| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jun 13, 2025 | 72344 | HancockDistrict 6 | Bridge deck and approach repairs on SN 034-0066 carrying US 136 EB over the Lamoine River, 6.8 miles east of IL 94 in Carthage and on SN 034-0070 carrying IL 94 over South Branch of Lamoine River, 0.6 miles north of IL 9 near LaHarpe. | — | Executed | County Contractors, Inc. $499,691 · | ||
| Jun 13, 2025 | 72346 | AdamsDistrict 6 | Bridge deck patching on SN 001-0082 and SN 001-0083 carrying IL 336 over Rock Creek, 2.1 miles north of US 24. | — | Executed | Rees Construction Company of Quincy $552,332 · | ||
| Jun 13, 2025 | 72623 | PikeDistrict 6 | Shoulder repairs on I-72 from the Trumpet Interchange to 0.8 miles east of IL 96, east of Hull. , Cured-in-place liner and pipe culvert removal and replacement on IL 4 / Veterans Parkway in Springfield. | — | Executed | Diamond Construction Company $648,506 · | ||
| Jun 13, 2025 | 72634 | SangamonDistrict 6 | Cured-in-place pipe lines, and pipe culvert removal and replacement on Veterans Parkway (Rt 4) in Springfield | — | Executed | J.C. Dillon, Inc. $121,416 · | ||
| Jun 13, 2025 | 72942 | VariousDistrict 6 | Minor bridge abutment repairs on 25 bridges on various routes in various counties of District 6. | — | Executed | County Contractors, Inc. $273,258 · | ||
| Jun 13, 2025 | 72973 | MenardDistrict 6 | Expansion joint replacement and microsilica overlay on SN 065-0501 carrying IL 29 over Salt Creek at the Mason and Menard County line. | — | Executed | Otto Baum Company, Inc. $1,947,800 · | ||
| Jun 13, 2025 | 72A58 | MorganScottDistrict 6 | 6.7 miles of resurfacing, patching and bridge repair on I-72 from 1.5 miles east of Old US 36 to 0.7 miles west of US 67. (SN 086-0023, 086-0024, 086-0028, 069-0053 and 069-0054) | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $25,768,294 · | ||
| Jun 13, 2025 | 72C26 | SangamonDistrict 6 | Building removal at 3701 6th Street Frontage Road West in Springfield. | — | Executed | CSD Environmental Services, Inc. $74,707 · | ||
| Jun 13, 2025 | 72F42 | SangamonDistrict 6 | 2.8 miles of resurfacing and ADA improvements on Wabash Ave from west of Robbins Road to Macarthur Boulevard, Stanford Avenue from Macarthur Boulevard to 0.1 miles east of Macarthur Boulevard, and Macarthur Boulevard from 0.1 miles north to 0.1 miles south of Wabash Avenue. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $4,908,504 · | ||
| Jun 13, 2025 | 72M61 | AdamsPikeDistrict 6 | 11 miles of resurfacing with widening, gutter, guardrail and culvert replacement on IL 104 from 1.8 miles west of the Pike County line to IL 107. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $14,071,885 · | ||
| Jun 13, 2025 | 74564 | ColesDistrict 7 | Complete superstructure and substructure replacement of SN 015-0068 which carries 900N over Riley Creek, 0.3 mile west of Charleston. Includes; guardrail and resurfacing done under a full road closure. | — | Executed | Sangamo Construction Company $2,441,724 · | ||
| Jun 13, 2025 | 74648 | WayneDistrict 7 | Removal and replacement of a triple barrel box culvert on IL 15 over a stream located 0.5 miles east of CR 1225 E. | — | Executed | E. T. Simonds Construction Company $1,253,771 · | ||
