| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 28, 2023 | 85742 | StephensonDistrict 2 | Remove existing structure and replace with a single span PPC deck beam bridge with HMA approach, and traffic barrier terminals on Cedarville Road over a Branch of Brown Creek, 3 miles southeast of Dakota. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $554,922 · | ||
| Apr 28, 2023 | 87793 | IroquoisDistrict 3 | Remove existing structure and replace with a single span PPC deck beam bridge with aggregate approach on 1100 E Road over Branch of Prairie Creek, 2.9 miles southeast of Ashkum. | — | Executed | Iroquois Paving Corporation $455,093 · | ||
| Apr 28, 2023 | 87797 | BureauDistrict 3 | HMA overlay with aggregate shoulders on CH 8 from CH 12 to US 6. | — | Executed | Advanced Asphalt Company $2,153,163 · | ||
| Apr 28, 2023 | 87814 | IroquoisDistrict 3 | Resurfacing CH 10 from the Ford County line to US 45. | — | Executed | Iroquois Paving Corporation $1,002,116 · | ||
| Apr 28, 2023 | 89805 | TazewellDistrict 4 | Roadway extension of Freedom Parkway from east of IL 8 to Cummings Lane in Washington. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $6,595,005 · | ||
| Apr 28, 2023 | 91621 | McLeanDistrict 5 | Resurfacing, Base course widening, concrete curb and gutter and rumble strips on CH 18 from State Street in Donvers to US 150. | — | Executed | Rowe Construction, a div of UCM, Inc. $4,301,038 · | ||
| Apr 28, 2023 | 91629 | PiattDistrict 5 | Sidewalk replacement, ADA Ramps, Drainage improvements, on Moultsie Street from South Washington to Piatt Steet and at the intersectionof IL 105/Wing Street in Bement. | — | Executed | A&A Concrete LLC $154,862 · | ||
| Apr 28, 2023 | 93801 | HancockDistrict 6 | Replace the bridge carrying CH 12 over Mallard Creek, 5 miles south of Warsaw. | — | Executed | County Contractors, Inc. $959,001 · | ||
| Apr 28, 2023 | 93802 | AdamsDistrict 6 | Resurfacing CH 11 from north of W2100th Avenue to south of SN 001-3303. | — | Executed | Diamond Construction Company $757,418 · | ||
| Apr 28, 2023 | 95928 | FayetteDistrict 7 | Replace the bridge carrying TR 178 over Steve Branch of Shobonier. | — | Executed | C-Hill Civil Contractors, Inc. $310,889 · | ||
| Apr 28, 2023 | 95929 | FayetteDistrict 7 | Replace the bridge carrying TR 78 over Raccoon Creek, 4 miles southwest of Vandalia. | — | Executed | C-Hill Civil Contractors, Inc. $404,888 · | ||
| Apr 28, 2023 | 95930 | WayneDistrict 7 | Resurfacing IL 161 Extension from the Marion County line to CH 12. | — | Executed | E. T. Simonds Construction Company $2,872,260 · | ||
| Apr 28, 2023 | 95932 | LawrenceDistrict 7 | Replace existing pipe culverts with a single span precast deck beam bridge to carry 220 East Road over a tributary to Muddy Creek. | — | Executed | Lake Contracting, Inc. $709,450 · | ||
| Apr 28, 2023 | 97782 | WashingtonDistrict 8 | Replace existing structure with a single span precast, prestressed concrete deck beam bridge with approach to carry Hoover Road over Archie Creek. | — | Executed | Lake Contracting, Inc. $319,999 · | ||
| Apr 28, 2023 | 97795 | St. ClairDistrict 8 | HMA resurfacing with ADA improvements on Lebanon Avenue from F Street to IL 161 in Belleville. | — | Executed | Christ Bros. Asphalt, Inc. $1,482,045 · | ||
| Apr 28, 2023 | 97798 | MonroeDistrict 8 | Construct a shared-use path along Centerville Road from Main Street to Ferkel Street to Cherry in Columbia. | — | Executed | DMS Contracting, Inc. $355,694 · | ||
