IDOT Jobs

All dates · 10,653 jobs · $20,005,846,000 Sign up free
★ My Jobs

10,653 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jun 13, 2025 72344 HancockDistrict 6 Bridge deck and approach repairs on SN 034-0066 carrying US 136 EB over the Lamoine River, 6.8 miles east of IL 94 in Carthage and on SN 034-0070 carrying IL 94 over South Branch of Lamoine River, 0.6 miles north of IL 9 near LaHarpe. — Executed Nov 25 New County Contractors, Inc. $499,691 ·
Jun 13, 2025 72346 AdamsDistrict 6 Bridge deck patching on SN 001-0082 and SN 001-0083 carrying IL 336 over Rock Creek, 2.1 miles north of US 24. — Executed Nov 25 New Rees Construction Company of Quincy $552,332 ·
Jun 13, 2025 72623 PikeDistrict 6 Shoulder repairs on I-72 from the Trumpet Interchange to 0.8 miles east of IL 96, east of Hull. , Cured-in-place liner and pipe culvert removal and replacement on IL 4 / Veterans Parkway in Springfield. — Executed Nov 25 New Diamond Construction Company $648,506 ·
Jun 13, 2025 72634 SangamonDistrict 6 Cured-in-place pipe lines, and pipe culvert removal and replacement on Veterans Parkway (Rt 4) in Springfield — Executed Nov 25 New J.C. Dillon, Inc. $121,416 ·
Jun 13, 2025 72942 VariousDistrict 6 Minor bridge abutment repairs on 25 bridges on various routes in various counties of District 6. — Executed Nov 25 New County Contractors, Inc. $273,258 ·
Jun 13, 2025 72973 MenardDistrict 6 Expansion joint replacement and microsilica overlay on SN 065-0501 carrying IL 29 over Salt Creek at the Mason and Menard County line. — Executed Nov 25 New Otto Baum Company, Inc. $1,947,800 ·
Jun 13, 2025 72A58 MorganScottDistrict 6 6.7 miles of resurfacing, patching and bridge repair on I-72 from 1.5 miles east of Old US 36 to 0.7 miles west of US 67. (SN 086-0023, 086-0024, 086-0028, 069-0053 and 069-0054) — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $25,768,294 ·
Jun 13, 2025 72C26 SangamonDistrict 6 Building removal at 3701 6th Street Frontage Road West in Springfield. — Executed Nov 25 New CSD Environmental Services, Inc. $74,707 ·
Jun 13, 2025 72F42 SangamonDistrict 6 2.8 miles of resurfacing and ADA improvements on Wabash Ave from west of Robbins Road to Macarthur Boulevard, Stanford Avenue from Macarthur Boulevard to 0.1 miles east of Macarthur Boulevard, and Macarthur Boulevard from 0.1 miles north to 0.1 miles south of Wabash Avenue. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $4,908,504 ·
Jun 13, 2025 72M61 AdamsPikeDistrict 6 11 miles of resurfacing with widening, gutter, guardrail and culvert replacement on IL 104 from 1.8 miles west of the Pike County line to IL 107. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $14,071,885 ·
Jun 13, 2025 74564 ColesDistrict 7 Complete superstructure and substructure replacement of SN 015-0068 which carries 900N over Riley Creek, 0.3 mile west of Charleston. Includes; guardrail and resurfacing done under a full road closure. — Executed Nov 25 New Sangamo Construction Company $2,441,724 ·
Jun 13, 2025 74648 WayneDistrict 7 Removal and replacement of a triple barrel box culvert on IL 15 over a stream located 0.5 miles east of CR 1225 E. — Executed Nov 25 New E. T. Simonds Construction Company $1,253,771 ·
