IDOT Jobs

All dates · 10,653 jobs · $20,005,846,000 Sign up free
★ My Jobs

10,653 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Nov 7, 2025 85779 WhitesideDistrict 2 Replace the bridge carrying East 11th Street over the Illinois-Mississippi Feeder Canal and re-align the canal's parallel path, in Rock Falls. — Executed Nov 25 New Martin & Company Excavating $1,699,166 ·
Nov 7, 2025 85783 HenryDistrict 2 Construction of PCC Sidewalk along Lake Street in Kewanee. Includes: storm sewer, PCC entrances, HMA pavement, and seeding. — Executed Nov 25 New Advanced Asphalt Company $535,939 ·
Nov 7, 2025 85785 Rock IslandDistrict 2 Construction of a PCC shared-use path along 19th Street and 27th Street from Avenue of the Cities to 36th Avenue in Moline. Includes; curb and gutter, storm sewer, and traffic signal improvements. — Executed Nov 25 New Gensini Excavating, Inc. $5,092,254 ·
Nov 7, 2025 87843 DeKalbDistrict 3 Construction of HMA multi-use trail from Old Mill Park to Pleasant Street in Sycamore. Includes a prefabricated pedestrian bridge with boardwalk and concrete approach pavement, storm sewer, and signage. — Executed Nov 25 New Martin & Company Excavating $1,580,482 ·
Nov 7, 2025 87889 DeKalbDistrict 3 Construct a three-span PPC deck beam bridge to carry Pratt Road over Somonauk Creek in Sandwich. — Executed Nov 25 New D. Construction, Inc. $1,441,346 ·
Nov 7, 2025 87890 FordDistrict 3 Replace the bridge carrying Clarence Road over Sugar Creek, 0.01 mile south of IL 9 — Executed Nov 25 New Tobey's Construction & Cartage, Inc. $679,036 ·
Nov 7, 2025 87891 FordDistrict 3 Replace the bridge carrying Gallahue Road over an un-named stream, 0.1 mile northeast of N 1200 E Road. — Executed Nov 25 New Tobey's Construction & Cartage, Inc. $637,458 ·
Nov 7, 2025 89832 TazewellDistrict 4 Guardrail replacement on various routes in Tazewell, Peoria and Woodford Counties. Includes, curb and gutter, and pedestrian railing. — Executed Nov 25 New Lovewell Fencing, Inc. $2,498,941 ·
Nov 7, 2025 89872 PeoriaDistrict 4 Intersection improvements at Northmoor Road and University Street in Peoria. Includes; full-depth HMA, traffic signals, lighting, and storm sewer. — Executed Nov 25 New Otto Baum Company, Inc. $5,897,500 ·
Nov 7, 2025 93843 MenardDistrict 6 Widening and HMA resurfacing of Kent Street to Ingram Street west of Athens. Includes; aggregate shoulders, and pipe culverts. — Executed Nov 25 New L. W. Rouland Trucking Service, Inc. $2,121,212 ·
Nov 7, 2025 93846 LoganDistrict 6 Replace PCC deck beams on a three-span structure carrying CH 24 over Prairie Creek, 5 miles South of San Jose. — Executed Nov 25 New County Contractors, Inc. $474,620 ·
Nov 7, 2025 93847 PikeDistrict 6 HMA Resurfacing on N. Monroe Street, E. Adams Street, and Madison Street in Pittsfield. Includes; watermain, sidewalk, ADA ramps, storm sewer, and Lighting. — Executed Nov 25 New Rees Construction Company of Quincy $5,451,649 ·
Jan 16, 2026 46939 TazewellDistrict 4 Removal and replacement of SN's 090-9922 and 090-9923, and resurfacing and rehabilitation of internal park roads and campgrounds at the Spring Lake State Fish and Wildlife Area in rural Tazewell County. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $4,375,041 ·
Jan 16, 2026 46943 LakeDistrict 1 Bridge replacement (Ex SN 049-0185, Pr SN 049-0400) and other misc repairs at Illinois Beach State Park in Lak This project consists of bridge replacement (Ex SN 049-0185, Pr SN 049-0400) and other misc repairs at Illinois Beach State Park in Lake County, IL. — Executed Nov 25 New Alliance Contractors, Inc. $578,450 ·
