| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jun 16, 2023 | 87809 | IroquoisDistrict 3 | Resurfacing various routes within the City of Watseka. | — | Executed | Iroquois Paving Corporation $537,824 · | ||
| Jun 16, 2023 | 87836 | LaSalleDistrict 3 | Resurface Chartres Street Raccuglia Drive to 24th Street in La Salle. | — | Executed | Advanced Asphalt Company $353,063 · | ||
| Jun 16, 2023 | 87837 | LaSalleDistrict 3 | Sidewalk reconstruction with ADA accommodations along Shooting Park Road from Sycamore Street to Parkside School entrance in Peru. | — | Executed | Gensini Excavating, Inc. $119,776 · | ||
| Jun 16, 2023 | 89779 | WoodfordDistrict 4 | Removal and replacement of a three-span and four-span PPC deck beam superstructure with concrete bent substructures, HMA approaches, on CH 7 over Panther Creek, 2.5 miles south of US 24. | — | Executed | Otto Baum Company, Inc. $1,998,400 · | ||
| Jun 16, 2023 | 89809 | McDonoughDistrict 4 | Removal and resurfacing of HMA pavement with storm sewer construction, driveway and sidewalk improvements, utility adjustments, seeding, and erosion control along Johnson Street from Grant Street to Harmony Lane, and on Grant Street at the intersection with Harmony lane in Macomb. | — | Rejected | Gunther Construction, a div of UCM, Inc. $6,189,408 · | ||
| Jun 16, 2023 | 91617 | VermilionDistrict 5 | Replace existing structure with a single-span PPC deck beam bridge with aggregate roadways, lane widening, aggregate shoulders, and pipe culverts on TR 13 over Fountain Creek. | — | Executed | Iroquois Paving Corporation $447,972 · | ||
| Jun 16, 2023 | 91622 | VermilionDistrict 5 | Resurfacing, patching and ADA ramps on Williams Street from Bowman Avenue to State Street in Danville. | — | Rejected | Feutz Contractors, Inc. $1,636,078 · | ||
| Jun 16, 2023 | 91624 | VermilionDistrict 5 | Resurfacing and patching Vermilion Street from US 150 to 0.1 mile south of US 150. Includes pavement grinding and drainage improvements on Batestown Road from west of God's Acre Road to Jackson Street. | — | Executed | G. M. Sipes Construction, Inc. $1,345,785 · | ||
| Jun 16, 2023 | 91632 | ChampaignDistrict 5 | Replace existing superstructure with PPC deck beams on Windsor Road over Kaskaskia Ditch. | — | Executed | C-Hill Civil Contractors, Inc. $333,888 · | ||
| Jun 16, 2023 | 91633 | ChampaignDistrict 5 | Replace existing superstructure with PPC deck beams on Kirby Avenue over Kaskaskia Ditch. | — | Executed | C-Hill Civil Contractors, Inc. $361,888 · | ||
| Jun 16, 2023 | 91634 | ChampaignDistrict 5 | Replace existing superstructure with PPC deck beams on 3200 North Road over Upper Salt Creek. | — | Executed | C-Hill Civil Contractors, Inc. $343,888 · | ||
| Jun 16, 2023 | 93671 | SangamonDistrict 6 | Construction of two structures; one to carry Iron Bridge Road over the Union Pacific Railroad, the other to carry the Union Pacific Railroad over Woodside Road. Project includes a pedestrian truss bridge over Woodside Road, reconstruction of the signalized intersection of Iron Bridge Road at Woodside Road, and the relocation of the Interurban Trail. | — | Rejected | |||
| Jun 16, 2023 | 93804 | CassDistrict 6 | Replace the bridge carrying CH 4 over Cox Creek located 1.5 miles southwest of Newmansville. | — | Executed | County Contractors, Inc. $1,329,997 · | ||
