18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Jun 2, 2026 | 0216-03-034C 216-3-34 | Guadalupe San Antonio |
FM 466: 0216-03-034; IOIFM 466 · Intersection & Operational Imprv | $2,982,000 | $2,728,902 | HUNTER INDUSTRIES, LTD. | -8.5% | 7 |
| Jun 2, 2026 | 6500-41-001RMC - A00220777 | Gregg Tyler |
MILL & INLAY IH 20 FY 27IH0020 · Routine Maintenance Project - Sealed | $3,489,919 | $2,670,044 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | -23.5% | 5 |
| Jun 2, 2026 | 0915-00-285F 2026(705) | Bexar San Antonio |
VA: 0915-00-285: TCDVarious · Traffic Control Devices | $3,134,330 | $2,418,380 | CENTERLINE TECHNOLOGIES, LLC | -22.8% | 9 |
| Jun 2, 2026 | 0190-05-078F 2026(646) | Smith Tyler |
US 69, N of IH 20 & S of IH 20 FRTGUS 69 · Safety Improvement Projects | $1,960,952 | $2,362,671 | ICOS MANAGEMENT, LLC | +20.5% | 5 |
| Jun 2, 2026 | 0919-13-020BR 2024(649) | Panola Atlanta |
CR 430 at McFaddin Creek TributaryCOUNTY ROAD 430 · Bridge Replacement | $2,765,156 | $2,349,069 | THK CONSTRUCTION LLC | -15.0% | 7 |
| Jun 2, 2026 | 0915-00-284F 2026(704) | Bexar San Antonio |
VA: 0915-00-284: TCDVarious · Traffic Control Devices | $2,949,230 | $2,201,472 | INTERSTATE BARRICADES & MARKINGS, INC. | -25.4% | 3 |
| Jun 2, 2026 | 0907-00-236F 2026(663) | Tom Green San Angelo |
0907-00-236 ADA RemediationVarious · Pedestrian, Sidewalks & Curb Ramps | $2,079,597 | $1,672,395 | TI-ZACK CONCRETE, LLC | -19.6% | 7 |
| Jun 2, 2026 | 1068-04-181STP 2026(661)HES | Dallas Dallas |
IH 30 at Cockrell Hill RdIH 30 · Safety Improvement Projects | $2,403,467 | $1,547,641 | SICE, INC. | -35.6% | 9 |
| Jun 2, 2026 | 0914-05-264F 2026(657) | Williamson Austin |
GTAO FY26 GR-- IH35; FM 972; US 79; SH95Various · Landscape & Scenic Enhancement | $2,098,984 | $1,517,875 | GREEN SAGE SERVICES LLC | -27.7% | 6 |
| Jun 2, 2026 | 6501-10-001RMC - A00221301 | Childress Childress |
FY 27-28 Call-out stripping contractUS0287 · Routine Maintenance Project - Sealed | $1,999,375 | $1,420,929 | TEXAS PANHANDLE CONSTRUCTION, INC. | -28.9% | 4 |
| Jun 2, 2026 | 6500-87-001RMC - A00221074 | Wichita Wichita Falls |
On-Call Pavement Markings FY27IH0044 · Routine Maintenance Project - Sealed | $1,736,490 | $1,388,612 | TRP INFRASTRUCTURE SERVICES, LLC | -20.0% | 2 |
| Jun 2, 2026 | 6498-37-001RMC - A00219996 | Brazoria Houston |
FY26 Brazoria Flexpave/Asphalt RepairSH0288 · Routine Maintenance Project - Sealed | $1,276,674 | $1,369,590 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | +7.3% | 4 |
| Jun 2, 2026 | 0315-03-070F 2026(081) | Grimes Bryan |
SH 90 at FM 244 - Turn Lane FY 26SH 90 · Safety Improvement Projects | $1,274,704 | $1,241,183 | LARRY YOUNG PAVING, INC. | -2.6% | 7 |
| Jun 2, 2026 | 2266-02-168F 2026(808) | Tarrant Fort Worth |
SH 360 NBFR: At AVE JSH 360 · Transportation Non-Roadway | $1,434,972 | $1,177,759 | IBCTX, LLC | -17.9% | 7 |
| Jun 2, 2026 | 6500-39-001RMC - A00220775 | Henderson Tyler |
MILL & INLAY SOUTH FY 27SH0031 · Routine Maintenance Project - Sealed | $1,086,902 | $977,218 | BIG CREEK CONSTRUCTION, LTD. | -10.1% | 5 |
| Jun 2, 2026 | 6501-09-001RMC - A00221298 | Wheeler Childress |
