(18B)BR,RS & Y
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $5,077,494 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… |
|---|---|---|---|---|---|---|
| 1 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $20,000.00 | |
| 2 | X0326275 | RR ROW ENTRY PERMIT | 1 | EACH | $1,149.50 | |
| 3 | X4421002 | PART DEPTH PATCH SPL | 5 | SQ YD | $500.00 | |
| 4 | X4810200 | AGGREGATE SHLD REMOVL | 92 | CU YD | $55.00 | |
| 5 | X5080530 | BAR TERMINATORS | 556 | EACH | $40.00 | |
| 6 | X5427602 | REMOV EX FLAR END SEC | 2 | EACH | $500.00 | |
| 7 | X5619210 | WATER VALVES ADJ SPL | 5 | EACH | $700.00 | |
| 8 | X6030310 | FR & LIDS ADJUST SPL | 14 | EACH | $1,000.00 | |
| 9 | X6350204 | LINEAR DELIN PANELS 4 | 19 | EACH | $137.50 | |
| 10 | X6350206 | LINEAR DELIN PANELS 6 | 8 | EACH | $165.00 | |
| 11 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $315,000.00 | |
| 12 | Z0005216 | HMA STAB 6 AT SPBGR | 577 | SQ YD | $45.00 | |
| 13 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $20,000.00 | |
| 14 | Z0018002 | DRAINAGE SCUPPR DS-11 | 9 | EACH | $2,500.00 | |
| 15 | Z0030850 | TEMP INFO SIGNING | 42 | SQ FT | $30.00 | |
| 16 | Z0034105 | MATL TRANSFER DEVICE | 5,799 | TON | $5.00 | |
| 17 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $4,450.60 | |
| 18 | Z0076600 | TRAINEES | 1,000 | HOUR | $0.8000 | |
| 19 | Z0076604 | TRAINEES TPG | 1,000 | HOUR | $15.00 | |
| 20 | 20100110 | TREE REMOV 6-15 | 144 | UNIT | $44.00 | |
| 21 | 20100210 | TREE REMOV OVER 15 | 36 | UNIT | $55.00 | |
| 22 | 20200100 | EARTH EXCAVATION | 375 | CU YD | $50.00 | |
| 23 | 20200600 | EXC & GR EX SHOULDER | 200 | UNIT | $100.00 | |
| 24 | 25000210 | SEEDING CL 2A | 1 | ACRE | $3,300.00 | |
| 25 | 25000350 | SEEDING CL 7 | 1 | ACRE | $2,200.00 | |
| 26 | 25000400 | NITROGEN FERT NUTR | 92 | POUND | $3.30 | |
| 27 | 25000500 | PHOSPHORUS FERT NUTR | 92 | POUND | $3.30 | |
| 28 | 25000600 | POTASSIUM FERT NUTR | 92 | POUND | $3.30 | |
| 29 | 25100115 | MULCH METHOD 2 | 1 | ACRE | $3,300.00 | |
| 30 | 25100635 | HD EROS CONTR BLANKET | 4,051 | SQ YD | $2.20 | |
| 31 | 28000250 | TEMP EROS CONTR SEED | 92 | POUND | $9.90 | |
| 32 | 28000305 | TEMP DITCH CHECKS | 72 | FOOT | $16.50 | |
| 33 | 28000400 | PERIMETER EROS BAR | 253 | FOOT | $13.75 | |
| 34 | 28100107 | STONE RIPRAP CL A4 | 1,283 | SQ YD | $85.00 | |
| 35 | 28200200 | FILTER FABRIC | 1,283 | SQ YD | $5.00 | |
| 36 | 35101600 | AGG BASE CSE B 4 | 346 | SQ YD | $12.00 | |
| 37 | 40200100 | AGG SURF CSE A | 59 | TON | $50.00 | |
| 38 | 40600290 | BIT MATLS TACK CT | 20,550 | POUND | $0.0100 | |