| Jun 16, 2023 | 93805 | MorganDistrict 6 | Resurfacing CH 123 from the Morgan/Cass County line to Old US 36. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $3,045,731 · | ||
| Jun 16, 2023 | 93807 | SangamonDistrict 6 | HMA resurfacing on 7th Street from Lincoln Street to IL 54 in Riverton. | — | Executed | P. H. Broughton & Sons, Inc. $783,494 · | ||
| Jun 16, 2023 | 95901 | LawrenceDistrict 7 | Replace existing structure with a thirteen-span PPC IL36N beam bridge with HMA approaches on Wabash Cannonball Road over the Wabash River overflow in St. Francisville. | — | Executed | Samron Midwest Contracting, Inc. $11,635,682 · | ||
| Jun 16, 2023 | 95935 | EffinghamDistrict 7 | HMA resurfacing with aggregate shoulders, and guardrail replacement on East 1600th Avenue from North 700th Street to North 1000th Street. | — | Executed | Howell Paving, Inc. $1,759,700 · | ||
| Jun 16, 2023 | 95937 | LawrenceDistrict 7 | HMA resurfacing with pip culvert replacement on Lancaster Road from Sand Barrens Lane to the Wabash County line. | — | Executed | Ambraw Asphalt Materials, Inc. $1,389,384 · | ||
| Jun 16, 2023 | 95938 | LawrenceDistrict 7 | Resurfacing on Lexington Avenue from IL 1 to 12th Street, and sidewalk improvements at four intersections in Lawrenceville. | — | Active | Kieffer Bros. Construction Co., Inc. $886,837 · | ||
| Jun 16, 2023 | 95939 | MoultrieDistrict 7 | Remove and replace guardrail at various locations in Moultrie County. | — | Rejected | Midwest Fence Corporation $508,101 · | ||
| Jun 16, 2023 | 97713 | MadisonDistrict 8 | Replace existing structure with a single span steel beam structure with poured concrete deck, aggregate approaches and guardrail on Silver Creek Road over a branch of Silver Creek. | — | Executed | Keller Construction, Inc. $1,097,790 · | ||
| Jun 16, 2023 | 97770 | MonroeDistrict 8 | Roadway reconstruction on Moore Street from IL 3 to 0.2 mile north of Columbia Avenue in Waterloo. | — | Executed | Baxmeyer Construction, Inc. $1,197,128 · | ||
| Jun 16, 2023 | 97800 | JerseyDistrict 8 | Full depth pavement reconstruction, storm sewer, combination curb and gutter, sidewalk, and pavement markings on Hollow Avenue from Hickory Street to Westlake Drive in Jerseyville. | — | Executed | Stutz Excavating, Inc. $2,034,135 · | ||
| Jun 16, 2023 | 97801 | MadisonDistrict 8 | Construction of a Shared-Use Path along Rock Springs Drive from Memorial Drive to Brown Street, and along College Avenue at the intersection of Rock Springs Drive in Alton. | — | Executed | Stutz Excavating, Inc. $642,226 · | ||
| Jun 16, 2023 | 97803 | St. ClairDistrict 8 | Resurfacing Market Place from east of Commerce Drive to west of Lanaghan Drive in Fairview. | — | Rejected | Stutz Excavating, Inc. $533,207 · | ||
| Jun 16, 2023 | 97804 | MonroeDistrict 8 | HMA Resurfacing and shoulders with rumble strips on Floraville Road from the Waterloo Corporate Limits to the St. Clair County Line. | — | Executed | Christ Bros. Asphalt, Inc. $1,435,980 · | ||
| Jun 16, 2023 | 97806 | MadisonDistrict 8 | HMA resurfacing, curb and gutter, driveways, storm sewers, and pavement markings on University Drive from IL 157 to Devon Court in Edwardsville. | — | Executed | Stutz Excavating, Inc. $842,773 · | ||