| Jun 13, 2025 | 74B63 | EffinghamDistrict 7 | 4.7 miles of safety shoulder on US 45 from the Shelby County line to 0.2 miles north of Rickleman Avenue in Effingham. | — | Executed | Howell Paving, Inc. $1,185,220 · | ||
| Jun 13, 2025 | 74C83 | MaconDistrict 7 | Cleaning and repairing bridge drains and drainpipes on SN 058-0120 carrying IL 121 (North 22nd Street) over Norfolk Southern Railroad in Decatur. | — | Executed | Freesen, a div of UCM, Inc. $162,026 · | ||
| Jun 13, 2025 | 74C97 | MaconDistrict 7 | Lighting improvements at 3 locations: 1) I-72: IL 36 exit to Harristown Boulevard; 2) US 36: I-72 to 0.2 miles west of Harristown Boulevard; 3) US 51: I-72 to Cantrell Road. | — | Executed | Bodine Electric of Decatur $2,670,320 · | ||
| Jun 13, 2025 | 74D29 | EffinghamDistrict 7 | 1.3 miles of patching on IL 32 / Keller Drive from West Evergreen to 0.1 miles south of Grove Avenue. | — | Executed | Kinney Contractors, Inc. $727,801 · | ||
| Jun 13, 2025 | 74D32 | ColesDistrict 7 | Line existing corrugated metal pipe culverts with polyethylene solid wall or profile wall smooth interior pipe at various locations on IL 16 between Mattoon and Charleston. | — | Executed | CSD Environmental Services, Inc. $473,517 · | ||
| Jun 13, 2025 | 74D40 | ClarkDistrict 7 | Tree removal on US 40 from 0.4 miles west of N 450th Street to 0.75 miles east of Livingston Road. | — | Executed | Mosley Construction 1, LLC $196,948 · | ||
| Jun 13, 2025 | 74D43 | FayetteDistrict 7 | 1 mile of patching at the Brownstown Weigh Station on I-70. | — | Executed | Beniach Construction Co., Inc. $611,741 · | ||
| Jun 13, 2025 | 74D45 | ColesDistrict 7 | 7.3 miles of longitudinal joint repair on I-57 from 0.4 miles southwest of US to 1 mile north of IL 16. | — | Executed | Howell Paving, Inc. $1,058,359 · | ||
| Jun 13, 2025 | 74D49 | VariousDistrict 7 | Repair of guardrail at various locations and on call repair of guardrail damage throughout District 7. | — | Executed | Kujo, Inc. $1,053,945 · | ||
| Jun 13, 2025 | 76F82 | MadisonSt. ClairDistrict 8 | Force main cleaning at the Missouri Avenue pump station in East St. Louis, the 25th Street pump station in East St. Louis and the Venice pump station in Venice. | — | Executed | Haier Plumbing and Heating, Inc. $614,950 · | ||
| Jun 13, 2025 | 76K06 | St. ClairDistrict 8 | 1.1 mile of patching on Lebanon Road from West Main Street in Belleville to IL 161 in Fairview Heights. | — | Executed | Keeley & Sons, Inc. $697,698 · | ||
| Jun 13, 2025 | 76K74 | St. ClairDistrict 8 | 3.00 miles of widening, resurfacing, interchange improvements, and new drainage system on I-64 from west of Green Mount Road to 1.1 miles west of IL 158. | — | Executed | Keeley & Sons, Inc. Keller Construction Inc. $72,449,132 · | ||
| Jun 13, 2025 | 76R11 | VariousDistrict 8 | Guardrail and cable median repair at various locations throughout District 8. | — | Executed | Illini Excavation & Reclamation, Inc. $4,962,155 · | ||
| Jun 13, 2025 | 76R28 | VariousDistrict 8 | Highway lighting, traffic signal repair and maintenance at various locations throughout District 8. | — | Active | Electrico, Inc. $1,935,305 · | ||
| Jun 13, 2025 | 76R61 | VariousDistrict 8 | Maintenance and service of all ITS equipment at various locations throughout District 8. | — | Rejected | Electrico, Inc. $558,010 · | ||
