Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jun 14, 2019 72L19 PikeDistrict 6 Deck patching on SN 075-0081 carrying IL 104 over McKee Creek at the east edge of Chambersburg. — Executed Nov 26 New County Contractors, Inc. $86,995 ·
Jun 14, 2019 72L20 SangamonDistrict 6 Patching on various routes in Sangamon County. — Executed Nov 26 New Kinney Contractors, Inc. $378,580 ·
Jun 14, 2019 72L21 ScottDistrict 6 Patching on I-72 in Scott County. — Executed Nov 26 New Kinney Contractors, Inc. $184,672 ·
Jun 14, 2019 72L23 MacoupinDistrict 6 REPLACING EXPANSION JOINTS AND INSTALLING A MICROSILICA OVERLAY ON SN 059-0009 CARRYING IL 4 OVER THE UPRR, 2 MILES NORTH OF STAUNTON. — Executed Nov 26 New Keeley & Sons, Inc. $473,842 ·
Jun 14, 2019 72L24 VariousDistrict 6 Installation of signage to designate pollinator habitat areas along various routes. — Executed Nov 26 New CSD Environmental Services, Inc. $69,661 ·
Jun 14, 2019 74703 EdwardsDistrict 7 7.6 miles of patching, resurfacing, safety shoulders and other repairs to 3 structures on IL 130 from IL 1 in Garyville to the Northfolk Southern Railroad Bridge south of Albion. (SN 024-0005, 7011 and 7013) — Executed Nov 26 New Howell Paving, Inc. $4,693,180 ·
Jun 14, 2019 74754 JasperDistrict 7 12.2 miles of resurfacing on IL 49 from the Cumberland County line to Main Street in Willow Hill. — Executed Nov 26 New Howell Paving, Inc. $3,872,911 ·
Jun 14, 2019 74867 ClayDistrict 7 12.2 miles of cape seal on Zion Lane from south of Bible Grove Road to just north of the railroad tracks in Clay City. — Executed Nov 26 New Beniach Construction Company, Inc. and Pavement Maintenance Systems, LLC $706,720 ·
Jun 14, 2019 74880 VariousDistrict 7 District-wide repair/replace steel plate beam guardrail damaged by vehicles. — Rejected Nov 26 New COLLINS & HERMANN, INC. $299,763 ·
Jun 14, 2019 74895 VariousDistrict 7 Replace obsolete guardrail and terminals at various locations. — Executed Nov 26 New Midwest Fence Corporation $824,964 ·
Jun 14, 2019 74896 WayneDistrict 7 Removal and replacement of the bridge deck and parapet wall over the damaged beam, and removal and replacement of the damaged PCC I-beam on SN 096-0031 on I-64 approximately 3.5 miles east of IL 242. — Executed Nov 26 New E. T. Simonds Construction Company $408,476 ·
Jun 14, 2019 74901 ClayDistrict 7 Traffic signal modernization on US 45 and North State Road in Flora. — Executed Nov 26 New Bodine Electric of Decatur $195,962 ·
Jun 14, 2019 74911 WayneDistrict 7 Beam end repairs on SN 096-0010 carrying IL 15 over Little Wabash River 4.5 miles west of the Edwards County line. — Executed Nov 26 New Keeley & Sons, Inc. $24,810 ·
Jun 14, 2019 74913 VariousDistrict 7 Removal and replacement of light towers and light poles, rewiring light towers and poles, removal and replacement of wiring, removal and replacement of concrete foundations and LED reetrofits on various routes throughout District 7. — Executed Nov 26 New Bodine Electric of Decatur $655,982 ·
Jun 14, 2019 74914 EffinghamDistrict 7 Tree removal and seeding along 1-70 east of Effingham, from milepost 98 to milepost 105. — Executed Nov 26 New Brewster Companies, Inc. $142,000 ·
Jun 14, 2019 74919 MoultrieDistrict 7 1.6 miles of patching on Bruce/Findlay Road. — Executed Nov 26 New Kinney Contractors, Inc. $140,672 ·
Jun 14, 2019 76J82 JerseyDistrict 8 ADA improvements on US 67 from Oak Street to County Road in Jerseyville. — Executed Nov 26 New RCS Construction, Inc. $615,678 ·