| Jun 16, 2023 | 97812 | St. ClairDistrict 8 | Replace existing structure with a three-span PPC deck beam bridge with concrete wearing surface, approach slabs, HMA approach pavement, and traffic barrier terminals, on IMBS Station Road over Prairie DuPont Creek, 2.0 miles west of IL 163. | — | Executed | C-Hill Civil Contractors, Inc. $1,717,889 · | ||
| Jun 16, 2023 | 97813 | St. ClairDistrict 8 | Resurfacing Sullivan Drive from south of Frank Scott Parkway to Huntwood Drive. | — | Executed | The Kilian Corporation $1,263,097 · | ||
| Jun 16, 2023 | 99666 | WilliamsonDistrict 9 | HMA resurfacing with pavement patching, sidewalks, ADA ramps, and pavement markings on East Herrin Street from IL 148 to North 3rd Street, and on North 3rd Street from Bond Street to East Herrin Street in Herrin. | — | Executed | Samron Midwest Contracting, Inc. $673,149 · | ||
| Jun 16, 2023 | 99683 | JacksonDistrict 9 | Construct an offset right turn lane and install traffic signal equipment at the intersection of Giant City Road and East Pleasant Hill Road in Carbondale. | — | Executed | E. T. Simonds Construction Company $733,609 · | ||
| Jun 16, 2023 | 99698 | PulaskiDistrict 9 | Resurfacing Tick Ridge Road from IL 37 to the Massac County line. | — | Executed | E. T. Simonds Construction Company $1,861,497 · | ||
| Jun 16, 2023 | 99700 | WilliamsonDistrict 9 | Construction of a concrete multi-use trail from the Marion High School Sports Complex to Prison Road within the Crab Orchard National Wildlife Refuge. | — | Executed | Samron Midwest Contracting, Inc. $3,086,491 · | ||
| Jun 16, 2023 | 99701 | UnionDistrict 9 | Resurface Wing Hill Road from 0.4 mile east of Cbden to US 51. | — | Executed | E. T. Simonds Construction Company $722,633 · | ||
| Jun 16, 2023 | 99702 | MassacDistrict 9 | Remove and replace guardrail on New Columbia Road, 7.6 miles northeast of Joppa and on Unionville Road, 3.2 miles east of Brookport. | — | Executed | Midwest Fence Corporation $122,345 · | ||
| Jun 16, 2023 | 99703 | GallatinDistrict 9 | Resurfacing Eldorado Road from the Saline County Line to IL 1. | — | Executed | E. T. Simonds Construction Company $1,257,240 · | ||
| Jun 16, 2023 | 99705 | SalineDistrict 9 | HMA resurfacing with aggregate shoulders, precast box culvert extensions, and pavement markings on College Road from IL 142 to IL 13. | — | Executed | E. T. Simonds Construction Company $1,063,122 · | ||
| Jun 16, 2023 | 99708 | WilliamsonDistrict 9 | Resurface Pentecost Road from south of West DeYoung Street to Old Route 13, and Old Bainbridge Trail from Crab Orchard and Eqyptian Railroad to Old Route 13, and south of West DeYoung Street to Crab Orchard and Eqyptian Railroad, all within the City of Marion. | — | Executed | Samron Midwest Contracting, Inc. $621,140 · | ||
| Jun 16, 2023 | 99710 | HamiltonDistrict 9 | HMA resurfacing and aggregate shoulders on Dahlgren Road from 1900 North Road to IL 14. | — | Executed | E. T. Simonds Construction Company $1,432,052 · | ||
| Aug 4, 2023 | 60R77 | CookDistrict 1 | (260.2-Ft) Bridge deck overlay, bridge painting, and bridge repair of 1-94 at 111TH ST (overhead) in the city of Chicago, Cook County. | — | Executed | Lorig Construction Company $2,767,449 · | ||
| Aug 4, 2023 | 61H88 | CookDistrict 1 | Resurfacing Ridge Road from Torrence Avenue to State Line Road in Lansing. | — | Executed | K-Five Construction Corporation $2,144,525 · | ||
