| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 26, 2024 | 72M82 | SangamonDistrict 6 | 1 mile of standard overlay, concrete curb and gutter ADA improvements and traffic signal upgrades on Business 55 / 6th Street in Springfield from north of Myrtle Street to Stanford Avenue. | — | Executed | Kinney Contractors, Inc. $5,399,080 · | ||
| Apr 26, 2024 | 74443 | LawrenceDistrict 7 | Replacement of SN 051-0009 carrying US 50 over Muddy Creek, 0.5 miles east of Summer Road. | — | Executed | Sangamo Construction Company $3,650,480 · | ||
| Apr 26, 2024 | 74458 | FayetteDistrict 7 | 5.8 miles of resurfacing and ADA improvements on US 51 in the Village of Ramsey. | — | Executed | Howell Paving, Inc. $7,439,035 · | ||
| Apr 26, 2024 | 74857 | WayneDistrict 7 | Bridge superstructure replacement on SN 096-0064 carrying IL 15 over Pond Creek, 0.4 miles west of 2095E, east of Fairfield. | — | Executed | E. T. Simonds Construction Company $1,606,937 · | ||
| Apr 26, 2024 | 74986 | ColesDistrict 7 | 8 miles of patching, HMA surface removal, HMA resurfacing, aggregate shoulders and guardrail replacement on Lake Paradise Road from IL 16 to the Cumberland County line. | — | Executed | Howell Paving, Inc. $6,034,809 · | ||
| Apr 26, 2024 | 74A08 | LawrenceRichlandDistrict 7 | 6.4 miles of resurfacing on US 50 from 4 miles west of the Lawrence County line to 0.2 miles east of IL 250. | — | Executed | Ambraw Asphalt Materials, Inc. $9,731,126 · | ||
| Apr 26, 2024 | 74A85 | CrawfordDistrict 7 | Culvert removal and precast concrete culvert placement at 5 entrance locations on TR 183A (East 1000th Avenue) in Palestine. | — | Executed | Samron Midwest Contracting, Inc. $790,790 · | ||
| Apr 26, 2024 | 74B18 | MaconDistrict 7 | HMA resurfacing over bare concrete with geometric improvements on IL 48 from 0.5 miles north of US 51 to south of Bowman Road. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $5,507,664 · | ||
| Apr 26, 2024 | 74B42 | EffinghamDistrict 7 | 5.5 miles of crack and joint sealing on US 40 from East Division Street in Altamont to 0.3 miles west of Lake Sara Road. | — | Executed | Complete Asphalt Service Co. $40,973 · | ||
| Apr 26, 2024 | 74B47 | ClarkDistrict 7 | Removal and replacement of PCC sidewalks and ADA ramps at the Cumberland Rest Area on I-70. | — | Executed | Feutz Contractors, Inc. $219,895 · | ||
| Apr 26, 2024 | 74C41 | ColesDistrict 7 | 3.8 miles of patching, milling and resurfacing on IL 16 from just east of 36th Street in Mattoon to the Moultrie County line. | — | Executed | Ne-Co Asphalt Co., Inc. $1,284,222 · | ||
| Apr 26, 2024 | 74C43 | EffinghamFayetteDistrict 7 | 2.4 miles of cape seal on IL 128 from the Shelby County line to IL 33. | — | Executed | A. C. Pavement Striping Co. $329,696 · | ||
| Apr 26, 2024 | 74C67 | WayneDistrict 7 | Bridge painting at various locations in Wayne County. | — | Executed | Three Star Painting, Inc. $920,000 · | ||
| Apr 26, 2024 | 74C71 | CrawfordDistrict 7 | Partial width resurfacing on IL 33 from 0.7 miles west of 1300th Street to 0.1 miles west of 1300th Street in Robinson. | — | Executed | Ambraw Asphalt Materials, Inc. $338,337 · | ||
| Apr 26, 2024 | 74C72 | WayneDistrict 7 | Patching at the intersection of US 45 and IL 15 in Fairfield. | — | Executed | Ramirez Diversified Services, LLC $628,179 · | ||
| Apr 26, 2024 | 74C73 | MaconDistrict 7 | 3.6 miles of patching on IL 48, IL 121 from 0.5 miles north of I-72 to 0.3 miles south of Pershing Road in Decatur. | — | Executed | Earth Worx Solutions LLC $856,417 · | ||