FY 27 Concrete Pavement RepairsIH0040 · Routine Maintenance Project - Sealed | $1,000,000 | $847,645 | WINDING ROAD CONSTRUCTION, INC. | -15.2% | 5 |
| Jun 2, 2026 | 0916-36-023BR 2025(285) | Karnes Corpus Christi |
CR 230 Bridge Replacement HBPCOUNTY ROAD 230 · Bridge Replacement | $1,115,075 | $817,325 | C & W SOUTHERN LLC | -26.7% | 10 |
| Jun 2, 2026 | 0924-00-162F 2026(667) | El Paso El Paso |
FY 2026 BRIDGE MAINT (DISTRICTWIDE)Various · Bridge Maintenance | $769,257 | $812,410 | RAGLE CONSTRUCTION, INC. | +5.6% | 6 |
| Jun 2, 2026 | 0920-38-301STP 2026(698)HESG | Jefferson Beaumont |
2025 HSIP(COLLEGE ST.) INTERCONN SIGNALSVarious · Safety Improvement Projects | $1,065,220 | $750,343 | DECO CONTRACTORS, INC. | -29.6% | 8 |
| Jun 2, 2026 | 0050-12-002F 2026(450) | Harris Houston |
BU 290-L, Fry Rd. to US 290 OverlayBU 290L · Overlay | $785,715 | $733,755 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -6.6% | 4 |
| Jun 2, 2026 | 0688-03-031STP 2026(784)HES | Lamar Paris |
FM 1497FM 1497 · Safety Improvement Projects | $806,243 | $648,365 | THK CONSTRUCTION LLC | -19.6% | 5 |
| Jun 2, 2026 | 0914-04-356STP 2026(654)HESG | Travis Austin |
Dee Gabriel Collins at Cottonmouth SchCR 1397 · Safety Improvement Projects | $406,871 | $388,598 | GARRET SHIELDS INFRASTRUCTURE | -4.5% | 7 |
| Jun 2, 2026 | 0990-02-015STP 2026(671)HRR | Jim Wells Corpus Christi |
FM1930 FY26 RwD SYSSWFM 1930 · Safety Improvement Projects | $440,636 | $374,220 | TRP INFRASTRUCTURE SERVICES, LLC | -15.1% | 5 |
| Jun 2, 2026 | 0908-33-115STP 2025(989)HESG | Taylor Abilene |
14th Street Signal Improve - HSIP 2024S 14TH ST · Traffic Control Devices | $414,755 | $332,527 | WILLIS ELECTRIC CO., LP | -19.8% | 1 |
| Jun 2, 2026 | 0907-00-235F 2026(664) | Tom Green San Angelo |
0907-00-235 Clean and Seal Bridge JointsVarious · Bridge Maintenance | $418,763 | $306,395 | MACIAS SPECIALTY CONTRACTING LLC | -26.8% | 9 |
| Jun 2, 2026 | 0916-00-263C 916-00-263 | Nueces Corpus Christi |
Scour bridges FY 26 KarnesVarious · Bridge Maintenance | $221,134 | $177,547 | TAYLOR BRIDGE LLC | -19.7% | 14 |
| Jun 2, 2026 | 6503-55-001SUP - A00222417 | Brown Brownwood |
SU PICNIC BROWN CO 2027US0183 · State Use Project | $127,449 | — | 0 | ||
| Jun 2, 2026 | 6504-08-001SUP - A00222567 | Lampasas Brownwood |
STATE USE LITTER REMOVAL LAMPASAS 2026US0190 · State Use Project | $118,350 | — | 0 | ||
| May 29, 2026 | 6498-73-001RMC - A00220046 | Hood Fort Worth |
FY 26 Micro Surfacing FM 3210FM3210 · Routine Maintenance Project - Sealed | $360,920 | $410,561 | GRANITE CONSTRUCTION COMPANY | +13.8% | 1 |
| May 29, 2026 | 6503-67-001SUP - A00222434 | Tarrant Fort Worth |
Grounds Special MaintenanceIH0035W · State Use Project | $6,900 | — | 0 | ||
| May 28, 2026 | 6501-03-001RMC - A00221256 | Tom Green San Angelo |
MBGF Repair North FY 27SH0208 · Routine Maintenance Project | $508,475 | $427,879 | AUSTIN BARRICADE COMPANY, L.L.C. | -15.9% | 4 |
| May 28, 2026 | 6503-19-001RMC - A00222263 | Collin Dallas |
On Call Traffic Control - 07 - June LetUS0075 · Routine Maintenance Project - Sealed | $80,500 | $199,875 | FC TRAFFIC CONTROL, LLC | +148.3% | 1 |
