(1976-165-WRS)BDR,BJR 25
- Let date
- Friday, January 16, 2026
- Contract
- 62Y14 · job page
- District
- District 1
- County
- Cook
- Highway
- Limits
- (296-Ft) Bridge joint repair and replacement, and bridge deck latex overlay project (SN 016-2545) consist of I-beam repair, joint sealing, HMA surface removal, butt joints, HMA surface course, guardrail removal, traffic barrier terminal installation, pavement markings, temporary concrete barrier, maintenance of traffic with temporary pavement markings, temporary traffic signals. This project is in the City of Chicago Heights, in Cook County, IL.
- Classification
- I-beam repair, joint sealing, HMA surface removal, butt joints, HMA surface course, guardrail removal, traffic ·
- Project number
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $742,733 | ||
| 2 | MYS, Incorporated | $905,721 | +21.9% | |
| 3 | Lorig Construction Company | $914,997 | +23.2% | |
| 4 | Areatha Construction Co., Inc. | $957,295 | +28.9% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… | #2 MYS, Incorporat… | #3 Lorig Construct… | #4 Areatha Constru… |
|---|---|---|---|---|---|---|---|---|---|
| 1 | X0325748 | ACRYLIC COATING | 20 | SQ YD | $176.00 | $113.10 | $100.00 | $300.00 | |
| 2 | X0325749 | FIBER WRAP | 180 | SQ FT | $110.00 | $169.65 | $100.00 | $185.00 | |
| 3 | X2010350 | TREE REMOV ACRES SPL | 0.4 | ACRE | $35,200.00 | $36,193.59 | $32,000.00 | $32,000.00 | |
| 4 | X2100002 | PRUN SAFETY/EQUIP CLR | 7 | UNIT | $1,265.00 | $1,300.70 | $500.00 | $1,150.00 | |
| 5 | X2511630 | EROS CONT BLANKET SPL | 1,936 | SQ YD | $2.20 | $2.26 | $2.00 | $2.00 | |
| 6 | X5060700 | CLEAN/PAINT BEARINGS | 20 | EACH | $2,750.00 | $2,827.62 | $2,500.00 | $2,500.00 | |
| 7 | X6700407 | ENGRS FLD OFC TY A D1 | 6 | CAL MO | $5,000.00 | $4,677.00 | $3,800.00 | $2,500.00 | |
| 8 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $35,000.00 | $31,053.80 | $125,000.00 | $17,000.00 | |
| 9 | X7200061 | TEMP INFO SIGNING | 64 | SQ FT | $30.00 | $22.62 | $25.00 | $20.00 | |
| 10 | X8900104 | TEMP TR SIGNAL TIMING | 4 | EACH | $1,375.00 | $848.29 | $750.00 | $1,250.00 | |
| 11 | Z0001899 | JACK & REM EX BEARING | 4 | EACH | $6,000.00 | $10,369.27 | $8,000.00 | $10,324.35 | |
| 12 | Z0006016 | BR DK LTX C OLY 2 3/4 | 559 | SQ YD | $149.00 | $223.11 | $180.00 | $269.30 | |
| 13 | Z0010400 | CLEANING BRIDGE SEATS | 517 | SQ FT | $5.50 | $5.66 | $5.00 | $2.90 | |
| 14 | Z0012130 | BR DECK SCAR 3/4 | 559 | SQ YD | $75.00 | $114.10 | $100.00 | $166.15 | |
| 15 | Z0012754 | STR REP CON DP = < 5 | 46 | SQ FT | $280.00 | $282.77 | $550.00 | $338.55 | |
