IDOT Jobs

2024 · 994 jobs · — Sign up free
★ My Jobs

994 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Apr 26, 2024 46645 VariousDistrict 2 Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised reflective pavement marker castings within the limits shown on each individual work order. — Executed Nov 26 New Precision Pavement Markings Inc. $998,000 ·
Apr 26, 2024 60P75 DuPageDistrict 1 (1.62-Mile) Proposed improvement includes widening and reconstruction of IL Route 56 (Butterfield Road) from West of I-355 to Arboretum Drive including Bridge repairs, multi-use path, traffic signals and lighting. — Executed Nov 26 New R. W. Dunteman Company $38,948,948 ·
Apr 26, 2024 61D34 WillDistrict 1 Pavement widening and reconstrtution;includes resurfacing, traffic signals and lightings at the intersection of Bell Road and 143rd Street in Homer Glen. — Executed Nov 26 New D. Construction, Inc. $24,310,460 ·
Apr 26, 2024 61H34 WillDistrict 1 New roadway construction to extend 143rd Street from IL 59 to IL 126. Includes; construction of a new bridge over the DuPage River, culvert exetensions, retaining walls, traffic signals and lighting in Plainfield. — Executed Nov 26 New D. Construction, Inc. $53,042,202 ·
Apr 26, 2024 61J08 WillDistrict 1 Construct a single-lane eliptical roundabout at the intersection of Cedar Road and Haven Avenue in New Lenox. Includes full-depth HMA Pavement, curb and gutter, sidewalk, lighting, and landscaping. — Executed Nov 26 New Austin Tyler Construction, Inc. $2,355,249 ·
Apr 26, 2024 61J14 DuPageDistrict 1 Replace existing structure with a single-span PPC bulb t-beam superstructure with concrete deck, HMA pavement, retaining wall, HMA multi-use path, storm sewers, sidewalks, ADA improvements, Guardrail, curb and gutter, and signage on Warrenville Road over the East Branch of the DuPage River in Lisle. — Executed Nov 26 New Dunnet Bay Construction Company $8,419,194 ·
Apr 26, 2024 61K00 DuPageDistrict 1 Resurfacing Lombard Road from Army Trial Boulevard to Fullerton Avenue in the Village of Addison. — Executed Nov 26 New R. W. Dunteman Company $1,427,498 ·
Apr 26, 2024 61K13 DuPageDistrict 1 Sidewalk construction along Armitage Avenue from Ardmore Avenue to Ellsworth Avenue in Addison. — Executed Nov 26 New R. W. Dunteman Company $544,000 ·
Apr 26, 2024 61K15 KaneDistrict 1 Construct an HMA Shared-Use path with a prefabricated steel truss pedestrian bridge over Blackberry Creek. Includes drainage improvements and landscaping. Project is located between Bell Vue Lane and the Virgil Gilman Nature Trail in Sugar Grove. — Executed Nov 26 New D. Construction, Inc. $571,413 ·
Apr 26, 2024 61K29 CookDistrict 1 HMA Resurfacing, curb and gutter, driveways, sidewalks, pavement patching, pavement markings, restoring Parkways on 25th Avenue from Lawrence Avenue to Waveland Avenue in Schiller Park — Executed Nov 26 New Builders Paving, LLC $1,542,137 ·
Apr 26, 2024 61K30 CookDistrict 1 Extend a multi-use path from 84th Avenue to 179th Street in Tinley Park. — Executed Nov 26 New D. Construction, Inc. $264,969 ·
Apr 26, 2024 61K31 CookDistrict 1 Sidewalk construction on various routes within Alsip. — Executed Nov 26 New Davis Concrete Construction Co. $268,435 ·
Apr 26, 2024 61K32 DuPageDistrict 1 Pavement reconstruction with an HMA multi-use path, curb and gutter, HMA shoulders, sidewalks, ADA ramps, traffic signals, culvert extension, and storm sewer on Gary Avenue from Jewell Road to Harrison Avenue in Wheaton. — Executed Nov 26 New Plote Construction, Inc. $4,291,788 ·