| May 28, 2026 | 6501-86-001SUP - A00221589 | Palo Pinto Fort Worth |
SUP for Weatherford OfficesIH0020 · State Use Project | $132,865 | — | 0 | ||
| May 27, 2026 | 6499-55-001RMC - A00220353 | Potter Amarillo |
Sweeping E-Way FY 2026IH0040 · Routine Maintenance Project | $611,613 | $588,387 | PANHANDLE SWEEPING & MAINTENANCE, LLC | -3.8% | 2 |
| May 27, 2026 | 6502-19-001MMC - A00221741 | Archer Wichita Falls |
Cement Material OnlyFM0368 · Material Maintenance Project | $365,500 | $421,600 | AKA-MATERIALS | +15.3% | 3 |
| May 27, 2026 | 6502-43-001RMC - A00221790 | Carson Amarillo |
Guardrail Pampa AE FY 26IH0040 · Routine Maintenance Project - Sealed | $292,950 | $249,834 | TI-ZACK CONCRETE, LLC | -14.7% | 3 |
| May 27, 2026 | 6503-76-001SUP - A00222488 | Stonewall Abilene |
FY26 Stonewall Co JanitorialUS0380 · State Use Project | $9,727 | — | 0 | ||
| May 27, 2026 | 6503-77-001SUP - A00222489 | Scurry Abilene |
FY 26 Scurry Co. JanitorialUS0084 · State Use Project | $9,672 | — | 0 | ||
| May 27, 2026 | 6504-14-001SUP - A00222595 | Jefferson Beaumont |
IH10 HV Debris Pick UpIH0010 · State Use Project | $456,463 | — | 0 | ||
| May 27, 2026 | 6504-15-001SUP - A00222601 | Liberty Beaumont |
US59 HV Debris PickupUS0059 · State Use Project | $47,819 | — | 0 | ||
| May 27, 2026 | 6504-16-001SUP - A00222604 | Jefferson Beaumont |
US69 and SH73 HV Debris PickupUS0069 · State Use Project | $341,697 | — | 0 | ||
| May 27, 2026 | 6504-20-001SUP - A00222654 | Bexar San Antonio |
Bexar Metro Power WashingIH0410 · State Use Project | $3,511 | — | 0 | ||
| May 26, 2026 | 6498-99-001RMC - A00220136 | La Salle Laredo |
La Salle County Right of Way MowingIH0035 · Routine Maintenance Project - Sealed | $531,343 | $632,346 | R&M INCORPORATED | +19.0% | 1 |
| May 26, 2026 | 6502-75-001MMC - A00221958 | Jefferson Beaumont |
FY 27 Rock/RipRapUS0069 · Material Maintenance Project - Sealed | $336,250 | $287,250 | TOUCHSTONE RESOURCES, LLC | -14.6% | 4 |
| May 26, 2026 | 6502-83-001MMC - A00222000 | Orange Beaumont |
FY 27 OAO Rock/RipRapSH0062 · Material Maintenance Project - Sealed | $231,750 | $211,750 | TOUCHSTONE RESOURCES, LLC | -8.6% | 4 |
| May 26, 2026 | 6502-92-001MMC - A00222037 | Liberty Beaumont |
FY 27 LAO Rock/RipRapUS0090 · Material Maintenance Project - Sealed | $175,800 | $145,000 | TOUCHSTONE RESOURCES, LLC | -17.5% | 4 |
| May 22, 2026 | 6503-22-001SUP - A00222283 | Lamar Paris |
Grounds Maintenance - N Main Dist HQBU0271B · State Use Project | $42,230 | — | 0 | ||
| May 21, 2026 | 6501-80-001MMC - A00221579 | Grayson Paris |
LRA - GraysonFY26US0075 · Material Maintenance Project - Sealed | $510,000 | $485,865 | MARTIN MARIETTA MATERIALS, INC. | -4.7% | 2 |
| May 21, 2026 | 6501-81-001MMC - A00221580 | Hopkins Paris |
Cut Back Asphalt DW - 26SH0011 · Material Maintenance Project - Sealed | $490,750 | $470,350 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -4.2% | 2 |
| May 21, 2026 | 6500-15-001RMC - A00220668 | Lamar Paris |
On Call Tree Removal FY26 PAOUS0082 · Routine Maintenance Project - Sealed | $266,350 | $212,515 | MERCER TREE SERVICE | -20.2% | 5 |
