IDOT Jobs

All dates · 10,653 jobs · $20,005,846,000 Sign up free
★ My Jobs

10,653 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Sep 19, 2025 70F21 McLeanDistrict 5 3P Policy, Designed Overlay, ADA improvements, curb and gutter, and traffic signal replacement on IL 9 from west of Towanda Ave to Carnahan Dr east of Bloomington; and on Hershey Rd from Lamon Dr to Castleton Dr in Bloomington. Gross length of 2.189 mi. — Executed Nov 25 New Rowe Construction, a div of UCM, Inc. $23,522,450 ·
Sep 19, 2025 70H51 McLeanDistrict 5 Replacing light towers and poles with aluminum poles and LED lighting on US 51 from I-74 to Filbert Rd. — Executed Nov 25 New Champaign Signal and Lighting Co. a division of Evergreen Roadworks, LLC $869,829 ·
Sep 19, 2025 72286 PikeDistrict 6 Bridge deck overlay and bridge deck painting on various structures on I-72: (SN 075-0090 and 0091) over McCraney Creek 1.8 miles east of the IL 96/Hull Interchange, (SN 075-0124 and 0125) over tributary to McCraney Creek 2.1 miles east of the IL 96/Hull interchange, (SN 075-0092) TR 52 (205th Street) overhead 2.2 miles east of the IL 96/Hull Interchange and (SN 075-0094 and 0095) over TR 62 (213th Street) 3.3 miles east of the IL 96/Hull Interchange. — Executed Nov 25 New Freesen, a div of UCM, Inc. $5,360,782 ·
Sep 19, 2025 72324 ScottDistrict 6 Bridge deck overlay on SN 086-0029 carrying CH 14 (800E Hoots Road) over I-72, 0.9 miles east of Plum Creek. — Executed Nov 25 New Freesen, a div of UCM, Inc. $544,972 ·
Sep 19, 2025 72416 SangamonDistrict 6 7.5 miles of crack and joint sealing on I-55 from north of the Glenarm interchange to 0.2 miles north of Southwind Road. — Executed Nov 25 New Complete Asphalt Service Co. $247,563 ·
Sep 19, 2025 72974 LoganDistrict 6 Installing helical ground anchors at SN 054-7102 carrying I-55 over a drainage ditch 0.4 miles north of IL 10 near Lincoln. — Executed Nov 25 New Foundation Mechanics $55,250 ·
Sep 19, 2025 72976 CassDistrict 6 Filed tile removal and replacement on IL 125 east of Philadelphia. — Executed Nov 25 New CSD Environmental Services, Inc. $120,678 ·
Sep 19, 2025 72977 LoganDistrict 6 Installation of highway lighting on I-55 at the Elkhart interchange. — Executed Nov 25 New Bodine Electric of Decatur $397,966 ·
Sep 19, 2025 72M33 PikeDistrict 6 Bridge deck overlay on I-72 at Bay Creek, 0.9 miles west of CH 3 at the New Salem interchange. — Executed Nov 25 New Freesen, a div of UCM, Inc. $2,292,624 ·
Sep 19, 2025 74164 LawrenceDistrict 7 Complete structure replacement of SN 051-0004 carrying IL 1 over the Embarras River Overflow approximately 1 mile north of US 50. — Executed Nov 25 New Sangamo Construction Company $21,455,785 ·
Sep 19, 2025 74597 CumberlandDistrict 7 Bridge replacement on I-57 over Eastern Illinois Railroad, 0.3 miles south of the Neoga interchange, and over US 45 at the Neoga interchange. (SN 018-0001, 018-0002, 018-0003, 018-0004) — Executed Nov 25 New William Charles Construction Company, LLC $54,599,804 ·
Sep 19, 2025 74608 EffinghamDistrict 7 0.3 miles of resurfacing and ADA improvements on Dietrich Blacktop from IL 33 to Church Street in Dietrich. — Executed Nov 25 New Howell Paving, Inc. $947,329 ·
Sep 19, 2025 74654 ClayDistrict 7 Bridge superstructure replacement on SN 013-0037 carrying Old US 50 over Raccoon Creek, 2.5 miles west of the US 45 North Junction. — Executed Nov 25 New C-Hill Civil Contractors, Inc. $1,139,288 ·
Sep 19, 2025 74A04 EffinghamDistrict 7 Structure removal and replacement, paved shoulder removal, pavement removal, pipe underdrains, PCC pavement, PCC shoulders, HMA base course, guardrail and median crossovers on I-57 at Green Creek, 1.5 miles south of the Shelby County line. (SN 025-0003) — Executed Nov 25 New Howell Paving, Inc. $7,201,957 ·
