(4-2)RS-5,(3-2)RS-2
- Let date
- Friday, April 26, 2024
- Contract
- 74A08 · job page
- District
- District 7
- County
- Lawrence, Richland
- Highway
- Limits
- 6.4 miles of resurfacing on US 50 from 4 miles west of the Lawrence County line to 0.2 miles east of IL 250.
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Ambraw Asphalt Materials, Inc. Low bidder | $9,731,126 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Ambraw Asphalt … |
|---|---|---|---|---|---|---|
| 1 | X0326440 | SURF REM VAR DP (SPL) | 2,941 | SQ YD | $1.86 | |
| 2 | X4402020 | CONC MEDIAN SURF REM | 230 | SQ FT | $7.95 | |
| 3 | X6060074 | COMB CC&G TM SPL AEP | 86 | FOOT | $76.32 | |
| 4 | X8302135 | WOOD POLE 35 CL 4 | 1 | EACH | $2,924.90 | |
| 5 | X8440102 | RELOC EX LUMINAIRE | 1 | EACH | $462.00 | |
| 6 | 20400800 | FURNISHED EXCAVATION | 34 | CU YD | $38.16 | |
| 7 | 25100630 | EROSION CONTR BLANKET | 120 | SQ YD | $3.82 | |
| 8 | 40200800 | AGG SURF COURSE TY B | 84 | TON | $150.00 | |
| 9 | 40600290 | BIT MATLS TACK CT | 111,557 | POUND | $0.4100 | |
| 10 | 40600370 | LONG JOINT SEALANT | 39,596 | FOOT | $3.35 | |
| 11 | 40600990 | TEMPORARY RAMP | 28 | SQ YD | $25.00 | |
| 12 | 40603219 | P HMA BC IL-9.5FG N90 | 24,295 | TON | $169.03 | |
| 13 | 40604164 | P HMA SC IL-9.5 D N90 | 13,887 | TON | $177.93 | |
| 14 | 40800050 | INCIDENTAL HMA SURF | 454 | TON | $257.22 | |
| 15 | 44000155 | HMA SURF REM 1 1/2 | 123,722 | SQ YD | $1.86 | |
| 16 | 44000500 | COMB CURB GUTTER REM | 84 | FOOT | $24.70 | |
| 17 | 44004250 | PAVED SHLD REMOVAL | 1,534 | SQ YD | $38.46 | |
| 18 | 44201815 | CL D PATCH T2 14 | 3,545 | SQ YD | $283.97 | |
| 19 | 44201819 | CL D PATCH T3 14 | 200 | SQ YD | $283.97 | |
| 20 | 44201821 | CL D PATCH T4 14 | 137 | SQ YD | $283.97 | |
| 21 | 48102100 | AGG WEDGE SHLD TYPE B | 7,269 | TON | $44.23 | |
| 22 | 48203029 | HMA SHOULDERS 8 | 1,534 | SQ YD | $120.93 | |
| 23 | 50105220 | PIPE CULVERT REMOV | 16 | FOOT | $53.00 | |
| 24 | 542A0265 | P CUL CL A 1 60 | 16 | FOOT | $408.10 | |
| 25 | 54213705 | PRC FLAR END SEC 60 | 1 | EACH | $9,985.20 | |
| 26 | 60618300 | CONC MEDIAN SURF 4 | 214 | SQ FT | $24.70 | |
| 27 | 64200108 | SHOULDER RUM STRIP 8 | 69,621 | FOOT | $0.1600 | |
| 28 | 67000400 | ENGR FIELD OFFICE A | 6 | CAL MO | $2,730.00 | |
| 29 | 67000600 | ENGR FIELD LAB | 6 | CAL MO | $1,250.00 | |
| 30 | 67100100 | MOBILIZATION | 1 | L SUM | $387,862.29 | |
| 31 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $29,956.30 | |
| 32 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $185,928.90 | |
| 33 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $11,951.50 | |