| May 20, 2026 | 6498-72-001RMC - A00220045 | Trinity Lufkin |
2026-05 Trinity TCPUS0287 · Routine Maintenance Project - Sealed | $954,500 | $934,175 | FC TRAFFIC CONTROL, LLC | -2.1% | 2 |
| May 20, 2026 | 6500-18-001MMC - A00220698 | Tarrant Fort Worth |
DG Hot Mix Asphalt; North Tarrant CountyIH0820 · Material Maintenance Project - Sealed | $760,692 | $784,000 | EUROVIA ATLANTIC COAST LLC | +3.1% | 4 |
| May 19, 2026 | 6501-21-001MMC - A00221374 | San Patricio Corpus Christi |
6501-21-001 Hot Mix Sinton MaintUS0181 · Material Maintenance Project | $543,000 | $618,000 | ANDERSON COLUMBIA CO., INC. | +13.8% | 1 |
| May 19, 2026 | 6500-85-001RMC - A00220960 | Aransas Corpus Christi |
6500-85-001 Aransas MowingSH0035 · Routine Maintenance Project - Sealed | $487,086 | $535,829 | R&M INCORPORATED | +10.0% | 1 |
| May 19, 2026 | 6498-92-001RMC - A00220125 | San Patricio Corpus Christi |
RMC-Mill, Inlay and Pavement RepairFM0666 · Routine Maintenance Project - Sealed | $498,201 | $517,855 | CK NEWBERRY, LLC | +3.9% | 3 |
| May 19, 2026 | 6500-64-001MMC - A00220866 | Goliad Corpus Christi |
6500-64-001 Hot Mix Goliad MaintUS0059 · Material Maintenance Project | $534,000 | $514,500 | TEXAS MATERIALS GROUP, INC. | -3.7% | 3 |
| May 19, 2026 | 6501-89-001RMC - A00221592 | Nueces Corpus Christi |
6501-89-001 East Nueces MOWINGIH0037 · Routine Maintenance Project | $428,610 | $510,044 | R&M INCORPORATED | +19.0% | 1 |
| May 19, 2026 | 6501-88-001MMC - A00221591 | Refugio Corpus Christi |
6501-88-001 HMCL Refugio, etc.US0077 · Material Maintenance Project | $480,000 | $468,600 | BRAUNTEX MATERIALS, INC. | -2.4% | 3 |
| May 19, 2026 | 6501-16-001MMC - A00221323 | Refugio Corpus Christi |
6501-16-001 Hot Mix RefugioUS0077 · Material Maintenance Project | $440,500 | $439,500 | TEXAS MATERIALS GROUP, INC. | -0.2% | 3 |
| May 19, 2026 | 6498-25-001MMC - A00219971 | Bell Waco |
Hydraulic Cement Concrete - DistrictwideUS0190 · Material Maintenance Project | $403,058 | $393,173 | DIGG COMMERCIAL, LLC | -2.5% | 2 |
| May 19, 2026 | 6501-84-001MMC - A00221587 | Refugio Corpus Christi |
6501-84-001 LRA Refugio MaintUS0077 · Material Maintenance Project | $362,500 | $361,060 | VULCAN CONSTRUCTION MATERIALS, LLC | -0.4% | 2 |
| May 19, 2026 | 6501-85-001MMC - A00221588 | Aransas Corpus Christi |
6501-85-001 LRA Rockport MaintSH0035 · Material Maintenance Project | $302,000 | $314,975 | VULCAN CONSTRUCTION MATERIALS, LLC | +4.3% | 2 |
| May 19, 2026 | 6501-87-001MMC - A00221590 | Jim Wells Corpus Christi |
6501-87-001 HMCL George West MaintUS0281 · Material Maintenance Project | $339,000 | $297,000 | BRAUNTEX MATERIALS, INC. | -12.4% | 3 |
| May 19, 2026 | 6503-21-001SUP - A00222281 | Lamar Paris |
Janitorial - LamarSL0286 · State Use Project | $14,063 | — | 0 | ||
| May 18, 2026 | 6503-25-001SUP - A00222318 | Angelina Lufkin |
2026-05 Angelina Janitorial MaintenanceBU0069J · State Use Project | $8,921 | — | 0 | ||
| May 18, 2026 | 6503-28-001SUP - A00222321 | San Augustine Lufkin |
2026-05 San Augustine JanitorialUS0096 · State Use Project | $6,732 | — | 0 | ||