Apr 26, 2024 61K33 DuPageDistrict 1 HMA Resurfacing, sidewalks, traffic signal modifications, and pavement markings on Main Street from Sherman Road to Franklin Street in Downers Grove. — Executed Nov 26 New K-Five Construction Corporation $2,384,159 ·
Apr 26, 2024 61K34 LakeDistrict 1 Pavement reconstruction on FAU 160 (Sprucewood Ln.) from Rolling Ridge Lane to Lake Shore Drive, continuing on Lake Shore from Sprucewood Lane to Beck Road in Lindenhurst. — Executed Nov 26 New Lenny Hoffman Excavating, Inc. $5,300,754 ·
Apr 26, 2024 61K35 McHenryDistrict 1 Roadway widening, reconstruction, resurfacing and triffic signals at the intersectionof Three Oaks Road and Lutter Drive/Sands Road in Crystal Lake. — Executed Nov 26 New Curran Contracting Company $2,591,532 ·
Apr 26, 2024 61K39 KaneDistrict 1 Resurface Baseline Road from US 30 to IL 31 in Montgomery. — Executed Nov 26 New Geneva Construction Company $431,447 ·
Apr 26, 2024 61K41 CookDistrict 1 Construct a concrete paver parking lot, retention basin, drainage improvements, and other work on the Cal-Sag Trial at the Lake Katherine Nature Center in Palos Heights. — Executed Nov 26 New D. Construction, Inc. $870,603 ·
Apr 26, 2024 61K42 McHenryDistrict 1 Traffic signal replacement on Virginia Road from Teckler Boulevard to James R. Rekow Road, and at the intersection of Pyott Road and James R. Rekow Road in Crystal Lake and Lake of the Hills. — Executed Nov 26 New H & H Electric Co. $1,455,916 ·
Apr 26, 2024 62380 WillDistrict 1 Location 1: FAU 354 (Richards Street) at Hickory Creek North of I-80 (SN 099- 0123) 1,835 Feet (0.35 Mile) project which includes reconstruction and widening of the bridge bridge superstructure, pavement reconstruction, noise barriers, drainage, signing, lighting, and traffic signals in the City of Joliet and Joliet Township in Will County. Location feet 2: FAI 80 (I-80) over Des Plaine River (099-0056 EB and 099-0057 WB) 782 feet (0.15 Mile) project which includes structural steel repairs in th — Executed Nov 26 New D. Construction, Inc. $19,992,722 ·
Apr 26, 2024 62L16 McHenryDistrict 1 7.3 miles of Standard Overlay, Milled Rumble Strips and drainage improvements on IL 173 in the Villages of Hebron and Alden. — Executed Nov 26 New Peter Baker & Son Co. $5,133,133 ·
Apr 26, 2024 62L31 CookDistrict 1 (1,560-Ft) Bridge structural repairs, bridge deck overlay removal and replacement, joint replacement, and bridge drainage repairs, for the Ohio St. Bascule Bridge over the North Branch Chicago River, and the west and east approach bridges, in the City of Chicago, Cook County, IL. — Executed Nov 26 New Lorig Construction Company $15,385,971 ·
Apr 26, 2024 62M25 LakeMcHenryDistrict 1 (8.47-Mile) Standard Overlay, Milled Rumble Strips, Drainage Improvements on IL 173 (Kenosha St) from Greenwood Rd to Madison Ave. This project is in the Villages of Richmond, Spring Grove and in Unincorporated Hebron, Richmond and Burton Townships in McHenry and Lake Counties. — Executed Nov 26 New Payne & Dolan, Inc. $7,564,874 ·
Apr 26, 2024 62M37 DuPageDistrict 1 Bridge deck overlay and joint repair of the structure located at IL 83 (Kingery Highway) over I-88, Dupage Cou (1014-Ft) The proposed improvement consists of bridge deck overlay and joint repair of the structure located at IL 83 (Kingery Highway) over I-88, Dupage County. — Executed Nov 26 New Lorig Construction Company $2,360,619 ·