Sep 19, 2025 74D09 WayneDistrict 7 Expansion joint replacement, bridge deck patching, scarification, bridge deck overlay and HMA surface course to tie into the existing pavement on IL 15 over Skillet Fork and Skillet Fork Overflow approximately 0.5 and 0.2 miles southwest of CR 635E near Wayne City. — Executed Nov 25 New C-Hill Civil Contractors, Inc. $1,024,888 ·
Sep 19, 2025 74D11 ClarkDistrict 7 Bridge deck overlay, bridge joint repair/replacement, bridge deck repairs and striping on I-70 at Crooked Creek, 1.8 miles west of US 40. — Executed Nov 25 New Sangamo Construction Company $1,148,961 ·
Sep 19, 2025 74D31 LawrenceDistrict 7 Tree removal and tree installation along US 50 from 320E to 750E. — Active Nov 25 New Homer Tree Service, Inc. $526,741 ·
Sep 19, 2025 74D57 EffinghamDistrict 7 Installation of a median crossover on I-70 approximately 0.4 miles west of the IL 128 interchange. — Executed Nov 25 New Howell Paving, Inc. $860,301 ·
Sep 19, 2025 76F84 MadisonDistrict 8 Intersection reconstruction on IL 3 at Delmar Avenue and at Pierce Lane, both in Godfrey. — Executed Nov 25 New Stutz Excavating, Inc. $10,524,883 ·
Sep 19, 2025 76R08 ClintonDistrict 8 1.3 miles of resurfacing and ADA improvements on Old US 50, 0.6 miles east of Pipeline Road to 13th Street in Carlyle. — Executed Nov 25 New Howell Paving, Inc. $1,023,182 ·
Sep 19, 2025 76T17 St. ClairDistrict 8 Bridge replacement, pavement reconstruction, ADA and APS improvements, new intersection and traffic signal installation, upgrading drainage system and signage upgrades on IL 203 from 0.1 miles north of IL 3 Connector to 0.1 miles south of IL 3 Connector in Madison. — Executed Nov 25 New Keeley & Sons, Inc. $13,758,278 ·
Sep 19, 2025 76U51 VariousDistrict 8 Call-out bridge deck patching at various locations throughout District 8 on access-controlled roadways. — Executed Nov 25 New Keeley & Sons, Inc. $1,280,653 ·
Sep 19, 2025 78789 GallatinWhiteDistrict 9 Shoulder widening, culvert replacement and culvert extensions on US 45 / IL 141 from south of TR400N to 0.1 miles south of IL 141. Project also includes pavement removal and replacement at the intersection of US 45 and IL 141. — Executed Nov 25 New Sierra Bravo Contractors, LLC $5,191,314 ·
Sep 19, 2025 78793 PulaskiDistrict 9 Removal and replacement of the existing single span bridge (SN 077-0023) carrying IL 169 over Kitchel Slough, west of Karnak. — Executed Nov 25 New E. T. Simonds Construction Company $2,356,816 ·
Sep 19, 2025 78B70 JeffersonDistrict 9 1.2 miles of pavement patching on I-64 ramps at Exit 89. — Executed Nov 25 New Samron Midwest Contracting, Inc. $145,862 ·
Sep 19, 2025 85764 WinnebagoDistrict 2 construct a three-span steel plate girder bridge to carry Prairie Hill Road over the Rock River, 1.75 miles southwest of South Beloit. Includes; HMA approach, pavement patching, guardrails, and HMA shoulders. — Executed Nov 25 New Civil Constructors, Inc. d/b/a/ Helm Civil $6,340,772 ·
Sep 19, 2025 85782 Rock IslandDistrict 2 Sidewalk replacement on 10th Street from 12th Avenue to 16th Avenue, on 10th Street from 16th Avenue to 17th Avenue, and on 16th Avenue from 10th Street to 11th street in Moline. — Executed Nov 25 New Centennial Contractors of the Quad Cities, Inc. $445,774 ·
Sep 19, 2025 87846 KendallDistrict 3 Convert the intersecton of Wolf's Crossing Road and Douglas Road to a roundabout. Includes; full depth HMA paving, drainage improvements, detention pond grading, culverts, multi-use path and sidewalks. — Executed Nov 25 New D. Construction, Inc. $10,727,441 ·
Sep 19, 2025 87871 LaSalleDistrict 3 Sidewalk construction at various locations in Oglesby. — Executed Nov 25 New D. Construction, Inc. $283,773 ·
