Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jun 14, 2024 60J10 CookDistrict 1 Bridge replacement for the Rand Road Bridge over the Des Plaines River (SN 016-0362) roadway reconstruction and widening, traffic signal modernization, drainage improvements, lighting, and landscaping, in the City of Des Plaines, Cook County, IL. — Executed Nov 26 New IHC Construction Companies, L.L.C. $18,192,045 ·
Jun 14, 2024 61H55 CookDistrict 1 HMA Resurfacing with construction of a right turn lane, traffic signals, street lighting, curb and gutter, pavement markings, and landscaping at the intersection of 111th Street and Roberts Road in Palos Hills — Executed Nov 26 New K-Five Construction Corporation $3,065,792 ·
Jun 14, 2024 61J28 KaneDistrict 1 Reconstruction of the existing intersection of us 20 and Reinking road in the c ty of Elgin to a three-leg roundabout. Work includes pavement removal, storm se sewers, watermains, pcc roadway pavement, curb and gutter, sidewalks, lighting, landscaping, pavement markings and other necessary work. — Executed Nov 26 New Plote Construction, Inc. $3,364,000 ·
Jun 14, 2024 61K36 CookDistrict 1 Sidewalk construction on 91st Street from 0.1 mile east of California Avenue to Western Avenue at the CSX Railroad in Evergreen Park. , Sidewalk Construction on 91st Street from 0.1 mile east of California Avenue to Western Avenue at the CSX Railroad in Evergreen Park. — Rejected Nov 26 New
Jun 14, 2024 61K38 KaneDistrict 1 Resurface Main Street from Cross Street to 630' north of IL 47 in Sugar Grove. — Executed Nov 26 New D. Construction, Inc. $446,051 ·
Jun 14, 2024 61K40 CookDistrict 1 Resurface 9th Avenue from Chicago Avenue to Main Street in Melrose Park. — Executed Nov 26 New K-Five Construction Corporation $767,574 ·
Jun 14, 2024 61K43 McHenryDistrict 1 HMA resurfacing, PCC sidewalks, curb and gutter, outdoor fireplace construction, shelter construction, landscaping at the downtown Cary Gateway Plaza on the northwest corner of Main Street and Spring Street. — Rejected Nov 25 New Sjostrom & Sons, Inc. $1,190,661 ·
Jun 14, 2024 61K47 CookDistrict 1 Resurface 154th Street from Dr. MLK Drive/South park Avenue to Dante Avenue in South Holland. — Executed Nov 26 New Gallagher Asphalt Corporation $1,777,633 ·
Jun 14, 2024 62F11 CookDistrict 1 (1.73-Mile) Intersection improvements, roadway reconstruction and widening, resurfacing, railroad crossing improvements, traffic signal modernization, drainage improvements, lighting and landscaping in the Villages of McCook, LaGrange Brookfield, Cook County, IL. — Executed Nov 26 New Judlau Contracting, Inc. $17,861,924 ·
Jun 14, 2024 62J23 CookDistrict 1 (810-Ft) Bridge Replacement, Drainage and ADA Improvements, Traffic Signal and Lighting, I-90 at Foster Avenue. (SN 016-1100) — Executed Nov 26 New IHC Construction Companies, L.L.C. $25,221,182 ·
Jun 14, 2024 62L00 CookDistrict 1 (3.02-Mile) Standard/SMART Overlay and ADA improvements includes combination curb and gutter removal and replacement, pavement marking, sidewalk removal and replacement. This project is located in the City of Chicago. — Executed Nov 26 New MAT Construction Leasing, Inc. $1,805,126 ·
Jun 14, 2024 62M79 WillDistrict 1 Rehabilitate bascule spans of US 30 (Cass St) bridge over Des Plaines River (SN 099-0101) including structural, mechanical, and electrical improvements for total length of 552 ft (0.1 mile). The project is located within the City of Joliet in Will County, Illinois. — Executed Nov 26 New D. Construction, Inc. $22,831,654 ·
