(111-BI)BDR,BJR 25
- Let date
- Friday, January 16, 2026
- Contract
- 62Y05 · job page
- District
- District 1
- County
- Mchenry
- Highway
- Limits
- (1050-Ft) Bridge Deck Overlay (SN 056-0037) consists of replacing the expansion joints at both abutments, updating the guardrail, removing tree debris from the channel. Located on FAP Route 336, IL 31 (Richmond Road) over Nippersink Creek in The City of Richmond in McHenry County, IL.
- Classification
- Replacing the expansion joints at both abutments, updating the guardrail, removing tree debris from the channe ·
- Project number
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Martam Construction Incorporated Low bidder | $740,984 | ||
| 2 | Lorig Construction Company | $771,565 | +4.1% | |
| 3 | Areatha Construction Co., Inc. | $892,051 | +20.4% | |
| 4 | Alliance Contractors, Inc. | $912,447 | +23.1% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Martam Construc… | #2 Lorig Construct… | #3 Areatha Constru… | #4 Alliance Contra… |
|---|---|---|---|---|---|---|---|---|---|
| 1 | X0326276 | TEMP LGHT SNGL LN STG | 1 | L SUM | $36,000.00 | $20,000.00 | $33,105.00 | $33,105.00 | |
| 2 | X5030250 | BR DECK GROOVING LONG | 445 | SQ YD | $13.00 | $15.00 | $19.00 | $26.75 | |
| 3 | X6310301 | REP TRAF B TERM T1 SP | 3 | EACH | $2,400.00 | $3,400.00 | $2,110.25 | $2,110.24 | |
| 4 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $3,600.00 | $3,200.00 | $3,000.00 | $250.00 | |
| 5 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $83,500.00 | $110,000.00 | $15,500.00 | $39,150.00 | |
| 6 | X7200061 | TEMP INFO SIGNING | 412 | SQ FT | $20.00 | $21.00 | $16.00 | $15.00 | |
| 7 | X7830050 | RRPM REFLECTOR REMOVL | 8 | EACH | $10.00 | $10.00 | $50.00 | $6.00 | |
| 8 | X7830052 | RRPM REFLECTOR REPLAC | 8 | EACH | $25.00 | $40.00 | $50.00 | $50.00 | |
| 9 | X8900104 | TEMP TR SIGNAL TIMING | 1 | EACH | $2,500.00 | $1,400.00 | $2,485.00 | $2,485.00 | |
| 10 | Z0006016 | BR DK LTX C OLY 2 3/4 | 816 | SQ YD | $155.00 | $160.00 | $255.05 | $186.00 | |
| 11 | Z0012130 | BR DECK SCAR 3/4 | 816 | SQ YD | $65.00 | $105.00 | $137.25 | $152.00 | |
| 12 | Z0012754 | STR REP CON DP = < 5 | 132 | SQ FT | $240.00 | $425.00 | $215.70 | $140.00 | |
| 13 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $4,000.00 | $10,000.00 | $6,000.00 | $7,500.00 | |
| 14 | Z0015550 | DEBRIS REMOVAL | 16 | CU YD | $128.00 | $350.00 | $649.30 | $400.00 | |
| 15 | Z0029090 | DIAMOND GRIND BR SEC | 742 | SQ YD | $15.00 | $16.00 | $15.55 | $20.25 | |
| 16 | 25000210 | SEEDING CL 2A | 0.25 | ACRE | $10,000.00 | $10,000.00 | $9,000.00 | $9,000.00 | |
| 17 | 25000400 | NITROGEN FERT NUTR | 23 | POUND | $6.00 | $5.00 | $5.00 | $5.00 | |
| 18 | 25000500 | PHOSPHORUS FERT NUTR | 23 | POUND | $6.00 | $5.00 | $5.00 | $5.00 | |
| 19 | 25000600 | POTASSIUM FERT NUTR | 23 | POUND | $6.00 | $5.00 | $5.00 | $5.00 | |