Apr 26, 2024 62P05 CookDistrict 1 Bridge deck overlay and joint repair of the structure located at Forest Avenue over Des Plaines River in the V The proposed improvement consists of bridge deck overlay and joint repair of the structure located at Forest Avenue over Des Plaines River in the Village of Riverside, Cook County. — Executed Nov 26 New D. Construction, Inc. $510,572 ·
Apr 26, 2024 62P06 DuPageDistrict 1 Culvert repair of the structure located at I-55 at stream (0 (1157-Ft) The proposed improvement consists of culvert repair of the structure located at I-55 at stream (0.9 Mi E. of Cass Ave) in Downers Grove Township, DuPage County. — Executed Nov 26 New Lorig Construction Company $1,281,947 ·
Apr 26, 2024 62P12 CookDistrict 1 A bridge deck overlay and joint replacement of IL59/ Sutton Road located over I-90 (2,500-FT) The proposed improvement consist of a bridge deck overlay and joint replacement of IL59/ Sutton Road located over I-90. The project is located in the Village of Hoffman Estates, Cook County. — Executed Nov 26 New Martam Construction Incorporated $2,534,342 ·
Apr 26, 2024 62P34 CookDistrict 1 (6,564-Ft) Standard Overlay project located on Cumberland Avenue from Belle Plaine Avenue to I-90 within the Village of Park Ridge and the City of Chicago in Cook County. — Executed Nov 26 New Plote Construction, Inc. $2,781,187 ·
Apr 26, 2024 62P50 CookDistrict 1 (4,470-Ft) Corridor improvement, traffic signal modernization/ replacement and ADA improvements project on IL Route 43 (Harlem Avenue) and includes the intersections of 78th St., 79th St., 83rd St., 84th St., 87th St., 88th St./ Southfield Shopping Center Dr., and 90th St. in the Village of Bridgeview in Cook County. — Executed Nov 26 New R. W. Dunteman Company $7,068,889 ·
Apr 26, 2024 62P69 CookDistrict 1 Bridge deck overlay and joint repair of the structure located at Foster Avenue over North branch Chicago River The proposed improvement consists of bridge deck overlay and joint repair of the structure located at Foster Avenue over North branch Chicago River in the of Chicago, Cook County. Gross and Net length: 2639 Ft (0.50 Mi), 1088 Ft (0.21 Mi) — Executed Nov 26 New Martam Construction Incorporated $2,061,184 ·
Apr 26, 2024 62P76 CookDistrict 1 Replace wooden noise abatement walls along IL 53 from Dundee Road to Lake Cook Road with precast concrete walls on both east and west sides for a total length of 2.1 miles. Located within Platine, Arlington Heights and Palatine Township. — Executed Nov 26 New Lorig Construction Company $14,991,712 ·
Apr 26, 2024 62R43 CookDistrict 1 (4,090-Ft) Standard Overlay, ADA Improvements. Project located on Kedzie Ave. from 71st St to 77th St within the City of Chicago in Cook County. — Executed Nov 26 New Gallagher Asphalt Corporation $871,931 ·
Apr 26, 2024 62R53 CookDistrict 1 A standard overlay of the existing FAU 2691 (Wolf Road) from IL 58 (Golf Road) to North of Touhy Avenue in the This improvement consists of a standard overlay of the existing FAU 2691 (Wolf Road) from IL 58 (Golf Road) to North of Touhy Avenue in the City of DES Plaines in Cook County approximately 13,627 ft in length. — Executed Nov 26 New Builders Paving, LLC $3,359,808 ·
Apr 26, 2024 62R65 CookDistrict 1 Cleaning and painting existing steel on various structures located in Villages of Hodgkins and Summit in Cook The improvement consists of cleaning and painting existing steel on various structures located in Villages of Hodgkins and Summit in Cook County. Location 1 (SN: 016-0004, 0005, 0006, and 0007) in Village of Hodgkins, Location 2 (016-0012 and 0013) in Village of Summit, and Location 3 (SN: 016-0014 and 0015) Village of Summit. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $1,693,659 ·