Jun 14, 2024 62N32 DuPageDistrict 1 (14.64-Mile) Changeable Message Signs, Signal Timing/ Progression, Signing (New), Surveillance, Traffic Signal Modernization and ADA improvements. Located on IL 56 from IL 59 to York Rd in the Cities of Wheaton, Warrenville, Oakbrook Terrace, the Villages of Downers Grove, Oak Brook, Lombard, and Milton Township in DuPage County. — Executed Nov 26 New H & H Electric Co. $15,380,412 ·
Jun 14, 2024 62N40 CookDuPageDistrict 1 (10.1-Mile) Changeable Message Signs, Signal Timing/ Progression, Signing (New) Surveillance, Traffic Signal Modernization and ADA Improvements. Located on IL 64 (North Avenue) from York Rd to IL 50 (Cicero Ave) in the Cities of Chicago, Elmhurst, Northlake, the Villages of Elmwood Park, Melrose Park, Oak Park, River Forest, River Grove and Stone Park in DuPage and Cook Co. — Executed Nov 26 New John Burns Construction Company $17,075,556 ·
Jun 14, 2024 62P44 CookDistrict 1 Bridge Superstructure, Lighting, and Resurfacing, I-290 at Ashland Avenue. The project is on Ashland Avenue over FAI 290 from Congress Parkway to Van Buren Street in the City of Chicago, Cook County. — Executed Nov 26 New Lorig Construction Company $13,414,940 ·
Jun 14, 2024 62R41 CookDistrict 1 Rumble strips pavement patching, PCC curb and gutter removal and replacement, pedestrian curb ramps improvemen (2.02-miles) Designed Overlay, (ADA) improvements consists of rumble strips pavement patching, PCC curb and gutter removal and replacement, pedestrian curb ramps improvements (ADA), asphalt surface removal, asphalt resurfacing, pavement markings and raised reflective pavement markers. Located on Kean Kean Avenue from South of US 12/ 20 (95th Street) to 111 Street within the Village of Palos Park in Cook County. — Executed Nov 26 New Gallagher Asphalt Corporation $1,494,018 ·
Jun 14, 2024 62R71 CookDistrict 1 (4.77-Mile) Standard Overlay, ADA Improvements. Project consisting of asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop loop replacement, curb ramps (ADA) sidewalk replacement and pavement markings. Located on 79th Street from IL 171 (Archer Ave.) to IL 50 (Cicero Ave.) within the Villages of Justice and Bridgeview and the City of Burbank, in Cook County. — Executed Nov 26 New Gallagher Asphalt Corporation $7,274,556 ·
Jun 14, 2024 62R72 CookDistrict 1 (2,763-Ft) SMART Overlay, ADA Improvements: Hot-mix asphalt surface removal, pavement patching, asphalt surface overlay, sidewalk removal / replacement, removal and replacement of curb and gutter, longitudinal joint sealing, pavement markings, raised reflective pavement markers located on Palatine Road North Frontage Road, from East of Salt Creek to Alison Drive within the Village of Palatine in Cook County. — Executed Nov 26 New Builders Paving, LLC $322,381 ·
Jun 14, 2024 62R84 CookLakeDistrict 1 Installation of new fiber optic cable, conduit, PTZ cameras, network switches along six different corridors located in Cook and Lake Counties located primarily within Village of Skokie, Elmwood Park, North Chicago, and Lincolnwood. — Executed Nov 26 New H & H Electric Co. $1,113,578 ·
Jun 14, 2024 62T19 WillDistrict 1 (304-Ft) Bridge deck overlay and bridge joint repairs improvement of the structure that carries IL 126 / Lockport Street over the DuPage River. The improvement is located in the Village of Plainfield in Will County. — Executed Nov 26 New D. Construction, Inc. $784,236 ·
Jun 14, 2024 62T24 CookDistrict 1 (550-Ft) Bridge deck overlay, partial full-depth slab repair, concrete repairs to the abutments and parapets, and ADA ramp replacements improvements at the intersection with IL 21 / Milwaukee Avenue. Located in the City of Niles in Cook County. — Executed Nov 26 New Martam Construction Incorporated $1,727,948 ·
Jun 14, 2024 62T28 WillDistrict 1 (1.14-Mile) SMART Overlay and curb ramps (ADA) improvements on US 30 (Center St/ Western Ave/ Cass St) from US 30 (Jefferson St/ Center St) to US 6 (Collins St). Located in the City of Joliet in Will County. — Executed Nov 26 New D. Construction, Inc. $1,201,456 ·