| 16 | Z0016002 | DECK SLAB REP (FD-T2) | 3 | SQ YD | $2,000.00 | $2,092.44 | $3,800.00 | $3,746.30 | |
| 17 | Z0029090 | DIAMOND GRIND BR SEC | 559 | SQ YD | $19.04 | $25.29 | $18.00 | $20.00 | |
| 18 | Z0043800 | P P CONC I-BM REPAIR | 2 | SQ FT | $1,000.00 | $791.73 | $500.00 | $350.00 | |
| 19 | 20200100 | EARTH EXCAVATION | 5 | CU YD | $250.00 | $111.33 | $110.00 | $139.20 | |
| 20 | 21101600 | TOPSOIL F & P VAR DP | 52 | SQ YD | $26.40 | $27.14 | $25.00 | $24.00 | |
| 21 | 25000115 | SEEDING CL 1B | 0.4 | ACRE | $4,620.00 | $4,750.41 | $4,200.00 | $4,200.00 | |
| 22 | 25000400 | NITROGEN FERT NUTR | 45 | POUND | $3.30 | $3.39 | $3.00 | $3.00 | |
| 23 | 25000600 | POTASSIUM FERT NUTR | 45 | POUND | $3.30 | $3.39 | $3.00 | $3.00 | |
| 24 | 40600290 | BIT MATLS TACK CT | 566 | POUND | $0.0100 | $1.46 | $0.0100 | $0.1000 | |
| 25 | 40600370 | LONG JOINT SEALANT | 284 | FOOT | $37.63 | $17.51 | $53.00 | $35.00 | |
| 26 | 40600982 | HMA SURF REM BUTT JT | 444 | SQ YD | $20.00 | $27.00 | $27.00 | $1.00 | |
| 27 | 40604062 | HMA SC IL-9.5 D N70 | 130 | TON | $130.00 | $310.77 | $255.00 | $250.00 | |
| 28 | 40800025 | BIT MATLS PR CT | 222 | POUND | $0.0100 | $1.46 | $0.0100 | $0.1000 | |
| 29 | 40800050 | INCIDENTAL HMA SURF | 30 | TON | $140.00 | $437.89 | $400.00 | $600.00 | |
| 30 | 42001300 | PROTECTIVE COAT | 16 | SQ YD | $1.00 | $47.94 | $16.00 | $12.85 | |
| 31 | 44000150 | HMA SURF REM 1/4 | 719 | SQ YD | $5.00 | $14.59 | $17.00 | $22.00 | |
| 32 | 44000500 | COMB CURB GUTTER REM | 388 | FOOT | $12.00 | $29.95 | $20.00 | $18.65 | |
| 33 | 44000600 | SIDEWALK REM | 890 | SQ FT | $5.00 | $3.64 | $8.00 | $5.25 | |
| 34 | 44213200 | SAW CUTS | 285 | FOOT | $5.00 | $2.54 | $7.00 | $4.00 | |
| 35 | 45000120 | RELIEF JOINT 3 | 147 | FOOT | $100.00 | $96.14 | $70.00 | $102.10 | |
| 36 | 50102400 | CONC REM | 15.3 | CU YD | $3,000.00 | $2,679.23 | $2,800.00 | $1,848.20 | |
| 37 | 50300225 | CONC STRUCT | 0.9 | CU YD | $3,250.00 | $5,938.01 | $12,000.00 | $17,085.25 | |
| 38 | 50300255 | CONC SUP-STR | 16.4 | CU YD | $3,250.00 | $2,411.14 | $2,600.00 | $3,357.65 | |
| 39 | 50300300 | PROTECTIVE COAT | 589 | SQ YD | $1.00 | $6.19 | $2.25 | $4.80 | |
| 40 | 50800205 | REINF BARS, EPOXY CTD | 980 | POUND | $5.00 | $7.52 | $6.00 | $6.50 | |
| 41 | 50800515 | BAR SPLICERS | 12 | EACH | $100.00 | $97.83 | $85.00 | $58.15 | |
| 42 | 52000110 | PREF JT STRIP SEAL | 171 | FOOT | $250.00 | $295.34 | $290.00 | $413.10 | |
| 43 | 52100010 | ELAST BEARING ASSY T1 | 4 | EACH | $3,200.00 | $5,473.31 | $2,500.00 | $2,019.45 | |
| 44 | 52100520 | ANCHOR BOLTS 1 | 8 | EACH | $180.00 | $261.30 | $300.00 | $346.60 | |