Jan 16, 2026 60R94 CookDistrict 1 (3366.37-Ft) Intersection Reconstruction of IL-171 at 95th Street, reconfigure the existing "wye" intersection into a "tee" intersection, in Unincorporated Willow Springs, Illinois in. Cook County. — Executed Nov 25 New OHLA Central, Inc. $8,643,219 ·
Jan 16, 2026 61J01 DuPageDistrict 1 Intersection improvements and traffic signal modification on Lemont Road from 83rd Street to 87th Street, and on 87th Street from Havens Drive to Lemont Rd. — Executed Nov 25 New R. W. Dunteman Company $9,341,000 ·
Jan 16, 2026 61K16 CookDistrict 1 Roadway reconstruction, lighting and traffic signal modernization on Belmont Avenue from Williams Drive to Mannheim Road and on Mannheim Road from South of Gage Avenue to Anderson Place in Franklin Park. — Executed Nov 25 New Alliance Contractors, Inc. $3,835,382 ·
Jan 16, 2026 61L19 LakeDistrict 1 Construction of a single-span PPC IL-beam bridge with intgral abutments carrying Greenwood Avenue over the Union Pacific Railroad in Waukegan. Additional work includes MSE retaining walls, HMA approach roadways, guardrail, and lighting. — Executed Nov 25 New Dunnet Bay Construction Company $7,980,812 ·
Jan 16, 2026 61L36 DuPageDistrict 1 HMA resurfacing and intersection channelization at Main Street and Oxford St. in Downers Grove. Includes sidewalks, curb and gutter, storm sewers, street light relocation and pavement markings. — Executed Nov 25 New Acura Inc. $2,105,861 ·
Jan 16, 2026 61L42 LakeDistrict 1 Roadway widening and HMA resurfacing of Waukegan Road and Westleigh Road in Lake Forest. Includes traffic signal modernization, lighting, curb and gutter, sidewalks, and storm sewer. — Executed Nov 25 New D'Land Construction, LLC $3,663,043 ·
Jan 16, 2026 61L44 DuPageDistrict 1 Resurfacing Mittel Drive from Thorndale Avenue to Devon Avenue in Wood Dale. — Executed Nov 25 New Builders Paving, LLC $895,259 ·
Jan 16, 2026 61L56 KaneDistrict 1 Resurfacing Molitor Road from Elizebeth Lane to Felton Road, Diehl Road from Felton Road to Eola Road, Molitor Road from Diehl Road to Eola Road in Aurora. — Executed Nov 25 New K-Five Construction Corporation $2,502,456 ·
Jan 16, 2026 61L75 CookDistrict 1 Resurfacing 5th Avenue from Harrison Street to Quincy Street in Maywood. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $424,594 ·
Jan 16, 2026 61L81 WillDistrict 1 Resurfacing Remington Road from Weber Road to Claar Boulevard in Romeoville. — Executed Nov 25 New K-Five Construction Corporation $596,750 ·
Jan 16, 2026 61L89 CookDistrict 1 HMA resurfacing on Maple Avenue from Brookfield Avenue to 31st Street in Brookfield. Includes pavement patching, curb and gutter, sidewalk, driveways, ADA ramps, curb bump-outs, and flashing beacons. — Executed Nov 25 New Builders Paving, LLC $1,934,050 ·
Jan 16, 2026 61L90 CookDistrict 1 Resurfacing on Jackson Boulevard from Des Plaines Avenue to Harlem Avenue in Forest Park. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $3,554,981 ·
Jan 16, 2026 61L94 McHenryDistrict 1 Resurfacing on Raffel Road from Ware Road to IL 120 in Woodstock. — Executed Nov 25 New Geske and Sons, Inc. $928,920 ·
Jan 16, 2026 61L95 KaneDistrict 1 Resurfacing various routes and locations in Aurora. — Executed Nov 25 New Geneva Construction Company LLC. $3,133,675 ·
Jan 16, 2026 61L99 WillDistrict 1 Decorative lighting, landscaping and parkway restoration on IL 50 from Bruce Street Road to Steger Drive in University Park. — Executed Nov 25 New Iroquois Paving Corporation $1,829,797 ·