Jun 14, 2019 76K34 MarionDistrict 8 5.7 MILES OF RESURFACING ON US 50 FROM LACKET STREET IN SALEM TO METCALF ROAD. — Executed Nov 26 New Howell Paving, Inc. $2,691,578 ·
Jun 14, 2019 76L69 MadisonDistrict 8 6.5 miles of micro-surfacing on I-55/70 from 0.5 mile west of Black Lane to 0.4 mile east of IL 159; — Executed Nov 26 New Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $4,445,900 ·
Jun 14, 2019 76L80 VariousDistrict 8 Patching at various locations throughout District 8. — Executed Nov 26 New Kinney Contractors, Inc. $566,144 ·
Jun 14, 2019 76L85 St. ClairDistrict 8 Electrical repairs at the Bowman Pump Station on I-55/70. — Executed Nov 26 New Pyramid Electrical Contractors, Inc. $126,750 ·
Jun 14, 2019 76L87 VariousDistrict 8 Guardrail and cable rail repair at various locations thorughout District 8. — Executed Nov 26 New Illini Excavation & Reclamation, Inc. $1,832,633 ·
Jun 14, 2019 76M02 St. ClairDistrict 8 0.7 miles of resurfacing and patching on IL 4/IL 15 from just east of 1st Street in Fayetteville to just east of Bee Hollow Road. — Executed Nov 26 New The Kilian Corporation $430,977 ·
Jun 14, 2019 76M18 VariousDistrict 8 Maintenance and service of all ITS equipment at various location throughout District 8. — Executed Nov 26 New Electrico, Inc. $407,003 ·
Jun 14, 2019 76M19 VariousDistrict 8 Setup, maintenance and pickup of traffic control devices at various locations throughout District 8. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $40,920 ·
Jun 14, 2019 76M20 VariousDistrict 8 Highway lighting and traffic signal repairs and maintenance at various locations throughout District 8. — Executed Nov 26 New Electrico, Inc. $806,295 ·
Jun 14, 2019 76M21 GreeneDistrict 8 Deck replacement on SN 031-0015 carrying IL 267 over Apple Creek, 8.6 miles north of Greenfield. — Executed Nov 26 New Halverson Construction Co., Inc. $2,133,409 ·
Jun 14, 2019 76M23 MadisonDistrict 8 Guardrail and bridge repair on SN 060-0188 carrying IL 143 over Mooney Creek, 0.5 miles east of IL 157 in Edwardsville. — Executed Nov 26 New Stutz Excavating, Inc. $75,957 ·
Jun 14, 2019 76M26 MadisonSt. ClairDistrict 8 Roadway and bridge deck patching along I-255 from 0.4 miles south of Mousette Lane to Collinsville Road. — Executed Nov 26 New Keeley & Sons, Inc. $1,612,468 ·
Jun 14, 2019 76M27 VariousDistrict 8 Weed spraying on various routes throughout District 8. — Executed Nov 26 New The Daltons Inc. $95,987 ·
Jun 14, 2019 76M29 VariousDistrict 8 Tree removal at various locations throughout District 8. — Rejected Nov 26 New
Jun 14, 2019 76M31 MadisonDistrict 8 14.9 miles of patching on IL 4 from I-55 to US 40. — Executed Nov 26 New The Kilian Corporation $341,087 ·
Jun 14, 2019 76M32 RandolphDistrict 8 3.2 miles of patching on IL 3/IL 150 from High Street in Chester to 0.2 miles south of Water Street. — Executed Nov 26 New E. T. Simonds Construction Company $482,228 ·
Jun 14, 2019 78162 WhiteDistrict 9 removal and replacement of SN 097-0036 carrying IL 141 over a tributary to Cane Creek, 0.25 mile east of IL 1. — Executed Nov 26 New E. T. Simonds Construction Company $1,137,238 ·
Jun 14, 2019 78623 MassacDistrict 9 Bridge repairs including joint reconstruction, deck repair, overlay removal and replacement, bearing removal and replacement, and substructure repairs on SN 064-0016. 0037, and 0038, at the I-24 Big Bay Road Interchange. — Executed Nov 26 New E. T. Simonds Construction Company $422,949 ·
Jun 14, 2019 78635 JacksonDistrict 9 Box culvert replacement (SN 039-7061) carrying US 51 over an unnamed creek, adjacent to the Elkville Resevoir, 0.9 mile south of Hallidayboro Road, south of Elkville. — Executed Nov 26 New Sierra Bravo Contractors, LLC $191,403 ·
