| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 25, 2025 | 61L31 | LakeDistrict 1 | Resurfacing, curb and gutter, and sidewalk replacement on Sheridan Road from Washington Street to south of Liberty Street in Waukegan. | — | Executed | Peter Baker & Son Co. $605,278 · | ||
| Apr 25, 2025 | 61L32 | LakeDistrict 1 | Resurfcing, curb and gutter, and sidewalk replacement on Galilee Avenue from 21st Street to 33rd Street in Zion. | — | Executed | Peter Baker & Son Co. $892,838 · | ||
| Apr 25, 2025 | 61L33 | CookDistrict 1 | Resurfacing on Shermer Road from Golf road to East Lake Avenue in Glenview. Includes; patching, curb and gutter, and ADA improvements. | — | Executed | Peter Baker & Son Co. $2,603,039 · | ||
| Apr 25, 2025 | 61L41 | CookDistrict 1 | Sidewalk removal and replacement on various routes in Evanston. | — | Executed | Triggi Construction, Inc. $396,952 · | ||
| Apr 25, 2025 | 62J72 | KaneDistrict 1 | (5,107-Ft) Designed Overlay and ADA Improvements: HMA surface removal and replacement, Class D patches, sidewalk and curb removal and replacement, drainage structures adjustments, minor traffic signal (APS) improvements, detector loops replacement, pavement markings. Located along ILL 31/ ILL 56 (State Street) from I-88 to North River Road within the Village of North Aurora | — | Executed | Geneva Construction Company LLC. $1,373,951 · | ||
| Apr 25, 2025 | 62J79 | CookDistrict 1 | IL 64: Gross Length (5.53 miles), Net Length = (5.05 miles) Frontage Rd: (500 feet) Designed Overlay, Drainage and ADA Improvements. The project is located within the City of Northlake, Villages of Melrose Park, River Forest, Stone Park, River Grove and Elmwood Park in Cook County, Illinois. | — | Executed | Plote Construction, Inc. $17,639,508 · | ||
| Apr 25, 2025 | 62R02 | CookDistrict 1 | This is a curb ramp for sidewalk ADA improvements, HMA surface removal and overlay, sidewalk removal, combination concrete curb and gutter removal and replacement, concrete sidewalk and detectable warnings, drainage structure adjustments, placement of pavement markings. This work is located on various State maintained arterial routes within Cook County. | — | Executed | Triggi Construction, Inc. $1,609,615 · | ||
| Apr 25, 2025 | 62R62 | CookDistrict 1 | (1,239-Ft) Bridge Replacement Project for Michigan City Rd., bridge over I-94 (SN 016-1068) and reconstruction of a new bridge (SN 016-8320 and a new concrete retaining wall, underpass lighting at two locations and High Mast Lighting Towers (HMLT) modifications within I-94 corridor in Cook County, Village of Dolton, IL | — | Executed | Areatha Construction Co., Inc. $12,098,192 · | ||
| Apr 25, 2025 | 62T20 | CookDistrict 1 | Hot-mix asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replaceme (1.37-Mile) Smart Overlay and pedestrian ramp (ADA) consists of hot-mix asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, concrete sidewalk removal replacement, resurfacing with hot-mix asphalt surface course, thermoplastic pavement markings. Located in the Village of Midlothian and City of Oak Forest in Bremen Township in Cook County. | — | Executed | Iroquois Paving Corporation $2,071,695 · | ||
| Apr 25, 2025 | 62T27 | WillDistrict 1 | (3,073-Ft) Bridge repairs on (S.N.099-0292), includes bridge deck scarification latex concrete overlay, joint reconstruction, bearings and substructures repair repairs and bearing painting. The roadway work encompasses concrete scarification, butt joints, asphalt overlay, removal and replacement of the median, and curb and gutter, reconstruction of a catch basin and adjustment of inlets. Located along IL 171 (N. State St.) over Fiddyment Creek in the City of Lockport in Will County, Illinois. | — | Executed | D. Construction, Inc. $1,260,740 · | ||