Apr 26, 2024 62R69 CookDistrict 1 (2.07-Mile) SMART Overlay on 183rd Street from Oak Park Ave to IL 50 (Cicero Ave). This project is located in the City of Country Club Hills, the Village of Tinley Park and unincorporated Cook County. — Executed Nov 26 New Gallagher Asphalt Corporation $1,015,841 ·
Apr 26, 2024 62R75 CookDistrict 1 Bridge deck overlay and joint replacement of IL 83/Sibley Blvd located over UPRR (0 (1,770-Ft) Improvement consists of bridge deck overlay and joint replacement of IL 83/Sibley Blvd located over UPRR (0.2-mile east of the State Street/Indiana Avenue). The project is in the Village of Dolton, Cook County. — Executed Nov 26 New D. Construction, Inc. $1,984,514 ·
Apr 26, 2024 62R91 DuPageDistrict 1 Bridge Deck Overlay, Bridge Joint Replacement / Repair at US 20 (Lake Street) over IL 390 (Elgin O'Hare Expressway). This project is located in the Village of Hanover Park in DuPage County. — Executed Nov 26 New Martam Construction Incorporated $1,888,608 ·
Apr 26, 2024 62T00 McHenryDistrict 1 (200-Ft) Bridge Preservation project including bridge deck overlay, bridge joint replace/repair of SN 056-0052 carrying US 14 (Division Street) over Rush Creek, 0.1-miles North of IL 23 located within the City of Harvard in McHenry County. — Executed Nov 26 New Martam Construction Incorporated $637,548 ·
Apr 26, 2024 62T33 WillDistrict 1 This is a bridge preservation project of SN 099-0282; US 6 (Maple Road) over CN Railroad. Scope of work includes bridge deck scarification and overlay, joint repair, approach slab repair and sidewalk and guardrail replacement. The project is located within the City of Joliet in Will County. — Executed Nov 26 New D. Construction, Inc. $1,303,768 ·
Apr 26, 2024 62T42 CookDistrict 1 (5.626-Mile) Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course and sidewalk ramps improvements. Located in the Villages of Oak Brook, Westchester, Broadview, North Riverside, and Forest Park in Cook County. — Executed Nov 26 New Builders Paving, LLC $8,297,082 ·
Apr 26, 2024 62T45 KaneDistrict 1 This is a bridge preservation project of (SN 045-2015); Galena Blvd. over Blackberry Creek. Scope of work includes bridge deck scarification and latex overlay, full depth deck patching, approach slab repair and drainage adjustments. The project is located within the City of Aurora in Kane County. — Executed Nov 26 New Lorig Construction Company $256,821 ·
Apr 26, 2024 62T69 LakeDistrict 1 (4.65-Mile) SMART Resurfacing and ADA Ramp improvements from County Line Road to West of US 12 and includes road surface removal, HMA paving, sidewalk removal, installation of PCC sidewalk, detectable warnings, and placement of pavement markings. Improvements is in the Villages of Lake Zurich, North Barrington, Lake Barrington, and in Cuba and ELA Townships in Lake County. — Executed Nov 26 New Peter Baker & Son Co. $1,732,377 ·
Apr 26, 2024 62T85 CookDistrict 1 Bridge deck overlay and joint repair of the structure located at the Dundee Road Bridge (SN 016-0940) on FAU 1 The proposed improvement consists of bridge deck overlay and joint repair of the structure located at the Dundee Road Bridge (SN 016-0940) on FAU 1273 (IL- 68 Dundee Road) 0.2 miles east of I-94 in Northfield Township and New Trier Township in Cook County. — Executed Nov 26 New Lorig Construction Company $1,150,113 ·