| Apr 26, 2024 | 74C74 | MaconDistrict 7 | Patching on IL 121 from Garfield Avenue to Locust Street and on IL 105 from 0.1 miles north of Cantrell to 0.1 miles south of Cantrell. | — | Executed | Kinney Contractors, Inc. $289,978 · | ||
| Apr 26, 2024 | 74C80 | ColesEffinghamDistrict 7 | Parking lot improvements at the Effingham District Office and the Mattoon Yard. | — | Executed | G. M. Sipes Construction, Inc. $352,266 · | ||
| Apr 26, 2024 | 74C82 | MaconDistrict 7 | Remove and replace light poles, light pole foundations, wiring, electric service, and lighting controller at the Niantic Intechange on I-72, Exit 128. | — | Executed | Bodine Electric of Decatur $544,837 · | ||
| Apr 26, 2024 | 74C86 | ClarkDistrict 7 | 2.9 miles of pothole patching and seal coat for bituminous surface treatment at 12 locations in Clark County. | — | Executed | Ramirez Diversified Services, LLC $289,930 · | ||
| Apr 26, 2024 | 74C88 | VariousDistrict 7 | Repairing, replacing, servicing, and maintaining the electrical systems throughout District 7. | — | Executed | Bodine Electric of Decatur $467,940 · | ||
| Apr 26, 2024 | 76L34 | WashingtonDistrict 8 | 8.5 miles of crack and joint sealing on I-64 from the Clinton County line to 1.1 miles west of Covington Road. | — | Executed | Complete Asphalt Service Co. $259,280 · | ||
| Apr 26, 2024 | 76R12 | MadisonDistrict 8 | Bridge deck sealing on US 67 at the Clark Bridge (SN 0606-0255) over the Mississippi River in Alton. | — | Executed | All States Painting, Inc. $77,994 · | ||
| Apr 26, 2024 | 76R37 | St. ClairDistrict 8 | 4.8 miles of fog seal on IL 156 from IL 159 to IL 13. | — | Executed | DeLaurent Construction Co., Inc. $393,454 · | ||
| Apr 26, 2024 | 76R39 | MadisonDistrict 8 | 6.3 miles of crack and joint sealing on I-70 from 0.1 miles west of Prairie Road to the Bond County line. | — | Executed | Complete Asphalt Service Co. $199,270 · | ||
| Apr 26, 2024 | 76R59 | MadisonDistrict 8 | Milling and resurfacing of the District 8 office parking area (west, southwest parking area and loading docks). | — | Executed | Christ Bros. Asphalt, Inc. $539,212 · | ||
| Apr 26, 2024 | 76R94 | St. ClairDistrict 8 | Replacing high mast, roadway and underpass luminaires along I-55/70/64 near East St. Louis. | — | Executed | Gerstner Electric, Inc. $351,983 · | ||
| Apr 26, 2024 | 76T20 | St. ClairDistrict 8 | 0.5 miles of resurfacing on Boul Avenue from IL 161 to IL 159 in Swansea. | — | Executed | The Kilian Corporation $272,718 · | ||
| Apr 26, 2024 | 76T29 | St. ClairDistrict 8 | 1 mile of patching and resurfacing on IL 111 from the CSX Railroad bridge to Collinsville Road. | — | Executed | Christ Bros. Asphalt, Inc. $694,979 · | ||
| Apr 26, 2024 | 76T32 | ClintonDistrict 8 | 0.7 miles of patching and resurfacing on IL 161 from 0.3 miles west of Red Fox Road to 0.1 miles east of Church Steeple Road. | — | Executed | The Kilian Corporation $721,636 · | ||
| Apr 26, 2024 | 76T34 | St. ClairDistrict 8 | Patching and resurfacing on Collinsville Road/9th Street/Fairmont Avenue from 0.1 miles west of Rose Lake Road in East St. Louis to east of Exchange Avenue. | — | Executed | Christ Bros. Asphalt, Inc. $1,504,972 · | ||
| Apr 26, 2024 | 76T40 | ClintonDistrict 8 | Bridge painting on US 50 under Schumacher Road, 5 miles east of Trenton (SN 014-0050), and on IL 127 over Flat Branch Creek, 8.1 miles north of Carlyle (SN 014 0063). | — | Executed | Civil Coatings and Construction Inc. $376,650 · | ||