Jan 16, 2026 61M01 WillDistrict 1 Widening and reconstruction of Seil Road and replacement of the Seil Road Bridge across the DuPage River in Shorewood. Includes; mini roundabouts and street lighting at Seil Road and Raven Road, and at Seil Road and States Lane. — Executed Nov 25 New Austin Tyler Construction, Inc. $8,923,156 ·
Jan 16, 2026 61M02 KaneDistrict 1 Traffic signals improvements at various locations on Kimball Street between Grove Avenue to Dundee Avenue in Elgin. — Executed Nov 25 New H & H Electric Co. $584,382 ·
Jan 16, 2026 61M07 McHenryDistrict 1 HMA resurfacing and culvert replacement on Winn Road from US 12 to East Solon Road, and from East Solon Road to Main Street in Spring Grove. Inclues aggregate shoulders. — Executed Nov 25 New Curran Contracting Company $910,908 ·
Jan 16, 2026 61M08 LakeDistrict 1 Reconstruction of Green Bay Road from IL 176 to South of Witchwood Lane in the Village of Lake Bluff. — Executed Nov 25 New Campanella and Sons, Inc. $3,131,134 ·
Jan 16, 2026 61M09 CookDistrict 1 HMA resurfacing on 34th Street from Harlem Avenue to Ogden Avenue in Berwyn. Includes patching, PCC base course widening, sidewalk, curb and gutter, drainage improvements and traffic signal modernization. — Executed Nov 25 New Martam Construction Incorporated $7,777,148 ·
Jan 16, 2026 62321 CookDistrict 1 (1,375-Ft) Standard Overlay, ADA Improvements Project with HMA surface and binder course, thermoplastic pavement markings, curb ramps located on Kimball Avenue from Diversey Avenue to Wellington Avenue located in the City of Chicago Cook County. — Executed Nov 25 New MAT Construction Leasing, Inc. $548,280 ·
Jan 16, 2026 62D34 CookDistrict 1 The removal and replacement of the existing bridge including traffic signal modernization and ADA improvements (430-Ft) Proposed improvement consists of the removal and replacement of the existing bridge including traffic signal modernization and ADA improvements located on Touhy Avenue at North Branch of the Chicago River in Cook County. — Executed Nov 25 New Lorig Construction Company $6,966,559 ·
Jan 16, 2026 62F94 WillDistrict 1 The realignment and reconstruction of the mainline and interchange pavement and related roadway elements, incl (2,577-Ft) The work consists of the realignment and reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, enclosed storm sewer system with drainage structures and detention ponds, earth excavation and embankment grading, installation of retaining and noise walls, barrier and moment slab construction, bridge replacement, roadway lighting, traffic signals ITS implementation, erosion and sediment — Executed Nov 25 New D. Construction, Inc. $104,386,503 ·
Jan 16, 2026 62K62 CookDistrict 1 The construction of the Central Park Avenue bridge (SN 016-2091) includes bridge construction, roadway reconst (480-Ft) The work consists of the construction of the Central Park Avenue bridge (SN 016-2091) includes bridge construction, roadway reconstruction, erosion control and protection, utility relocation of existing storm sewers, earth excavation and embankment, storm sewers, pavements, pavement marking and signage, roadway lighting, traffic signals, ITS, traffic control and protection urban enhancements. Located along Central Park Avenue over I-290 in the City of Chicago, Cook County, Illinois. — Executed Nov 25 New F. H. Paschen, S.N. Nielsen & Associates LLC $19,469,072 ·
