 | 0197-02-138F 2026(476) | Dallas Dallas |
US175 Malloy Bridge RD to Kaufman CoUS 175 · Freeway Operational Improvements | $3,844,434 | $3,975,784 | AUSTIN BRIDGE & ROAD SERVICES, LP | +3.4% | 4 |
| Apr 8, 2026 | 1016-04-021F 2026(472) | Rockwall Dallas |
FM 548 from SH 276 to SH 205FM 548 · Overlay | $3,419,170 | $3,381,745 | ICOS MANAGEMENT, LLC | -1.1% | 7 |
| Apr 8, 2026 | 0500-01-154F 2026(484) | Galveston Houston |
IH 45; Virginia Point Rd to SH 87IH 45 · Landscape & Scenic Enhancement | $3,887,385 | $3,185,937 | YELLOWSTONE LANDSCAPE - CENTRAL, INC. | -18.0% | 4 |
| Apr 8, 2026 | 0309-01-048BR 2026(526) | Gray Amarillo |
SH 70/N FORK RED RIVER BRG FY 27 BMIPSH 70 · Bridge Maintenance | $3,424,040 | $3,039,519 | GILVIN-TERRILL, LTD. | -11.2% | 8 |
| Apr 8, 2026 | 0908-23-058BR 2024(403) | Fisher Abilene |
REPLACE BRIDGE CR 305 @ ALKALI CRK TRIBCR 305 · Bridge Replacement | $2,507,178 | $1,880,830 | TUCAN CONTRACTING, LLC | -25.0% | 7 |
| Apr 8, 2026 | 0909-40-081BR 2024(452) | Limestone Waco |
BR | @ WILLIAMS CREEK |(MAP #2)COUNTY ROAD 104 · Bridge Replacement | $2,205,161 | $1,810,423 | TUCAN CONTRACTING, LLC | -17.9% | 10 |
| Apr 8, 2026 | 6495-98-001RMC - A00219047 | Montgomery Houston |
Cleaning and Sweeping RMC 6495-98-001IH0045 · Routine Maintenance Project | $1,625,355 | $1,670,180 | T & M LAWN-FENCE SERVICE, LLC | +2.8% | 2 |
| Apr 8, 2026 | 1790-02-048F 2026(531) | Smith Tyler |
SL 323, S. OF US 271 - UPRR, BRGSL 323 · Bridge Replacement | $1,629,506 | $1,516,226 | DRAKE COMPANIES LLC | -7.0% | 9 |
| Apr 8, 2026 | 6489-47-001RMC - A00217428 | Hidalgo Pharr |
Maintenance of Roadway FlashersSH0495 · Routine Maintenance Project - Sealed | $1,359,546 | $1,249,484 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC | -8.1% | 3 |
| Apr 8, 2026 | 0674-01-083F 2026(468) | El Paso El Paso |
FM 76 CURB RAMP/ADA IMPROVE (FY 2026)FM 76 · Pedestrian, Sidewalks & Curb Ramps | $1,307,462 | $1,248,951 | SYNERGY PROJECT CONTRACTORS, INC. | -4.5% | 6 |
| Apr 8, 2026 | 6489-29-001RMC - A00217348 | Ellis Dallas |
Flexible Pvmt. Structure Repair 09 0326BU0287S · Routine Maintenance Project - Sealed | $1,437,046 | $1,143,764 | KNIFE RIVER CORPORATION - SOUTH | -20.4% | 7 |
| Apr 8, 2026 | 1745-01-020F 2026(394) | Waller Houston |
FM 1887, SH 159 to FM 359FM 1887 · Overlay | $848,686 | $1,140,623 | KNIFE RIVER CORPORATION - SOUTH | +34.4% | 5 |
| Apr 8, 2026 | 6498-59-001RMC - A00220028 | Burnet Austin |
FY 26 Striping Burnet AERM0243 · Routine Maintenance Project - Sealed | $1,706,599 | $1,072,388 | STRIPE-A-ZONE, LLC | -37.2% | 4 |
| Apr 8, 2026 | 0911-00-127C 911-00-127 | Angelina Lufkin |
FY2026_VA_Bridge Maint - BMNVarious · Bridge Maintenance | $1,032,174 | $948,750 | GARRET SHIELDS INFRASTRUCTURE | -8.1% | 7 |
| Apr 8, 2026 | 0216-01-062STP 2026(536)HES | Comal San Antonio |
SAT_SL0337SL 337 · Safety Improvement Projects | $1,034,120 | $816,254 | E-Z BEL CONSTRUCTION, LLC | -21.1% | 10 |
| Apr 8, 2026 | 6497-03-001RMC - A00219520 | McLennan Waco |
Misc Concrete Repair DWUS0084 · Routine Maintenance Project - Sealed | $968,609 | $755,540 | SHALOM SERVICES CORPORATION | -22.0% | 8 |
| Apr 8, 2026 | 0901-00-069C 901-00-69 | Lamar Paris |
FUA erosion Repair 26Various · Bridge Maintenance | $823,730 | $734,734 | THE TRUESDELL CORPORATION | -10.8% | 12 |
| Apr 8, 2026 | 0902-51-029BR 2018(623) | Hood Fort Worth |
CS; OLD GRANBURY RD OVER WALNUT CRKOLD GRANBURY RD · Bridge Replacement | $795,481 | $632,977 | GARRET SHIELDS INFRASTRUCTURE | -20.4% | 8 |
| Apr 8, 2026 | 2150-03-034C 2150-3-34 | Webb Laredo |