| Jun 13, 2025 | 76T70 | St. ClairDistrict 8 | Pump station cleaning at the Missouri Avenue Pump Station in East St. Louis. | — | Executed | Layne Christensen Company $1,124,450 · | ||
| Jun 13, 2025 | 76T77 | MadisonDistrict 8 | Traffic signal replacement at the intersection of IL 111/140 at Thelma Avenue / Franklin Avenue in Cottage Hills. | — | Executed | Gerstner Electric, Inc. $678,250 · | ||
| Jun 13, 2025 | 76U24 | St. ClairDistrict 8 | Bridge joint replacement on SN 082-0322 carrying I-70 ramp over I-55, I-64 and KCS Railroad in East St. Louis. | — | Executed | Keeley & Sons, Inc. $1,987,660 · | ||
| Jun 13, 2025 | 76U25 | ClintonMadisonSt. ClairDistrict 8 | Traffic signal modernization at various locations throughout District 8. | — | Executed | Gerstner Electric, Inc. $669,700 · | ||
| Jun 13, 2025 | 76U34 | St. ClairDistrict 8 | Well repairs at the 25th Street Pump Station south of I-64. | — | Executed | Davinroy Mechanical Contractor, Inc. $76,100 · | ||
| Jun 13, 2025 | 76U37 | MadisonMarionSt. ClairDistrict 8 | Pump repairs at the Bowman Pump Station in East St. Louis, Grey's Pump Station in Pontoon Beach, Venice Pump Station in Venice, 9th Street Pump Station in East St. Louis and Centralia Pump Station in Centralia. | — | Rejected | Davinroy Mechanical Contractor, Inc. $1,593,635 · | ||
| Jun 13, 2025 | 76U39 | BondDistrict 8 | 12.4 miles of chip seal on IL 143 from the Madison County line to IL 127. | — | Executed | Evergreen Roadworks, LLC $935,089 · | ||
| Jun 13, 2025 | 76U99 | VariousDistrict 8 | Tree removal in various locations throughout District 8. | — | Executed | Clean Cut Tree Service, Inc. $223,072 · | ||
| Jun 13, 2025 | 78399 | SalineDistrict 9 | Replacement of 3 structures: 1) SN 083-7000 carrying IL 34 over a creek 1.5 miles east of Franklin County; 2) SN 083-7001 carrying IL 34 over a creek 2.4 miles east of Franklin County; 3) SN 083-7022 carrying IL 145/34 over a creek 3.2 miles south of US 45. | — | Executed | Samron Midwest Contracting, Inc. $797,387 · | ||
| Jun 13, 2025 | 78786 | FranklinDistrict 9 | 2.3 miles of resurfacing on IL 154 from IL 37 to Fitzgerrell Park Road. Also includes replacement of SN 028-0052 over Rend Lake and construction of a multi-use path. | — | Executed | E. T. Simonds Construction Company $20,462,811 · | ||
| Jun 13, 2025 | 78831 | WilliamsonDistrict 9 | Replacement of SN 100-0053 carrying Stiritz Road (TR 23) over I-57, approximately 0.6 miles west of IL 37. | — | Executed | E. T. Simonds Construction Company $4,956,078 · | ||
| Jun 13, 2025 | 78943 | FranklinDistrict 9 | 10.5 miles of milling, patching and resurfacing on IL 14 from IL 37 in Benton to west of Happy Row Road in Macedonia. | — | Executed | E. T. Simonds Construction Company $5,779,645 · | ||
| Jun 13, 2025 | 78985 | JacksonDistrict 9 | Slope repair on SN 039-0075 carrying IL 13 over the Big Muddy River, east of IL 127 in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $11,674,263 · | ||
| Jun 13, 2025 | 78A15 | UnionDistrict 9 | Culvert replacement (SN 091-7057) on Old US 51 west of Locust Street in Cobden. | — | Executed | Sierra Bravo Contractors, LLC $793,569 · | ||
| Jun 13, 2025 | 78A25 | JohnsonDistrict 9 | 0.6 miles of pavement patching, HMA resurfacing and ADA ramp improvements on IL 146 from 0.1 miles west of 11th Street to US 45 in Vienna. | — | Executed | Samron Midwest Contracting, Inc. $686,026 · | ||