| Apr 26, 2024 | 76T41 | St. ClairWashingtonDistrict 8 | Bridge painting on the structure carrying I-64 westbound over NS Railroad, 0.3 miles east of IL 161 and on the structure carrying IL 127 over Locust Creek, 5.5 miles south of Nashville. (SN 082-0195 and SN 095-0065) | — | Executed | ERA-Valdivia Contractors, Inc. $379,102 · | ||
| Apr 26, 2024 | 76T42 | GreeneDistrict 8 | Bridge painting on the structure carrying IL 267 over Apple Creek, 8.6 miles north of Greenfield and the structure carrying IL 267 over Lick Creek, 6.6 miles north of Greenfield. (SN 031-0015 and SN 031-0016) | — | Executed | Civil Coatings and Construction Inc. $593,796 · | ||
| Apr 26, 2024 | 76T45 | VariousDistrict 8 | Video detection system replacement at various locations in District 8. | — | Executed | Gerstner Electric, Inc. $346,843 · | ||
| Apr 26, 2024 | 76T46 | RandolphDistrict 8 | Bridge repair on Little Mary-s Covered Bridge (SN 079-9000) on IL 150, 4 miles northeast of Chester. | — | Executed | Samron Midwest Contracting, Inc. $311,703 · | ||
| Apr 26, 2024 | 76T51 | St. ClairDistrict 8 | Demolition of buildings along Old IL 3 (South Main Street) near Imbs Station Road in Dupo. | — | Executed | Stutz Excavating, Inc. $250,615 · | ||
| Apr 26, 2024 | 76T53 | MadisonSt. ClairDistrict 8 | Traffic signal modernization at various locations: St. Clair Ave. and 37th/38th Street; Foley Drive/70th Street and W. Main Street; 74th Street and Foley Drive; IL 159 and IL 13/158; IL 15 and 74th Street; IL 161 and Frank Scott Parkway in Belleville; IL 3 and Pontoon Road in Granite City. | — | Executed | Electrico, Inc. $263,300 · | ||
| Apr 26, 2024 | 76T54 | JerseyMadisonDistrict 8 | Bridge approach roadway on IL 255 and US 67 at various locations: IL 255 over Humbert Road (SN 060-0309), UP and KCS Railroad (SN 060-0311), and over IL 111/IL 267 (SN 060-0331); US 67 over IL 255 (SN 060-0332) and over Piasa Creek (SN 042-0027). | — | Executed | Charles E. Mahoney Co. $626,537 · | ||
| Apr 26, 2024 | 76T55 | VariousDistrict 8 | Lighting and traffic signal repair and maintenance at various locations throughout District 8. | — | Executed | Electrico, Inc. $1,753,628 · | ||
| Apr 26, 2024 | 76T59 | WashingtonDistrict 8 | 8.1 miles of resurfacing on IL 15 from 0.1 miles east of Gardner Street in Nashville to the US 51 West Junction. | — | Executed | Samron Midwest Contracting, Inc. $2,173,724 · | ||
| Apr 26, 2024 | 76T60 | RandolphDistrict 8 | 8 miles of ultra-thin bonded wearing surface on IL 3 from 0.1 miles north of Roots Road to 0.1 miles south of Elmer and Edna Kipp Lane. | — | Executed | The Kilian Corporation $1,603,498 · | ||
| Apr 26, 2024 | 76T61 | WashingtonDistrict 8 | 3.4 miles of resurfacing on IL 127 from Masonic Drive to Conservation Drive, south of Nashville. | — | Executed | Samron Midwest Contracting, Inc. $1,157,685 · | ||
| Apr 26, 2024 | 76T64 | St. ClairDistrict 8 | Pump replacement at the Bowman Pump Station in East St. Louis. | — | Executed | Haier Plumbing and Heating, Inc. $590,000 · | ||
| Apr 26, 2024 | 76T65 | MadisonDistrict 8 | 6.6 miles of overlay on IL 140 from 0.2 miles west of IL 159 to 0.1 miles west of Park Avenue. | — | Executed | Charles E. Mahoney Co. $2,396,248 · | ||
| Apr 26, 2024 | 78825 | JacksonDistrict 9 | Slope stabilization and resurfacing on IL 127 approximately 0.5 miles south of Tomcat Hill Lane, south of Murphysboro. | — | Executed | Sierra Bravo Contractors, LLC $508,955 · | ||