Jun 14, 2024 62T40 CookDistrict 1 This is a bridge repair project OF (SN 016-2603): Lawrence Avenue over Des Plaines River. Scope of work includes bridge deck and approach slab patching, joint replacement, curb and gutter removal and replacement, and milling and resurfacing of the bridge deck and approach pavements. The project is located within the City of Chicago and Village of Schiller Park in Cook County. — Executed Nov 26 New Areatha Construction Co., Inc. $1,031,253 ·
Jun 14, 2024 62T43 CookDistrict 1 (1,000-Ft) Bridge Preservation Project: Deck repairs, scarification, overlay, joints repairs and replacement, approach slab patching, miscellaneous. located on (SN 016-1016), 26th Street at Des Plaines River within the Village of North Riverside in Cook County. — Executed Nov 26 New MYS, Incorporated $849,814 ·
Jun 14, 2024 62T55 WillDistrict 1 (2,710-Ft) Smart overlay and ADA project, located on FAP 607: US 6, US 30 (Collins Street) within the City of Joliet in Will County. — Executed Nov 26 New Gallagher Asphalt Corporation $734,798 ·
Jun 14, 2024 62T56 WillDistrict 1 (4,758-Ft) SMART Overlay: hot-mix asphalt surface removal, earth excavation, new shoulders, pavement patching, hot-mix asphalt surface, curb and gutter removal and replacement, longitudinal joint sealing, pavement markings, and detector loops replacement. Located on US 6 (Channahon Road) from Southwest of Terry Drive to Northeast of Hollywood Road, in the City of Joliet in Will Co. — Executed Nov 26 New P. T. Ferro Construction Co. $1,020,995 ·
Jun 14, 2024 62T91 VariousDistrict 1 Applying selective and non-selective herbicide mixtures to control weeds within medians, guardrails, interchan This work consists of applying selective and non-selective herbicide mixtures to control weeds within medians, guardrails, interchanges, infields, shoulders and slopes within the limits of the right of way within various areas in District One. — Executed Nov 26 New McGinty Bros., Inc. $986,540 ·
Jun 14, 2024 62U10 CookDistrict 1 (3.48-Mile) Standard overlay and ADA improvement project. The project begins at Palatine Road South Frontage Road East of US Route 12 to East of Pinecrest Drive and is located within the City of Arlington Heights in Cook County. — Executed Nov 26 New K-Five Construction Corporation $2,076,778 ·
Jun 14, 2024 62U21 CookDistrict 1 Pavement marking and traffic signal modernization (1,356-Ft) This project consists of pavement marking and traffic signal modernization. The project is located in the Village of Western Springs and unincorporated Proviso Township, Cook County. — Active Nov 26 New John Burns Construction Company $2,249,775 ·
Jun 14, 2024 62U76 WillDistrict 1 (3,093-Ft) Traffic Signal Modernization, Left Turn Lanes includes resurfacing, traffic signals, drainage improvements, and pavement markings. Located on IL 7 (Renwick Road) at the intersection with IL 53 (Independence Blvd) in the Cities of Lockport and Crest Hill in Will County. — Executed Nov 26 New Alliance Contractors, Inc. & Home Towne Electric, Inc. $2,728,452 ·
Jun 14, 2024 62U77 LakeDistrict 1 ADA pedestrian ramps improvements, pavement patching, hot-mix asphalt surface removal, combination concrete cu (0.35-Mile) Designed Overlay consists of ADA pedestrian ramps improvements, pavement patching, hot-mix asphalt surface removal, combination concrete curb and gutter removal and replacement, structure adjustments and drainage structure cleaning, asphalt leveling binder and surface course, pavement markings, raised reflective pavement marker installation. Located on IL 176 (Park Avenue) from Garfield Rd to Park Pl, within the Village of Libertyville in Lake County. — Executed Nov 26 New Peter Baker & Son Co. $649,700 ·