| Apr 28, 2023 | 97802 | WashingtonDistrict 8 | HMA resurfacing with reflective crack control treatment on CH 10 from IL 153 to the east corporate limits of Elkton. | — | Executed | The Kilian Corporation $1,346,483 · | ||
| Apr 28, 2023 | 99681 | SalineDistrict 9 | Replace existing structure with a single-span PPC Deck Beam Bridge with Aggregate approaches on Tuller Road over a drainage ditch 1.6 miels south of Carrier Mills. | — | Executed | Dees, Inc. $317,900 · | ||
| Apr 28, 2023 | 99691 | PerryDistrict 9 | Resurfacing with HMA shoulders, Aggregate Shoulders, Signage, and Guardrail upgrades along Pyatt-Cutler Road from Union school Road to IL 131127. | — | Executed | Samron Midwest Contracting, Inc. $2,089,377 · | ||
| Apr 28, 2023 | 99695 | WilliamsonDistrict 9 | PCC Pavement, Curb and Gutter, sidewalk replacement, concrete median, decorative lighting, and landscaping on Park Avenue from Adams Street to Herrin Street in Herrin. | — | Executed | E. T. Simonds Construction Company $1,573,149 · | ||
| Jun 16, 2023 | 46606 | VariousDistrict 1 | Raised reflective pavement marker removal and replacement and replacement of raised reflective pavement marker This work shall consist of raised reflective pavement marker removal and replacement and replacement of raised reflective pavement marker reflectors. The work to be completed on various Interstates routes throughout District 1. | — | Rejected | ROADSAFE TRAFFIC SYSTEMS, INC. $4,199,948 · | ||
| Jun 16, 2023 | 46615 | VariousDistrict 4 | D4 HT Pavement Marker RPR 23-23 on various routes in various counties throughout District 4. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $2,865,095 · | ||
| Jun 16, 2023 | 46616 | VariousDistrict 4 | D4 Reflector replacement on various routes in various counties throughout District 4. | — | Executed | P & P Construction Co. $278,959 · | ||
| Jun 16, 2023 | 46617 | ChampaignDouglasDistrict 5 | Pavement marking repair on I-57 and I-74 in Douglas and Champaign Counties. | — | Executed | Varsity Striping & Construction Co. $176,916 · | ||
| Jun 16, 2023 | 46619 | ChampaignDistrict 5 | Pavement marking at various locations in District 5. | — | Executed | Varsity Striping & Construction Co. $461,303 · | ||
| Jun 16, 2023 | 46620 | CookDistrict 1 | Applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width. The locations of the work will be on various State-maintained highways in Cook County. | — | Executed | Preform Traffic Control Systems, Ltd. $2,944,000 · | ||
| Jun 16, 2023 | 46621 | LakeWillDistrict 1 | Application of water borne, lead free, white and yellow paint pavement marking lines of 4, 6 and 8 inches at various locations. The work will be on various State-maintained highways in Lake and Will Counties. | — | Executed | Precision Pavement Markings Inc. $1,816,500 · | ||
| Jun 16, 2023 | 46622 | DuPageMcHenryDistrict 1 | Application of water borne, lead free, white and yellow paint pavement marking lines of 4, 6 and 8 inches at various locations. The work will be on various State-maintained highways in McHenry and DuPage Counties. | — | Executed | Precision Pavement Markings Inc. $787,650 · | ||
| Jun 16, 2023 | 46623 | VariousDistrict 6 | Pavement marking on various routes in various counties throughout District 6. | — | Executed | Varsity Striping & Construction Co. $2,196,936 · | ||
| Jun 16, 2023 | 46624 | CookDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and p This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. Located in various routes throughout South Cook County. | — | Executed | Superior Road Striping, Inc. $3,228,282 · | ||