| Aug 4, 2023 | 61J40 | DuPageDistrict 1 | HMA Resurfacing with Utility and structure adjustments, curb and gutter, sidewalk improvements, sodding, aggregate shoulders, and pavement markings on Crestwood Boulevard, from Park Right-of-Way to the east corporate limits of Glen Ellyn. | — | Executed | K-Five Construction Corporation $1,620,838 · | ||
| Aug 4, 2023 | 61J42 | CookDistrict 1 | Install push button actuated flashing pedestrian beacons, sidewalk improvements , signage, and pavement markings at Midblock Crossing on Wolf Road in Burr Ridge. | — | Executed | Meade Inc. $122,184 · | ||
| Aug 4, 2023 | 61J52 | DuPageDistrict 1 | Construction of a Shared-Use path along Wildwood Avenue and Monterey Avenue to provide connection between the Great Western Trail, the Illinois Prarie Path and Salt Creek Greenway Trail in Villa Park. | — | Executed | A Lamp Concrete Contractors, Inc. $738,989 · | ||
| Aug 4, 2023 | 61J64 | LakeDistrict 1 | HMA Resurfacing with Curb and Gutter, Sidewalk Repair, Drainage Adjustments, and Parkway Restoration algon Glen Flora Avenue from McAree Road to Lewis Avenue, and on Sheridan Road from Greenwood Avenue to Flora Avenue in Waukegan. | — | Executed | Peter Baker & Son Co. $1,253,279 · | ||
| Aug 4, 2023 | 61J67 | CookDistrict 1 | construcion of a prefabricated steel truss pedestrian bridge over IL 59. Includes an elevated boardwalk and lighting in Streamwood. | — | Rejected | Herlihy Mid-Continent Company $10,785,770 · | ||
| Aug 4, 2023 | 62N36 | CookDistrict 1 | (9.5-Mile) Smart overlay project on I-57 from Will County Line /Steger Rd. to US 6 / 159th St. located within the Cities of Markham, Oak Forest, County Club Hills and Villages of Matteson and Richton Park in Cook County. | — | Executed | D. Construction, Inc. & K-Five Construction Corporation & Iroquois Paving Corporation JV $26,289,947 · | ||
| Aug 4, 2023 | 62P00 | CookDistrict 1 | Bridge superstructure replacement of the structure on 1-57 at Parnell Avenue in the City of Chicago, Cook Coun (1000-Ft) The proposed improvement consists of bridge superstructure replacement of the structure on 1-57 at Parnell Avenue in the City of Chicago, Cook County. | — | Executed | Lorig Construction Company $4,577,544 · | ||
| Aug 4, 2023 | 62P03 | DuPageDistrict 1 | Culvert repair of IL 83 (Kingery Hwy) over drainage ditch, 0 (900-Ft) The proposed improvement consists of culvert repair of IL 83 (Kingery Hwy) over drainage ditch, 0.6 miles south of 91st Street in the Village of Burr Ridge in DuPage County. | — | Executed | D. Construction, Inc. $324,577 · | ||
| Aug 4, 2023 | 62P42 | KaneDistrict 1 | ADA Improvements at Various locations throughout Kane and McHenry counties This project consists of ADA Improvements at Various locations throughout Kane and McHenry counties. | — | Executed | Copenhaver Construction, Inc. $881,658 · | ||
| Aug 4, 2023 | 62R18 | LakeDistrict 1 | (3,068-Ft) Intersection improvement with traffic signal modernization, dual left-turn lanes, pedestrian signals, drainage System, ADA improvements at the intersection IL 120 at O'Plaine Road in the City of Waukegan and Village of Gurnee, Lake County. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $4,281,204 · | ||
| Aug 4, 2023 | 62R59 | CookDistrict 1 | Location 1 is located along the I-90 WB to IL 53 NB ramp. Location 2 is located along the I-290 NB to I-90 EB, ramp with scope of work of high-friction surface treatment (HFST). Location 3 is located along I-290 EB near I-88 with scope of work of diamond grooving. This project is located in the City of Rolling Meadows and the Village of Hillside in Cook County with a net length of 4,377 feet. | — | Executed | K-Five Construction Corporation $891,023 · | ||