| Jun 13, 2025 | 78A33 | WilliamsonDistrict 9 | Signal modifications, pedestrian crossings and sidewalks at the intersection of IL 13 and Halfway Road in Marion. | — | Executed | Brown Electric, Inc. $1,056,436 · | ||
| Jun 13, 2025 | 78A39 | GallatinWhiteDistrict 9 | Intersection reconstruction at the intersection of IL 1 and IL 141 near Omaha. | — | Executed | Samron Midwest Contracting, Inc. $1,697,173 · | ||
| Jun 13, 2025 | 78A72 | JeffersonDistrict 9 | 9.2 miles of patching and resurfacing on IL 15 from the Washington County line to 0.4 miles west of the Mt. Vernon west city limits. | — | Executed | E. T. Simonds Construction Company $2,283,905 · | ||
| Jun 13, 2025 | 78A78 | JacksonUnionDistrict 9 | Joint reconstruction with strip seal and modular seal on SN 039-0048 carrying IL3 over a railroad in Jackson County and joint reconstruction with strip seals on SN 091-0031carrying IL3 over the Big Muddy River in Union County. | — | Executed | E. T. Simonds Construction Company $968,450 · | ||
| Jun 13, 2025 | 78A92 | UnionDistrict 9 | Earth and furnished excavation and placement of stone riprap to repair existing slopes along Old US 51, 0.7 miles northwest of Coben. | — | Executed | Samron Midwest Contracting, Inc. $92,263 · | ||
| Jun 13, 2025 | 78A96 | JohnsonDistrict 9 | Bridge joint repair on SN 044-0033 carrying Eagle Point Road over I-24. | — | Executed | C-Hill Civil Contractors, Inc. $108,746 · | ||
| Jun 13, 2025 | 78A97 | JacksonDistrict 9 | Aggregate shoulders, earth and furnished excavation, stone riprap, pipe underdrains and erosion control blanket to repair existing slopes along IL 149 at SN 039-7036, 0.4 miles west of the Williamson County line west of Hurst. | — | Executed | Sierra Bravo Contractors, LLC $170,723 · | ||
| Jun 13, 2025 | 78B03 | JacksonDistrict 9 | Replacing 615' of pavement and shoulders on westbound IL 13 at Watson Road. | — | Executed | Samron Midwest Contracting, Inc. $1,041,511 · | ||
| Jun 13, 2025 | 78B04 | JacksonDistrict 9 | Patching on US 51 in Carbondale from Willow Street to Grand Avenue and on Mill Street from South Normal Avenue to South Illinois Avenue. | — | Executed | E. T. Simonds Construction Company $543,043 · | ||
| Jun 13, 2025 | 78B05 | JacksonDistrict 9 | Signal grounding at multiple locations on IL 149 and IL 13 in Murphysboro and Carbondale. | — | Executed | Gerstner Electric, Inc. $116,085 · | ||
| Jun 13, 2025 | 78B06 | SalineDistrict 9 | Signal replacement at the intersection of US 45 and Poplar Street in Harrisburg. | — | Executed | Brown Electric, Inc. $493,996 · | ||
| Jun 13, 2025 | 78B13 | WhiteDistrict 9 | 12.3 miles of resurfacing on US 45 from IL 14 to the Wayne County line as well as ADA upgrades in Enfield and Mill Shoals. | — | Executed | Howell Paving, Inc. $7,158,886 · | ||
| Jun 13, 2025 | 78B21 | PulaskiUnionDistrict 9 | 9.3 miles of tree removal on I-57 from the IL 146 interchange to the Perks Road overpass. | — | Executed | Sierra Bravo Contractors, LLC $880,649 · | ||
| Jun 13, 2025 | 78B22 | JacksonDistrict 9 | 0.85 miles of overlay and pavement patching on Airport Road from IL 13 to 1 mile north of IL 13, northwest of Carbondale. | — | Executed | E. T. Simonds Construction Company $297,405 · | ||