Apr 26, 2024 62U73 DuPageDistrict 1 (2,000-Ft) Traffic Signal Modernization and Intersection Improvements located at IL 83 (Kingery Highway) and Bluff Rd. in the Downers Grove Township, DuPage County. — Active Nov 26 New R. W. Dunteman Company $1,457,500 ·
Apr 26, 2024 62U81 CookDistrict 1 Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course and sidewalk ra (1.14-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course and sidewalk ramps improvements. Located in the Villages of Winnetka in Cook County. — Executed Nov 26 New Peter Baker & Son Co. $678,134 ·
Apr 26, 2024 62U84 KaneDistrict 1 (4,485-Ft) Pavement rehabilitation and widening, drainage, intersection channelization, signing, lighting, traffic signals and safety improvements of US 20 from west of Nesler Road to east of Weld Road/Longcommon Parkway in the City of Elgin within Kane County. — Executed Nov 26 New Martam Construction Incorporated $2,186,382 ·
Apr 26, 2024 62U87 CookDistrict 1 Scope of work includes pavement removal, Drainage Improvement, Concrete Barrier removal and construction of new Concrete Barrier, retaining wall repair, placement of subbase granular material, HMA asphalt pavement and thermoplastic pavement markings. Located at the IDOT Northbrook Maintenance yard at 1916 Techny Rd., Northbrook, IL. — Executed Nov 26 New Schroeder Asphalt Services, Inc. $1,375,038 ·
Apr 26, 2024 62V18 VariousDistrict 1 Repairing damaged concrete barrier wall, bridge parapet, retaining walls and wooden sound wall in various Town This improvement consists of repairing damaged concrete barrier wall, bridge parapet, retaining walls and wooden sound wall in various Townships in various Counties throughout District 1. — Executed Nov 26 New D. Construction, Inc. $932,635 ·
Apr 26, 2024 62V97 DuPageDistrict 1 This improvement is located at the IDOT Oakbrook Maintenance yard at 17W125 Butterfield Road, Villa Park, IL. Scope of work includes pavement removal, Catch Basins PCC reconstruction, placement of subbase granular material, HMA asphalt pavement, PCC pavement, and thermoplastic pavement marking. — Executed Nov 26 New K-Five Construction Corporation $780,422 ·
Apr 26, 2024 62W01 CookDistrict 1 2 lots, adjacent to each other This is a parking lot improvement project for the District 1 Landscape Maintenance Yard. The Yard consists of 2 lots, adjacent to each other. Both lots are located at 1260 West Augusta Boulevard within the City of Chicago. — Executed Nov 26 New M.Q. Sewer Water Contractors, Inc. d/b/a M. Q. Construction Company $1,029,731 ·
Apr 26, 2024 62W06 CookDistrict 1 Full depth removal of existing HMA pavement and replacement, PCC pavement replacement/patching, drainage, ligh Parking lot improvement project consists of full depth removal of existing HMA pavement and replacement, PCC pavement replacement/patching, drainage, lighting relocation. Location of Work: IDOT District 1 Emergency Traffic Patrol (ETP) facility at 3501 South Normal Avenue within the City of Chicago in Cook County. — Executed Nov 26 New M.Q. Sewer Water Contractors, Inc. d/b/a M. Q. Construction Company $456,692 ·
Apr 26, 2024 62W09 CookDuPageDistrict 1 Debris cleaning and litter picking located on I-55 - Stevenson expressway from IL 43 (Harlem Ave) to I-355 in This project consists of debris cleaning and litter picking located on I-55 - Stevenson expressway from IL 43 (Harlem Ave) to I-355 in Cook and DuPage Co. — Executed Nov 26 New The Final Connection, Inc. $140,400 ·
Apr 26, 2024 62W10 WillDistrict 1 Debris cleaning and litter picking This work is located on I-55 expressway from I-355 to Reed Rd in Will County. It consists of debris cleaning and litter picking. — Executed Nov 26 New The Final Connection, Inc. $168,480 ·