| Aug 4, 2023 | 62T01 | McHenryDistrict 1 | (457-Ft) Bridge rehabilitation project and scope of work includes deck scarification, latex concrete overlay, joint replacement and approach slab and shoulders repair on IL Route 47 over Nippersink Creek in the City of Woodstock in McHenry County. | — | Executed | Areatha Construction Co., Inc. $769,506 · | ||
| Aug 4, 2023 | 62T05 | CookDistrict 1 | (105.5-Ft) Bridge Preservation Project: bridge repair, joint replace/ repair and deck overlay on bridge carrying US 45 (Des Plaines River Rd) over McDonald Creek (North of Enclave Dr). Located in Unincorporated Wheeling Township in Cook County. | — | Executed | MYS, Incorporated $412,484 · | ||
| Aug 4, 2023 | 62T35 | WillDistrict 1 | (2.6-mile) SMART Overlay project located on IL 113 (Coal City Rd.) from I-55 to IL 53, located in the Cities of Braidwood and Wilmington in Will County. | — | Executed | Austin Tyler Construction, Inc. $995,198 · | ||
| Aug 4, 2023 | 62T39 | CookDistrict 1 | (188-Ft) Bridge deck overlay, joint replacement/ repair of bridge carrying IL 72 (Higgins Road) over Willow Creek, in the City of Des Plaines and the Village Rosemont in Cook County. | — | Executed | Rausch Infrastructure, LLC $867,410 · | ||
| Aug 4, 2023 | 62T73 | CookDistrict 1 | (3,100-Ft) SMART Overlay and ADA improvements, located in the City of Oak Forest, Cook County. | — | Executed | Iroquois Paving Corporation $722,978 · | ||
| Aug 4, 2023 | 62T78 | KaneDistrict 1 | (2.14-Mile) Crack and Joint Sealing. Location: FAP 341 (IL 72) from 0.1- mile West of Richmond Road to 0.1-mile West of IL 31 in the Villages of Sleepy Hollow and West Dundee in Kane County. | — | Executed | Denler, Inc. $98,679 · | ||
| Aug 4, 2023 | 62T81 | LakeDistrict 1 | (2.17-Mile) Crack and Joint Sealing project is located on IL. 137, (Greenwood Ave.) It Begins at Genesse St and proceeds NE to Joe Favero Dr through the City of Waukegan, Lake County. | — | Executed | SKC Construction, Inc. $231,615 · | ||
| Aug 4, 2023 | 62T93 | CookDistrict 1 | Smart overlay resurfacing on Western Ave from 87th St (2818-Ft) This improvement consists of Smart overlay resurfacing on Western Ave from 87th St. to 91st St. in the Village of Evergreen and City of Chicago in Cook County. | — | Executed | MAT Construction Leasing, Inc. $571,193 · | ||
| Aug 4, 2023 | 62U08 | CookDistrict 1 | (1.96 mile) SMART Overlay, ADA and drainage improvement on US 30 (Lincoln Highway) from Hilltop Ave. to Lowe Ave. within the City of Chicago Heights in Cook County. | — | Executed | Iroquois Paving Corporation $3,987,890 · | ||
| Aug 4, 2023 | 62U47 | CookKaneDistrict 1 | Trombone Mast Arm replacement in various locations in District 1. | — | Executed | Home Towne Electric, Inc. $1,389,836 · | ||
| Aug 4, 2023 | 62U70 | VariousDistrict 1 | Nighttime sweeping along various expressways in District 1 This contract consists of nighttime sweeping along various expressways in District 1. | — | Active | |||
| Aug 4, 2023 | 62U86 | VariousDistrict 1 | Upgrading existing pedestrian push buttons to APS push buttons at various D1 ADA compliant intersections. | — | Active | Meade Inc. $683,765 · | ||