| Apr 25, 2025 | 62V35 | WillDistrict 1 | Hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement (4857.6-Ft) Smart overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement of thermoplastic pavement markings. Located on Illinois Route FAP 112, IL 53 (Independence Blvd), it begins N of University Pkwy and ends at Renwick Rd. in the City of Lockport in Will County. | — | Executed | Builders Paving, LLC $731,556 · | ||
| Apr 25, 2025 | 62V36 | CookDistrict 1 | Asphalt surface removal, pavement patching, resurfacing with polymerized asphalt surface course drainage struc (3.59-Mile) Smart Overlay and ADA improvements consists of asphalt surface removal, pavement patching, resurfacing with polymerized asphalt surface course drainage structures adjustment and cleaning, thermoplastic pavement markings, sidewalk curb ramps, accessible pedestrian signal (APS). Located within the municipal limits of the Village of Oak Lawn, Village of Alsip, and City of Chicago, in Cook County, IL. | — | Executed | Iroquois Paving Corporation $5,393,745 · | ||
| Apr 25, 2025 | 62V37 | KaneDistrict 1 | (2.08-Mile). Smart HMA surface removal and overlay, pavement widening, ADA curb ramp improvements, APS improvements, pavement widening, pavement markings, This project is located along IL 64 (Main Street) and begins just west of 13th Avenue and extends in an easterly direction to Kautz Road/Smith Road. This project is located within the City of St. Charles in Kane County. | — | Executed | Plote Construction, Inc. $3,811,382 · | ||
| Apr 25, 2025 | 62V38 | LakeDistrict 1 | (2.07-Mile) Pavement Patching, hot-mix asphalt surface removal and resurfacing, pavement patching, aggregate wedge shoulder and thermoplastic pavement marking. This improvement is in Village of Old Mill Creek and Unincorporated Lake Villa and Antioch Township in Lake County. | — | Executed | Peter Baker & Son Co. $682,917 · | ||
| Apr 25, 2025 | 62V41 | CookDistrict 1 | (3,705-Ft) Pavement patching, asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermoplastic pavement marking. This project in the Village of Arlington Heights, Cook County. | — | Executed | Plote Construction, Inc. $751,115 · | ||
| Apr 25, 2025 | 62V53 | McHenryDistrict 1 | Pavement patching, hot-mix asphalt surface removal, hot-mix asphalt surface and level binder resurfacing, shou (2,646-Ft) Standard Overlay consists of pavement patching, hot-mix asphalt surface removal, hot-mix asphalt surface and level binder resurfacing, shoulder and centerline rumble strips, placement of thermoplastic pavement markings on US 20 (Grant Highway) from 0.2 Miles Southeast of Harmony Road to Getty Road in Coral Township. | — | Executed | Schroeder Asphalt Services, Inc. $293,954 · | ||
| Apr 25, 2025 | 62V54 | CookDistrict 1 | (3,000-Ft) SMART Overlay, ADA Improvements HMA surface removal and resurfacing, sidewalk removal, pavement markings, combination curb and gutter removal and replacement, concrete sidewalk and detectable warnings, drainage structure adjustments and pedestrian ramp. Located on US 41 (Skokie Blvd) from South of Old Glenview Road to North of Golf Road within the Villages of Skokie. | — | Executed | Builders Paving, LLC $1,679,248 · | ||
| Apr 25, 2025 | 62V56 | CookDistrict 1 | (2.70-Mile) Standard and Designed Overlay, ADA Improvements Accessible pedestrian signal additions, pavement marking restriping. Project located on IL 171 (Archer Avenue) from South of Ogden Avenue to West of Harlem Avenue, in the Villages of Summit, McCook, and Lyons in Cook County. | — | Executed | K-Five Construction Corporation $5,412,662 · | ||
| Apr 25, 2025 | 62V61 | CookDistrict 1 | (2.55-Mile) Standard Overlay and ADA sidewalk ramp improvement, pavement patching, milling of HMA surface, placing HMA surface course and HMA binder course, drainage structures adjustment and cleaning, pavement markings, ramp improvements located on Pulaski Rd. / Crawford Ave. from S. of 123rd St to 103rd St. in the Villages of Oak Lawn, Alsip and the City of Chicago in Cook County. | — | Executed | K-Five Construction Corporation $5,275,535 · | ||