Jun 13, 2025 74B63 EffinghamDistrict 7 4.7 miles of safety shoulder on US 45 from the Shelby County line to 0.2 miles north of Rickleman Avenue in Effingham. — Executed Nov 25 New Howell Paving, Inc. $1,185,220 ·
Jun 13, 2025 74C83 MaconDistrict 7 Cleaning and repairing bridge drains and drainpipes on SN 058-0120 carrying IL 121 (North 22nd Street) over Norfolk Southern Railroad in Decatur. — Executed Nov 25 New Freesen, a div of UCM, Inc. $162,026 ·
Jun 13, 2025 74C97 MaconDistrict 7 Lighting improvements at 3 locations: 1) I-72: IL 36 exit to Harristown Boulevard; 2) US 36: I-72 to 0.2 miles west of Harristown Boulevard; 3) US 51: I-72 to Cantrell Road. — Executed Nov 25 New Bodine Electric of Decatur $2,670,320 ·
Jun 13, 2025 74D29 EffinghamDistrict 7 1.3 miles of patching on IL 32 / Keller Drive from West Evergreen to 0.1 miles south of Grove Avenue. — Executed Nov 25 New Kinney Contractors, Inc. $727,801 ·
Jun 13, 2025 74D32 ColesDistrict 7 Line existing corrugated metal pipe culverts with polyethylene solid wall or profile wall smooth interior pipe at various locations on IL 16 between Mattoon and Charleston. — Executed Nov 25 New CSD Environmental Services, Inc. $473,517 ·
Jun 13, 2025 74D40 ClarkDistrict 7 Tree removal on US 40 from 0.4 miles west of N 450th Street to 0.75 miles east of Livingston Road. — Executed Nov 25 New Mosley Construction 1, LLC $196,948 ·
Jun 13, 2025 74D43 FayetteDistrict 7 1 mile of patching at the Brownstown Weigh Station on I-70. — Executed Nov 25 New Beniach Construction Co., Inc. $611,741 ·
Jun 13, 2025 74D45 ColesDistrict 7 7.3 miles of longitudinal joint repair on I-57 from 0.4 miles southwest of US to 1 mile north of IL 16. — Executed Nov 25 New Howell Paving, Inc. $1,058,359 ·
Jun 13, 2025 74D49 VariousDistrict 7 Repair of guardrail at various locations and on call repair of guardrail damage throughout District 7. — Executed Nov 25 New Kujo, Inc. $1,053,945 ·
Jun 13, 2025 76F82 MadisonSt. ClairDistrict 8 Force main cleaning at the Missouri Avenue pump station in East St. Louis, the 25th Street pump station in East St. Louis and the Venice pump station in Venice. — Executed Nov 25 New Haier Plumbing and Heating, Inc. $614,950 ·
Jun 13, 2025 76K06 St. ClairDistrict 8 1.1 mile of patching on Lebanon Road from West Main Street in Belleville to IL 161 in Fairview Heights. — Executed Nov 25 New Keeley & Sons, Inc. $697,698 ·
Jun 13, 2025 76K74 St. ClairDistrict 8 3.00 miles of widening, resurfacing, interchange improvements, and new drainage system on I-64 from west of Green Mount Road to 1.1 miles west of IL 158. — Executed Nov 25 New Keeley & Sons, Inc. Keller Construction Inc. $72,449,132 ·
Jun 13, 2025 76R11 VariousDistrict 8 Guardrail and cable median repair at various locations throughout District 8. — Executed Nov 25 New Illini Excavation & Reclamation, Inc. $4,962,155 ·
Jun 13, 2025 76R28 VariousDistrict 8 Highway lighting, traffic signal repair and maintenance at various locations throughout District 8. — Active Nov 25 New Electrico, Inc. $1,935,305 ·
Jun 13, 2025 76R61 VariousDistrict 8 Maintenance and service of all ITS equipment at various locations throughout District 8. — Rejected Nov 25 New Electrico, Inc. $558,010 ·