| Aug 4, 2023 | 62U93 | VariousDistrict 1 | Repairing high tension cable median barrier systems throughout District 1 on a work order basis The work to be completed under this contract consists of repairing high tension cable median barrier systems throughout District 1 on a work order basis. | — | Executed | Northern Contracting, Inc. $644,494 · | ||
| Aug 4, 2023 | 62U94 | VariousDistrict 1 | The repair and installation of fence along various expressway and arterial highways in various counties throug This improvement consists of the repair and installation of fence along various expressway and arterial highways in various counties throughout District One. | — | Executed | Fence Masters, Inc. $809,009 · | ||
| Aug 4, 2023 | 64K08 | WhitesideDistrict 2 | Reconstruction of IL 78 from 0.1 mile S. of US 30 to 0.1 mile S. of Academic Drive in Morrison. | — | Executed | Fischer Excavating, Inc. $5,087,535 · | ||
| Aug 4, 2023 | 66M89 | IroquoisDistrict 3 | HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors This job is located on FAP 317 (US 24) from 0.1 mile east of IL 45 to IL 49 in Crescent City, for a length of 5.87 miles. The work consists of HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors. | — | Executed | Iroquois Paving Corporation $2,370,974 · | ||
| Aug 4, 2023 | 66N15 | KankakeeDistrict 3 | This project is located at the intersection of IL-17 and IL-1 in Kankakee County, to replace two traffic signal mast arms in northbound and southbound traffic. | — | Executed | Outsen Electric, Incorporated $160,756 · | ||
| Aug 4, 2023 | 66N21 | VariousDistrict 3 | Repairing and maintaining traffic signals, flashing beacons, and roadway lighting in Grundy and Kankakee Count Repairing and maintaining traffic signals, flashing beacons, and roadway lighting in various counties in District 3. | — | Active | Outsen Electric, Incorporated $339,315 · | ||
| Aug 4, 2023 | 66N27 | IroquoisKankakeeDistrict 3 | The installation of a flashing red beacon at each of the stop controlled approaches to the intersection of US This project consists of the installation of a flashing red beacon at each of the stop controlled approaches to the intersection of US 45/52 and W 8000S Rd. It also includes the installation of a flashing yellow beacon at each of the advanced intersection warning signs adjacent to US 45/52. | — | Executed | Outsen Electric, Incorporated $148,037 · | ||
| Aug 4, 2023 | 66N29 | VariousDistrict 3 | The installation, maintenance, and pickup/removal of smart traffic monitoring systems or real-time traffic con This project consists of the installation, maintenance, and pickup/removal of smart traffic monitoring systems or real-time traffic control systems. The work will be completed on a work order basis for repairs and maintenance activities. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $648,625 · | ||
| Aug 4, 2023 | 66N37 | LaSalleDistrict 3 | The removal and replacement of 6 foot of the structrure slab and sidewalls, guardrail replacement, striping, p This project is located at Structure No. 050-2540 carrying IL Route 170 over a stream approximately 3.8 miles north of Ransom. This project consists of the removal and replacement of 6 foot of the structrure slab and sidewalls, guardrail replacement, striping, pavement patching and other related work. | — | Executed | Riber Construction, Inc. $495,072 · | ||