| Apr 26, 2024 | 78920 | GallatinDistrict 9 | Joint reconstruction with strip seals, base course widening, bridge deck, approach slab and structure repair, deck scarification and microsilica overlay on SN 030-0020 carrying IL 1 over Lawler Ditch and SN 030-0021 carrying IL 1 over Saline River southeast of Equality. | — | Executed | E. T. Simonds Construction Company $912,047 · | ||
| Apr 26, 2024 | 78999 | HamiltonWhiteDistrict 9 | Removal and replacement of 2 box culverts: SN 097-7066 carrying US45 over an unnamed ditch, north of Norris City and SN 033-7020 carrying IL242 over an unnamed ditch, south of Belle Prairie City. | — | Executed | Samron Midwest Contracting, Inc. $338,757 · | ||
| Apr 26, 2024 | 78A06 | WilliamsonDistrict 9 | Microsilica deck overlay, joint replacement and bridge deck patching on SN 100-0037 carrying IL 148 over Middle Wolf Creek, 1 mile north of I-57. | — | Executed | Samron Midwest Contracting, Inc. $376,698 · | ||
| Apr 26, 2024 | 78A08 | HamiltonJeffersonDistrict 9 | Bridge repairs of SN 041-0062 on IL 142 over I-64, 1.5 miles southeast of Mt. Vernon and bridge repairs of SN 033-0038 on IL 14 over Sullivan Creek, 1.5 miles northeast of Macedonia. | — | Executed | Samron Midwest Contracting, Inc. $1,493,637 · | ||
| Apr 26, 2024 | 78A10 | JeffersonDistrict 9 | Bridge deck overlay on SN 041-0099 carrying IL 142 over Rock Branch, 1.4 miles southeast of Belle Rive; and bridge deck overlay on SN 041-0048 carrying IL 142 over Rocky Branch Tributary, 1.4 miles southeast of Belle Rive. | — | Executed | E. T. Simonds Construction Company $294,033 · | ||
| Apr 26, 2024 | 78A19 | WilliamsonDistrict 9 | 2.2 miles of resurfacing on IL 13 from Sinclair Street to IL 37. | — | Executed | Samron Midwest Contracting, Inc. $2,745,072 · | ||
| Apr 26, 2024 | 78A21 | JacksonPerryDistrict 9 | 10.9 miles of HMA surface removal, resurfacing, HMA shoulders, patching, rumble strips and guardrail improvements on IL 4 from IL 150 to Keller Street, west of the Ava. | — | Executed | E. T. Simonds Construction Company $5,862,388 · | ||
| Apr 26, 2024 | 78A22 | PulaskiDistrict 9 | Structural repair of concrete, pier cap encasement and replacement of seismic restrainer cables on piers 7-15 on SN 077-0002 carrying I-57 over Old US 51. | — | Executed | Samron Midwest Contracting, Inc. $1,194,840 · | ||
| Apr 26, 2024 | 78A36 | JacksonDistrict 9 | 0.94 miles of patching on IL 149 from Grimsby Road to 1 mile east of the truck climbing lane near Kinkaid Creek in Murphysboro. | — | Executed | E. T. Simonds Construction Company $131,011 · | ||
| Apr 26, 2024 | 78A60 | JacksonDistrict 9 | Traffic signal detection at 2 intersection: 1) IL 13 at New Era; 2) IL 13 at Sycamore/Emerald. | — | Executed | Gerstner Electric, Inc. $319,167 · | ||
| Apr 26, 2024 | 78A61 | JeffersonDistrict 9 | Patching of the ramps and parking lots at the eastbound and westbound Goshen Road Rest Areas on I-57. | — | Executed | Samron Midwest Contracting, Inc. $164,538 · | ||
| Apr 26, 2024 | 78A62 | FranklinJeffersonDistrict 9 | 9.8 miles of patching on I-57 from 2.5 miles south of IL 154 to Atchison Creek, south of Bonnie. | — | Executed | E. T. Simonds Construction Company $1,659,506 · | ||
| Apr 26, 2024 | 85757 | LeeDistrict 2 | HMA resurfacing with aggregate shoulders on Indian Road from the Bureau County Line to Van Petten Road, and on Van Petten Road from the Whiteside County Line to Indian Head Road. | — | Executed | Martin & Company Excavating $1,065,955 · | ||