Jun 13, 2025 76T70 St. ClairDistrict 8 Pump station cleaning at the Missouri Avenue Pump Station in East St. Louis. — Executed Nov 25 New Layne Christensen Company $1,124,450 ·
Jun 13, 2025 76T77 MadisonDistrict 8 Traffic signal replacement at the intersection of IL 111/140 at Thelma Avenue / Franklin Avenue in Cottage Hills. — Executed Nov 25 New Gerstner Electric, Inc. $678,250 ·
Jun 13, 2025 76U24 St. ClairDistrict 8 Bridge joint replacement on SN 082-0322 carrying I-70 ramp over I-55, I-64 and KCS Railroad in East St. Louis. — Executed Nov 25 New Keeley & Sons, Inc. $1,987,660 ·
Jun 13, 2025 76U25 ClintonMadisonSt. ClairDistrict 8 Traffic signal modernization at various locations throughout District 8. — Executed Nov 25 New Gerstner Electric, Inc. $669,700 ·
Jun 13, 2025 76U34 St. ClairDistrict 8 Well repairs at the 25th Street Pump Station south of I-64. — Executed Nov 25 New Davinroy Mechanical Contractor, Inc. $76,100 ·
Jun 13, 2025 76U37 MadisonMarionSt. ClairDistrict 8 Pump repairs at the Bowman Pump Station in East St. Louis, Grey's Pump Station in Pontoon Beach, Venice Pump Station in Venice, 9th Street Pump Station in East St. Louis and Centralia Pump Station in Centralia. — Rejected Nov 25 New Davinroy Mechanical Contractor, Inc. $1,593,635 ·
Jun 13, 2025 76U39 BondDistrict 8 12.4 miles of chip seal on IL 143 from the Madison County line to IL 127. — Executed Nov 25 New Evergreen Roadworks, LLC $935,089 ·
Jun 13, 2025 76U99 VariousDistrict 8 Tree removal in various locations throughout District 8. — Executed Nov 25 New Clean Cut Tree Service, Inc. $223,072 ·
Jun 13, 2025 78399 SalineDistrict 9 Replacement of 3 structures: 1) SN 083-7000 carrying IL 34 over a creek 1.5 miles east of Franklin County; 2) SN 083-7001 carrying IL 34 over a creek 2.4 miles east of Franklin County; 3) SN 083-7022 carrying IL 145/34 over a creek 3.2 miles south of US 45. — Executed Nov 25 New Samron Midwest Contracting, Inc. $797,387 ·
Jun 13, 2025 78786 FranklinDistrict 9 2.3 miles of resurfacing on IL 154 from IL 37 to Fitzgerrell Park Road. Also includes replacement of SN 028-0052 over Rend Lake and construction of a multi-use path. — Executed Nov 25 New E. T. Simonds Construction Company $20,462,811 ·
Jun 13, 2025 78831 WilliamsonDistrict 9 Replacement of SN 100-0053 carrying Stiritz Road (TR 23) over I-57, approximately 0.6 miles west of IL 37. — Executed Nov 25 New E. T. Simonds Construction Company $4,956,078 ·
Jun 13, 2025 78943 FranklinDistrict 9 10.5 miles of milling, patching and resurfacing on IL 14 from IL 37 in Benton to west of Happy Row Road in Macedonia. — Executed Nov 25 New E. T. Simonds Construction Company $5,779,645 ·
Jun 13, 2025 78985 JacksonDistrict 9 Slope repair on SN 039-0075 carrying IL 13 over the Big Muddy River, east of IL 127 in Murphysboro. — Executed Nov 25 New Samron Midwest Contracting, Inc. $11,674,263 ·
Jun 13, 2025 78A15 UnionDistrict 9 Culvert replacement (SN 091-7057) on Old US 51 west of Locust Street in Cobden. — Executed Nov 25 New Sierra Bravo Contractors, LLC $793,569 ·
Jun 13, 2025 78A25 JohnsonDistrict 9 0.6 miles of pavement patching, HMA resurfacing and ADA ramp improvements on IL 146 from 0.1 miles west of 11th Street to US 45 in Vienna. — Executed Nov 25 New Samron Midwest Contracting, Inc. $686,026 ·