| Aug 4, 2023 | 66N49 | LivingstonDistrict 3 | Class B pavement patching This project is located on US 24 Beginning at the Intersection of N. 2000 E. Rd and ending at the curb and gutter just east of Tenth Street in Fairbury. This work consists of Class B pavement patching. | — | Executed | G. M. Sipes Construction, Inc. $459,272 · | ||
| Aug 4, 2023 | 66N51 | GrundyLivingstonDistrict 3 | Class A pavement Patching, striping and other related work This project is located on Interstate Route 55 beginning at M.M. 2.15 (Beginning of concrete section) to M.M. 218.81(Livingston/Grundy County Line) to M.M. 222 end of concrete section in Grundy County. This work consists of Class A pavement Patching, striping and other related work. | — | Executed | G. M. Sipes Construction, Inc. $378,840 · | ||
| Aug 4, 2023 | 66N55 | KankakeeDistrict 3 | Milling and resurfacing a 2 foot wide path along the centerline of roadway and micro-surfacing 4' wide path al This project is located on IL Route 17 beginning at the east abutment of SN 046-0027 (+/-1200 feet east of Livingston/Kankakee County Line and ending at S. 2000 W. Rd (Herscher Rd). This work consists of milling and resurfacing a 2 foot wide path along the centerline of roadway and micro-surfacing 4' wide path along the centerline, pavement striping and raised reflective pavement markers. | — | Executed | Kankakee Valley Construction Company, Inc. $368,861 · | ||
| Aug 4, 2023 | 68H72 | PeoriaDistrict 4 | Partial depth HMA patching and longitudinal joint repair. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $570,899 · | ||
| Aug 4, 2023 | 70860 | VermilionDistrict 5 | 0.078 Miles of Bridge Replacement and Bridge Deck Overlay at Griffin St. and Stony Creek. | — | Executed | White Construction LLC $10,240,000 · | ||
| Aug 4, 2023 | 70G83 | McLeanDistrict 5 | 30.7 mi of patching on I-55 0.3 mi SW of Airport Rd to N of Turkey Creek W of Lexington; I-55 0.2 mi S of Six Points Rd to up RR; I-74 Veterans Parkway to 1 mi S of Chestnut St SW of Leroy; I-74 Carlock to I-55 N of Bloomington; I-74 at Carlock weigh station ramps. | — | Executed | Kinney Contractors, Inc. $762,847 · | ||
| Aug 4, 2023 | 70G84 | McLeanDistrict 5 | 1.34 mi of longitudinal joint repair W of Colton Ave to Empire Crossing in Bloomington. | — | Executed | Rowe Construction, a div of UCM, Inc. $433,701 · | ||
| Aug 4, 2023 | 72300 | VariousDistrict 6 | On-call repair of guardrail and cable median barrier at locations throughout District 6. | — | Executed | COLLINS & HERMANN, INC. $1,370,056 · | ||
| Aug 4, 2023 | 72711 | PikeDistrict 6 | Deck patching and expansion joint repairs on SN 075-0047 and SN 075-0048 carrying IL 96 over KCS Railroad and 6 Mile Bay Diversion, southeast of Pleasant Hill. | — | Executed | Freesen, a div of UCM, Inc. $459,690 · | ||
| Aug 4, 2023 | 72712 | PikeDistrict 6 | Deck patching and expansion joint repair on SN 075-0155 carrying IL 106 over I-72 at the IL 106 and I-72 interchange, 1.2 miles east of the Missouri state line. | — | Executed | Freesen, a div of UCM, Inc. $140,703 · | ||
| Aug 4, 2023 | 72713 | PikeDistrict 6 | Patching on I-72, IL 110 from the Mississippi River to the Sny Slough. | — | Executed | G. M. Sipes Construction, Inc. $109,346 · | ||
| Aug 4, 2023 | 72714 | MorganDistrict 6 | Patching on I-72 from the Scott County line to US 67. | — | Executed | G. M. Sipes Construction, Inc. $363,767 · | ||