Apr 26, 2024 62W42 WillDistrict 1 (231.5-Ft) This project includes overlay of Gougar Road Bridge over I-80 (SN 099-0 203) and replacement of permanent protective shield, in the Village of New Lenox within Will County. — Executed Nov 26 New D. Construction, Inc. $128,211 ·
Apr 26, 2024 62W46 VariousDistrict 1 Impact attenuators removal and replacement, sand modules replacement and any collateral work necessary to comp The work to be completed under this contract consist of impact attenuators removal and replacement, sand modules replacement and any collateral work necessary to complete the improvement as shown on the plans and as described herein on a work order basis and per the Department-s request. — Executed Nov 26 New Traffic Control and Protection LLC dba High Star Traffic $2,614,163 ·
Apr 26, 2024 64L95 WinnebagoDistrict 2 Patching, milling, and resurfacing on IL 75 from 0.2 mile East of Moate Rd to 0.4 mile East of Meridian Rd. — Executed Nov 26 New Rock Road Companies, Inc. $1,979,788 ·
Apr 26, 2024 64N90 Rock IslandDistrict 2 5.98 mile, HMA resurfacing on IL 92 from 115th St West in Andalusia to 0.4 mile East of IL 92 (N). — Executed Nov 26 New Langman Construction, Inc. $2,106,327 ·
Apr 26, 2024 64P27 WinnebagoDistrict 2 0.55 miles of cold milling, patching, and HMA resurfacing from 0.4 miles East of Lyford Rd to 0.1 mile West of Winnebago County Line. — Executed Nov 26 New Curran Contracting Company $800,800 ·
Apr 26, 2024 64P58 OgleDistrict 2 1.08 miles of cold milling, pavement patching, hot-mix asphalt resurfacing from West of Illinois St to 1st St in Oregon. — Executed Nov 26 New Martin & Company Excavating $1,070,501 ·
Apr 26, 2024 64S27 WhitesideDistrict 2 Deck repair, joint replacement, deck overlay and other miscellaneous repairs on the existing bridges carrying I-88 over Rock Creek, BNSF RR Barstow Sub., Henry Road and Deer Creek. — Executed Nov 26 New Martin & Company Excavating $4,099,617 ·
Apr 26, 2024 64S30 LeeDistrict 2 Deck repair, joint replacement, deck overlay, and other miscellaneous repairs on SN 052-0061 over Coon Creek, 3.2 miles South of Amboy. — Executed Nov 26 New Martin & Company Excavating $585,814 ·
Apr 26, 2024 64S38 OgleDistrict 2 0.15 mile milling and standard overlay; tollway ramp (EB) to Steward Rd south of Rochelle. — Executed Nov 26 New Curran Contracting Company $201,632 ·
Apr 26, 2024 64S55 Jo DaviessDistrict 2 1.3 miles of patching through Elizabeth. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $442,965 ·
Apr 26, 2024 64S61 StephensonDistrict 2 Bridge deck repair on SN's 089-0058 and 089-0059, carrying US 20 over Silver Creek, 0.5 miles east of Springfield Rd. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $449,840 ·
Apr 26, 2024 64S65 WhitesideDistrict 2 Bridge repair, deck repair, joint replacement on SN 098-0033, carrying US 30 over Elkhorn Creek. — Executed Nov 26 New Martin & Company Excavating $402,242 ·
Apr 26, 2024 64S68 HenryDistrict 2 3.39 miles of HMA resurfacing and pavement patching, IL 82 frokm IL 81 in Camridge to N 70th Ave. — Executed Nov 26 New Advanced Asphalt Company $1,798,693 ·
Apr 26, 2024 64S95 HenryDistrict 2 Pavement patching on I-74 from the I-74/I-80/I-280 interchange to IL 81. — Executed Nov 26 New G. M. Sipes Construction, Inc. $553,125 ·
Apr 26, 2024 64T03 VariousDistrict 2 Various routes on-call guardrail. — Executed Nov 26 New Northern Contracting, Inc. $319,684 ·