Jan 16, 2026 62K64 CookDistrict 1 (780-Ft) Bridge Superstructure (S.N. 016-0098) replacement including approach slab replacement, pier repairs, lighting, ADA improvements, traffic signal modernization, pedestrian walkways, bike lanes, curb ramp, and curb and gutter replacement located at I-290 at Paulina Street. — Executed Nov 25 New F. H. Paschen, S.N. Nielsen & Associates LLC $13,918,848 ·
Jan 16, 2026 62K65 CookDistrict 1 (740-Ft) Bridge Superstructure reconstruction (SN-016-0754), approach slab reconstruction, bridge railing, fencing, earth excavation, topsoil excavation and placement, seeding and sodding, storm sewer and drainage structures, erosion control, hot-mix asphalt base, binder, and surface courses, PCC driveway pavement, PCC sidewalk, combination curb and gutter, traffic signal modernization, roadway and underpass lighting located I-290 at Sacramento Boulevard. — Executed Nov 25 New F. H. Paschen, S.N. Nielsen & Associates LLC $13,380,221 ·
Jan 16, 2026 62P93 CookDistrict 1 ADA Improvements: curb ramps for sidewalks (ADA) including combination curb and gutter removal and replacement, sidewalk removal and replacement, installation of detectable warning surfaces, drainage structure adjustments, minor traffic signal improvements (accessible pedestrian signals), thermoplastic pavement markings work. Location: Various Routes, Various Locations within Norwood Park and Leyden Townships (Villages of Norridge, Park Ridge, River Grove and Elmwood Park). — Executed Nov 25 New Triggi Construction, Inc. $2,633,662 ·
Jan 16, 2026 62R76 WillDistrict 1 Reconstruction of the expansion joints with strip seals, hydro scarification (3/4-), deck and approach slab re (290-Ft) Bridge Deck Overlay, (SN 099-0210) over I-55. The project consists of reconstruction of the expansion joints with strip seals, hydro scarification (3/4-), deck and approach slab repairs, latex concrete overlay (2¼-) with diamond grinding and longitudinal grooving, application of a protective coat, and substructure concrete repair. Roadway improvements include HMA on each side of the bridge. I-55 at Caton Farm Road (3 miles north of US 52) in the Village of Plainfield. — Executed Nov 25 New D. Construction, Inc. $647,187 ·
Jan 16, 2026 62U12 CookDistrict 1 (520-Ft) Bridge Superstructure replacement, approach slab replacement, lighting ADA improvement and traffic signal modernization. The project is located at Structure No. 016-2114 on Loomis Street over I-290 in the City of Chicago in Cook County. — Executed Nov 25 New F. H. Paschen, S.N. Nielsen & Associates LLC $11,102,837 ·
Jan 16, 2026 62V42 CookDistrict 1 Resurfacing the existing HMA pavement with HMA surface course, HMA Binder course, thermoplastic pavement marki (4,061-Ft) Standard Overlay and ADA improvements consists of resurfacing the existing HMA pavement with HMA surface course, HMA Binder course, thermoplastic pavement markings, ADA Improvements for curb ramps. This project is in the villages of Niles and Morton Grove in Cook County. — Rejected Nov 25 New
Jan 16, 2026 62W33 CookDistrict 1 (2,652-Ft) Drainage improvements, installation of new trunk storm sewer includes pavement restoration, designed overlay, curb ramps for sidewalks (ADA) improvements and lane re-allocation via pavement markings. Location of Work: FAU 2843: Dixie Hwy, from Harwood Avenue to north of Sycamore Drive, within the Village of Homewood in Cook County. — Executed Nov 25 New Iroquois Paving Corporation $7,521,180 ·
Jan 16, 2026 62W47 CookDistrict 1 (2,231-Ft) Intersection Improvements, Traffic Signal Modernization, ADA compliant curb ramps at pedestrian crossings, driveway improvements, pavement markings, landscaping, roadway lighting locations at IL 7 (Southwest Hwy) and IL 43 (Harlem Ave) in the Villages of Worth and Chicago Ridge in Cook County. — Executed Nov 25 New D. Construction, Inc. $3,827,864 ·