| Apr 25, 2025 | 62V73 | CookDistrict 1 | Asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, resu (2.90-Mile) Smart Overlay project consists of asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, resurfacing with asphalt binder course and asphalt surface course, pavement markings This project located on Illinois Route 68 (Dundee Rd) begins at Kane County Line and ends at IL 62 (Algonquin Rd) located within the Village of Barrington Hills in Cook County. | — | Executed | Plote Construction, Inc. $991,171 · | ||
| Apr 25, 2025 | 62V75 | LakeDistrict 1 | (2.80-Mile) SMART Overlay, Traffic Signal Modernization and ADA Ramp Improvements hot-mix asphalt surface removal, placement of hot mix surface course, pedestrian ramp improvements, pavement patching, placement of pavement markings. Location: IL 59 (Fox Lake Rd) from IL 173 to Highwoods Dr within the Village of Antioch. | — | Executed | Peter Baker & Son Co. $1,949,721 · | ||
| Apr 25, 2025 | 62V85 | CookDistrict 1 | (4.87- Mile) SMART Overlay, ADA including HMA surface course replacement. Pavement patching and curb and gutter removal and replacement. Curb ramps for sidewalks (ADA) improvements. Drainage structures adjustment and cleaning. New pavement markings and raised reflective pavement markers. Pedestrian signals improvements (APS), detector loops replacement. Location: IL 72 (Higgins Road) from I-290 (Eisenhower Expwy) going East to Northwest of Landmeier Road, within the Villages of Schaumburg and El | — | Rejected | Builders Paving, LLC $8,106,254 · | ||
| Apr 25, 2025 | 62V86 | DuPageDistrict 1 | (1.929-Mile) SMART Overlay, ADA Improvements: Removing and replace (HMA) surface course, pavement patching and curb removal and replacement, curb ramps, drainage structures adjustment and cleaning, pavement markings, raised reflective pavement markers. Pedestrian signals improvements (APS), detector loops replacement located on IL 53 (Lincoln Avenue), from North of 61st Street to 75th Street in the Villages of Woodridge and Lisle in DuPage County. | — | Executed | K-Five Construction Corporation $2,285,003 · | ||
| Apr 25, 2025 | 62V87 | CookDistrict 1 | (1.43-Mile) SMART Overlay and ADA improvement consisting of hot-mix asphalt surface removal, pavement patching, curb and gutter replacement, curb ramps for sidewalks (ADA) improvements, hot-mix asphalt resurfacing, and thermoplastic pavement markings on Western Avenue from south of Broadway Street to Interstate 57 within the City of Blue Island and the Villages of Posen and Dixmoor. | — | Executed | D. Construction, Inc. $1,137,768 · | ||
| Apr 25, 2025 | 62V89 | CookDistrict 1 | (1.27-Mile) SMART Overlay and ADA Improvements: HMA surface removal and replacement, Class D patches, sidewalk and curb removal and replacement, drainage structures adjustments, minor traffic signal (APS) improvements, detector loops replacement, pavement markings. Located along IL 72 (Higgins Road) from Audubon Street to Lexington Drive within the Villages of Hoffman Estates and Schaumburg. | — | Executed | Plote Construction, Inc. $2,516,963 · | ||
| Apr 25, 2025 | 62W50 | CookDistrict 1 | (1.08-miles) SMART Overlay, curb ramps for sidewalks (ADA) Improvements, asphalt surface removal, pavement patching, new asphalt surface, curb and gutter removal and replacement, sidewalk removal and replacement, pavement markings, raised reflective pavement markers. Location: IL 53 West Frontage Road from US 12 (Rand Rd) to Anderson Drive, located within the Village of Palatine. | — | Executed | Schroeder Asphalt Services, Inc. $458,691 · | ||