Apr 26, 2024 64T08 VariousDistrict 2 Maintain and service all Intelligent Transportation System equipment located in the Department's Districts 2 and 3 to ensure the safety of the motoring public. — Rejected Nov 26 New Laser Electric, Inc. $155,725 ·
Apr 26, 2024 64T14 Rock IslandDistrict 2 7.26 miles of patching, milling, widening, and resurfacing along 104th St from US 150 south of Coal Valley to Mercer County Line north of Sherrard. — Executed Nov 26 New Advanced Asphalt Company $4,786,212 ·
Apr 26, 2024 64T15 OgleWhitesideDistrict 2 8.8 miles of patching, milling, and resurfacing on Freeport Rd from West Sterling Rd to East Lynn Blvd in Sterling. — Executed Nov 26 New Martin & Company Excavating $3,350,526 ·
Apr 26, 2024 64T22 Rock IslandDistrict 2 31.1 miles of aggregate shoulder improvement. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $539,770 ·
Apr 26, 2024 66C45 IroquoisDistrict 3 Work beings at the Iroquois/Ford county line on IL 116 extending 8.22 miles, ending at the interchange limits of IL 116 and I 57. The project is a milling and resurfacing designed overlay of IL 116 including drainage improvements. — Executed Nov 26 New Iroquois Paving Corporation $5,775,587 ·
Apr 26, 2024 66M98 IroquoisKankakeeDistrict 3 Work beings at 0.1 Mi N of Ambrose St in St Anne to 1.8 Mi S of Papineau Rd. 6.22 Miles of smart overlay with ADA and drainage repairs. — Executed Nov 26 New Iroquois Paving Corporation $2,586,271 ·
Apr 26, 2024 66N40 LivingstonDistrict 3 Micro surfacing Joint Repair, Located on FAI 55 in Livingston County, from McLean County Line to 1.7 miles South of IL 116. — Executed Nov 26 New A. C. Pavement Striping Co. $577,571 ·
Apr 26, 2024 66N44 IroquoisDistrict 3 Milling and resurfacing the Illinois Department of Transportation Ashkum Maintenance facility. — Executed Nov 26 New H. J. Eppel & Co. $781,331 ·
Apr 26, 2024 66N50 GrundyDistrict 3 Raising existing concrete pavement adjacent to approach pavement IL 47 at the north abutment, southbound lanes of structure No. 032-0099; the work consists of raising existing concrete pavement adjacent to approach pavement. — Executed Nov 26 New D. Construction, Inc. $59,606 ·
Apr 26, 2024 66N53 BureauDistrict 3 Bridge repairs at Structure No. 006-0083 carrying FAS 1252 (IL 26/29) over Bureau Creek Overflow, 0.3 mi. northeast of IL 26 and IL 29 junction. — Executed Nov 26 New Gensini Excavating, Inc. $431,733 ·
Apr 26, 2024 66N54 IroquoisDistrict 3 Remove concrete slope wall, install stone riprap, filter fabric, stone bedding, replace expansion joint seal, and structural repair of concrete (pier) on SN 038-0174. — Executed Nov 26 New Iroquois Paving Corporation $313,415 ·
Apr 26, 2024 66N92 LaSalleDistrict 3 Cleaning and painting all structural steel on Structure No. 050-0019 carrying IL 351 over the Lone Star Cement Railroad, 2.0 miles south of US Route 6 (Oglesby). — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $186,186 ·
Apr 26, 2024 66N93 BureauDistrict 3 Cleaning and painting all structural steel on Structure No. 006-0083 carrying IL 29/26 over Big Bureau Creek Overflow, 0.3 mi. north of the south junction of IL 26 and Structure No. 006-0084 carrying IL 29 over over Big Bureau Creek, 0.3 mi. south of the south junction of IL 26. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $548,417 ·
Apr 26, 2024 66N96 KankakeeDistrict 3 SN 046-0108, riprap replacement, controlled low-strength material, riprap removal, grout for use with riprap. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $33,295 ·