Jan 16, 2026 62Y05 McHenryDistrict 1 Replacing the expansion joints at both abutments, updating the guardrail, removing tree debris from the channe (1050-Ft) Bridge Deck Overlay (SN 056-0037) consists of replacing the expansion joints at both abutments, updating the guardrail, removing tree debris from the channel. Located on FAP Route 336, IL 31 (Richmond Road) over Nippersink Creek in The City of Richmond in McHenry County, IL. — Executed Nov 25 New Martam Construction Incorporated $740,984 ·
Jan 16, 2026 62Y09 WillDistrict 1 This is an advance procurement of selective mechanical, electrical, and structural components for the existing rolling movable bridges at Jackson Street and Jefferson Street over the Des Plaines River, Structure Number 099- 0239 and 099-0166 in Will County. — Executed Nov 25 New GRANITE CONSTRUCTION COMPANY $2,400,000 ·
Jan 16, 2026 62Y14 CookDistrict 1 I-beam repair, joint sealing, HMA surface removal, butt joints, HMA surface course, guardrail removal, traffic (296-Ft) Bridge joint repair and replacement, and bridge deck latex overlay project (SN 016-2545) consist of I-beam repair, joint sealing, HMA surface removal, butt joints, HMA surface course, guardrail removal, traffic barrier terminal installation, pavement markings, temporary concrete barrier, maintenance of traffic with temporary pavement markings, temporary traffic signals. This project is in the City of Chicago Heights, in Cook County, IL. — Executed Nov 25 New D. Construction, Inc. $742,733 ·
Jan 16, 2026 64L27 StephensonDistrict 2 Reconstruction of the intersection of US Route 20 and Illinois Route 73 including grade changes, replacing across road culverts, adding turn lanes, and installing traffic signals. The project includes Jointed PCC Pavement and Tied-Shoulders, 9", Hot-Mix Asphalt (HMA) surface removal and replacement 2-3/4", HMA Shoulders, 8", PCC and HMA Driveway Pavement, Pipe and Box Culverts pavement markings, tree removal, pavement removal, temporary pavement, intersection lighting, highway signage, earthwork — Executed Nov 25 New Martin & Company Excavating $11,833,444 ·
Jan 16, 2026 64L71 HenryDistrict 2 Culvert replacement on IL 82 Over a Drainage Ditch 0.3 mile north of roadway 1700N. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $811,655 ·
Jan 16, 2026 64T05 OgleDistrict 2 Bridge repairs and joint replacement on SN 071-0082, carrying IL 64 over Elkhorn Creek Tributary, 0.4 mile east of US 52. — Executed Nov 25 New Martin & Company Excavating $460,374 ·
Jan 16, 2026 64T96 LeeDistrict 2 Bridge repairs and joint replacement on SN 052-0068, carrying IL 251 over Bureau Creek, 0.80 miles north of Lee County line. — Executed Nov 25 New Martin & Company Excavating $369,059 ·
Jan 16, 2026 64U16 HenryDistrict 2 12.4 miles of patching, milling, and resurfacing on Osco Rd from IL 81 to US 6. — Executed Nov 25 New Advanced Asphalt Company $6,016,335 ·
Jan 16, 2026 64U18 HenryWhitesideDistrict 2 11.4 miles of patching, cold milling, and standard overlay on IL 78 from 0.2 mile north of IL 92 in Henry County to north of west 8th St in Prophetstown, Whiteside County; and IL 92 from IL 78 to Bureau County Line in Henry County. — Executed Nov 25 New Advanced Asphalt Company $5,878,533 ·
Jan 16, 2026 64U20 WhitesideDistrict 2 Designed overlay, milling, and patching from Emerson Rd to Galt Rd and US 30 Connector._Approximately 4.29 miles. — Executed Nov 25 New Civil Constructors, Inc. d/b/a/ Helm Civil $5,204,514 ·