| Apr 26, 2024 | 85759 | WhitesideDistrict 2 | Resuracing Hahnaman Road from Yorktown Road to Tampico Village Limits, and Yorktown Road from Hahnaman Road to Osage Road, and Yorktown Road to 0.2 mile east of Yorktown Road. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $979,286 · | ||
| Apr 26, 2024 | 87791 | GrundyDistrict 3 | Rehabilitate the bridge carrying CH 34V over the Mazon Ricer, 0.7 mile north of I-55, and replace the bridge carrying FAS 272 over an Unnamed Creek 3 miles southwest of Mazon. | — | Executed | D. Construction, Inc. $1,773,338 · | ||
| Apr 26, 2024 | 87792 | GrundyDistrict 3 | Replace 3 structures on Grand Ridge Road over Hog Run, Bills Run and Waupecan Creek, located between LaSalle Road anc Verona Road. | — | Executed | Riber Construction, Inc. $1,942,958 · | ||
| Apr 26, 2024 | 87794 | IroquoisDistrict 3 | Replace the bridge carrying CH 40 over a tributary to Possum Trot Ditch, 3.5 miles south of Sheldon. | — | Executed | Iroquois Paving Corporation $1,057,026 · | ||
| Apr 26, 2024 | 87815 | BureauDistrict 3 | Replace the bridge carrying TR 312 over the Tributary to Masters Creek, 4 miles west of LaMolle. | — | Executed | Curnyn Construction Co. $499,288 · | ||
| Apr 26, 2024 | 87820 | LivingstonDistrict 3 | Replace existng structure with a three-span RC slab bridge with HMA approach, aggregate and HMA shoulders, and guardrail improvements on CH 3 over Broughton Creek, one mile north of Campus. | — | Executed | Tobey's Construction & Cartage, Inc. $737,652 · | ||
| Apr 26, 2024 | 87824 | BureauDistrict 3 | Resurface CH 8 from east city limits of Walnut to 2600 Avenue/CH 22, and from the Lee County line to IL 92. | — | Executed | Advanced Asphalt Company $949,527 · | ||
| Apr 26, 2024 | 87826 | DeKalbDistrict 3 | HMA resurfacing and shoulders on Chicago Road from the Lee County line to Shabbona Road, on Rollo Road from Chicago Road to Suydam Road, and on Suydam Road from Rool Road to the LaSalle County Line. | — | Executed | Curran Contracting Company $2,522,533 · | ||
| Apr 26, 2024 | 87829 | KankakeeDistrict 3 | Resurfacing CH 3 from the Iroquois County line to CH 37. | — | Executed | Kankakee Valley Construction Company, Inc. $323,707 · | ||
| Apr 26, 2024 | 87831 | LivingstonDistrict 3 | HMA Resurfacing with Cold-In-Place Recycling, aggregate base course widening, and aggregate shoulders on CH 6 rom 20000N Road to CH 8. | — | Executed | Kankakee Valley Construction Company, Inc. $2,522,672 · | ||
| Apr 26, 2024 | 87847 | LaSalleDistrict 3 | Resurfacing CH 2 from the Somonauk South City Limits to US 52. | — | Executed | Curran Contracting Company $2,100,248 · | ||
| Apr 26, 2024 | 89827 | KnoxDistrict 4 | HMA resurfacing with ADA improvements, drainage improvements and pavement markings on West Carl Sandburg Drive from Henderson Street to Broad Street in Galesburg. | — | Executed | Gunther Construction, a div of UCM, Inc. $1,097,188 · | ||
| Apr 26, 2024 | 89831 | PeoriaDistrict 4 | Construct 4" wide HMA Shoulders with Rumble Strips and pavement markings on Smithville Road to Lancaster Road. | — | Executed | Advanced Asphalt Company $873,700 · | ||
| Apr 26, 2024 | 89835 | PeoriaDistrict 4 | Reconstruct the intersecton of Pioneer Parkway and University Street in Peoria. | — | Executed | Gensini Excavating, Inc. $7,079,330 · | ||
| Apr 26, 2024 | 90392 | VermilionDistrict 5 | 2.94 miles designed overlay from Catlin/Indianola Rd to 0.3 mile west of US 150 in Westville. | — | Executed | Cross Construction, Inc. $1,934,015 · | ||