| Jun 16, 2023 | 46625 | CookDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and p This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new new raised pavement marker castings within the limits shown. Located in various routes throughout North Cook County. | — | Executed | Superior Road Striping, Inc. $851,082 · | ||
| Jun 16, 2023 | 46626 | LakeDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and p This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. The work to be completed in various routes throughout Lake County. | — | Executed | Superior Road Striping, Inc. $1,279,775 · | ||
| Jun 16, 2023 | 46627 | McHenryDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and p This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. The work to be completed will be performed on various routes throughout McHenry County. | — | Executed | Superior Road Striping, Inc. $510,312 · | ||
| Jun 16, 2023 | 46628 | VariousDistrict 6 | Replacing sign components of interstate signs on I-72 and I-55 in various counties of District 6. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $724,188 · | ||
| Jun 16, 2023 | 46932 | FranklinDistrict 9 | Parking lot resurfacing, sealing, striping, ADA sidewalk improvements, lighting and signing at the Wayne Fitzgerrell State Recreation Area. | — | Executed | E. T. Simonds Construction Company $1,974,520 · | ||
| Jun 16, 2023 | 61H30 | CookDistrict 1 | Sidewalk replacement, ADA ramps, pedestrian traffic signals, lighting, and landscaping along Cicero Avenue from 143rd Street to the Calumet Sag Channel in Crestwood. | — | Rejected | D. Construction, Inc. $4,544,722 · | ||
| Jun 16, 2023 | 61H85 | KaneDistrict 1 | Pavement reconstruction, traffic signals, and street lighting on Indian Trail Road from Mitchell Road to Church Road in Aurora. | — | Executed | R. W. Dunteman Company $8,184,713 · | ||
| Jun 16, 2023 | 61J09 | CookDistrict 1 | HMA resurfacing with storm sewers, Curb and gutter, lighting, landscaping, and pavement markings on Rodenburg Road from Irving park Road to Central Avenue in Schaumburg. | — | Executed | R. W. Dunteman Company $5,220,905 · | ||
| Jun 16, 2023 | 61J35 | KaneDistrict 1 | HMA Pavement widening and resurfacing with sidewalks, ADA ramps, curb and gutter, storm sewer, pavement markings and signing at the intersecton of Prairie Street and Wilson Street in Batavia. | — | Rejected | Copenhaver Construction, Inc. $3,934,612 · | ||
| Jun 16, 2023 | 61J38 | CookDistrict 1 | Replace the bridge carrying Brookwood Drive over Butterfield Creek, 0.2 mile west of Western Avenue in Flossmor. | — | Executed | D. Construction, Inc. $1,018,214 · | ||
| Jun 16, 2023 | 61J44 | KaneDistrict 1 | Resurfacing Highland Avenue from Randall Road to McLean Boulevard, Coombs Road from Highland Avenue to 0.7 mile south of Highland Avenue, and McDonald Road from 1,700 feet east of Dittman Road to Corron Road in Elgin. | — | Executed | J. A. Johnson Paving Company $1,652,700 · | ||
| Jun 16, 2023 | 61J59 | CookDistrict 1 | Resurfacing Northgate Parkway from north of Dundee Road(IL 68) to Lake-Cook Road in Wheeling. | — | Executed | Builders Paving, LLC $782,668 · | ||
| Jun 16, 2023 | 61J60 | WillDistrict 1 | Resurfacing Normantown Road from 135th Street to Weber Road in Romeoville. | — | Executed | Gallagher Asphalt Corporation $1,182,978 · | ||