| 39 | 40600370 | LONG JOINT SEALANT | 13,346 | FOOT | $3.90 | |
| 40 | 40600990 | TEMPORARY RAMP | 1,402 | SQ YD | $0.0100 | |
| 41 | 40603080 | HMA BC IL-19.0 N50 | 3,886 | TON | $76.00 | |
| 42 | 40604050 | HMA SC IL-9.5 C N50 | 2,671 | TON | $83.00 | |
| 43 | 40800050 | INCIDENTAL HMA SURF | 407 | TON | $150.00 | |
| 44 | 42000080 | PVT CON PCC BR APP SL | 132 | SQ YD | $250.00 | |
| 45 | 42001300 | PROTECTIVE COAT | 132 | SQ YD | $1.00 | |
| 46 | 42400100 | PC CONC SIDEWALK 4 | 3,114 | SQ FT | $14.00 | |
| 47 | 42400800 | DETECTABLE WARNINGS | 310 | SQ FT | $30.00 | |
| 48 | 44000100 | PAVEMENT REM | 226 | SQ YD | $20.00 | |
| 49 | 44000155 | HMA SURF REM 1 1/2 | 8,558 | SQ YD | $2.25 | |
| 50 | 44000164 | HMA SURF REM 3 3/4 | 27,662 | SQ YD | $4.50 | |
| 51 | 44000500 | COMB CURB GUTTER REM | 298 | FOOT | $10.00 | |
| 52 | 44000600 | SIDEWALK REM | 1,994 | SQ FT | $5.00 | |
| 53 | 44004000 | PAVED DITCH REMOVAL | 289 | FOOT | $10.00 | |
| 54 | 44004250 | PAVED SHLD REMOVAL | 419 | SQ YD | $20.00 | |
| 55 | 48102100 | AGG WEDGE SHLD TYPE B | 189 | TON | $60.00 | |
| 56 | 48203021 | HMA SHOULDERS 6 | 4,480 | SQ YD | $35.00 | |
| 57 | 50100100 | REM EXIST STRUCT | 1 | EACH | $265,000.00 | |
| 58 | 50200100 | STRUCTURE EXCAVATION | 186 | CU YD | $50.00 | |
| 59 | 50200300 | COFFERDAM EXCAVATION | 102 | CU YD | $50.00 | |
| 60 | 50201121 | COFFERDAM TYP 2 LOC 1 | 1 | EACH | $0.0100 | |
| 61 | 50300225 | CONC STRUCT | 138.1 | CU YD | $1,300.00 | |
| 62 | 50300255 | CONC SUP-STR | 342.2 | CU YD | $1,250.00 | |
| 63 | 50300260 | BR DECK GROOVING | 1,012 | SQ YD | $6.90 | |
| 64 | 50300265 | SEAL COAT CONC | 61.1 | CU YD | $500.00 | |
| 65 | 50300300 | PROTECTIVE COAT | 1,331 | SQ YD | $1.00 | |
| 66 | 50301350 | CONC SUPSTR APP SLAB | 96.8 | CU YD | $500.00 | |
| 67 | 50500105 | F & E STRUCT STEEL | 1 | L SUM | $1,128,779.00 | |
| 68 | 50500505 | STUD SHEAR CONNECTORS | 3,168 | EACH | $5.00 | |
| 69 | 50800205 | REINF BARS, EPOXY CTD | 133,510 | POUND | $2.25 | |
| 70 | 51201900 | FUR STL PILE HP14X89 | 801 | FOOT | $114.00 | |
| 71 | 51202305 | DRIVING PILES | 465 | FOOT | $0.0100 | |
| 72 | 51203900 | TEST PILE ST HP14X89 | 2 | EACH | $5,000.00 | |
| 73 | 51204650 | PILE SHOES | 12 | EACH | $400.00 | |
| 74 | 51265001 | DRILL & SET PILES (IS) | 164 | CU FT | $55.00 | |
| 75 | 51265002 | DRILL & SET PILES (IR) | 434 | CU FT | $265.00 | |
| 76 | 51500100 | NAME PLATES | 1 | EACH | $1,000.00 | |
| 77 | 52100520 | ANCHOR BOLTS 1 | 24 | EACH | $120.00 | |
| 78 | 52100530 | ANCHOR BOLTS 1 1/4 | 12 | EACH | $140.00 | |