Jun 14, 2019 78647 JeffersonDistrict 9 10 MILES OF HIGH TENSION GUARDRAIL IN THE MEDIAN, EARTHWORK AND WEED CONTROL MOW STRIP ON I-57 FROM THE JEFFERSON COUNTY LINE TO JUST SOUTH OF THE TRI-LEVEL — Rejected Nov 26 New
Jun 14, 2019 78695 JacksonDistrict 9 INSTALLING CONDUIT, FIBER OPTIC CABLE, CONTROLLER AND NETWORK EQUIPMENT ON IL 13 FROM STRIEGEL ROAD TO REED STATION ROAD IN CARBONDALE. — Executed Nov 26 New Gerstner Electric, Inc. $1,216,698 ·
Jun 14, 2019 78698 FranklinDistrict 9 1.9 miles of patching, milling and resurfacing at 2 locations: 1) IL 14 from Court Street to Glen Street in West City, 2)IL 14/37 from Bond Street to the Square in Benton. — Executed Nov 26 New E. T. Simonds Construction Company $1,671,585 ·
Jun 14, 2019 78706 FranklinDistrict 9 5.4 miles of milling, resurfacing and ADA Sidewalk improvements on IL 149 from Ziegler to West Frankfort. — Executed Nov 26 New E. T. Simonds Construction Company $1,328,449 ·
Jun 14, 2019 78707 VariousDistrict 9 REPAIRING AND REPLACING DAMAGED GUARDRAIL, BARRIER TERMINALS, IMPACT ATTENUATORS, CABLE MEDIAN BARRIER AND FENCE ON A WORK ORDER BASIS THROUGHOUT DISTRICT 9. — Executed Nov 26 New COLLINS & HERMANN, INC. $641,579 ·
Jun 14, 2019 78708 VariousDistrict 9 Electrical repair and/or replacement on various routes in District 9. — Executed Nov 26 New Brown Electric, Inc. $51,950 ·
Jun 14, 2019 78711 JohnsonUnionDistrict 9 Cleaning and painting portions of SN 044-0011, 0025, 0027, and 091-0064. — Executed Nov 26 New Venus Painting Co. $295,460 ·
Jun 14, 2019 78712 JeffersonDistrict 9 11 MILES OF PATCHING AND RESURFACING ON I-64 EASTBOUND FROM MILEPOST 62 (WASHINGTON COUNTY LINE) TO MILEPOST 73. — Executed Nov 26 New G. M. Sipes Construction, Inc. $569,048 ·
Jun 14, 2019 78713 JacksonDistrict 9 1.5 MILES OF PATCHING AND PAVEMENT MARKINGS ON EASTBOUND IL 13 FROM UNIVERSITY AVENUE TO MCKINNEY AVENUE IN CARBONDALE. — Executed Nov 26 New E. T. Simonds Construction Company $271,810 ·
Jun 14, 2019 78727 JeffersonDistrict 9 1.3 miles of patching and resurfacing on IL 15 from just east of 44th Street to just west of 25th Street in Mt. Vernon. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $1,845,801 ·
Jun 14, 2019 78728 FranklinJeffersonDistrict 9 Patching and resurfacing on I-57 from 1 mile north of the West Frankfort interchange (MP 66) to Bonnie (MP 87.4). — Executed Nov 26 New E. T. Simonds Construction Company $4,645,456 ·
Jun 14, 2019 78729 JeffersonDistrict 9 3.6 MILES OF HMA SURFACE REMOVAL, INLAYING WITH HMA SURFACE AND BINDER COURSE, PAVEMENT PATCHING, HMA SHOULDERS, STRIPING AND REFLECTIVE PAVEMENT MARKERS ON IL 142 FROM IL 37 TO JUST PAST I-64. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $1,784,771 ·
Jun 14, 2019 85680 StephensonDistrict 2 Replace the bridge carrying School Street over Cedar Creek, located south of Hubbard Street in the Village of Winslow. — Executed Nov 26 New Fischer Excavating, Inc. $376,862 ·
Jun 14, 2019 87691 IroquoisDistrict 3 Replace the bridge carrying TR74 over Spring Creek, 1.5 miles southeast of Onarga. — Executed Nov 26 New Iroquois Paving Corporation $735,366 ·
Jun 14, 2019 87697 DeKalbDistrict 3 Pavement widening to add right turn lanes on Peace Road at Freed Road and Brickville Road. — Executed Nov 26 New Curran Contracting Company $166,009 ·
Jun 14, 2019 87715 KankakeeDistrict 3 Resurfacing CH 9 from IL Route 50 to IL Route 1. — Executed Nov 26 New Kankakee Valley Construction Co., Inc. & Gallagher Asphalt Corporation $2,358,766 ·