Sep 19, 2025 93841 ChristianDistrict 6 Reconstruction of West Main Cross Street from Silver Street to Clay Street in Taylorville. Includes; HMA pavement, PCC driveways, ADA Ram and storm sewer. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $4,986,965 ·
Sep 19, 2025 95980 MoultrieDistrict 7 Remove and replace sidewalks, curb and driveway pavements, and install flashing beacons for pedestrian crossing on IL 121 from Jefferson Street to Church Street in Bethany. — Executed Nov 25 New A & R Mechanical Service, Inc. $280,980 ·
Sep 19, 2025 95983 MoultrieDistrict 7 Construction of three pipe culverts, earth embankment and approaches on Joe Pound Road from 0.4 mile east of 1300 E Road to 0.6 mile east of 1300 E Road. — Executed Nov 25 New Stark Excavating, Inc. $369,000 ·
Sep 19, 2025 95984 WayneDistrict 7 Construct a single-span steel plate girder bridge with concrete deck to carry 250 N Road over Little Pond Creek, 4.5 miles south of Golden Gate. — Executed Nov 25 New C-Hill Civil Contractors, Inc. $813,000 ·
Sep 19, 2025 95988 ClayDistrict 7 Sidewalk construction and sidewalk replacement along Shadwell Street to Floyd Henson Jr. High School in Flora. — Executed Nov 25 New Kieffer Bros. Construction Co., Inc. $215,353 ·
Sep 19, 2025 97833 MadisonDistrict 8 Reconstruction of Summit Avenue with a shared-use path from Notting Hill Court to Dooner Drive in Collinsville. — Executed Nov 25 New Keller Construction, Inc. $2,218,364 ·
Sep 19, 2025 97868 MadisonDistrict 8 Contruction of a new sidewalk and shared-use path from Pontoon Road to Raes Creek Drive in Granite City. — Executed Nov 25 New Kinney Contractors, Inc. $612,809 ·
Sep 19, 2025 97869 MadisonDistrict 8 Resurfacing on Madison Avenue from 14th Street to 3rd Street in Madison. — Executed Nov 25 New Stutz Excavating, Inc. $3,789,307 ·
Sep 19, 2025 97874 MadisonDistrict 8 Reconstruction of C Street from West 7th Street to 1st Street, and the reconstruction of West 7th Street from C Street to D Street within America's Central Post District. — Executed Nov 25 New RCS Construction, Inc. $2,566,151 ·
Sep 19, 2025 99745 MassacDistrict 9 Construct a 12'x 6' precast box culvert to carry Country Club Road over an unnamed creek one mile northwest of Metropolis. Includes PCC pavement and Guardrail. — Executed Nov 25 New Samron Midwest Contracting, Inc. $255,588 ·
Sep 19, 2025 99749 PerryDistrict 9 Intersection reconstruction and replace the bridge carrying Greens Mark Road over Six Mile Creek, one mile west of US 51. — Executed Nov 25 New Samron Midwest Contracting, Inc. $2,286,217 ·
Nov 7, 2025 46669 VariousDistrict 6 Removing and replacing damaged raised reflective pavement and markers and/or lenses throughout District 6. — Executed Nov 25 New
Nov 7, 2025 46944 WhitesideDistrict 2 Bridge deck replacement and other brige repairs to structure SN 098-3751 in Whiteside County. — Executed Nov 25 New Martin & Company Excavating $1,029,566 ·
Nov 7, 2025 61J54 DuPageDistrict 1 Extension of the west branch of DuPage River Trail from Gary's Mill Road to an existing trail within the West DuPage Woods Forest Preserve. — Executed Nov 25 New Lorig Construction Company $6,927,969 ·
Nov 7, 2025 61J94 CookDistrict 1 Construct a shared-use path adjacent to Meacham Road, from IL 72 to American Lane, and adjacent to Golf Road from Meacham Road to Roosevelt Boulevard in Schaumburg. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $997,000 ·
Nov 7, 2025 61L43 CookDistrict 1 HMA resurfacing on Woodfield Road from Plum Grove Road to Meacham Road in Schaumburg. Includes; HMA full depth patching, curb and gutter, sidewalks, shared use path, traffic signal modifications, and lighting. — Executed Nov 25 New K-Five Construction Corporation $5,837,039 ·