Jan 16, 2026 64U21 LeeDistrict 2 8 Miles Cold-In Place Eldena Road to US 30. — Executed Nov 25 New Martin & Company Excavating $4,655,130 ·
Jan 16, 2026 64U81 Rock IslandDistrict 2 Class B patches along IL 5 at 16th St. in Moline with Approx. 560' of resurfacing. — Executed Nov 25 New G. M. Sipes Construction, Inc. $779,622 ·
Jan 16, 2026 64U83 Rock IslandDistrict 2 1.5 miles of pavement patching from 1st St. to Archer Rd. HMA skip patching frontage roads in Rock Island County. — Executed Nov 25 New G. M. Sipes Construction, Inc. $685,514 ·
Jan 16, 2026 64U84 BooneDistrict 2 650 ft of standard overlay at US BUS 20 and Logan Ave. South to 2nd St. — Executed Nov 25 New Rock Road Companies, Inc. $233,841 ·
Jan 16, 2026 64U94 VariousDistrict 2 Restoration of turf right-of-way as a result of motorist caused damage. This involves tilling, fertilizing, seeding, and installing soil retention blanket on Disturbed areas throughout District 2. — Executed Nov 25 New O'Brien Civil Works, Inc. $83,680 ·
Jan 16, 2026 64V02 VariousDistrict 2 Concrete sealer applied to bridge decks at various locations in Henry, Rock Island and Whiteside Counties. — Executed Nov 25 New M & M Concrete, Inc. $44,239 ·
Jan 16, 2026 64V03 WinnebagoDistrict 2 Concrete sealer applied to bridge decks at various locations in Winnebago County. — Executed Nov 25 New M & M Concrete, Inc. $79,732 ·
Jan 16, 2026 64V04 VariousDistrict 2 Concrete sealer applied to bridge decks at various locations in Carroll, Jo Daviess, Lee and Ogle Counties. — Executed Nov 25 New M & M Concrete, Inc. $27,283 ·
Jan 16, 2026 64V08 VariousDistrict 2 Bridge washing of 6 structures over the Rock River in various Counties. — Executed Nov 25 New Pressure Washing Unlimited Inc. $41,570 ·
Jan 16, 2026 64V09 HenryRock IslandDistrict 2 Bridge washing of 5 structures over the Rock River in Henry and Rock Island Counties. — Executed Nov 25 New Pressure Washing Unlimited Inc. $53,315 ·
Jan 16, 2026 64V10 VariousDistrict 2 Bridge washing of 8 structures over the Rock River in various Counties. — Executed Nov 25 New All States Painting, Inc. $66,330 ·
Jan 16, 2026 64V22 HenryDistrict 2 Tree Removal, 0.1 mi W of Union St to 0.3 mi W of ILL 78 in Kewanee. — Executed Nov 25 New Homer Tree Service, Inc. $353,310 ·
Jan 16, 2026 66D52 LivingstonDistrict 3 8.78 miles gross of HMA designed overlay and installation of four foot HMA safety shoulders along with edge line rumble strips on IL 17 in Livingston County. — Executed Nov 25 New Kankakee Valley Construction Company, Inc. $7,195,925 ·
Jan 16, 2026 66N78 BureauDistrict 3 5.8 miles of milling and resurfacing 3 3/4" (designed overlay) for IL 29/26 and milling 3 1/2", resurfacing 3 3/4" (designed overlay) for SBI 29; additional work includes ditch cleaning, pipe culvert replacement, guardrail as applicable, pavement marking, and raised reflective pavement markers. This is located on FAS 318 (IL 29), SBI 29 A (IL 29), FAS 2245 (IL 29/26), starting at the Putnam County line and_ending south of Kansas St. in Bureau Junction, and on SBI 29 (OR 29), from IL 29 to dead e — Executed Nov 25 New Advanced Asphalt Company $4,503,804 ·
Jan 16, 2026 66R21 LaSalleDistrict 3 Bridge deck wearing surface removal and replacement, deck patching, expansion joint replacement, bearing replacement, concrete repairs, HMA shoulder repairs, pavement striping, and other related construction work at two structures: SN's 050-0077 and 050-0078 carrying IL Route 251 over I-80 in LaSalle County. — Executed Nov 25 New D. Construction, Inc. $1,801,296 ·