Jun 14, 2024 62U79 WillDistrict 1 (0.71-Mile) Designed Overlay, ADA Improvements Located along IL 53 (Baltimore Street) from IL 102 (Water Street) to Kankakee Street and from Forked Creek to to just South of Wilmington/ Peotone Road within the City of Wilmington in Will County. — Executed Nov 26 New Iroquois Paving Corporation $856,805 ·
Jun 14, 2024 62U83 CookKaneDistrict 1 6,108 feet (1.16 mi) project which includes pavement reconstruction and widening, pavement rehabilitation, drainage, lighting, signing, noise barriers, safety improvements, superstructure replacement and widening of US 20 over St Charles St (SN 045-0006), and superstructure replacement of US 20 over Liberty St (045-0007) and US 20 over Poplar Creek (SN 016-0217) from E of Grace St to W of Shales Pkwy in the City of Elgin within Kane and Cook Counties. — Executed Nov 26 New Dunnet Bay Construction Company $27,446,572 ·
Jun 14, 2024 62V07 McHenryDistrict 1 (2.61-miles) Designed Overlay, HMA Shoulder Widening, and ADA improvements located on IL 176 (Terra Cotta Avenue) from Hickory Drive to Mistwood Lane within the City of Crystal Lake in McHenry County. — Executed Nov 26 New Builders Paving, LLC $2,978,841 ·
Jun 14, 2024 62V20 CookDistrict 1 Pavement patching, hot-mix asphalt pavement resurfacing and overlay, pavement marking, electrical detection ra The length of the project is 1,269-Ft (0.24-Miles) This project consists of pavement patching, hot-mix asphalt pavement resurfacing and overlay, pavement marking, electrical detection ramp improvements at various locations along I-55 The project is in the City of Chicago and Hodgkins, Cook County. — Executed Nov 26 New Gallagher Asphalt Corporation $1,216,839 ·
Jun 14, 2024 62V24 CookDistrict 1 Cleaning and painting existing steel structures at 2 locations This improvement consists of cleaning and painting existing steel structures at 2 locations. Location 1 is at the structure carrying Metra RR over I-57 (SN 016 -0068) in the Village of Calumet Park. Location 2 is at the structure carrying a Bike Path over I-57 (SN 016-0070) in the City of Chicago. All are located within Cook County. — Executed Nov 26 New Capital Industrial Services, LLC $1,483,300 ·
Jun 14, 2024 62W18 CookDistrict 1 Trombone Mast Arm replacement and APS push button installation at various locations in District 1. — Executed Nov 26 New H & H Electric Co. $1,032,783 ·
Jun 14, 2024 62W48 CookDistrict 1 (4,823-feet) Bridge Rehabilitation / Bikeway: rehabilitation and modification of SN 016-0194 and SN 016-0195. Widening of the existing west side concrete sidewalk for bikeway, bridge joints replacement/ repair, deck hydroscarification, repair and overlay with latex modified concrete, approach slabs and substructure repairs, median removal, guardrail, pavement markings and all incidental and collateral work necessary to complete the project. Located on IL 1 (Halsted Street) over IHB Railroad and — Executed Nov 26 New ICC Group Inc. $8,563,500 ·
Jun 14, 2024 62W74 CookDistrict 1 Resurfacing and patching, pavement marking at various locations along I-290 The length of the project is 695 ft (0.131 miles). This project consists of resurfacing and patching, pavement marking at various locations along I-290. The project is located in the Village of Schaumburg, Cook County. — Executed Nov 26 New Mosley Construction 1, LLC $528,136 ·
Jun 14, 2024 62W85 VariousDistrict 1 Repair to the high tension cable barrier median system. This work includes removing and replacing damaged high tension cable barrier system components and replacing with new material. This work is located on various counties. — Executed Nov 26 New Kujo, Inc. $1,371,721 ·