| Jun 13, 2025 | 78B31 | WilliamsonDistrict 9 | 1.1miles of pavement patching and resurfacing on IL 37 from 0.1 miles north of 18th Street to south of 4th Street in Johnston City. | — | Executed | E. T. Simonds Construction Company $685,210 · | ||
| Jun 13, 2025 | 78B32 | AlexanderDistrict 9 | 3.25 miles of pavement patching and partial structure removal on US 51 beginning 0.29 miles south of New Cross Street and proceeding south for 3.25 miles. | — | Executed | E. T. Simonds Construction Company $832,728 · | ||
| Jun 13, 2025 | 78B40 | VariousDistrict 9 | Electrical repair and/or maintenance on various routes throughout District 9. | — | Active | F. W. Electric, Inc. $230,826 · | ||
| Jun 13, 2025 | 87855 | BureauDistrict 3 | HMA resurfacing with aggregate shoulders on CH 24 from US 34 to CH 9. | — | Executed | Advanced Asphalt Company $2,426,250 · | ||
| Jun 13, 2025 | 87858 | IroquoisDistrict 3 | HMA Resurfacing with aggregate shoulders on CH 4 from the west village limits of Clifton to CH 24. | — | Executed | Iroquois Paving Corporation $1,783,862 · | ||
| Jun 13, 2025 | 87860 | KankakeeDistrict 3 | Resurfacing CH 41 from the Will County line to South Street. | — | Executed | Kankakee Valley Construction Company, Inc. $580,188 · | ||
| Jun 13, 2025 | 87863 | DeKalbDistrict 3 | Asphalt resurfacing of Barber Green Road, and four (4) multi-use trails at various locations in DeKalb County. Includes aggregate shoulders and PCC sidewalk. | — | Executed | Curran Contracting Company $868,058 · | ||
| Jun 13, 2025 | 87874 | KankakeeDistrict 3 | Streetscaping improvements at various locations in Grank Park. | — | Executed | M & J Underground Inc. $2,806,802 · | ||
| Jun 13, 2025 | 87882 | LaSalleDistrict 3 | Construction of a single-span PPC deck beam bridge to carry River Road over a drainage ditch, 0.7 miles west of IL 170 in Seneca. | — | Executed | D. Construction, Inc. $535,667 · | ||
| Jun 13, 2025 | 87883 | KankakeeDistrict 3 | Construction of shared-use paths at various location in Bradley. | — | Executed | M & J Underground Inc. $327,924 · | ||
| Jun 13, 2025 | 87884 | LivingstonDistrict 3 | Sidewalk construction at various locations in Dwight. | — | Rejected | D. Construction, Inc. $230,453 · | ||
| Jun 13, 2025 | 87885 | DeKalbDistrict 3 | HMA resurfacing with 3' HMA safety shoulds on Somonauk Road from Chicago Road to US 30. | — | Executed | Curran Contracting Company $881,892 · | ||
| Jun 13, 2025 | 89806 | KnoxDistrict 4 | Cold-in-place recycling and HMA surfacing on CH 25 and CH 26 from the south corporate limits of Galesburg to CH 26. | — | Executed | Gunther Construction, a div of UCM, Inc. $1,710,475 · | ||
| Jun 13, 2025 | 89859 | TazewellDistrict 4 | Pavement reconstruction, sidewalk replacement, curb and gutter replacement, storm sewer, traffic signals and lighting on Court Street from 8th Street to 10th Street in Pekin. | — | Executed | William Charles Construction Company, LLC $4,930,196 · | ||
| Jun 13, 2025 | 89866 | KnoxDistrict 4 | Construction of PCC Sidewalk with ADA Ramps along East Fifer Street from Willard Street to Morton Avenue in Galesburg. | — | Executed | Illinois Civil Contractors, Inc. $302,246 · | ||
| Jun 13, 2025 | 89869 | PeoriaDistrict 4 | Resurfacing on Cloverdale Road from west of White Clover Drive to IL 29 in Chillicothe. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $405,578 · | ||