Nov 7, 2025 61L57 DuPageDistrict 1 Resurfacing Stonebridge Boulevard from Sheffer Road to Indian head Road, and from Sheffer Road to Eola Road in Aurora. — Executed Nov 25 New K-Five Construction Corporation $1,786,248 ·
Nov 7, 2025 61L73 WillDistrict 1 Extension of Old Renwick Road Trial from the DuPage River to West Renwick Road. — Executed Nov 25 New D. Construction, Inc. $352,856 ·
Nov 7, 2025 61L76 CookDistrict 1 Resurfacing and pedestrian safety improvements at the intersection of 9th Ave. at Van Buren Street, and at Quiney Street in Maywood. — Executed Nov 25 New Davis Concrete Construction Co. $298,167 ·
Nov 7, 2025 61L77 CookDistrict 1 Construct PCC Sidewalks along Center Avenue from Maple Avenue to Laurel Avenue. Includes: ADA Ramps, curb and gutter, landscaping, pavement markings and driveways. — Executed Nov 25 New Triggi Construction, Inc. $359,832 ·
Nov 7, 2025 61L78 DuPageDistrict 1 Resurfacing Rober Palmer Drive from North York Street to South York Street in Elmhurst. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $1,308,888 ·
Nov 7, 2025 61L79 DuPageDistrict 1 HMA resurfacing on Lambert Road from the South Village limits to IL 38 in Glen Ellyn. Includes; pavement patching, curb and gutter, sidewalks, ADA ramps, and q traffic signal maintenance. — Executed Nov 25 New K-Five Construction Corporation $1,759,309 ·
Nov 7, 2025 61L80 DuPageDistrict 1 Resurfacing Riford Road from St. Harles Road to Crescent Boulevard in Glen Ellyn. — Executed Nov 25 New Schroeder Asphalt Services, Inc. $603,175 ·
Nov 7, 2025 61L82 CookDistrict 1 Construction of a three-span cast-in-place RC slab bridge to carry 21st Street over Addison Creek in Broadview. Includes; full depth HMA pavement, sidewalk, curb and gutter, storm sewer, and lighting. — Executed Nov 25 New Dunnet Bay Construction Company $2,582,436 ·
Nov 7, 2025 61L83 LakeDistrict 1 HMA resurfacing on Oak Spring Road from Appley Avenue to St. Mary's Road in Libertyville. Includes; pavement pathcing, ADA ramps, and signage. — Executed Nov 25 New Peter Baker & Son Co. $774,012 ·
Nov 7, 2025 61L88 McHenryDistrict 1 Construct a four-span RC slabl bridge to carry Allendale Road over Nippersink C Creek. Includes HMA pavement, and guardrail. — Executed Nov 25 New Dunnet Bay Construction Company $5,134,451 ·
Nov 7, 2025 61L92 CookDistrict 1 Rehabilitation of Devon Avenue from Lincoln Avenue to McCormick Boulevard in Lincolnwood. Includes; HMA resurfacing, curb and gutter, sidewalks, lighting, parkway ebhancements and water main. — Executed Nov 25 New Capitol Cement Co., Inc. $5,462,909 ·
Nov 7, 2025 61L97 KaneDistrict 1 HMA resurfacing on Spruce and E. Main Street from Gilbert Street to Kenyon Road in South Elgin. Includes; curb and gutter, drainage, parkway restoration, patching, replacment of pedestrian push buttons and detector loops. — Executed Nov 25 New Everlast Blacktop Inc. $763,936 ·
Nov 7, 2025 61L98 CookDistrict 1 Reconstruction and HMA resurfacing of shoenbeck Road from US 12 to Camp McDonald Road in Mount Prospect. Includes; sidewalks, ADA ramps, pedestrian signals, driveways, storm sewers, and curb and gutter. — Executed Nov 25 New PirTano Construction Co., LLC $1,778,510 ·
Nov 7, 2025 62R51 WillDistrict 1 (3,400-Ft) Intersection Improvement (channelization, pavement widening, resurfacing),traffic signal Installation at railroad crossing, traffic signal modernization, Interconnect, minor lighting improvements, drainage Improvements (including new storm sewer at Monee Maintenance Yard), Location: IL 50 (Cicero Avenue) at Dralle Road, at Governors Hwy and at Monee Maintenance Yard, located withing the Villages of University Park and Monee. — Executed Nov 25 New Iroquois Paving Corporation $3,192,530 ·