Jun 14, 2024 62W86 VariousDistrict 1 Installing fence and gates at new locations and repairing existing damaged pedestrian fence barrier Project consists of installing fence and gates at new locations and repairing existing damaged pedestrian fence barrier. This contract is to provide prompt installation of new fence and repair of damaged fence. This work is located on various State maintained arterial and expressway routes within the counties of Cook, DuPage, Kane, Lake, McHenry and Will. — Executed Nov 26 New Fence Masters, Inc. $885,436 ·
Jun 14, 2024 64R17 OgleDistrict 2 4.51 mi. resurfacing, IL 64 from Illinois Railway in Mt. Morris to west of Illinois St. in Oregon. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $2,468,747 ·
Jun 14, 2024 64R35 Jo DaviessDistrict 2 Culvert end section and erosion repair 0.4 mile east of Galena Ridge Dr. on US 20. — Executed Nov 26 New Fischer Excavating, Inc. $286,287 ·
Jun 14, 2024 64R99 OgleDistrict 2 6.35 miles of cold milling, patching, and hot-mix asphalt resurfacing on IL 64 from IL 251 to the DeKalb County Line. — Executed Nov 26 New Rock Road Companies, Inc. $3,806,433 ·
Jun 14, 2024 64S85 Jo DaviessDistrict 2 House and garage demolition at William Dr 3.2 mi S of Galena and Lust cleanup at IL 35: SE of 4th St in East Dubuque. — Executed Nov 26 New Law Excavating, Inc. $528,422 ·
Jun 14, 2024 64S92 WinnebagoDistrict 2 3.21 miles of tree removal for reconstruction of I-39/US 20, I-39 from 0.3 mi east of Mulford Rd. to 0.2 mi north of Harrison_Ave. — Executed Nov 26 New Homer Tree Service, Inc. $364,009 ·
Jun 14, 2024 64T17 CarrollOgleDistrict 2 6.65 miles, design overlay, cold milling, pavement patching, 0.2 mile NW of IL 64 to IL 26. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $2,854,652 ·
Jun 14, 2024 64T18 HenryDistrict 2 6 mi patching, milling, and resurfacing W South St in Kewanee to US 34. — Executed Nov 26 New Advanced Asphalt Company $2,907,108 ·
Jun 14, 2024 64T19 OgleDistrict 2 3.55 miles of cold milling, patching, and hot-mix asphalt resurfacing on IL 38 from 0.5 mile west of Mulford Road to DeKalb County Line. — Executed Nov 26 New Rock Road Companies, Inc. $2,139,439 ·
Jun 14, 2024 64T24 Rock IslandDistrict 2 Pavement patching on I-88 from the I-88/I-80 interchange to 0.2 miles NE of 256th St North. — Executed Nov 26 New G. M. Sipes Construction, Inc. $467,758 ·
Jun 14, 2024 64T25 HenryDistrict 2 Lighting controller, coupling, and luminaire replacement. — Executed Nov 26 New Davenport Electric Contract Company $206,152 ·
Jun 14, 2024 64T26 OgleDistrict 2 Inlet replacement and pavement patching along IL 2 on SN 071-0097 approach pavement. — Executed Nov 26 New Sjostrom & Sons, Inc. $108,222 ·
Jun 14, 2024 64T28 VariousDistrict 2 Maintenance of signs along state maintained routes in District 2. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $199,580 ·
Jun 14, 2024 64T44 OgleDistrict 2 13 miles of aggregate shoulder improvement. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $223,592 ·
Jun 14, 2024 66H56 LivingstonDistrict 3 Milling and resurfacing, culvert repairs, and latex overlays on I-55 0.8 miles north of Wolf Creek to 1.8 miles south of IL 17 and CH1 in Odell from OR 66 to 0.25 miles east of N 2000 Rd. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $39,441,550 ·
Jun 14, 2024 66K66 BureauDistrict 3 Arispie Township superstructure replacement of SN 006-0053 and SN006-0054 and bridge replacement of SN 006-0051 and SN 006-0052. SN 006-0051 and SN 006-0052 carry I 180 over Bureau Creek and SN 006-0053 and SN 006-0054 carry I 180 over CH 23 (Bottom Road). — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $24,206,955 ·