| Jun 13, 2025 | 91631 | EdgarDistrict 5 | Construction of a three-span steel beam structure with concrete deck to carry CH 16 over Flemington Tributary in Edgar County. Includes HMA approach pavement and traffic barrier terminals. | — | Executed | Big O Services, LLC $1,648,370 · | ||
| Jun 13, 2025 | 91657 | DeWittDistrict 5 | Guardrail improvements at various locations in DeWitt County | — | Executed | Lovewell Fencing, Inc. $1,235,769 · | ||
| Jun 13, 2025 | 91756 | McLeanDistrict 5 | Roadway reconstruction and new multi-use path on West College Avenue from West of the Norfolk Southern Railroad to White Oak Street in Normal. | — | Executed | Rowe Construction, a div of UCM, Inc. $1,506,116 · | ||
| Jun 13, 2025 | 93828 | MacoupinDistrict 6 | Replace the bridge carrying CH 34 over Solomon Creet, 0.3 mile east of Bethal Road | — | Executed | C-Hill Civil Contractors, Inc. $1,520,000 · | ||
| Jun 13, 2025 | 93831 | ChristianDistrict 6 | Sidewalk replacement at various locations in Taylorville. Includes HMA resurfacing, driveway replacement, drainage improvements, ADA improvements, and Seeding. | — | Executed | Earth Worx Solutions LLC $700,361 · | ||
| Jun 13, 2025 | 93832 | SangamonDistrict 6 | Sidewalk replacement at various locations in Auburn. | — | Executed | Otto Baum Company, Inc. $223,575 · | ||
| Jun 13, 2025 | 93836 | HancockDistrict 6 | Construct a single-span PPC IL36N-Beam Bridge to carry CH 3 over Deer Creek, 0.6 mile north of Burnside. | — | Executed | County Contractors, Inc. $1,156,235 · | ||
| Jun 13, 2025 | 93837 | ChristianDistrict 6 | Resurfacing East 6 Street from Spruce Street to Minnesota Street in Pana. | — | Executed | P. H. Broughton & Sons, Inc. $235,358 · | ||
| Jun 13, 2025 | 97771 | St. ClairDistrict 8 | Patching of failed concrete pavement joints along Old Collinsville Road from Lebanon Avenue to Ashland Avenue in St. Clair County. Includes raised reflective pavement markers. | — | Executed | Kinney Contractors, Inc. $691,627 · | ||
| Jun 13, 2025 | 97834 | St. ClairDistrict 8 | Resurfacing on West Washington Street from Centreville Avenue to South Illinois Street in Belleville. | — | Executed | Stutz Excavating, Inc. $531,515 · | ||
| Jun 13, 2025 | 97848 | St. ClairDistrict 8 | Pavement widening on Maple Street from Main Street to Shiloh Heights Drive, and the construction of a right-turn lane from Maple Street onto northbound Main Street in Shiloh. | — | Executed | Stutz Excavating, Inc. $1,468,668 · | ||
| Jun 13, 2025 | 97859 | St. ClairDistrict 8 | Resurfacing Martin Luther King Drive from Collinsville Avenue to 8th Street in East St. Louis. | — | Executed | Keeley & Sons, Inc. $1,352,831 · | ||
| Jun 13, 2025 | 97860 | St. ClairDistrict 8 | Reconstruct the northwest corner of IL 3 at Monsanto Avenue, and resurface Monsanto Avenue from IL 3 east for 0.04 miles in Sauget. | — | Active | Hank's Excavating & Landscaping, Inc. $607,366 · | ||
| Jun 13, 2025 | 97864 | MonroeDistrict 8 | HMA resurfacing on CH 12 from Meyer Avenue in Valmeyer to Bluff Road North. | — | Executed | Christ Bros. Asphalt, Inc. $823,576 · | ||
| Jun 13, 2025 | 97870 | MadisonDistrict 8 | Construction of an HMA multi-use path on a lime-modified subgrade adjacent to US 40 from South Main Street to Creekside Drive in Troy. | — | Executed | Stutz Excavating, Inc. $683,304 · | ||