Jan 16, 2026 66R58 LivingstonDistrict 3 Removing existing dual CMP culverts at three locations and replacement with a precast concrete box culvert, ditch cleaning, pavement removal and replacement, landscaping and other related construction work on IL Route 116 beginning approximately 138 feet west of N. 1450 Rd and ending approximately 170 feet east of 1304 W. Reynolds St. in Pontiac. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $686,220 ·
Jan 16, 2026 66R74 VariousDistrict 3 Application of growth regulator and broadleaf herbicide chemicals to vegetation within the "Safety Zone" along_shoulders of District 3 Interstate Routes and ramps, including I-80, I-180, I-55, I-39, and I-57 within the counties of Bureau, LaSalle, Grundy, Livingston, Kankakee, Iroquois, and Ford. — Executed Nov 25 New ALLEN CHASE ENTERPRISES INC. $147,145 ·
Jan 16, 2026 66R77 VariousDistrict 3 Bridge Deck Concrete Sealing with the parapets/curbs on various routes at various locations throughout Dekalb, Grundy, Kendall and Lasalle Counties. — Executed Nov 25 New M & M Concrete, Inc. $195,933 ·
Jan 16, 2026 66R83 LaSalleDistrict 3 Milling and resurfacing, patching, pavement striping, pavment markers, and other related construction work on FAU_Route 6081 north of I-80 in Peru beginning at Il Route 251 and ending at Airport Rd; also on Charles St adjacent to east 3rd Rd in Lasalle County. — Executed Nov 25 New Advanced Asphalt Company $836,744 ·
Jan 16, 2026 66R85 LaSalleDistrict 3 Filling existing shoulder inlets, paved shoulder removal and replacement with PCC shoulders and concrete curbs, pipe drain removal, riprap installation Class A Patching (Special) and other related construction work on FAI 39 north and south of SNs 050-0167 and 050-0168 over the Chicago and Northwestern Railroad. — Executed Nov 25 New D. Construction, Inc. $333,979 ·
Jan 16, 2026 66R89 KendallDistrict 3 Cleaning and painting steel bridge, pavement striping, and traffic control at SN 047-0052 carrying US Route 52 over Roods Creek in Kendall County. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $118,285 ·
Jan 16, 2026 66R90 DeKalbDistrict 3 Cleaning and painting steel bridge, pavement striping, and traffic control at SN 019-0012 carrying IL Route 64 over S. Branch Kishwaukee River in Dekalb County. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $132,665 ·
Jan 16, 2026 66R91 BureauDistrict 3 Cleaning and painting all structural steel, pavement striping, and traffic control of SN 019-0012 carrying IL Route 92 over a branch of Masters Creek in Bureau County. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $118,396 ·
Jan 16, 2026 66T16 GrundyDistrict 3 0.60 miles of seeding, Minooka Rd to Aux Sable Creek. — Executed Nov 25 New Central Landscaping, LP $117,275 ·
Jan 16, 2026 68F50 FultonDistrict 4 Bridge painting and repair on SN 063-0002, the Scott W. Lucas Memorial Bridge over the Illinois River, in Fulton County. — Executed Nov 25 New Civil Coatings and Construction Inc. $14,341,242 ·
Jan 16, 2026 68F92 TazewellDistrict 4 3.22 miles patching, resurfacing and traffic signals; from west of Grosenbach Road to east of Cummings Lane in Peoria County. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $11,508,683 ·
Jan 16, 2026 68J43 TazewellDistrict 4 Bridge joint replacement, structural steel repairs, floor drain extension, and deck sealer on East Washington Street over Farm Creek in East Peoria. — Executed Nov 25 New Stark Excavating, Inc. $498,351 ·