| 34 | 70107025 | CHANGEABLE MESSAGE SN | 28 | CAL DA | $166.38 | |
| 35 | 70300100 | SHORT TERM PAVT MKING | 14,897 | FOOT | $1.50 | |
| 36 | 70300150 | SHRT TRM PAVT MK REM | 1,234 | SQ FT | $4.00 | |
| 37 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 250 | SQ FT | $0.0100 | |
| 38 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 75,357 | FOOT | $0.3000 | |
| 39 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 842 | FOOT | $0.0100 | |
| 40 | 70300251 | TEMP PVT MK LINE 8 - PAINT | 1,002 | FOOT | $0.0100 | |
| 41 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 1,120 | FOOT | $0.0100 | |
| 42 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 136 | FOOT | $0.0100 | |
| 43 | 72000100 | SIGN PANEL T1 | 61 | SQ FT | $58.69 | |
| 44 | 73000100 | WOOD SIN SUPPORT | 64 | FOOT | $48.42 | |
| 45 | 78000100 | THPL PVT MK LTR & SYM | 250 | SQ FT | $20.00 | |
| 46 | 78000200 | THPL PVT MK LINE 4 | 17,133 | FOOT | $0.7400 | |
| 47 | 78000400 | THPL PVT MK LINE 6 | 842 | FOOT | $4.00 | |
| 48 | 78000500 | THPL PVT MK LINE 8 | 1,002 | FOOT | $6.00 | |
| 49 | 78000600 | THPL PVT MK LINE 12 | 1,120 | FOOT | $10.00 | |
| 50 | 78000650 | THPL PVT MK LINE 24 | 136 | FOOT | $20.00 | |
| 51 | 78001110 | PAINT PVT MK LINE 4 | 68,877 | FOOT | $0.3000 | |
| 52 | 78011000 | GRV RCSD PM LTR & SYM | 250 | SQ FT | $8.50 | |
| 53 | 78011025 | GRV RCSD PVT MRKG 5 | 17,133 | FOOT | $0.5500 | |
| 54 | 78011035 | GRV RCSD PVT MRKG 7 | 842 | FOOT | $3.00 | |
| 55 | 78011045 | GRV RCSD PVT MRKG 9 | 1,002 | FOOT | $4.00 | |
| 56 | 78011065 | GRV RCSD PVT MRKG 13 | 1,120 | FOOT | $6.00 | |
| 57 | 78011125 | GRV RCSD PVT MRKG 25 | 136 | FOOT | $12.00 | |
| 58 | 78100100 | RAISED REFL PAVT MKR | 545 | EACH | $42.00 | |
| 59 | 78200020 | CURB REFLECTORS | 14 | EACH | $11.00 | |
| 60 | 78300200 | RAISED REF PVT MK REM | 545 | EACH | $5.00 | |
| 61 | 80500100 | SERV INSTALL TY A | 1 | EACH | $6,414.10 | |
| 62 | 81028340 | UNDRGRD C PVC 1 1/2 | 1,878 | FOOT | $20.80 | |
| 63 | 81028350 | UNDRGRD C PVC 2 | 187 | FOOT | $42.65 | |
| 64 | 81100500 | CON AT ST 1 1/2 GALVS | 48 | FOOT | $66.00 | |
| 65 | 81400100 | HANDHOLE | 1 | EACH | $2,888.60 | |
| 66 | 81500100 | GULFBOX JUNCTION | 1 | EACH | $2,999.70 | |
| 67 | 85800100 | FL CONT | 1 | EACH | $1,831.50 | |
| 68 | 87301225 | ELCBL C SIGNAL 14 3C | 2,164 | FOOT | $2.39 | |
| 69 | 87301805 | ELCBL C SERV 6 2C | 25 | FOOT | $35.68 | |
| 70 | 88000105 | FLASH BEACON INSTALL | 1 | EACH | $2,028.40 | |
| 71 | 88040030 | SH P LED 1F 1S PM | 5 | EACH | $726.00 | |
| 72 | 89502400 | REM EX FB INSTAL COMP | 1 | EACH | $1,045.00 |