Jun 13, 2025 78A33 WilliamsonDistrict 9 Signal modifications, pedestrian crossings and sidewalks at the intersection of IL 13 and Halfway Road in Marion. — Executed Nov 25 New Brown Electric, Inc. $1,056,436 ·
Jun 13, 2025 78A39 GallatinWhiteDistrict 9 Intersection reconstruction at the intersection of IL 1 and IL 141 near Omaha. — Executed Nov 25 New Samron Midwest Contracting, Inc. $1,697,173 ·
Jun 13, 2025 78A72 JeffersonDistrict 9 9.2 miles of patching and resurfacing on IL 15 from the Washington County line to 0.4 miles west of the Mt. Vernon west city limits. — Executed Nov 25 New E. T. Simonds Construction Company $2,283,905 ·
Jun 13, 2025 78A78 JacksonUnionDistrict 9 Joint reconstruction with strip seal and modular seal on SN 039-0048 carrying IL3 over a railroad in Jackson County and joint reconstruction with strip seals on SN 091-0031carrying IL3 over the Big Muddy River in Union County. — Executed Nov 25 New E. T. Simonds Construction Company $968,450 ·
Jun 13, 2025 78A92 UnionDistrict 9 Earth and furnished excavation and placement of stone riprap to repair existing slopes along Old US 51, 0.7 miles northwest of Coben. — Executed Nov 25 New Samron Midwest Contracting, Inc. $92,263 ·
Jun 13, 2025 78A96 JohnsonDistrict 9 Bridge joint repair on SN 044-0033 carrying Eagle Point Road over I-24. — Executed Nov 25 New C-Hill Civil Contractors, Inc. $108,746 ·
Jun 13, 2025 78A97 JacksonDistrict 9 Aggregate shoulders, earth and furnished excavation, stone riprap, pipe underdrains and erosion control blanket to repair existing slopes along IL 149 at SN 039-7036, 0.4 miles west of the Williamson County line west of Hurst. — Executed Nov 25 New Sierra Bravo Contractors, LLC $170,723 ·
Jun 13, 2025 78B03 JacksonDistrict 9 Replacing 615' of pavement and shoulders on westbound IL 13 at Watson Road. — Executed Nov 25 New Samron Midwest Contracting, Inc. $1,041,511 ·
Jun 13, 2025 78B04 JacksonDistrict 9 Patching on US 51 in Carbondale from Willow Street to Grand Avenue and on Mill Street from South Normal Avenue to South Illinois Avenue. — Executed Nov 25 New E. T. Simonds Construction Company $543,043 ·
Jun 13, 2025 78B05 JacksonDistrict 9 Signal grounding at multiple locations on IL 149 and IL 13 in Murphysboro and Carbondale. — Executed Nov 25 New Gerstner Electric, Inc. $116,085 ·
Jun 13, 2025 78B06 SalineDistrict 9 Signal replacement at the intersection of US 45 and Poplar Street in Harrisburg. — Executed Nov 25 New Brown Electric, Inc. $493,996 ·
Jun 13, 2025 78B13 WhiteDistrict 9 12.3 miles of resurfacing on US 45 from IL 14 to the Wayne County line as well as ADA upgrades in Enfield and Mill Shoals. — Executed Nov 25 New Howell Paving, Inc. $7,158,886 ·
Jun 13, 2025 78B21 PulaskiUnionDistrict 9 9.3 miles of tree removal on I-57 from the IL 146 interchange to the Perks Road overpass. — Executed Nov 25 New Sierra Bravo Contractors, LLC $880,649 ·
Jun 13, 2025 78B22 JacksonDistrict 9 0.85 miles of overlay and pavement patching on Airport Road from IL 13 to 1 mile north of IL 13, northwest of Carbondale. — Executed Nov 25 New E. T. Simonds Construction Company $297,405 ·