| 20 | 25100630 | EROSION CONTR BLANKET | 392 | SQ YD | $6.00 | $5.00 | $5.00 | $5.00 | |
| 21 | 28000250 | TEMP EROS CONTR SEED | 9 | POUND | $12.00 | $10.00 | $10.00 | $10.00 | |
| 22 | 28000400 | PERIMETER EROS BAR | 690 | FOOT | $5.00 | $4.50 | $4.50 | $4.50 | |
| 23 | 40600290 | BIT MATLS TACK CT | 146 | POUND | $1.00 | $0.1000 | $0.1000 | $0.0100 | |
| 24 | 40600370 | LONG JOINT SEALANT | 210 | FOOT | $38.00 | $35.00 | $35.00 | $25.00 | |
| 25 | 40600982 | HMA SURF REM BUTT JT | 324 | SQ YD | $2.00 | $1.00 | $1.00 | $25.00 | |
| 26 | 40604062 | HMA SC IL-9.5 D N70 | 19 | TON | $1,300.00 | $1,150.00 | $1,100.00 | $775.00 | |
| 27 | 50102400 | CONC REM | 12 | CU YD | $2,400.00 | $3,500.00 | $3,127.00 | $8,175.00 | |
| 28 | 50300255 | CONC SUP-STR | 11.2 | CU YD | $3,200.00 | $3,800.00 | $5,556.45 | $13,050.00 | |
| 29 | 50300300 | PROTECTIVE COAT | 946 | SQ YD | $2.00 | $1.75 | $3.95 | $3.75 | |
| 30 | 50800205 | REINF BARS, EPOXY CTD | 2,450 | POUND | $4.00 | $5.00 | $5.20 | $2.95 | |
| 31 | 50800515 | BAR SPLICERS | 32 | EACH | $63.00 | $82.00 | $72.75 | $70.00 | |
| 32 | 52000110 | PREF JT STRIP SEAL | 118 | FOOT | $265.00 | $257.00 | $560.30 | $220.00 | |
| 33 | 58700300 | CONCRETE SEALER | 130 | SQ FT | $5.00 | $22.00 | $4.50 | $7.50 | |
| 34 | 63000001 | SPBGR TY A 6FT POSTS | 637.5 | FOOT | $32.00 | $29.00 | $29.65 | $29.66 | |
| 35 | 63100089 | TRAF BAR TERM T6B | 1 | EACH | $5,200.00 | $6,000.00 | $4,866.00 | $4,866.00 | |
| 36 | 63200310 | GUARDRAIL REMOV | 638 | FOOT | $8.00 | $6.00 | $6.65 | $6.66 | |
| 37 | 67100100 | MOBILIZATION | 1 | L SUM | $44,000.00 | $37,000.00 | $53,508.00 | $54,000.00 | |
| 38 | 70106500 | TEMP BR TRAF SIGNALS | 1 | EACH | $66,000.00 | $10,000.00 | $64,367.00 | $64,367.00 | |
| 39 | 70106700 | TEMP RUMBLE STRIPS | 12 | EACH | $90.00 | $75.00 | $665.00 | $75.00 | |
| 40 | 70107025 | CHANGEABLE MESSAGE SN | 168 | CAL DA | $30.00 | $25.00 | $35.00 | $25.00 | |
| 41 | 70300150 | SHRT TRM PAVT MK REM | 826 | SQ FT | $0.5000 | $0.4000 | $1.00 | $0.4000 | |
| 42 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 1,908 | FOOT | $0.5000 | $0.4000 | $0.8000 | $0.4000 | |
| 43 | 70307120 | TEMP PVT MK L4 T4 TAPE | 2,205 | FOOT | $1.30 | $1.25 | $1.30 | $1.18 | |
| 44 | 70307210 | TEMP PVT MK L24 T4 TAPE | 49 | FOOT | $8.00 | $7.50 | $7.60 | $7.20 | |
| 45 | 78000200 | THPL PVT MK LINE 4 | 1,532 | FOOT | $4.80 | $3.50 | $3.50 | $2.20 | |
| 46 | 78009004 | MOD URETH PM LINE 4 | 376 | FOOT | $15.00 | $15.00 | $15.00 | $8.00 | |
| 47 | 78100100 | RAISED REFL PAVT MKR | 3 | EACH | $1,600.00 | $1,700.00 | $1,500.00 | $400.00 | |
| 48 | 78200005 | GRDRAIL REF TYPE A | 15 | EACH | $15.00 | $12.00 | $12.00 | $12.00 | |
| 49 | 78300200 | RAISED REF PVT MK REM | 3 | EACH | $30.00 | $50.00 | $20.00 | $50.00 | |
| 50 | 78300202 | PVT MKG REM WTR BLAST | 1,259 | SQ FT | $3.00 | $2.50 | $2.85 | $2.50 |