| May 18, 2026 | 6503-29-001SUP - A00222322 | Sabine Lufkin |
2026-05 Sabine Janitorial MaintenanceFM0083 · State Use Project | $25,066 | — | 0 | ||
| May 18, 2026 | 6503-30-001SUP - A00222324 | San Augustine Lufkin |
2026-05 San Augustine Grounds & MailboxFM0083 · State Use Project | $83,450 | — | 0 | ||
| May 18, 2026 | 6503-38-001SUP - A00222356 | Angelina Lufkin |
2026-05 Angelina (AREA) LitterUS0059 · State Use Project | $252,786 | — | 0 | ||
| May 18, 2026 | 6503-39-001SUP - A00222362 | Shelby Lufkin |
2026-05 Shelby Area Litter RemovalSH0007 · State Use Project | $261,020 | — | 0 | ||
| May 18, 2026 | 6503-40-001SUP - A00222363 | Angelina Lufkin |
2026-05 Angelina Grounds Mailbox and C&GUS0059 · State Use Project | $123,077 | — | 0 | ||
| May 18, 2026 | 6503-41-001SUP - A00222364 | San Jacinto Lufkin |
2026-05 San Jacinto Grounds and PicnicSH0150 · State Use Project | $121,804 | — | 0 | ||
| May 15, 2026 | 6502-46-001SUP - A00221803 | Travis Austin |
Travis North Maintenance Litter FY26US0183 · State Use Project | $215,257 | — | 0 | ||
| May 15, 2026 | 6503-61-001SUP - A00222427 | Bowie Atlanta |
Grounds - New Boston FY 26SH0008 · State Use Project | $14,177 | — | 0 | ||
| May 14, 2026 | 6500-60-001MMC - A00220849 | Val Verde Laredo |
Emulsions - Val Verde CountyUS0277 · Material Maintenance Project - Sealed | $280,800 | $287,820 | ERGON ASPHALT & EMULSIONS, INC. | +2.5% | 1 |
| May 14, 2026 | 6503-50-001SUP - A00222398 | Marion Atlanta |
Grounds - Jefferson MO FY 26SH0049 · State Use Project | $35,075 | — | 0 | ||
| May 14, 2026 | 6503-62-001SUP - A00222428 | Harrison Atlanta |
Litter Pickup & Disposal South FY 26US0059 · State Use Project | $185,235 | — | 0 | ||
| May 13, 2026 | 6495-92-001RMC - A00219000 | Hays Austin |
Asphalt Repair FY 26-2RM0150 · Routine Maintenance Project - Sealed | $938,785 | $890,314 | LONE STAR PAVING COMPANY | -5.2% | 3 |
| May 13, 2026 | 6496-82-001RMC - A00219475 | Dallas Dallas |
FLEXIBLE PAV STR REPAIR - WEST DALLASUS0067 · Routine Maintenance Project | $897,082 | $873,192 | ICOS MANAGEMENT, LLC | -2.7% | 4 |
| May 13, 2026 | 6495-84-001RMC - A00218959 | Navarro Dallas |
01 Traffic Control 0526IH0045 · Routine Maintenance Project - Sealed | $885,650 | $789,165 | FC TRAFFIC CONTROL, LLC | -10.9% | 2 |
| May 13, 2026 | 6499-06-001RMC - A00220151 | Bastrop Austin |
FY 26 GuardrailUS0290 · Routine Maintenance Project - Sealed | $970,617 | $757,352 | ROSS SA ENTERPRISE LLC | -22.0% | 5 |
| May 13, 2026 | 6498-17-001RMC - A00219922 | Hays Austin |
FY 26-2 SAAO MBGFFM2001 · Routine Maintenance Project - Sealed | $929,515 | $754,625 | RHINO EQUITY, LLC | -18.8% | 4 |
| May 13, 2026 | 6481-94-001RMC - A00214602 | Kent Abilene |
FM2320 Drainage ImprovementFM2320 · Routine Maintenance Project - Sealed | $867,769 | $572,628 | ICOS MANAGEMENT, LLC | -34.0% | 7 |
| May 13, 2026 | 6484-52-001RMC - A00215477 | Travis Austin |
CTTS Small Signs Set 5 FY 25SH0045 · Routine Maintenance Project - Sealed | $522,354 | $439,781 | HAZMAT INTERNATIONAL, INC. | -15.8% | 4 |
| May 13, 2026 | 6468-26-001RMC - A00210106 | Travis Austin |