| Jun 16, 2023 | 61J61 | WillDistrict 1 | HMA resurfacing with patching, sidewalk replacement, ADA improvements, detector loop replacements, and pavement markings on Normantown Road, from Crossroads Parkway to Montrose Drive, in Romeoville. | — | Executed | Austin Tyler Construction, Inc. $777,617 · | ||
| Jun 16, 2023 | 61J62 | WillDistrict 1 | Resurfacing 135th Street from the Chicago Ship and Sanitary Cnal Bridge to New Avenue in Romeoville. | — | Executed | Austin Tyler Construction, Inc. $331,797 · | ||
| Jun 16, 2023 | 62G37 | CookDistrict 1 | (8,538.08-Ft) 3R resurfacing and widening along 55th. ADA, traffic signal, drainage, shared path improvements. The Project extends in an east/west direction through the Village of Western Springs, Lyons township, the City of Countryside, and the Village of La Grange in Cook County, Illinois. | — | Executed | K-Five Construction Corporation $9,496,988 · | ||
| Jun 16, 2023 | 62G38 | CookDistrict 1 | (0.73-Mile) ADA, Traffic Signal Modernization and Channelization at IL Route 50 in Matteson, IL, Cook County. | — | Executed | D. Construction, Inc. $12,192,447 · | ||
| Jun 16, 2023 | 62G41 | KaneDistrict 1 | Replacing the existing (SN 045-0017) single span IL 31 bridge with a proposed (SN 045-2106) two span structure (1.174-Mile) This project consists of replacing the existing (SN 045-0017) single span IL 31 bridge with a proposed (SN 045-2106) two span structure. Also roadway reconstruction along IL 31, US 20 and entrance and exit ramps. In addition, a 10 ft shared-use path, 7 ft sidewalk will be constructed. Traffic signals and lighting will be replaced. Also included in this contract is replacement of City of Elgin's watermain, sanitary sewer and fiber optic conduit installation. Project is located in the | — | Executed | Martam Construction Incorporated and Dunnet Bay Construction Company JV $18,715,185 · | ||
| Jun 16, 2023 | 62H52 | CookDistrict 1 | (1,056-Mile) Bridge Deck and approach slab replacement, superstructure and substructure repairs, cleaning and painting of the steel members, bridge lighting, navigational lighting, sidewalk and multi-use path construction. The bridge carrying IL 83 over the Cal Sag Channel in the Village of Alsip and Crestwood. | — | Executed | D. Construction, Inc. $14,441,528 · | ||
| Jun 16, 2023 | 62H82 | CookDistrict 1 | (1.22-Mile) Reconstruction, Resurfacing, Drainage Improvements, Culvert Replacement, Traffic Signal Modernization, Pedestrian Accommodations, and Ditch Cleaning in Orland Park, IL in Cook County. | — | Executed | Judlau Contracting, Inc. $20,567,520 · | ||
| Jun 16, 2023 | 62J41 | LakeDistrict 1 | Replacing the existing 8-x10- double box culvert (SN 049-0214) and replacing it with a 12'x12' triple box culv This project consists of replacing the existing 8-x10- double box culvert (SN 049-0214) and replacing it with a 12'x12' triple box culvert (SN 049-0700). Also included is the construction of a 7' PCC sidewalk on the east side and an 8' multi-use path on the west side of IL 137. In addition, light pole relocation, guardrail replacement, and watermain, sanitary sewer relocation and embankment stabilization. | — | Executed | Campanella and Sons, Inc. $7,886,157 · | ||
| Jun 16, 2023 | 62K04 | DuPageDistrict 1 | (3847-Ft) Channelization and traffic signal modernization project on US 20 at Gary Avenue within the Village of Hanover Park, the Village of Roselle, and Bloomingdale Township in DuPage County. | — | Executed | R. W. Dunteman Company $5,675,641 · | ||