Jun 14, 2024 66K85 LaSalleDistrict 3 2.6 Miles. SN 050-0040 Bridge Replacement with 2 span SN 050-0265 US 34 reprofiling and detour route improvements. Located on US 34 over Indian Creek in Earlville 0.3 miles east of 1251st Road. — Executed Nov 26 New D. Construction, Inc. $5,077,494 ·
Jun 14, 2024 66L10 KankakeeDistrict 3 This project is located on FAP 41 (IL 17) 0.7 mile east of Union Hill Road, consisting of replacing SN 046-0031 with SN 046-0162, carrying FAP 41 (IL 17) over Horse Creek. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $1,975,085 ·
Jun 14, 2024 66N38 GrundyDistrict 3 Variable depth milling and resufacing of Ashley Road and US-6 intersection in Morris city (Grundy County). — Executed Nov 26 New Gallagher Asphalt Corporation $85,098 ·
Jun 14, 2024 66N52 KankakeeDistrict 3 Bridge repairs including expansion joint replacement, deck and approach patching, structural repair of concret This project consists of bridge repairs including expansion joint replacement, deck and approach patching, structural repair of concrete, drain cleaning, traffic control, pavement striping; on F.A.P. Route 332 (IL 1/17) at two structures, Structure No. 046-0023 and Structure No. 046-0111 carrying IL 1/17 over the Kankakee River in Momence. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $850,262 ·
Jun 14, 2024 66N60 DeKalbDistrict 3 I+stallation of a flashing red beacon at each of the stop controlled approaches to the intersections of IL 23 with and Melms, Perry and Baseline RD. It also includes the installation of a flashing yellow beacon at each of the advanced intersection warning signs adjacent to IL 23. — Executed Nov 26 New William Charles Construction Co, LLC $240,792 ·
Jun 14, 2024 66N62 GrundyDistrict 3 Installation of flashing beacons. — Executed Nov 26 New D. Construction, Inc. $248,311 ·
Jun 14, 2024 66N75 LaSalleDistrict 3 3.46 Miles OF Class B pavement patching and shoulder repair. Work is at the exterior ramps of I-39. — Executed Nov 26 New Advanced Asphalt Company $1,918,205 ·
Jun 14, 2024 66P02 LivingstonDistrict 3 Pavement patching_(ramps and parking areas), sidewalk (ADA), curb and gutter, driveway pavement, and striping on FAI 55 at the Northbound Limestone Rest Area, 3.52 miles south of IL 116 (Pontiac) and Southbound Limestone Rest Area, 2.52 miles south of IL 116 (Pontiac). — Executed Nov 26 New K-Five Construction Corporation $2,825,368 ·
Jun 14, 2024 66P06 LaSalleDistrict 3 Removal and replacement of the finger plate expansion joint elastomeric troughs on SN 050-0191 carrying I-39 over the Illinois River, IAIS Railroad, and an abandoned railroad approximately 2.82 miles south of Interstate 80 (I-80). — Executed Nov 26 New D. Construction, Inc. $1,356,516 ·
Jun 14, 2024 66P12 FordDistrict 3 Class B pavement patching on F This project consists of Class B pavement patching on F.A.P. Route 681 (IL 116) beginning at the Ford/Iroquois County Line and ending at the Ford/Livingston County Line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $534,046 ·
Jun 14, 2024 66P13 FordDistrict 3 Class B pavement patching on F This project consists of Class B pavement patching on F.A.P. Route 796 (IL 115) beginning at Pine street (1450E Rd.) in Piper City and ending at the intersection of IL 115/116. — Rejected Nov 25 New G. M. Sipes Construction, Inc. $622,863 ·
Jun 14, 2024 66P14 IroquoisDistrict 3 Class A pavement patching on FAI 57 beginning at MM 285.5, 2.5 miles north of US 24 (Gilman Interchange) and ending at MM 293.5, 0.64 mile north of IL 116 (Ashkum Interchange). — Executed Nov 26 New G. M. Sipes Construction, Inc. $511,011 ·