Jun 13, 2025 78B31 WilliamsonDistrict 9 1.1miles of pavement patching and resurfacing on IL 37 from 0.1 miles north of 18th Street to south of 4th Street in Johnston City. — Executed Nov 25 New E. T. Simonds Construction Company $685,210 ·
Jun 13, 2025 78B32 AlexanderDistrict 9 3.25 miles of pavement patching and partial structure removal on US 51 beginning 0.29 miles south of New Cross Street and proceeding south for 3.25 miles. — Executed Nov 25 New E. T. Simonds Construction Company $832,728 ·
Jun 13, 2025 78B40 VariousDistrict 9 Electrical repair and/or maintenance on various routes throughout District 9. — Active Nov 25 New F. W. Electric, Inc. $230,826 ·
Jun 13, 2025 87855 BureauDistrict 3 HMA resurfacing with aggregate shoulders on CH 24 from US 34 to CH 9. — Executed Nov 25 New Advanced Asphalt Company $2,426,250 ·
Jun 13, 2025 87858 IroquoisDistrict 3 HMA Resurfacing with aggregate shoulders on CH 4 from the west village limits of Clifton to CH 24. — Executed Nov 25 New Iroquois Paving Corporation $1,783,862 ·
Jun 13, 2025 87860 KankakeeDistrict 3 Resurfacing CH 41 from the Will County line to South Street. — Executed Nov 25 New Kankakee Valley Construction Company, Inc. $580,188 ·
Jun 13, 2025 87863 DeKalbDistrict 3 Asphalt resurfacing of Barber Green Road, and four (4) multi-use trails at various locations in DeKalb County. Includes aggregate shoulders and PCC sidewalk. — Executed Nov 25 New Curran Contracting Company $868,058 ·
Jun 13, 2025 87874 KankakeeDistrict 3 Streetscaping improvements at various locations in Grank Park. — Executed Nov 25 New M & J Underground Inc. $2,806,802 ·
Jun 13, 2025 87882 LaSalleDistrict 3 Construction of a single-span PPC deck beam bridge to carry River Road over a drainage ditch, 0.7 miles west of IL 170 in Seneca. — Executed Nov 25 New D. Construction, Inc. $535,667 ·
Jun 13, 2025 87883 KankakeeDistrict 3 Construction of shared-use paths at various location in Bradley. — Executed Nov 25 New M & J Underground Inc. $327,924 ·
Jun 13, 2025 87884 LivingstonDistrict 3 Sidewalk construction at various locations in Dwight. — Rejected Nov 25 New D. Construction, Inc. $230,453 ·
Jun 13, 2025 87885 DeKalbDistrict 3 HMA resurfacing with 3' HMA safety shoulds on Somonauk Road from Chicago Road to US 30. — Executed Nov 25 New Curran Contracting Company $881,892 ·
Jun 13, 2025 89806 KnoxDistrict 4 Cold-in-place recycling and HMA surfacing on CH 25 and CH 26 from the south corporate limits of Galesburg to CH 26. — Executed Nov 25 New Gunther Construction, a div of UCM, Inc. $1,710,475 ·
Jun 13, 2025 89859 TazewellDistrict 4 Pavement reconstruction, sidewalk replacement, curb and gutter replacement, storm sewer, traffic signals and lighting on Court Street from 8th Street to 10th Street in Pekin. — Executed Nov 25 New William Charles Construction Company, LLC $4,930,196 ·
Jun 13, 2025 89866 KnoxDistrict 4 Construction of PCC Sidewalk with ADA Ramps along East Fifer Street from Willard Street to Morton Avenue in Galesburg. — Executed Nov 25 New Illinois Civil Contractors, Inc. $302,246 ·
Jun 13, 2025 89869 PeoriaDistrict 4 Resurfacing on Cloverdale Road from west of White Clover Drive to IL 29 in Chillicothe. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $405,578 ·