| Jun 13, 2025 | 99747 | FranklinDistrict 9 | Construction of stamped Concrete Sidewalk, street lighting system, Curb and gutter on IL 149 in West Frankfort. | — | Rejected | |||
| Jun 13, 2025 | 99750 | SalineDistrict 9 | Construction of a Roundabout at Small Street and Veterans Drive in Harrisburg. Includes PCC pavement, sidewalks, drainage, signing and lighting. | — | Executed | E. T. Simonds Construction Company $1,463,163 · | ||
| Jun 13, 2025 | 99751 | AlexanderDistrict 9 | Resurfacing on Ullin Road from IL 127 to the Pulaski County line. | — | Executed | E. T. Simonds Construction Company $742,951 · | ||
| Jun 13, 2025 | 99752 | PerryDistrict 9 | Replace the bridge carrying White Walnut Road over White Walnut Creek, 1.7 miles north of IL 154. | — | Executed | C-Hill Civil Contractors, Inc. $455,888 · | ||
| Jun 13, 2025 | 99753 | GallatinDistrict 9 | Resurfacing on Pounds Hallow Road from IL 1 to the Hardin County Line. | — | Executed | Samron Midwest Contracting, Inc. $741,652 · | ||
| Jun 13, 2025 | 99754 | PopeDistrict 9 | HMA overlay with aggregate shoulds on Bay City Road from west of Climer Road to Jones Orchard Road. | — | Executed | E. T. Simonds Construction Company $966,973 · | ||
| Jun 13, 2025 | 99756 | WilliamsonDistrict 9 | HMA Overlay with Aggregate Wedge Shoulders on Power Plant Road from County Club Road to McKinny Chapel Road. | — | Executed | E. T. Simonds Construction Company $660,852 · | ||
| Aug 1, 2025 | 61K77 | DuPageDistrict 1 | Construct a shared-use path along Elizabeth Drive from Forest Preserve Drive to Wood Dale Road, and Wood Dale from Murray Drive to Elizabeth Drive in Wood Dale. | — | Executed | R. W. Dunteman Company $553,433 · | ||
| Aug 1, 2025 | 61L37 | CookDistrict 1 | Reconstruction of McConnor Parkway from Meacham Road to Roosevelet Boulevard in Schaumburg. Includes HMA Roadway, Curb and Gutter, Sidewalks, Multi-Use Path, ADA Improvements, Drainage Improvements, Traffice Signal Modernization, and Lighting. | — | Executed | Plote Construction, Inc. $5,761,086 · | ||
| Aug 1, 2025 | 61L38 | CookDistrict 1 | Reconstruction of McConnor Parkway from Roosevelet Boulevard to Gold Road in Schaumburg. Includes HMA Roadway, Curb and Gutter, Sidewalks, Multi-Use Path, ADA Improvements, Drainage Improvements, Traffice Signal Modernization, and Lighting. | — | Executed | Plote Construction, Inc. $6,017,267 · | ||
| Aug 1, 2025 | 61L45 | DuPageDistrict 1 | Scarification of existing PCC pavement, and HMA resurfacing on Western Frontage Road from IL 83 to Oakleaf Drive in Addison Township. | — | Executed | R. W. Dunteman Company $495,500 · | ||
| Aug 1, 2025 | 61L46 | DuPageDistrict 1 | Construct Multi-Use Paths along various routes in Hanover Park. Includes; PCC Sidewalk, and steel plate beam guardrail. | — | Executed | A Lamp Concrete Contractors, Inc. $1,424,943 · | ||
| Aug 1, 2025 | 61L47 | DuPageDistrict 1 | HMA resurfacing and widening of Town Road from West Roosevelt Road (IL 38) to West Washington Street in West Chicago. Includes; curb and gutter, sidewalks, ADA ramps, driveways, and storm sewer. | — | Executed | Everlast Blacktop Inc. $1,807,185 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.