Jun 14, 2024 66P15 BureauPutnamDistrict 3 17.63 Miles. Centerline joint repair 3' wide and 2" depth resurfacing. This project begins south of the interchange between I 80 and I 180 and continues south to IL 29 and east toward Hennipen. The project terminates at both: the west side of Coffee Creek in Hennepin IL 29 and south at The Illinois River Road National Scenic Byway. — Executed Nov 26 New Advanced Asphalt Company $1,857,288 ·
Jun 14, 2024 66P23 BureauDistrict 3 Crack and Joint Sealing, located on FAP 698 (IL 89), FAU 5605 (US 6), FAS 1248 (US 34/US 6), FAP 316 (IL 26) i This project consists of Crack and Joint Sealing, located on FAP 698 (IL 89), FAU 5605 (US 6), FAS 1248 (US 34/US 6), FAP 316 (IL 26) in Bureau County. — Executed Nov 26 New Denler, Inc. $185,981 ·
Jun 14, 2024 66P24 LaSalleDistrict 3 14.45 miles of routing and crack sealing. Work begins in Ottawa at IL 23 and E Freemont Street on IL 23/IL71 including Columbus Street and LaSalle Street. Work continues at the intersection of Hitt Street and IL 23 to McKinley Rd. Work continues in Streator on IL 18, 0.1 miles east of IL 251 to east 0.1 miles West of E 16th Rd. — Executed Nov 26 New Denler, Inc. $88,496 ·
Jun 14, 2024 66P27 BureauDistrict 3 Class B Pavement Patching on F.A.I. Route 80 (I-80) beginning at M.M. 45.0, 0.1 miles east of IL Route 40 and ending at M.M. 59.6, 0.47 miles east of US Route 34. — Executed Nov 26 New G. M. Sipes Construction, Inc. $798,437 ·
Jun 14, 2024 66P28 BureauDistrict 3 This project is located at Structure_No. 006-0057 (EB) carrying F.A.I. Route 180 (I-180), Roadway "F" and structure No. 006-0058 (WB) carrying_F.A.I. Route 180 (I-180), Roadway "E" over IL Route 29 and the IAIS Railroad approximately 2.0 miles southwest of Bureau Junction. Removal of PCC slope wall/riprap placement. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $405,752 ·
Jun 14, 2024 66P29 IroquoisDistrict 3 8.09 miles, Crack and joint sealing, US 24 to US 45/52. — Executed Nov 26 New Freehill Asphalt, Inc. $83,979 ·
Jun 14, 2024 66P31 VariousDistrict 3 One year contract to repair damaged High Tension Cable Median Barrier, Guardrail, Attenuators, etc., caused by motorists along various routes in District 3. Funded by MCHD funds, Contract Maintenance funds, and Maintenance of HTC Median Barrier funds. — Rejected Nov 26 New Northern Contracting, Inc. $1,803,903 ·
Jun 14, 2024 66P38 LaSalleDistrict 3 Class A pavement patching, joint and pothole repairs, striping and traffic control on FAI 39 beginning at the Marshall/LaSalle County Line and ending at the LaSalle/Lee County Line in LaSalle County. — Executed Nov 26 New G. M. Sipes Construction, Inc. $793,086 ·
Jun 14, 2024 66P40 GrundyLaSalleDistrict 3 Centerline striping on I-39 in LaSalle County and on I-80 in LaSalle and Grundy Counties. — Executed Nov 26 New Maintenance Coatings Co. $1,382,491 ·
Jun 14, 2024 66P41 VariousDistrict 3 Pavement striping This project is located on IL 23 in LaSalle CO., IL 47 in Grundy Co. and IL 17 in Kankakee Co. This work consists of pavement striping. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $428,427 ·
Jun 14, 2024 68E35 KnoxDistrict 4 Superstructure replacement of SN 048-0051 and 048-0052 carrying I-74 over the Spoon River and TR 238A 0.2 mile west of the Spoon River rest area. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $14,446,748 ·
Jun 14, 2024 68H95 TazewellDistrict 4 4.2 miles of construction of HMA shoulders with an aggregate shoulder wedge, between Pekin and Tremont. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,978,846 ·
Jun 14, 2024 68H98 HendersonDistrict 4 Slope stabilization and culvert extension along IL 94, 500 feet north of CH 14. — Executed Nov 26 New J.C. Dillon, Inc. $575,033 ·