Jun 13, 2025 91631 EdgarDistrict 5 Construction of a three-span steel beam structure with concrete deck to carry CH 16 over Flemington Tributary in Edgar County. Includes HMA approach pavement and traffic barrier terminals. — Executed Nov 25 New Big O Services, LLC $1,648,370 ·
Jun 13, 2025 91657 DeWittDistrict 5 Guardrail improvements at various locations in DeWitt County — Executed Nov 25 New Lovewell Fencing, Inc. $1,235,769 ·
Jun 13, 2025 91756 McLeanDistrict 5 Roadway reconstruction and new multi-use path on West College Avenue from West of the Norfolk Southern Railroad to White Oak Street in Normal. — Executed Nov 25 New Rowe Construction, a div of UCM, Inc. $1,506,116 ·
Jun 13, 2025 93828 MacoupinDistrict 6 Replace the bridge carrying CH 34 over Solomon Creet, 0.3 mile east of Bethal Road — Executed Nov 25 New C-Hill Civil Contractors, Inc. $1,520,000 ·
Jun 13, 2025 93831 ChristianDistrict 6 Sidewalk replacement at various locations in Taylorville. Includes HMA resurfacing, driveway replacement, drainage improvements, ADA improvements, and Seeding. — Executed Nov 25 New Earth Worx Solutions LLC $700,361 ·
Jun 13, 2025 93832 SangamonDistrict 6 Sidewalk replacement at various locations in Auburn. — Executed Nov 25 New Otto Baum Company, Inc. $223,575 ·
Jun 13, 2025 93836 HancockDistrict 6 Construct a single-span PPC IL36N-Beam Bridge to carry CH 3 over Deer Creek, 0.6 mile north of Burnside. — Executed Nov 25 New County Contractors, Inc. $1,156,235 ·
Jun 13, 2025 93837 ChristianDistrict 6 Resurfacing East 6 Street from Spruce Street to Minnesota Street in Pana. — Executed Nov 25 New P. H. Broughton & Sons, Inc. $235,358 ·
Jun 13, 2025 97771 St. ClairDistrict 8 Patching of failed concrete pavement joints along Old Collinsville Road from Lebanon Avenue to Ashland Avenue in St. Clair County. Includes raised reflective pavement markers. — Executed Nov 25 New Kinney Contractors, Inc. $691,627 ·
Jun 13, 2025 97834 St. ClairDistrict 8 Resurfacing on West Washington Street from Centreville Avenue to South Illinois Street in Belleville. — Executed Nov 25 New Stutz Excavating, Inc. $531,515 ·
Jun 13, 2025 97848 St. ClairDistrict 8 Pavement widening on Maple Street from Main Street to Shiloh Heights Drive, and the construction of a right-turn lane from Maple Street onto northbound Main Street in Shiloh. — Executed Nov 25 New Stutz Excavating, Inc. $1,468,668 ·
Jun 13, 2025 97859 St. ClairDistrict 8 Resurfacing Martin Luther King Drive from Collinsville Avenue to 8th Street in East St. Louis. — Executed Nov 25 New Keeley & Sons, Inc. $1,352,831 ·
Jun 13, 2025 97860 St. ClairDistrict 8 Reconstruct the northwest corner of IL 3 at Monsanto Avenue, and resurface Monsanto Avenue from IL 3 east for 0.04 miles in Sauget. — Active Nov 25 New Hank's Excavating & Landscaping, Inc. $607,366 ·
Jun 13, 2025 97864 MonroeDistrict 8 HMA resurfacing on CH 12 from Meyer Avenue in Valmeyer to Bluff Road North. — Executed Nov 25 New Christ Bros. Asphalt, Inc. $823,576 ·
Jun 13, 2025 97870 MadisonDistrict 8 Construction of an HMA multi-use path on a lime-modified subgrade adjacent to US 40 from South Main Street to Creekside Drive in Troy. — Executed Nov 25 New Stutz Excavating, Inc. $683,304 ·