FY25 Large Sign MaintenanceUS0183 · Routine Maintenance Project - Sealed | $333,200 | $338,450 | HAZMAT INTERNATIONAL, INC. | +1.6% | 5 |
| May 13, 2026 | 6495-77-001RMC - A00218951 | Navarro Dallas |
01 Metal Beam Guard Fence Repair 0526IH0045 · Routine Maintenance Project - Sealed | $414,506 | $323,352 | AUSTIN BARRICADE COMPANY, L.L.C. | -22.0% | 3 |
| May 13, 2026 | 6497-73-001RMC - A00219774 | Collin Dallas |
Crash Cushion Attenuator Repair 5/26US0075 · Routine Maintenance Project - Sealed | $314,545 | $298,090 | FIREMAN EXCAVATING, INC. | -5.2% | 4 |
| May 13, 2026 | 6496-05-001BPM - A00219086 | Denton Dallas |
Clean and Seal Joints 04 0526SH0114 · Bridge Preventative Maintenance - Sealed | $306,320 | $238,282 | ROAD DOCTORS LLC | -22.2% | 9 |
| May 13, 2026 | 6489-38-001RMC - A00217376 | Collin Dallas |
Pavement Repair and Markings 05.26SH0078 · Routine Maintenance Project - Sealed | $197,454 | $236,151 | PEACHTREE CONSTRUCTION, LTD. | +19.6% | 1 |
| May 13, 2026 | 6497-29-001RMC - A00219568 | Navarro Dallas |
01 Crash Cushion Attenuator Repair 0526IH0045 · Routine Maintenance Project - Sealed | $273,410 | $196,178 | FIREMAN EXCAVATING, INC. | -28.2% | 2 |
| May 13, 2026 | 6498-61-001RMC - A00220031 | Polk Lufkin |
2026-05 Polk MBGFUS0059 · Routine Maintenance Project - Sealed | $267,244 | $156,885 | BK FIELD OPERATIONS LLC | -41.3% | 3 |
| May 13, 2026 | 6498-62-001RMC - A00220032 | Sabine Lufkin |
2026-05 Sabine MBGFUS0096 · Routine Maintenance Project - Sealed | $200,370 | $126,615 | ACE CONTRACTORS, INC. | -36.8% | 3 |
| May 13, 2026 | 6496-98-001MMC - A00219511 | Collin Dallas |
Limestone Rock Asphalt FY27SH0005 · Material Maintenance Project | $68,700 | $95,850 | MARTIN MARIETTA MATERIALS, INC. | +39.5% | 2 |
| May 13, 2026 | 6492-50-001RMC - A00218146 | Navarro Dallas |
Reflective Pav Markings 0326IH0045 · Routine Maintenance Project - Sealed | $74,053 | $72,949 | D. I. J. CONSTRUCTION, INC. | -1.5% | 2 |
| May 13, 2026 | 6497-28-001RMC - A00219567 | Navarro Dallas |
01 Cable Barrier Repair 0526SH0031 · Routine Maintenance Project - Sealed | $78,500 | $70,945 | FIREMAN EXCAVATING, INC. | -9.6% | 3 |
| May 13, 2026 | 6503-60-001SUP - A00222426 | Cass Atlanta |
Grounds - Linden MO FY 26SH0008 · State Use Project | $8,899 | — | 0 | ||
| May 12, 2026 | 6484-78-001RMC - A00215578 | Galveston Houston |
FY 2025 REFLECTIVE PAVEMENT MARKINGSSH0146 · Routine Maintenance Project - Sealed | $987,638 | $847,316 | BATTERSON, LLP | -14.2% | 4 |
| May 12, 2026 | 6501-22-001MMC - A00221379 | San Jacinto Lufkin |
2026-05 San Jacinto AggregateSH0150 · Material Maintenance Project | $759,000 | $776,800 | ARCOSA LWS, LLC | +2.3% | 1 |
| May 12, 2026 | 6500-52-001RMC - A00220799 | Smith Tyler |
FY26 TYLER AO GUARDRAIL REPAIRUS0069 · Routine Maintenance Project - Sealed | $568,750 | $631,830 | CATOCON, INC. | +11.1% | 1 |
| May 12, 2026 | 6499-08-001BPM - A00220166 | Burleson Bryan |
FY27 - Burleson Co BPMSH0036 · Bridge Preventative Maintenance | $552,329 | $612,294 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | +10.9% | 5 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.