Jun 14, 2019 89462 MarshallDistrict 4 Resurfacing, aggregate and HMA shoulders, culvert extensions, guardrail and pavement markings on Yankee Lane from IL 17 to Peoria County line. — Executed Nov 26 New Advanced Asphalt Company $1,499,476 ·
Jun 14, 2019 89715 FultonDistrict 4 Install ornamental lighting, sidewalks, curb and gutter, storm sewers, pavement milling, resurfacing and markings on IL 116/78 from Main Street to Lightfoot Road in Farmington. — Executed Nov 26 New Otto Baum Company, Inc. $1,756,231 ·
Jun 14, 2019 89742 FultonDistrict 4 Processing modified soils, HMA resurfacing, aggregate shoulders, pipe culverts and pavement markings on CH 2 from Airport Road to the BSNF Railroad crossing. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $1,105,754 ·
Jun 14, 2019 89750 PeoriaDistrict 4 Replace the bridge carrying Streitmattes Road over a Branch of Spoon River, located 1.6 miles Southeast of Duncan. — Executed Nov 26 New Stark Excavating, Inc. $823,220 ·
Jun 14, 2019 91582 PiattDistrict 5 Resurfacing Bridge Street from I-72 to Market Street and resurfacing Marion Street from Market Street to Piatt Street in the City of Monticello. — Executed Nov 26 New Cross Construction, Inc. $1,712,280 ·
Jun 14, 2019 91755 McLeanDistrict 5 Contruction of a bikeway along Old US 66, 1.1 miles South of E 850 North Road to E 550 North Road. — Rejected Nov 26 New Rowe Construction, a div of UCM, Inc. $2,132,081 ·
Jun 14, 2019 93682 MacoupinDistrict 6 Replace the bridge carrying Quarton Road over Otter Creek, located 5.5 miles West of Nilwood. — Executed Nov 26 New Kinney Contractors, Inc. $821,741 ·
Jun 14, 2019 93724 AdamsDistrict 6 Roadway reconstruction on 18th Street from Chestnut Street to Maple Street in the City of Quincy. — Executed Nov 26 New Rees Construction Company of Quincy $989,218 ·
Jun 14, 2019 93726 SangamonDistrict 6 Cold-in-place recylcing along Williamsville Road from McGrath Street to Wolf Creek Road and along Spaulding Orchard Road from Curran Road to IL Route 4. — Executed Nov 26 New P. H. Broughton & Sons, Inc. $2,391,511 ·
Jun 14, 2019 93727 AdamsDistrict 6 Resurfacing and aggregate shoulders on CH 12 from 450 feet South of the intersection with North 1753rd lane southerly to the intersection with Liberty St. in Columbus. — Executed Nov 26 New Diamond Construction Company $549,398 ·
Jun 14, 2019 93728 HancockDistrict 6 Remove and replace steel plate beam guardrail at various locatons throughout Hancock County. — Executed Nov 26 New COLLINS & HERMANN, INC. $1,351,915 ·
Jun 14, 2019 93730 PikeDistrict 6 Replace the bridge carrying CH 4 over Kiser Creek, 2.8 miles southwest of Barry. — Executed Nov 26 New County Contractors, Inc. $1,622,768 ·
Jun 14, 2019 93733 SangamonDistrict 6 Replace the structures carrying the NS Railroad over 5th and 6th Streets, and the construction of new structures to carry the UP Railroad over 5th and 6th Streets in Springfield. — Rejected Nov 26 New Freesen, a div of UCM, Inc. $32,059,959 ·
Jun 14, 2019 95840 ShelbyDistrict 7 Replace the bridge carryingh TR97A over Sand Creek, located 2.2 miles north of Windsor. — Executed Nov 26 New Depew and Owen Builders, Inc. $224,688 ·
Jun 14, 2019 95844 WayneDistrict 7 Replace the bridge carrying FAS 2821 over a branch of the Elm River Drain, 3.5 miles southwest of Mt. Erie. — Executed Nov 26 New Allendale Gravel Co., Inc. $368,441 ·
Jun 14, 2019 95848 CrawfordDistrict 7 Replace the bridge carrying TR 54 over Dogwood Creek, 0.5 miles southeast of Oblong. — Executed Nov 26 New Allendale Gravel Co., Inc. $259,455 ·