Jun 14, 2024 68J07 PeoriaDistrict 4 PCC island and median replacement, 1/4 mile HMA mill and overlay. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $766,039 ·
Jun 14, 2024 68J08 TazewellDistrict 4 4.61 miles of CIR and Mill and Overlay on IL 122 in Tazewell County. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $5,783,311 ·
Jun 14, 2024 68J11 VariousDistrict 4 Replace traffic signal equipment at various locations in District 4. — Rejected Nov 26 New Oberlander Electric Co. $1,200,346 ·
Jun 14, 2024 68J24 PeoriaTazewellDistrict 4 D4 highway lighting 2025: Inspection of existing high mast towers, luminaire repair and re-lamping, maintenance of existing lighting controllers in Peoria and Tazewell Counties. — Executed Nov 26 New Laser Electric, Inc. $516,745 ·
Jun 14, 2024 68J25 TazewellDistrict 4 Lighting upgrades at I-74 and I-155 interchange in Morton in Tazewell County. — Executed Nov 26 New Laser Electric, Inc. $455,220 ·
Jun 14, 2024 68J26 VariousDistrict 4 Add aggregate surface to shoulders along various routes in D4. — Rejected Nov 26 New Phoenix Corporation of the Quad Cities $499,553 ·
Jun 14, 2024 70C14 EdgarDistrict 5 Gross Length 75,737.81 FT = 14.344 MI, Net Length 75,460.81 = 14.292 MI. Standard Overlay Resurfacing and Culvert Replacement of FAP 749 (ILL 133) from Coles Co Line to ILL 16 in Paris. — Executed Nov 26 New Howell Paving, Inc. $12,326,497 ·
Jun 14, 2024 70G24 VermilionDistrict 5 0.657 miles of Smart Overlay on Bowman Ave from IL 119 north of Bismarck to CR 2820. — Executed Nov 26 New Cross Construction, Inc. $307,328 ·
Jun 14, 2024 70G90 McLeanDistrict 5 Traffic signal modernization on IL 9 at Towanda Barnes Rd in Bloomington. — Executed Nov 26 New Bodine Electric of Decatur $489,967 ·
Jun 14, 2024 70H04 ChampaignDistrict 5 1.605 miles of median cable improvements on I-74 from east of US 45 to High Cross Rd in Urbana. — Executed Nov 26 New Kujo, Inc. $431,710 ·
Jun 14, 2024 70H07 DeWittDistrict 5 1.26 miles, SMART Overlay and Bridge Deck Overlay, 0.4 mi N of Autumn Rd to 0.3 mi S of Tabor Rd N of Clinton. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $657,493 ·
Jun 14, 2024 70H09 DeWittDistrict 5 3.29 miles, Class A Patching, Spl, N First St in Wapella to 0.2 mi south of US 51 Bus north of Clinton. — Executed Nov 26 New Kinney Contractors, Inc. $629,607 ·
Jun 14, 2024 70H23 DeWittDistrict 5 1.805 mi of intermittent smart overlay at 0.4 mi south of Texas Church Rd. to 0.1 mi north of Ospur Rd, also 0.2 mi south of Little Gallilee Rd to Gulf Rd south of Clinton. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $585,590 ·
Jun 14, 2024 70H24 VermilionDistrict 5 4.02 miles of patching from 0.1 mile east of I-74 to Logan Ave in Danville. — Executed Nov 26 New G. M. Sipes Construction, Inc. $994,484 ·
Jun 14, 2024 70H25 VermilionDistrict 5 Patching on FAI 74 from ILL 49(N) to Middle Fork Vermilion River west of Danville. — Executed Nov 26 New Kinney Contractors, Inc. $929,899 ·
Jun 14, 2024 70H29 PiattDistrict 5 16.064 miles of contract maintenance patching from Macon/Piatt County Line to ILL 10 east of White Heath. — Executed Nov 26 New Kinney Contractors, Inc. $441,550 ·
Jun 14, 2024 70H35 VariousDistrict 5 District wide on-call guardrail and fence repairs. — Executed Nov 26 New COLLINS & HERMANN, INC. $1,181,396 ·
Jun 14, 2024 72284 PikeDistrict 6 24.4 miles of patching the right wheel path of driving lane on I-72 from 0.9 miles east of IL 96 to 0.4 miles east of US 54/IL 107. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $2,019,260 ·
Jun 14, 2024 72726 MorganDistrict 6 Patching on I-72 and IL 267 from Loves Drive to south Woods Road, south of Jacksonville. — Executed Nov 26 New Kinney Contractors, Inc. $365,276 ·
6,001–6,100 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.