FM 1472Taffic Signal ImprovmentsFM 1472 · Traffic Control Devices | $823,514 | $582,872 | THE LEVY COMPANY, LLC | -29.2% | 3 |
| Apr 8, 2026 | 0543-02-089F 2026(507) | Fort Bend Houston |
FM 359: At Jones Creek- Retaining WallFM 359 · Bridge Widening or Rehabilitation | $721,613 | $563,745 | GARRET SHIELDS INFRASTRUCTURE | -21.9% | 6 |
| Apr 8, 2026 | 0914-00-516F 2026(518) | Travis Austin |
STAO - FY 26 Small Sign UpgradesVarious · Traffic Control Devices | $513,907 | $388,999 | HAZMAT INTERNATIONAL, INC. | -24.3% | 7 |
| Apr 8, 2026 | 0916-00-287STP 2026(540)FRS | Nueces Corpus Christi |
RR Xing Sinton Area Office 2026Various · Rail Hwy Crossing Signals/Structures | $455,717 | $384,971 | TRP INFRASTRUCTURE SERVICES, LLC | -15.5% | 3 |
| Apr 8, 2026 | 0916-00-286STP 2026(539)FRS | Nueces Corpus Christi |
RR Xing Alice Area Office 2026Various · Rail Hwy Crossing Signals/Structures | $351,499 | $287,086 | TRP INFRASTRUCTURE SERVICES, LLC | -18.3% | 3 |
| Apr 8, 2026 | 0172-09-046F 2026(490) | Tarrant Fort Worth |
US 287 from Ellis CL to Sublett RdUS 287 · Traffic Control Devices | $286,038 | $250,000 | MICA CORPORATION | -12.6% | 7 |
| Apr 7, 2026 | 0047-03-091F 2026(545) | Grayson Paris |
US 75 Segment 2US 75 · Widen Freeway | $138,485,945 | $125,349,652 | RPM XCONSTRUCTION, LLC | -9.5% | 6 |
| Apr 7, 2026 | 0299-14-010F 2026(307) | Maverick Laredo |
0299-14, SL 480 New Non-FreewaySL 480 · New Location Non-Freeway | $131,978,368 | $93,685,507 | HUNTER INDUSTRIES, LTD. | -29.0% | 7 |
| Apr 7, 2026 | 2452-01-066F 2026(538) | Bexar San Antonio |
SL 1604: 2452-01-066; WNFSL 1604 · Widen Non-Freeway | $61,080,463 | $55,859,370 | POSILLICO CIVIL, INC. | -8.5% | 4 |
| Apr 7, 2026 | 0181-03-029F 2026(503) | Callahan Abilene |
SH 36 SUPER 2 CR 479 TO CR 459SH 36 · Super-2 Highway | $10,675,511 | $11,487,762 | BIG CREEK CONSTRUCTION, LTD. | +7.6% | 7 |
| Apr 7, 2026 | 2005-03-009F 2B24(001) | Ector Odessa |
FM1882_SP450_TO_BI20_REHABFM 1882 · Rehabilitation of Existing Road | $7,771,645 | $10,253,366 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | +31.9% | 3 |
| Apr 7, 2026 | 0255-07-153F 2026(410) | Hidalgo Pharr |
IH 69C Overlay FY 2026IH 69C · Overlay | $8,135,339 | $8,784,922 | FOREMOST PAVING, INC. | +8.0% | 3 |
| Apr 7, 2026 | 1388-01-010F 2026(471) | Rusk Tyler |
FM1251,CR394-PANOLAC/L,WDNFM 1251 · Rehabilitation of Existing Road | $8,986,324 | $8,734,908 | DRAKE COMPANIES LLC | -2.8% | 8 |
| Apr 7, 2026 | 1245-02-052F 2026(527) | Potter Amarillo |
FY 26 RM 1061 OVERLAYRM 1061 · Overlay | $7,802,745 | $7,487,324 | L A FULLER & SONS CONSTRUCTION, LTD. | -4.0% | 6 |
| Apr 7, 2026 | 0933-01-044BR 2026(481) | Lubbock Lubbock |
FM 835 and Brazos River Bridge ReplacemeFM 835 · Bridge Replacement | $4,462,426 | $5,991,100 | WEBBER, LLC | +34.3% | 2 |
| Apr 7, 2026 | 1330-02-052F 2026(493) | Tarrant Fort Worth |
FM1187: Old Hwy 1187 to Newt PattersonFM 1187 · Overlay | $8,810,552 | $5,395,974 | JAGOE-PUBLIC COMPANY | -38.8% | 7 |
| Apr 7, 2026 | 0735-01-020C 735-1-2 | Delta Paris |
FM 128 RehabFM 128 · Rehabilitation of Existing Road | $5,629,633 | $4,747,421 | A. K. GILLIS & SONS, LLC | -15.7% | 3 |
| Apr 7, 2026 | 0598-02-120CM 2026(482) | Brazoria Houston |
SH 288: SH 6 to FM 1462SH 288 · Corridor Traffic Management | $5,309,851 | $4,367,855 | ALLSTATE SIGNAL & CONSTRUCTION, LLC | -17.7% | 5 |
| Apr 7, 2026 | 6470-82-001RMC - A00211276 | Cameron Pharr |
FY 26 Pavement Repair (SB)US0077 · Routine Maintenance Project - Sealed | $3,735,225 | $4,198,453 | FOREMOST PAVING, INC. | +12.4% | 4 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.