| Apr 26, 2024 | 93818 | MorganDistrict 6 | HMA resurfacing with Curb and Gutter, sidewalks, storm sewers, lighting, signage and streetscape improvements on West State Street from Church Street to Sandy Street in Jacksonville. | — | Executed | K. E. Vas Company $3,387,270 · | ||
| Apr 26, 2024 | 95931 | LawrenceDistrict 7 | Replace existing structure with a Three-Span PPC Deck Beam Bridge with HMA Approach on Applegate Road over Eagle Branch, 4 miles southeast of Chauncey. | — | Executed | Samron Midwest Contracting, Inc. $1,292,081 · | ||
| Apr 26, 2024 | 95934 | CumberlandDistrict 7 | Replace existing structure with a single-span PPC deck beam bridge with HMA approach and guardrails on Cumberland Road over Embarras River Overflow, 0.5 miles west of Greenup. | — | Executed | C-Hill Civil Contractors, Inc. $969,999 · | ||
| Apr 26, 2024 | 95947 | CumberlandDistrict 7 | Sidewalk construction on various routes within Neoga. | — | Executed | McCarthy Improvement Company $1,130,147 · | ||
| Apr 26, 2024 | 95949 | RichlandDistrict 7 | Reconstruction of Calhoun Lane from IL 130 to east city limits of Calhoun. | — | Executed | Ambraw Asphalt Materials, Inc. $1,138,118 · | ||
| Apr 26, 2024 | 95951 | MoultrieDistrict 7 | Replace an existing culvert with a trip-cell cast-in-place box culvert to carry CH 10 over Jonathan Creek, .3 mile east of Cadwell. | — | Executed | Sangamo Construction Company $729,047 · | ||
| Apr 26, 2024 | 95954 | LawrenceDistrict 7 | Sidewalk constrution on Christy Avenue from North Railroad Street to Cedar Street, and Locust Street from May Street to Christy Avenue in Sumner. | — | Executed | Shores Builders, Inc. $289,794 · | ||
| Apr 26, 2024 | 95955 | ShelbyDistrict 7 | HMA resurfacing with pavement patching, aggregate wedge shoulders and driveway improvements on North Broadway Street from North 12th Street to North 9th Street in Shelbyville. | — | Executed | Howell Paving, Inc. $217,075 · | ||
| Apr 26, 2024 | 95956 | WabashDistrict 7 | Resurfacing on Poor Farm Road from Friendsville Avenue to IL 1, north of Mount Carmel. | — | Executed | Howell Paving, Inc. $647,145 · | ||
| Apr 26, 2024 | 95957 | EdwardsDistrict 7 | HMA Resurfacing with aggregate shoulders and pavement markings on CH 3 from the West Corporate Limits of West Salem to the Wabash County Line. | — | Executed | Howell Paving, Inc. $2,438,672 · | ||
| Apr 26, 2024 | 97807 | MadisonDistrict 8 | Construct a PCC Shared Use Path adjacent to IL 157 with concrete curb and gutter, driveway, drainage structures, retaining walls, traffic signal modifications, pavement markings and signage from the MCT Nature Trail to Levis Road in Edwardsville. | — | Executed | DMS Contracting, Inc. $1,053,422 · | ||
| Apr 26, 2024 | 97823 | MarionDistrict 8 | Replace existing structure with a three-span PPC deck beam structure on H-Pile supported abutments, individual concrete encased H-pile piers with approach roadways on Kline Road over Flat Creek, one mile northwest of Vernon. | — | Executed | C-Hill Civil Contractors, Inc. $669,999 · | ||
| Apr 26, 2024 | 97828 | BondDistrict 8 | HMA resurfacing with sidewalk ramps on Beaumont Avenue from North 3rd Street to IL 140 in Greenville. | — | Executed | The Kilian Corporation $621,353 · | ||
| Apr 26, 2024 | 99717 | JacksonDistrict 9 | PCC shared-use path with drainage improvements, signage and ADA ramps along IL 13 from West Murphysboro Road to Wood Road in Carbondale. | — | Executed | Samron Midwest Contracting, Inc. $2,139,256 · | ||