| Jun 16, 2023 | 62K05 | LakeDistrict 1 | The demolition of 3 (three) single family residences, 1 (one) shed, and culvert repair at various locations on This improvement consists of the demolition of 3 (three) single family residences, 1 (one) shed, and culvert repair at various locations on IL 22 between Quentin Rd and West of IL 83 in the Villages of Long Grove and Kildeer in Lake County, IL. | — | Executed | Martam Construction Incorporated $345,708 · | ||
| Jun 16, 2023 | 62L51 | CookDistrict 1 | Smart overlay resurfacing on Pulaski Road from 1-290 (Eisenhower Expressway) to Cermak Road (22nd Avenue) in t (1.51-Mile) Improvement consists of smart overlay resurfacing on Pulaski Road from 1-290 (Eisenhower Expressway) to Cermak Road (22nd Avenue) in the City of Chicago, Cook County. | — | Executed | MAT Construction Leasing, Inc. $755,754 · | ||
| Jun 16, 2023 | 62N88 | WillDistrict 1 | (2052-Ft); IL 394 at Burville Road: Intersection Improvement Conversion of the intersection to a Restricted Crossing U-Turn (RCUT)Ù; IL 394 at Exchange Street: Lengthening of the southbound left turn lane storage. The project is located on IL 394 in Unincorporated Crete Township in Will County. | — | Executed | Iroquois Paving Corporation $4,196,716 · | ||
| Jun 16, 2023 | 62P08 | CookDistrict 1 | Culvert repair of IL 58 (Golf Road) over Poplar Creek Tributary in the Village of Hoffman Estates, Cook Co (552-Ft) The proposed improvement consists of culvert repair of IL 58 (Golf Road) over Poplar Creek Tributary in the Village of Hoffman Estates, Cook Co. | — | Executed | Copenhaver Construction, Inc. $666,506 · | ||
| Jun 16, 2023 | 62P71 | VariousDistrict 1 | (2.78-Mile) Reconstruction of new continuously reinforced concrete pavement, concrete median barrier wall, Portland cement concrete shoulders, grading work, drainage improvements, erosion control, pavement marking and signage installation, maintenance of traffic, construction layout, landscaping, etc. Located in the Villages of Minooka and Shorewood and the Township of Troy in various Counties. | — | Executed | D. Construction, Inc. $55,371,028 · | ||
| Jun 16, 2023 | 62R88 | CookDistrict 1 | Bridge deck (SN 016-2665) overlay and joint repairs of I 55 (Stevenson Expressway) at US 12/20/45 (La- Grange (2,404-Ft) The proposed improvement consists of bridge deck (SN 016-2665) overlay and joint repairs of I 55 (Stevenson Expressway) at US 12/20/45 (La- Grange Road) (overpass) in the Village of Hodgkins and the City of Countryside, Cook County. | — | Executed | D. Construction, Inc. $1,656,000 · | ||
| Jun 16, 2023 | 62T16 | DuPageDistrict 1 | (700-Ft) This is a bridge preservation project and scope of work includes deck scarification, latex concrete overlay, joint sealing and replacement and approach slab repair on IL Route 38 over Winfield Creek in the City of Wheaton in DuPage County. | — | Executed | MYS, Incorporated $945,438 · | ||
| Jun 16, 2023 | 62T47 | CookDistrict 1 | (245.72-Ft) This is a Bridge Preservation Project: bridge repair, joint replace / repair and deck overlay on bridge carrying Pulaski Road over North Branch Chicago River. Located in the City of Chicago. | — | Executed | Martam Construction Incorporated $885,626 · | ||
| Jun 16, 2023 | 62T53 | CookDuPageDistrict 1 | Installation of new fiber optic cable, network switches, PTZ cameras, at 77 signalized intersections. This project located in Cook and DuPage Counties. | — | Executed | H & H Electric Co. $3,706,914 · | ||