| 45 | 58700300 | CONCRETE SEALER | 2,276 | SQ FT | $3.30 | $2.26 | $3.00 | $1.85 | |
| 46 | 60255500 | MAN ADJUST | 1 | EACH | $1,000.00 | $1,047.50 | $2,300.00 | $950.00 | |
| 47 | 60260100 | INLETS ADJUST | 8 | EACH | $900.00 | $507.94 | $1,300.00 | $950.00 | |
| 48 | 60605000 | COMB CC&G TY B-6.24 | 388 | FOOT | $45.00 | $81.23 | $90.00 | $115.35 | |
| 49 | 63100085 | TRAF BAR TERM T6 | 3 | EACH | $5,802.50 | $5,966.29 | $5,000.00 | $5,275.00 | |
| 50 | 63200310 | GUARDRAIL REMOV | 113 | FOOT | $9.90 | $10.18 | $24.00 | $9.00 | |
| 51 | 66900200 | NON SPL WASTE DISPOSL | 20 | CU YD | $150.00 | $159.41 | $100.00 | $161.80 | |
| 52 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $1,815.00 | $1,640.02 | $1,450.00 | $1,450.00 | |
| 53 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,475.00 | $3,506.25 | $3,100.00 | $3,100.00 | |
| 54 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,475.00 | $1,357.26 | $1,200.00 | $1,200.00 | |
| 55 | 66901006 | REG SUB MON | 35 | CAL DA | $0.0100 | $769.11 | $250.00 | $680.00 | |
| 56 | 67100100 | MOBILIZATION | 1 | L SUM | $42,041.29 | $36,378.56 | $50,000.00 | $57,300.00 | |
| 57 | 70107004 | PAVT MK BLKOUT TAPE 4 | 4,617 | FOOT | $3.00 | $2.26 | $1.00 | $1.90 | |
| 58 | 70107006 | PAVT MK BLKOUT TAPE 6 | 221 | FOOT | $3.00 | $3.39 | $2.00 | $2.00 | |
| 59 | 70107012 | PAVT MK BLKOUT TPE 12 | 73 | FOOT | $6.00 | $6.96 | $4.00 | $4.00 | |
| 60 | 70107024 | PAVT MK BLKOUT TPE 24 | 39 | FOOT | $12.00 | $13.86 | $15.00 | $15.00 | |
| 61 | 70107025 | CHANGEABLE MESSAGE SN | 28 | CAL DA | $100.00 | $39.59 | $50.00 | $40.00 | |
| 62 | 70300150 | SHRT TRM PAVT MK REM | 20 | SQ FT | $5.00 | $7.35 | $10.00 | $10.00 | |
| 63 | 70307130 | TEMP PVT MK L6 T4 TAPE | 40 | FOOT | $5.00 | $6.79 | $15.00 | $15.00 | |
| 64 | 78000200 | THPL PVT MK LINE 4 | 920 | FOOT | $5.12 | $5.37 | $1.00 | $1.00 | |
| 65 | 78000400 | THPL PVT MK LINE 6 | 10 | FOOT | $5.50 | $8.09 | $1.50 | $1.35 | |
| 66 | 78000600 | THPL PVT MK LINE 12 | 30 | FOOT | $7.04 | $16.12 | $3.00 | $2.90 | |
| 67 | 78000650 | THPL PVT MK LINE 24 | 15 | FOOT | $12.10 | $32.23 | $6.00 | $5.80 | |
| 68 | 78009004 | MOD URETH PM LINE 4 | 650 | FOOT | $7.76 | $9.05 | $1.00 | $1.00 | |
| 69 | 78009012 | MOD URETH PM LINE 12 | 10 | FOOT | $28.60 | $28.28 | $13.00 | $12.25 | |
| 70 | 78100100 | RAISED REFL PAVT MKR | 24 | EACH | $231.00 | $248.83 | $50.00 | $49.10 | |
| 71 | 78300200 | RAISED REF PVT MK REM | 24 | EACH | $20.00 | $62.21 | $25.00 | $25.00 | |
| 72 | 78300202 | PVT MKG REM WTR BLAST | 62 | SQ FT | $41.80 | $0.1100 | $15.00 | $15.00 |