Nov 7, 2025 62R63 CookDistrict 1 (2,891-Ft) Bridge Replacement Project. lighting, traffic signals and ADA improvements for structure (SN 016-0834) for I-94 (Edens Expressway) at Devon Avenue (Overhead) in the City of Chicago and the Village of Lincolnwood within Cook County. — Executed Nov 25 New Dunnet Bay Construction Company $15,646,955 ·
Nov 7, 2025 62U41 CookDistrict 1 (481-Ft) Bridge Replacement Project, bridge approach slab replacement for Structure Number (016-2068), lighting, traffic signal modernization, ADA improvement, resurfacing, I-290 at Keeler Avenue. — Executed Nov 25 New Lorig Construction Company $22,596,336 ·
Nov 7, 2025 62Y00 WillDistrict 1 Building demolition for eleven (11) residential and/or commercial parcels and outbuildings The work consists of building demolition for eleven (11) residential and/or commercial parcels and outbuildings. Each parcel removal will include removing any structure above and below the ground, including the main building frames, attached and detached buildings, facilities, and filling of basements, removal of fences, sidewalks and driveways, utilities, and trees within the parcels' limits. Interim grading and seeding. The project located in the City of Joliet, in the vicinity of FAI Route 80 — Executed Nov 25 New C & D Recycling Services, Inc. $346,900 ·
Nov 7, 2025 62Y33 VariousDistrict 1 The installing new signs, removal, relocation and repair of existing signs Project consist of the installing new signs, removal, relocation and repair of existing signs. Location of the project is in various counties in District 1. — Executed Nov 25 New ROADSAFE TRAFFIC SYSTEMS, INC. $484,900 ·
Nov 7, 2025 62Y36 VariousDistrict 1 The intent of this contract is to provide prompt repair to the high-tension cable barrier median system. This work includes removing and replacing damaged high tension cable barrier system components. This work is located on various State maintained routes in Various Counties. — Executed Nov 25 New Fence Masters, Inc. $857,222 ·
Nov 7, 2025 64U80 HenryDistrict 2 9 miles of intermittent resurfacing from IL 81 to culvert #1083 .25 miles South of I-80 ramps. — Executed Nov 25 New Advanced Asphalt Company $342,730 ·
Nov 7, 2025 64U82 HenryDistrict 2 9 miles of intermittent resurfacing along Atkinson Rd. from IL 92 to Atkinson and on I-80 ramps south of Atkinson. — Executed Nov 25 New Advanced Asphalt Company $529,895 ·
Nov 7, 2025 64U87 HenryDistrict 2 16.6 miles of agg. shoulder repair from Woodhull to Galva along IL 17/ US 34, and IL 91 to Henry Co. line. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $355,924 ·
Nov 7, 2025 64U98 WinnebagoDistrict 2 Furnishing the structural steel and bearings for the bridge on FAP Route 525 over the Kishwaukee River in Cherry Valley Township, in Winnebago, IL. — Executed Nov 25 New Industrial Steel Construction, Inc. $2,988,100 ·
Nov 7, 2025 64V05 Rock IslandDistrict 2 Bridge washing of SN 081-0011 carrying I-80 over the Mississippi River in Rock Island County. — Executed Nov 25 New Interstate Maintenance, Incorporated $138,300 ·
Nov 7, 2025 64V06 Rock IslandDistrict 2 Bridge washing of SN 081-0106 carrying I-280 over the Mississippi River in Rock Island County. — Executed Nov 25 New All States Painting, Inc. $53,333 ·
Nov 7, 2025 64V07 CarrollRock IslandWhitesideDistrict 2 Bridge washing of 3 structures over the Mississippi River in Carroll, Rock Island, and Whiteside Counties. — Executed Nov 25 New M & M Concrete, Inc. $112,000 ·
Nov 7, 2025 68B60 WarrenDistrict 4 Rehabilitation and resurfacing of the existing pavement including vertical adjustments, curve adjustments, shoulder widening, guardrail replacement, culvert replacements and extensions, addition of turn lanes, and all other related collateral work necessary to complete the project located on US 67 (FAP 310) from south of 270th St to south of 220th St_in Monmouth. Nearly 6 mi. — Executed Nov 25 New Gunther Construction, a div of UCM, Inc. $35,946,274 ·