| Jun 16, 2023 | 62T67 | WillDistrict 1 | (1.9-Mile) Crack and Joint Sealing project consisting of crack routing and filling of longitudinal joints, grading and shaping shoulders and pavement re-striping on IL 7 and IL 53 (Broadway Street) from Renwick Road to North of Caton Farm Road in the Cities of Lockport and Crest Hill in Will County. | — | Executed | Denler, Inc. $145,907 · | ||
| Jun 16, 2023 | 62T70 | CookDuPageDistrict 1 | (5.6-Mile) Crack and Joint Sealing project along IL Route 38, from East of Edson Ave to East of I-294 in the Villages of Elmhurst, Hillside, Lombard, Oakbrook Terrace and Villa Park in DuPage and Cook Counties. | — | Executed | Denler, Inc. $329,908 · | ||
| Jun 16, 2023 | 62T76 | KaneDistrict 1 | (1.838-Mile) Crack and Joint Sealing; Location: FAP 341 IL72 from Industrial Dr to 0.2 Mile West Of Highland Dr in the Village of Gilberts in Kane County. | — | Executed | Denler, Inc. $120,748 · | ||
| Jun 16, 2023 | 62T99 | McHenryDistrict 1 | Partial removal and extension of the culverts located on IL 173 (328 The proposed improvement consists of partial removal and extension of the culverts located on IL 173 (328.55-Ft) over Ditch (1.43 Mile, East of US 14) in Alden Township, and IL 176 (452.45-Ft) over Ditch (1.9 Mile East of IL 47) in the City of Crystal Lake, McHenry County. | — | Executed | Copenhaver Construction, Inc. $800,774 · | ||
| Jun 16, 2023 | 62U03 | KaneDistrict 1 | Substructure masonry repairs of the structure (SN-045-0020) carrying over Mill Creek in the Batavia Township o This improvement consists of substructure masonry repairs of the structure (SN-045-0020) carrying over Mill Creek in the Batavia Township on Kane County. | — | Executed | Lorig Construction Company $361,958 · | ||
| Jun 16, 2023 | 62U17 | LakeDistrict 1 | Bridge painting of the structures at IL 137 over 24th St (049-0163) in North Chicago, IL 137 over Washington S This improvement consists of bridge painting of the structures at IL 137 over 24th St (049-0163) in North Chicago, IL 137 over Washington St (049-0164) in Waukegan, and US 41 over Mill Creek (049-0028) in Wadsworth in Lake County. | — | Executed | Eagle Painting & Maintenance Company, Inc. $598,044 · | ||
| Jun 16, 2023 | 62U18 | CookDistrict 1 | A full bridge painting of span 2 of the structure (016-1110) carrying 1-90/94 over 15th to 16th Streets in the This improvement consists of a full bridge painting of span 2 of the structure (016-1110) carrying 1-90/94 over 15th to 16th Streets in the City of Chicago in Cook County. | — | Rejected | ERA-Valdivia Contractors, Inc. $1,380,000 · | ||
| Jun 16, 2023 | 62U20 | CookDistrict 1 | This improvement is a Bridge Repairs project with Partial Bridge Painting, on IL-7 over Cal-Sag Channel 0.5 miles. NE of IL-83 in the City of Palos Heights and Palos Hills in Cook County. | — | Executed | ERA-Valdivia Contractors, Inc. $521,589 · | ||
| Jun 16, 2023 | 62U26 | WillDistrict 1 | The furnishing and storage of structural steel beams and bearings for the bridges along I-80 between east of R (1.98-Mile) The project consists of the furnishing and storage of structural steel beams and bearings for the bridges along I-80 between east of River Road and west of Houbolt Road (EB/WB I-80 over I-55 bridges) located in the Villages of Minooka and Shorewood and Township of Troy in Will County. | — | Executed | DeLong's Inc. of Missouri $4,017,035 · | ||