Apr 26, 2024 66N97 IroquoisDistrict 3 Traffic Signal Mast Arm Replacement. This project is located in Iroquois County, at the west intersection of US-24 and IL-1 in Watseka. — Executed Nov 26 New Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $299,323 ·
Apr 26, 2024 68880 PeoriaDistrict 4 Bridge deck replacement and rehabilitation on SN 072-0114 and SN 072-0115 over Kickapoo Creek/BNSF RR. — Executed Nov 26 New Stark Excavating, Inc. $22,989,697 ·
Apr 26, 2024 68F84 HendersonDistrict 4 Bridge preservation to SN 036-0036 including: bridge joint replacement, hydroscarification, and MSC overlay on the bridge deck and roadway aproaches, slope wall repair, plating a beam end and other related collateral work to complete the work. — Executed Nov 26 New Brandt Construction Co. $1,768,094 ·
Apr 26, 2024 68H22 MarshallDistrict 4 NB and SN I-39 over TR 39, Sandy Creek and North Fork Sandy Creek in Marshall County. — Active Nov 26 New ICC Group Inc. $2,310,000 ·
Apr 26, 2024 68H26 VariousDistrict 4 Crack and joint sealing on various routes in various counties in District Four. — Executed Nov 26 New SKC Construction, Inc. $973,284 ·
Apr 26, 2024 68H27 VariousDistrict 4 D4 bridge deck sealing 2024 at various locations within District 4. — Executed Nov 26 New M & M Concrete, Inc. $175,287 ·
Apr 26, 2024 68H71 TazewellDistrict 4 D4 Bridge Joint Repair 2024 at SN's 090-0130, 090-0132, 090-0133, 090-0137, 090-0138 and 090-0139 in Tazewell County. — Active Nov 26 New Otto Baum Company, Inc. $5,662,800 ·
Apr 26, 2024 68H81 TazewellDistrict 4 Bridge deck patching on SN 090-0141 on Morton Ave (FAU 6729) over I-74 in Morton in Tazewell County. — Executed Nov 26 New Path Construction Company, Inc. $211,896 ·
Apr 26, 2024 68H83 PeoriaDistrict 4 Paving the invert of the culvert under IL Rt 6 between Knoxville Ave and Allen Rd. — Executed Nov 26 New Illinois Civil Contractors, Inc. $138,627 ·
Apr 26, 2024 68H84 MercerDistrict 4 Culvert wingwall and slope repairs along IL 17, 3.8 miles east of US 67 in Mercer County. — Executed Nov 26 New Miller Trucking & Excavating Company $243,778 ·
Apr 26, 2024 68H85 PeoriaDistrict 4 Culvert wing wall repair (remove and replace) along IL 78, north of IL 116 near Farmington in Peoria County. — Executed Nov 26 New Otto Baum Company, Inc. $324,600 ·
Apr 26, 2024 68H86 KnoxPeoriaDistrict 4 Pavement and drainage under RR viaducts on IL 90 and IL 78 in Peoria and Knox Counties. — Executed Nov 26 New Stark Excavating, Inc. $834,893 ·
Apr 26, 2024 68H91 VariousDistrict 4 D4 District-wide pavement markings. — Executed Nov 26 New Varsity Striping & Construction Co. $385,631 ·
Apr 26, 2024 68I01 WoodfordDistrict 4 Rehabilitation to existing lagoon at the eastbound I-74 Mackinaw Dells Rest Area. — Executed Nov 26 New Gensini Excavating, Inc. $3,190,549 ·
Apr 26, 2024 68I05 TazewellDistrict 4 Traffic signal mast arm replacement at IL 98 (Birchwood St.) and I-155 NB ramps in Morton. — Executed Nov 26 New Laser Electric, Inc. $243,063 ·
Apr 26, 2024 68J05 PeoriaDistrict 4 Traffic signal mast arm replacement at IL 29/Cedar Hills Drive in Peoria County. — Executed Nov 26 New Oberlander Electric Co. $291,000 ·
Apr 26, 2024 70254 ChampaignDistrict 5 0.34 mi Bridge Replacement over I-57 west of Champaign. — Executed Nov 26 New ICC Group Inc. $17,670,000 ·
Apr 26, 2024 70753 ChampaignDistrict 5 165' culvert replacement at ditch 0.6 and 2.2 miles east of Gifford ECL. — Executed Nov 26 New Stark Excavating, Inc. $683,695 ·
301–400 of 994‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.