| Jun 14, 2024 | 46630 | VariousDistrict 1 | Curb and Median Painting as well as various sizes of pain pavement marking lines, letters and symbols and the This work consists of Curb and Median Painting as well as various sizes of pain pavement marking lines, letters and symbols and the removal of existing pavement markings located on various state-maintained highways in various counties throughout District 1. | — | Executed | STF, LLC d/b/a Traffic Control Company $1,187,300 · | ||
| Jun 14, 2024 | 46631 | VariousDistrict 1 | Placing various widths of thermoplastic, preform plastic, hot spray thermoplastic and modified urethane paveme This work shall consist of placing various widths of thermoplastic, preform plastic, hot spray thermoplastic and modified urethane pavement marking lines, letters and symbols and the removal of existing pavement markings and the installation of grooved pavement markings. Located on various arterial routes throughout District 1. | — | Executed | Superior Road Striping, Inc. $4,518,200 · | ||
| Jun 14, 2024 | 46643 | VariousDistrict 9 | Installation of urethane pavement marking lines, letters and symbols, and the removal of existing pavement markings throughout District 9. | — | Executed | STF, LLC d/b/a Traffic Control Company $649,975 · | ||
| Jun 14, 2024 | 46644 | VariousDistrict 3 | Removing and replacing raised reflective pavememt_markers and reflectors on various highways, freeways, and expressways in various counties in District 3. | — | Executed | STF, LLC d/b/a Traffic Control Company $429,420 · | ||
| Jun 14, 2024 | 46646 | VariousDistrict 4 | Pavement marking in District 4. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,599,983 · | ||
| Jun 14, 2024 | 46647 | CookDistrict 1 | Applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width. The location of the work is on various State-maintained highways in McHenry and DuPage Counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $3,001,000 · | ||
| Jun 14, 2024 | 46648 | LakeWillDistrict 1 | Applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width. The location of of the work is on various State-maintained highways in Lake and Will Counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $1,812,600 · | ||
| Jun 14, 2024 | 46649 | DuPageMcHenryDistrict 1 | Applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width. The location of the work is on various State-maintained highways in McHenry and DuPage Counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $893,950 · | ||
| Jun 14, 2024 | 46650 | VariousDistrict 6 | Installation of pavement markings on various routes in various counties of District 6. | — | Executed | STF, LLC d/b/a Traffic Control Company $999,991 · | ||
| Jun 14, 2024 | 46652 | VariousDistrict 3 | Removing and replacing raised reflective pavement markers and reflectors on various highways, freeways, and expressways in various counties in District 3. | — | Executed | STF, LLC d/b/a Traffic Control Company $315,454 · | ||
| Jun 14, 2024 | 46653 | VariousDistrict 6 | Installation of pavement markings on various routes in various counties of District 6. | — | Executed | STF, LLC d/b/a Traffic Control Company $1,949,999 · | ||
| Jun 14, 2024 | 46938 | MassacDistrict 9 | Reconstruction of bridge approaches at the Fort Massac State Park bridge over Massac Creek. | — | Executed | Samron Midwest Contracting, Inc. $239,239 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.