| Jun 16, 2023 | 62U63 | CookDistrict 1 | Bridge deck (SN: 016-1056) overlay and joint repair of the structure located at 1-55 (EB) Ramp to Franklin Ave (1565-Ft) The proposed improvement consists of bridge deck (SN: 016-1056) overlay and joint repair of the structure located at 1-55 (EB) Ramp to Franklin Avenue (NB) in the City of Chicago, Cook County. | — | Executed | Martam Construction Incorporated $1,461,679 · | ||
| Jun 16, 2023 | 64B13 | WinnebagoDistrict 2 | Reconstruction of the I-39/US 20 Interchange. | — | Executed | Curran Contracting Company and Civil Constructors, Inc. d/b/a Helm Civil Joint Venture $98,823,286 · | ||
| Jun 16, 2023 | 64F57 | OgleWhitesideDistrict 2 | Removal and Replacment of two structures carrying Freeport Rd. over Jordan Creek: SN 071-1001 located 0.5M (N) of Pilgrim Rd. in Ogle Co. and SN 098-0049 located 0.2M (S) of Pilgrim Rd. in Whiteside Co., Jordan Creek 6 Mi N of Sterling and Sterling and Jordan Creek 0.4 Mi N of Lee/Whiteside Co Line. | — | Executed | Martin & Company Excavating $2,530,997 · | ||
| Jun 16, 2023 | 64P63 | WhitesideDistrict 2 | Expansion joint replacement, deck patching and concrete overlay, and other miscellaneous repairs on SN 098-0095 and 098-0096. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,610,549 · | ||
| Jun 16, 2023 | 64R55 | CarrollDistrict 2 | Expansion joint replacement, miscellaneous repairs and deck concrete wearing surface on SN 008-0028 carrying IL 84 over Plum River, 1.0 miles South of US 52/IL 64 South of Savanna and SN 008-0040 carrying IL 84 over BNSF RR, 0.3 miles South of US 52/IL 64 in Savanna. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,495,293 · | ||
| Jun 16, 2023 | 64R57 | WinnebagoDistrict 2 | Lighting on US 20 at Alpine Rd interchange. | — | Executed | William Charles Construction Co, LLC $428,323 · | ||
| Jun 16, 2023 | 64R58 | LeeDistrict 2 | Lighting at I-39 AT US 30. | — | Executed | William Charles Construction Co, LLC $335,994 · | ||
| Jun 16, 2023 | 64S03 | Rock IslandDistrict 2 | Bridge joint replacement, misc bridge repair carrying SN 081-0121 over I-88. | — | Executed | Path Construction Company, Inc. $42,950 · | ||
| Jun 16, 2023 | 64S04 | WhitesideDistrict 2 | Bridge joint replacement and misc bridge repairs carrying SN 098-0065 over I-88. | — | Executed | Martin & Company Excavating $925,041 · | ||
| Jun 16, 2023 | 64S08 | Rock IslandDistrict 2 | Bridge joint replacement, misc bridge repair carrying SN 081-0126 over I-88. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $125,695 · | ||
| Jun 16, 2023 | 64S09 | Rock IslandDistrict 2 | Bridge joint replacement, misc bridge repair carrying SN 081-0133 over I-88. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $187,707 · | ||
| Jun 16, 2023 | 64S16 | Jo DaviessDistrict 2 | House and Garage Demolition of 420 Wall St. in East Dubuque. | — | Executed | Fischer Excavating, Inc. $57,911 · | ||
| Jun 16, 2023 | 66B05 | LaSalleLivingstonDistrict 3 | Milling and resurfacing with a designed overlay of IL 18 including storm_sewer construction, drainage and ADA ramp improvements. From the intersection of IL 17 and IL 18 in south eastern Streator and ends at the intersection of Otter Creek Road and IL 18 in Streator. | — | Executed | Advanced Asphalt Company $4,236,173 · | ||
| Jun 16, 2023 | 66M71 | GrundyDistrict 3 | Crack Filling on FAP 326 (IL 47) 0.1 MI S of Southmor Rd to 0.2 MI S of IL 113 for a total of 3.59 MI. | — | Executed | Denler, Inc. $69,016 · | ||
| Jun 16, 2023 | 66M76 | LaSalleDistrict 3 | This work is located at two box culverts on IL Route 170: SN 050-2542 and SN 050-2543. | — | Executed | D. Construction, Inc. $627,241 · | ||