Nov 7, 2025 68F45 WoodfordDistrict 4 Class D patching, milling and resurfacing, ADA improvements, curb and gutter removal and replacement, drainage improvements, the addition of a turn-lane, and other related collateral work on IL 117 from 600' south of Grandview Circle to Mill St in Eureka. 1.87 miles. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $5,074,396 ·
Nov 7, 2025 70F19 McLeanDistrict 5 Mill, patch and resurface FAP 693 (ILL 9) from Hinshaw Avenue to Center Street in Bloomington, IL._Approximately 1.291 miles. — Executed Nov 25 New Rowe Construction, a div of UCM, Inc. $8,303,728 ·
Nov 7, 2025 72508 SangamonDistrict 6 Tree removal and vegetation removal along I-55 from 11th Street to Stevenson Drive in Springfield. — Executed Nov 25 New Homer Tree Service, Inc. $190,542 ·
Nov 7, 2025 72523 CassSchuylerDistrict 6 1.8 miles of tree removal on US 67 / IL 100 near the Illinois River Bridge in Beardstown. — Executed Nov 25 New Freesen, a div of UCM, Inc. $765,687 ·
Nov 7, 2025 72688 SangamonDistrict 6 Tree clearing and ditch grading along the IDOT access road near the Lincolnshire Subdivision, northwest of I-72 and Chatham Road in Springfield. — Executed Nov 25 New Freesen, a div of UCM, Inc. $97,470 ·
Nov 7, 2025 72A62 SangamonDistrict 6 Bridge removal on I-55 / I-72, 0.1 miles south of Stevenson Drive. — Executed Nov 25 New William Charles Construction Company, LLC $1,014,537 ·
Nov 7, 2025 74595 CumberlandDistrict 7 Bridge replacement on US 40 over the Embarras River, 0.5 miles east of Cumberland Road, west of Greenup. — Executed Nov 25 New Samron Midwest Contracting, Inc. $6,831,745 ·
Nov 7, 2025 74B78 WayneDistrict 7 Bridge deck overlay, bridge deck repairs and approach pavement on SN 096-0010 carrying IL 15 over the Little Wabash River, 0.3 miles east of CR 2500 East. — Executed Nov 25 New C-Hill Civil Contractors, Inc. $1,592,673 ·
Nov 7, 2025 76T66 GreeneDistrict 8 Structural, mechanical and electrical repairs to the Joe Page Bridge in Hardin. (SN 031-0001) — Rejected Nov 25 New Keeley & Sons, Inc. and Wissehr Electric, Inc. JV $22,242,413 ·
Nov 7, 2025 76U47 VariousDistrict 8 Bridge deck sealing on various bridges in Calhoun, Greene and Jersey Counties in District 8. — Executed Nov 25 New M & M Concrete, Inc. $43,640 ·
Nov 7, 2025 76U48 VariousDistrict 8 Bridge deck sealing on various bridges in Bond, Clinton, Marion, and Washington Counties in District 8. — Executed Nov 25 New All States Painting, Inc. $274,243 ·
Nov 7, 2025 76U50 MonroeRandolphDistrict 8 Bridge deck sealing on various bridges in Monroe and Randolph Counties in in District 8. — Executed Nov 25 New All States Painting, Inc. $56,364 ·
Nov 7, 2025 76U64 VariousDistrict 8 Litter removal - IL 100 from Norman-s Landing to US 67; US 67 from IL 100 to IL 143; I-270 from the Mississippi River to IL 3; I-70 from the Mississippi Riv River to I-55/64; I-55/64 from the Mississippi River to I-70; I-255 from the Mississippi River to IL 3. — Executed Nov 25 New The Final Connection, Inc. $76,044 ·
Nov 7, 2025 78209 WilliamsonDistrict 9 Replacement of SN 100-0031 carrying IL 166 over Sugar Creek at the east corporate limits of Creal Springs. — Executed Nov 25 New Samron Midwest Contracting, Inc. $2,526,591 ·
Nov 7, 2025 78813 PerryDistrict 9 1.6 miles of milling, resurfacing, shoulder work, culvert replacement and patching on IL 14 from US 51 in DuQuoin to Old Route 14. — Executed Nov 25 New Samron Midwest Contracting, Inc. $2,731,937 ·