Jun 14, 2019 95850 ClayDistrict 7 Replace the bridge carrying TR 179 (Quartz Lane) over Hurrican Creek, 3.0 miles south of Wendelin. — Executed Nov 26 New Depew and Owen Builders, Inc. $282,928 ·
Jun 14, 2019 95852 MaconDistrict 7 Replace the bridge carrying School Road over a ditch 4.4 miles northeast of Argenta. — Executed Nov 26 New County Contractors, Inc. $288,990 ·
Jun 14, 2019 95853 CrawfordDistrict 7 Resurfacing and lime modified soil and aggregate base on various routes from the Jasper County line to North 700th Street in Annapolis. — Executed Nov 26 New Ambraw Asphalt Materials, Inc. $3,003,011 ·
Jun 14, 2019 97677 St. ClairDistrict 8 Streetscape project consisting of ADA compliant sidewalks, curb and gutter, decorative street lighting and resurfacing on West Main Street from 12th Street to 6th Street, and 158 feet east of 'A' Street in Belleville. — Executed Nov 26 New Hank's Excavating & Landscaping, Inc. $1,958,263 ·
Jun 14, 2019 97679 MonroeDistrict 8 Streetscape improvements including resurfacing, decorative street lights and landscaping on Main Street from Whiteside Street to Legion Street and from Cherry Street to IL 3 in columbia. — Executed Nov 26 New Baxmeyer Construction, Inc. $2,443,977 ·
Jun 14, 2019 97691 MadisonDistrict 8 Pavement reconstruction, patching, curb and gutter, ADA compliant sidewalks, storm sewer, and pavement markings on West clay Street from IL 162 to North Main Street in Troy. — Executed Nov 26 New Stutz Excavating, Inc. $635,115 ·
Jun 14, 2019 97697 BondDistrict 8 Replace the bridge carrying TR 156 (dudleyville Road) over Beaver Creek, 2.75 miles south of Greenville. — Executed Nov 26 New Keller Construction, Inc. $1,074,740 ·
Jun 14, 2019 97698 MadisonDistrict 8 Resurfacing on Eastport Plaza Drive from south of the east connection of Executive Drive to Lentes Court in the Collinsville. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $628,195 ·
Jun 14, 2019 97702 JerseyDistrict 8 Replace the bridge carrying Ryan Road over a tributary of Macoupin Creek, 2.8 miles south of Kemper. — Executed Nov 26 New Yamnitz, William d/b/a Yamnitz & Associates $266,979 ·
Jun 14, 2019 97703 MadisonDistrict 8 Construction of a 18" reinforced concrete pavement, railroad track removal and replacement and HMA pavement, located on the East bank of the Chain of Rocks Canal, just North of Locks and Dam 27, within the property of America's Central Port District. — Executed Nov 26 New Baxmeyer Construction, Inc. $752,826 ·
Jun 14, 2019 97705 ClintonDistrict 8 Resurfacing and guardrail replacement on CH 3 from US 50 to Gambill Road. — Executed Nov 26 New Howell Paving, Inc. $1,166,409 ·
Jun 14, 2019 97706 St. ClairDistrict 8 Resurfacing Felling Springs Road from Monsanto Avenue to Queeny Avenue in the Village of Sauget. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $317,701 ·
Jun 14, 2019 99620 WilliamsonDistrict 9 Replace the bridge carrying Grassy Road over Little Wolf Creek, located 0.2 miles West of IL 148. — Executed Nov 26 New E. T. Simonds Construction Company $389,831 ·
Jun 14, 2019 99621 JeffersonDistrict 9 Resurfacing Riddle Lane from IL 15 East Dubois Road. — Executed Nov 26 New Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $324,064 ·
Jun 14, 2019 99622 FranklinDistrict 9 Resurfacing and aggregate shoulders on Rend City Road from Rend Lake Dam Road to IL 14. — Executed Nov 26 New E. T. Simonds Construction Company $871,427 ·