Jun 13, 2025 99747 FranklinDistrict 9 Construction of stamped Concrete Sidewalk, street lighting system, Curb and gutter on IL 149 in West Frankfort. — Rejected Nov 25 New
Jun 13, 2025 99750 SalineDistrict 9 Construction of a Roundabout at Small Street and Veterans Drive in Harrisburg. Includes PCC pavement, sidewalks, drainage, signing and lighting. — Executed Nov 25 New E. T. Simonds Construction Company $1,463,163 ·
Jun 13, 2025 99751 AlexanderDistrict 9 Resurfacing on Ullin Road from IL 127 to the Pulaski County line. — Executed Nov 25 New E. T. Simonds Construction Company $742,951 ·
Jun 13, 2025 99752 PerryDistrict 9 Replace the bridge carrying White Walnut Road over White Walnut Creek, 1.7 miles north of IL 154. — Executed Nov 25 New C-Hill Civil Contractors, Inc. $455,888 ·
Jun 13, 2025 99753 GallatinDistrict 9 Resurfacing on Pounds Hallow Road from IL 1 to the Hardin County Line. — Executed Nov 25 New Samron Midwest Contracting, Inc. $741,652 ·
Jun 13, 2025 99754 PopeDistrict 9 HMA overlay with aggregate shoulds on Bay City Road from west of Climer Road to Jones Orchard Road. — Executed Nov 25 New E. T. Simonds Construction Company $966,973 ·
Jun 13, 2025 99756 WilliamsonDistrict 9 HMA Overlay with Aggregate Wedge Shoulders on Power Plant Road from County Club Road to McKinny Chapel Road. — Executed Nov 25 New E. T. Simonds Construction Company $660,852 ·
Aug 1, 2025 61K77 DuPageDistrict 1 Construct a shared-use path along Elizabeth Drive from Forest Preserve Drive to Wood Dale Road, and Wood Dale from Murray Drive to Elizabeth Drive in Wood Dale. — Executed Nov 25 New R. W. Dunteman Company $553,433 ·
Aug 1, 2025 61L37 CookDistrict 1 Reconstruction of McConnor Parkway from Meacham Road to Roosevelet Boulevard in Schaumburg. Includes HMA Roadway, Curb and Gutter, Sidewalks, Multi-Use Path, ADA Improvements, Drainage Improvements, Traffice Signal Modernization, and Lighting. — Executed Nov 25 New Plote Construction, Inc. $5,761,086 ·
Aug 1, 2025 61L38 CookDistrict 1 Reconstruction of McConnor Parkway from Roosevelet Boulevard to Gold Road in Schaumburg. Includes HMA Roadway, Curb and Gutter, Sidewalks, Multi-Use Path, ADA Improvements, Drainage Improvements, Traffice Signal Modernization, and Lighting. — Executed Nov 25 New Plote Construction, Inc. $6,017,267 ·
Aug 1, 2025 61L45 DuPageDistrict 1 Scarification of existing PCC pavement, and HMA resurfacing on Western Frontage Road from IL 83 to Oakleaf Drive in Addison Township. — Executed Nov 25 New R. W. Dunteman Company $495,500 ·
Aug 1, 2025 61L46 DuPageDistrict 1 Construct Multi-Use Paths along various routes in Hanover Park. Includes; PCC Sidewalk, and steel plate beam guardrail. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $1,424,943 ·
Aug 1, 2025 61L47 DuPageDistrict 1 HMA resurfacing and widening of Town Road from West Roosevelt Road (IL 38) to West Washington Street in West Chicago. Includes; curb and gutter, sidewalks, ADA ramps, driveways, and storm sewer. — Executed Nov 25 New Everlast Blacktop Inc. $1,807,185 ·
7,101–7,200 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.