| Jun 16, 2023 | 66N26 | GrundyDistrict 3 | Pavement widening with resurfacing of Morey Road and Seneca Road including minor drainage improvements. | — | Executed | D. Construction, Inc. $375,288 · | ||
| Jun 16, 2023 | 66N28 | VariousDistrict 3 | Repair damaged High Tension Cable Median Barrier, Guardrail, Attenuators, etc., caused by motorists along various routes in District 3. One year contract. | — | Executed | Northern Contracting, Inc. $2,597,629 · | ||
| Jun 16, 2023 | 66N43 | GrundyLaSalleDistrict 3 | Washing the bridge components and replacing the elastomeric (expansion) trough on SN 050-0079 and the structur This project consists of washing the bridge components and replacing the elastomeric (expansion) trough on SN 050-0079 and the structure carrying IL 47 over the Illinois River and the IandM Canal approximately 1.2 miles south of US 6 in Morris. | — | Executed | All States Painting, Inc. $349,800 · | ||
| Jun 16, 2023 | 68862 | PeoriaDistrict 4 | This is a bridge replacement project on IL 8 over the West Fork of Kickapoo Creek, 0.5 mile East of Oak Hill in Peoria County. | — | Executed | Stark Excavating, Inc. $3,713,452 · | ||
| Jun 16, 2023 | 68F89 | HenryKnoxDistrict 4 | Resurfacing on I-74/IL 110 from North of Woodhull to North of US 34. | — | Executed | Gunther Construction & Advanced Asphalt Company JV $28,792,543 · | ||
| Jun 16, 2023 | 68H11 | PeoriaDistrict 4 | Pavement widening for WB left-turn lane, resurfacing, and drainage improvements at the intersection of IL 116 and Cameron Lane in Peoria County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,488,251 · | ||
| Jun 16, 2023 | 68H15 | TazewellDistrict 4 | Replace expansion joints and substructure repairs to structures carrying I-155 over IL 98 and TPandWRR. | — | Executed | Otto Baum Company, Inc. $1,191,200 · | ||
| Jun 16, 2023 | 68H36 | PeoriaDistrict 4 | Riprap for scour countermeasures at 1-74 over Kickapoo Creek and Swab Run; IL 91 over Kickapoo Creek. | — | Executed | Stark Excavating, Inc. $448,580 · | ||
| Jun 16, 2023 | 68H38 | VariousDistrict 4 | Weed Spraying at various locations throughout District 4. | — | Executed | The Daltons Inc. $128,373 · | ||
| Jun 16, 2023 | 68H55 | FultonPeoriaDistrict 4 | Remove and replace traffic signal mast arms and posts at Ash and Vine Streets along North Main Street in Canton and at Adams and Spring Streets in Peoria in Fulton and Peoria Counties. | — | Executed | Oberlander Electric Co. $672,500 · | ||
| Jun 16, 2023 | 68H58 | VariousDistrict 4 | Bridge painting. | — | Executed | Eagle Painting & Maintenance Company, Inc. $1,739,800 · | ||
| Jun 16, 2023 | 68H61 | VariousDistrict 4 | Traffic signal and highway lighting improvements at various locations in Peoria, Tazewell, Woodford and McDonough Counties. | — | Executed | Laser Electric, Inc. $276,769 · | ||
| Jun 16, 2023 | 68H62 | KnoxDistrict 4 | HMA patching on IL 167 from Knox Road 2000 East to IL 180 in Knox County. | — | Executed | Gunther Construction, a div of UCM, Inc. $118,583 · | ||
| Jun 16, 2023 | 68H63 | PeoriaDistrict 4 | Expansion joints, patching, and, substructure repairs to S.N. 072-0149, IL 6 ramp overpass, west of IL 29. | — | Executed | Stark Excavating, Inc. $559,300 · | ||
| Jun 16, 2023 | 68H64 | PeoriaDistrict 4 | Longitudinal Joint Repair on IL 116 from Route 9 to Kingston Mines. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $496,645 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.