Jun 14, 2019 99624 WilliamsonDistrict 9 Resurfacing Grassy Road from Spillway Road to West of Caney Branch Lane and resurfacing Spillway Road from Hayton Shcool Road to Grassy Road. — Executed Nov 26 New E. T. Simonds Construction Company $512,791 ·
Jun 14, 2019 99626 JeffersonDistrict 9 Replace the structure carrying Richview Road over Pierce Creek, 3 miles south-southeast of Boyd. — Executed Nov 26 New E. T. Simonds Construction Company $678,298 ·
Jun 14, 2019 99629 AlexanderDistrict 9 Resurfacing Grapevine trail from 0.6 miles east of Moseby Road to Sexton Creek. — Executed Nov 26 New E. T. Simonds Construction Company $1,892,007 ·
Jul 12, 2019 62B78 CookDistrict 1 Pump station 4 reconstruction. I-290 just west of the Des Plaines River in Forest Park. — Executed Nov 26 New IHC Construction Companies, L.L.C. $45,950,314 ·
Jul 12, 2019 62F29 CookDistrict 1 Extensive repairs to SN 016-0575 carrying Sauk Trail over I-57 in Richton. — Executed Nov 26 New Lorig Construction Company $4,914,414 ·
Jul 12, 2019 62G13 WillDistrict 1 2.73 miles of shoulder widening and milled rumble strips with ditch regrading on IL 53 between Murphey Drive to IL 7 in Romeoville. — Executed Nov 26 New D. Construction, Inc. $1,458,014 ·
Jul 12, 2019 62G29 McHenryDistrict 1 1.8 miles of resurfacing and pedestrian ramps on IL 47 from State Line Road to IL 173 in the Village of Hebron. — Executed Nov 26 New Curran Contracting Company $1,266,714 ·
Jul 12, 2019 62G59 DuPageDistrict 1 1.6 miles of resurfacing and ADA sidewalk repair on IL 53 from St. Charles Road to Sidney Avenue in the Villages of Addison and Lombard. — Executed Nov 26 New R. W. Dunteman Company $1,651,036 ·
Jul 12, 2019 62G69 CookDistrict 1 Standard overlay, ADA improvements, and pedestrian traffic signal on IL-58 from Lincoln St. to IL-43 in Morton Grove and Glenview. — Executed Nov 26 New Arrow Road Construction Co. $1,267,939 ·
Jul 12, 2019 62G70 CookDistrict 1 Resurfacing and pedestrian ramps on Central Avenue from just south of 53rd Street to just north of 47th Street in Chicago — Executed Nov 26 New Bigane Paving Company $829,349 ·
Jul 12, 2019 62G76 CookDistrict 1 1.7745 miles of resurfacing (smart) and ADA improvements on Niles Center Road in Skokie. — Executed Nov 26 New Arrow Road Construction Co. $2,125,538 ·
Jul 12, 2019 62G77 CookDistrict 1 1.9 miles of resurfacing and pedestrian ramps on Elston Avenue in Chicago. — Executed Nov 26 New Bigane Paving Company $1,760,423 ·
Jul 12, 2019 62H54 CookDistrict 1 Light tower removal and replacement, installing new light towers, light poles, foundations, conduits, cables, and site restoration at I-57 at US 30 in Matteson and I-290/IL-53 at I-90 in Rolling Meadows. — Executed Nov 26 New Meade Inc. $1,225,424 ·
Jul 12, 2019 62H56 CookDistrict 1 0.95 miles of standard overlay and pedestrian ramp improvements on Touhy Avenue from US 41 to Lawndale Avenue in Lincolnwood and Skokie. — Executed Nov 26 New Arrow Road Construction Co. $1,389,978 ·
Jul 12, 2019 62H83 McHenryDistrict 1 1.3 miles of standard overlay and ADA improvements on IL 31 from James R. Rakow Road to north of US 14 in Crystal Lake. — Executed Nov 26 New Arrow Road Construction Co. $1,542,056 ·
Jul 12, 2019 62H92 LakeDistrict 1 1.8 miles of resurfacing and pedestrian ramp improvements along US 45 from Lake Woodlawn Dr. to IL RTE 83 in Mundelein. — Executed Nov 26 New Builders Paving, LLC $2,634,888 ·
Jul 12, 2019 62H93 WillDistrict 1 1.3 miles of resurfacing along IL 50 from Cicero Avenue to Manhattan-Monee Road in Monee Township — Executed Nov 26 New Iroquois Paving Corporation $1,177,820 ·
601–700 of 936‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.