| Aug 4, 2023 | 72H76 | CassDistrict 6 | Pipe culvert removal and replacement on IL 125, 0.5 miles west of Newmansville Road. | — | Executed | CSD Environmental Services, Inc. $74,990 · | ||
| Aug 4, 2023 | 72N39 | AdamsDistrict 6 | Installing riprap at SN 001-0008 carrying IL 96 over Rock Creek, 2 miles south of IL 61. | — | Executed | County Contractors, Inc. $128,340 · | ||
| Aug 4, 2023 | 76L29 | MarionDistrict 8 | 2.7 miles of patching, ultra-thin bonded wearing course and ADA improvements IL 161 from Beech Street to Pleasant Avenue in Centralia. | — | Executed | The Kilian Corporation $4,015,807 · | ||
| Aug 4, 2023 | 76P67 | MadisonSt. ClairDistrict 8 | Installation of 2 dynamic message signs on butterfly trusses and fiber optic on northbound I-255 at mile marker 7.6 and southbound I-255 at mile marker 27.1. | — | Executed | Keeley & Sons, Inc. and Wissehr Electric, Inc. JV $3,386,988 · | ||
| Aug 4, 2023 | 76R27 | MadisonDistrict 8 | Lighting upgrades on I-55 at IL 140. | — | Executed | Gerstner Electric, Inc. $577,727 · | ||
| Aug 4, 2023 | 76R47 | MadisonDistrict 8 | Median removal and replacement on US 67 (Landmark Boulevard), near the intersection of Broadway Street, in Alton. | — | Executed | Stutz Excavating, Inc. $143,115 · | ||
| Aug 4, 2023 | 76R65 | RandolphDistrict 8 | Bridge deck overlay and bridge deck repairs on SN 079-0032 carrying IL 155 over a stream east of Bluff Road in Prairie Du Rocher. | — | Executed | Keeley & Sons, Inc. $554,302 · | ||
| Aug 4, 2023 | 76R82 | GreeneDistrict 8 | 0.09 miles of pavement patching on US 67 from Palm Street to Clay Street in Roodhouse. | — | Executed | G. M. Sipes Construction, Inc. $338,723 · | ||
| Aug 4, 2023 | 76R98 | VariousDistrict 8 | Weed spraying for Johnson Grass along various interstates throughout District 8. | — | Executed | The Daltons Inc. $121,088 · | ||
| Aug 4, 2023 | 76T09 | MadisonDistrict 8 | 9.6 miles of patching and resurfacing on IL 4 from 0.37 miles south of I-55 to IL 143. | — | Executed | Christ Bros. Asphalt, Inc. $4,788,328 · | ||
| Aug 4, 2023 | 78814 | FranklinDistrict 9 | Conversion of I-57 and IL 149 ramp terminals into roundabouts, pavement pavement reconstruction and bridge modifications in West Frankfort. | — | Rejected | Samron Midwest Contracting, Inc. $6,389,347 · | ||
| Aug 4, 2023 | 78944 | FranklinDistrict 9 | 0.78 miles of resurfacing on IL 149 from Orient Road to Ken Gray Boulevard in West Frankfort. | — | Executed | E. T. Simonds Construction Company $544,594 · | ||
| Aug 4, 2023 | 78964 | AlexanderDistrict 9 | Navigation lighting upgrade on SN 002-0005 on US 60/62 over the Mississippi River in Cairo. | — | Executed | Bodine Electric of Decatur $957,293 · | ||
| Aug 4, 2023 | 78971 | HardinDistrict 9 | Joint reconstruction, HMA widening, bridge deck, approach slab and structure repair, epoxy crack injection and waterproofing with HMA overlay on SN 035-0004 carrying IL 34 over Rose Creek, south of Herod and north of Karbers Ridge Road. | — | Executed | E. T. Simonds Construction Company $589,268 · | ||
| Aug 4, 2023 | 78A01 | VariousDistrict 9 | Repairing or replacing damaged guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a work order basis throughout District 9. | — | Executed | COLLINS & HERMANN, INC. $1,169,530 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.