Jan 16, 2026 68K52 PeoriaDistrict 4 1.38 miles of landscaping maintenance and installation along I-74 from Ellis St to the Illinois River. — Executed Nov 25 New JIMAX Landscape LLC $271,496 ·
Jan 16, 2026 68K60 VariousDistrict 4 Districtwide tree removal on an on call basis. — Executed Nov 25 New JIMAX Landscape LLC $137,673 ·
Jan 16, 2026 68K61 VariousDistrict 4 Weed spraying throughout District 4. Aproximately 2142 acres. — Executed Nov 25 New The Daltons Inc. $155,821 ·
Jan 16, 2026 70E65 PiattDistrict 5 Bridge deck overlay IL-32 over the Sangamon River 4.3 miles south of Cisco (SN 074-3171). — Executed Nov 25 New Sangamo Construction Company $1,304,781 ·
Jan 16, 2026 70F93 McLeanDistrict 5 Bridge deck overlay at Mackinaw River 2 miles southwest of Lexington and at Turkey Creek 1.5 miles southwest of Lexington on I-55. — Executed Nov 25 New Stark Excavating, Inc. $6,136,985 ·
Jan 16, 2026 70H59 ChampaignDistrict 5 Bridge Painting of 7 Structures on FAI 74 / (I-74) in Champaign County. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $2,340,051 ·
Jan 16, 2026 70H79 McLeanDistrict 5 88.7 miles of Litter removal along interstate right-of-ways in McLean County. — Executed Nov 25 New Thor General Contracting LLC $70,676 ·
Jan 16, 2026 70H80 ChampaignDistrict 5 75.3 miles of Litter removal along interstate right-of-ways in Champaign County. — Executed Nov 25 New Thor General Contracting LLC $60,155 ·
Jan 16, 2026 70H84 VariousDistrict 5 567.5 miles of weed spraying; approximately 2,004 acres on state ROW along US 51 and interstate routes including interchanges in Champaign, Dewitt, McLean, Piatt, and Vermilion Counties. — Executed Nov 25 New ALLEN CHASE ENTERPRISES INC. $149,012 ·
Jan 16, 2026 72047 VariousDistrict 6 Bridge washing at eight major river crossings within District 6. — Executed Nov 25 New All States Painting, Inc. $151,644 ·
Jan 16, 2026 72307 PikeDistrict 6 9.2 miles of partial depth pavement patching, resurfacing, HMA shoulders, concrete gutter replacement and guardrail updates on IL 107 from the Brown County line to north of Franklin Street in Griggsville. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $7,106,857 ·
Jan 16, 2026 72383 LoganDistrict 6 5 miles of Cape seal on the mainline and fog seal on the shoulders of IL 121 from west of IL 54, south of Mt Pulaski, to 0.2 miles west of CH 6 (2200th Avenue), west of Latham. — Executed Nov 25 New A. C. Pavement Striping Co. $639,547 ·
Jan 16, 2026 72415 ChristianDistrict 6 2.6 miles of milling, resurfacing and HMA shoulders on US 51 from IL 16 to 540 N. Road. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $1,716,492 ·
Jan 16, 2026 72419 MacoupinDistrict 6 6 miles of resurfacing on IL 111 from south of Albany Road, 1.8 miles south of Chesterfield, to IL 267 in Medora. — Executed Nov 25 New Charles E. Mahoney Co. $4,595,378 ·
Jan 16, 2026 72420 MacoupinDistrict 6 4.43 miles of cape sealing the existing mainline pavement of IL 4, and fog sealing the HMA shoulders. — Executed Nov 25 New A. C. Pavement Striping Co. $527,386 ·
Jan 16, 2026 72433 SangamonDistrict 6 2.7 miles of resurfacing on Andrew Road from 0.1 miles east of IL 29 to west of IL 124, west of Sherman. — Executed Nov 25 New P. H. Broughton & Sons, Inc. $1,115,449 ·
Jan 16, 2026 72464 ScottDistrict 6 3.9 miles of resurfacing on IL 106 from west of Hillview Blacktop to Old US 36 and on Old US 36 from IL 106 to north of Commercial Street in Winchester. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $2,868,473 ·
7,401–7,500 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.