| 79 | 54213657 | PRC FLAR END SEC 12 | 2 | EACH | $1,500.00 | |
| 80 | 58600101 | GRANULAR BACKFILL STR | 186 | CU YD | $60.00 | |
| 81 | 59100100 | GEOCOMPOSITE WALL DR | 94 | SQ YD | $38.00 | |
| 82 | 60146304 | P UNDR FOR STRUCT 4 | 143 | FOOT | $26.00 | |
| 83 | 60603800 | COMB CC&G TB6.12 | 76 | FOOT | $42.00 | |
| 84 | 60605000 | COMB CC&G TY B-6.24 | 221 | FOOT | $49.00 | |
| 85 | 63000001 | SPBGR TY A 6FT POSTS | 1,250 | FOOT | $35.75 | |
| 86 | 63100085 | TRAF BAR TERM T6 | 4 | EACH | $3,575.00 | |
| 87 | 63100167 | TR BAR TRM T1 SPL TAN | 4 | EACH | $4,235.00 | |
| 88 | 63200310 | GUARDRAIL REMOV | 1,394 | FOOT | $4.40 | |
| 89 | 63500105 | DELINEATORS | 19 | EACH | $82.50 | |
| 90 | 64200108 | SHOULDER RUM STRIP 8 | 2,461 | FOOT | $4.59 | |
| 91 | 66900200 | NON SPL WASTE DISPOSL | 379 | CU YD | $90.00 | |
| 92 | 66900530 | SOIL DISPOSAL ANALY | 13 | EACH | $1,650.00 | |
| 93 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,475.00 | |
| 94 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,475.00 | |
| 95 | 66901006 | REG SUB MON | 16 | CAL DA | $1,045.00 | |
| 96 | 67000400 | ENGR FIELD OFFICE A | 12 | CAL MO | $5,000.00 | |
| 97 | 67100100 | MOBILIZATION | 1 | L SUM | $304,500.00 | |
| 98 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $0.0100 | |
| 99 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $0.0100 | |
| 100 | 70100500 | TRAF CONT-PROT 701326 | 1 | L SUM | $0.0100 | |
| 101 | 70100600 | TRAF CONT-PROT 701336 | 1 | L SUM | $0.0100 | |
| 102 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $0.0100 | |
| 103 | 70103815 | TR CONT SURVEILLANCE | 365 | CAL DA | $0.0100 | |
| 104 | 70300100 | SHORT TERM PAVT MKING | 1,218 | FOOT | $1.00 | |
| 105 | 70300150 | SHRT TRM PAVT MK REM | 406 | SQ FT | $2.00 | |
| 106 | 72501000 | TERMINAL MARKER - DA | 4 | EACH | $55.00 | |
| 107 | 78004600 | PREF PL PM TD STD LTR/SYM | 123 | SQ FT | $15.13 | |
| 108 | 78004660 | PREF PL PM TD STD L12 | 915 | FOOT | $15.14 | |
| 109 | 78004720 | PREF PL PM TD STD L24 | 238 | FOOT | $20.96 | |
| 110 | 78009004 | MOD URETH PM LINE 4 | 6,000 | FOOT | $0.8800 | |
| 111 | 78009006 | MOD URETH PM LINE 6 | 44,351 | FOOT | $1.05 | |
| 112 | 78011000 | GRV RCSD PM LTR & SYM | 123 | SQ FT | $3.03 | |
| 113 | 78011065 | GRV RCSD PVT MRKG 13 | 915 | FOOT | $3.30 | |
| 114 | 78011125 | GRV RCSD PVT MRKG 25 | 238 | FOOT | $3.69 | |
| 115 | 78100100 | RAISED REFL PAVT MKR | 192 | EACH | $57.20 | |
| 116 | 78200005 | GRDRAIL REF TYPE A | 24 | EACH | $38.50 | |
| 117 | 78300200 | RAISED REF PVT MK REM | 192 | EACH | $8.00 |