Nov 7, 2025 78994 FranklinDistrict 9 Adjustment of a sanitary sewer forced main and the repair of two eroded downstream channels at I-57 Northbound Rend Lake Rest Area. — Executed Nov 25 New Samron Midwest Contracting, Inc. $124,571 ·
Nov 7, 2025 78B23 FranklinDistrict 9 Replacement of SN 028-7049 on IL 14, 1 mile east of Benton. — Executed Nov 25 New Samron Midwest Contracting, Inc. $758,456 ·
Nov 7, 2025 78B42 UnionDistrict 9 Installation of culvert liners at various locations along I-57 in District 9 (SN 091-7066, 091-7071, 091-7072, 091-7073 and 091-7077). — Executed Nov 25 New Samron Midwest Contracting, Inc. $1,423,409 ·
Nov 7, 2025 78B54 JacksonDistrict 9 Resurfacing Sweets Drive from Reed Station Road to 0.5 miles west of Reed Station Road in Carbondale. — Executed Nov 25 New E. T. Simonds Construction Company $175,469 ·
Nov 7, 2025 78B64 VariousDistrict 9 Bridge deck concrete sealing on various bridges in Alexander, Johnson, Massac, Pulaski and Union Counties. — Executed Nov 25 New M & M Concrete, Inc. $396,418 ·
Nov 7, 2025 78B74 WilliamsonDistrict 9 Patching on IL 166 from IL 13 to Tune Road east of Marion. — Executed Nov 25 New E. T. Simonds Construction Company $118,588 ·
Nov 7, 2025 78B82 VariousDistrict 9 Painting structures on various routes in various counties: 3 in Johnson County, 7 in Union County and 2 in Williamson County. — Executed Nov 25 New Eagle Painting & Maintenance Company, Inc. $2,044,033 ·
Nov 7, 2025 80B53 CookDistrict 1 A full bridge painting and cleaning for the BNSF Bridges (SN 016-0020) and (SN 016-0021) over FAI 55 (Stevenso This improvement consists of a full bridge painting and cleaning for the BNSF Bridges (SN 016-0020) and (SN 016-0021) over FAI 55 (Stevenson Expressway) in the City of Chicago and Cook County. — Executed Nov 25 New Eagle Painting & Maintenance Company, Inc. $1,180,528 ·
Nov 7, 2025 80B69 CookDistrict 1 Full Arterial Cleaning Cycle, Supplemental Sweeping including pickup, removal and satisfactory disposal of lim The project consists of Full Arterial Cleaning Cycle, Supplemental Sweeping including pickup, removal and satisfactory disposal of limbs, sticks, leaves, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter on various State maintained arterial routes located within the northern half of Cook County. — Executed Nov 25 New Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $4,622,500 ·
Nov 7, 2025 80B70 DuPageDistrict 1 Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of lim The project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes within DuPage County. — Executed Nov 25 New Central Sweeping of Illinois, LLC $2,013,220 ·
Nov 7, 2025 80B71 CookDistrict 1 Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of lim This project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes located within southern half of Cook County. — Executed Nov 25 New Central Sweeping of Illinois, LLC $4,010,755 ·
Nov 7, 2025 80B72 WillDistrict 1 Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of lim This project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes located within the county of Will. — Executed Nov 25 New Central Sweeping of Illinois, LLC $1,303,855 ·
Nov 7, 2025 80B73 CookDistrict 1 GRAFFITI REMOVAL and shall consist of removing graffiti from the surfaces on State DOT right of way located on The project consists of GRAFFITI REMOVAL and shall consist of removing graffiti from the surfaces on State DOT right of way located on the inbound and outbound mainlines and ramps of the Kennedy (I-90/94), Dan Ryan (I-90/94), Bishop Ford (I-94), the Stevenson (I-55), and I-57 Expressways in Cook County. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $1,110,000 ·
7,301–7,400 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.