| Apr 25, 2025 | 62W56 | VariousDistrict 1 | The work under Full Expressway Nighttime Cleaning Cycle and Supplement Sweeping includes the pickup, removal, and proper disposal of debris such as limbs, sticks, leaves, sand, stones, dirt, weeds, deceased animal carcasses, refuse, litter. This work is located on various State maintained expressway routes located within the counties of Cook, DuPage, and Will. | — | Active | Interstate Business Solutions, LLC $4,828,264 · | ||
| Apr 25, 2025 | 62W59 | LakeDistrict 1 | Trombone Mast Arms replacement project including new traffic signal heads, pedestrian traffic signal heads, accessible pedestrian signals, traffic signal posts, conduits, electric cable, and handholes installations at various locations in District 1. | — | Executed | H & H Electric Co. $1,101,716 · | ||
| Apr 25, 2025 | 62W69 | KaneDistrict 1 | Pavement patching, hot-mix asphalt pavement removal and replacement combination curb and gutter removal and re (3.37-Mile) This is a standard overlay and ADA improvement. This project consists of pavement patching, hot-mix asphalt pavement removal and replacement combination curb and gutter removal and replacement, ADA pedestrian ramp improvements, thermoplastic pavement marking, sidewalk removal and replacement. This improvement is on FAU 2503: IL-25, US 30 (Aurora Avenue) within the City of Aurora in Kane County. | — | Executed | Geneva Construction Company LLC. $4,184,234 · | ||
| Apr 25, 2025 | 62X20 | CookWillDistrict 1 | (627-Ft) Bridge Painting project consisting of cleaning and painting steel surfaces. The project is located at the structure No. 1 (SN. 016-1062) carrying I-94 eastbound to I-55 southbound over Archer Avenue/BNSF and ICC RR in the City of Chicago in Cook County, and structure No. 2 (SN. 099-0198) carrying Maple Road Over I-80 in the Village of Mokena in Will County. | — | Executed | ERA-Valdivia Contractors, Inc. $649,580 · | ||
| Apr 25, 2025 | 62X22 | CookWillDistrict 1 | This is a bridge painting project includes cleaning and painting steel surfaces as designated on the plans. LOCATION #1: New Avenue over Long Run Creek Overflow City of Lockport in Will County (SN: 099-0299). LOCATION #2: US 45 over Hickory Creek Village of Frankfort in Will County (SN: 099-0293). LOCATION #3: IL 43 (Harlem Ave.) over I-80 Village of Tinley Park in Cook County (SN: 016-0325). | — | Executed | Capital Industrial Services, LLC $503,300 · | ||
| Apr 25, 2025 | 62X25 | CookDistrict 1 | Partial replacement of the bridge deck thin polymer overlay, partial depth bridge deck repair, cleaning and resealing of relief joints. This project is located at bridge SN 016-0254 on FAP route 345 (US Rte 20) over IL Route 59 and at bridge SN 016-2786 on FAP route 305 (Palatine Rd) over IL Route 21/US 45 Milwaukee Ave in Cook County, Illinois. | — | Executed | Martam Construction Incorporated $241,055 · | ||
| Apr 25, 2025 | 62X27 | CookDistrict 1 | Replacement of the bridge joint sealers, partial depth approach slab repair, concrete curb repair, concrete parapet repair, replacement of curved bridge fence. This project is located at bridge SN 016-0243 on FAP route 374 (IL Rte 21) over Union Pacific Railroad and at bridge SN 016-0309 on FAP route 348 (IL Rte 43) over Interstate 90 and CTA in Cook County, Illinois. | — | Executed | Lorig Construction Company $433,056 · | ||
| Apr 25, 2025 | 62X32 | LakeDistrict 1 | (3.38-Mile) Standard and Designed Overlay, ADA Improvements: HMA surface removal and replacement, Class D patches, sidewalk and curb removal and replacement, drainage structures adjustments, detector loops replacement, pavement markings and collateral work. Location 1) Sheridan Road (Naval Station G Street to Moffett Road), Location 2) Scranton Avenue (Green Bay Road to Sheridan Road, both located in the Village of Lake Bluff. | — | Executed | Peter Baker & Son Co. $2,996,992 · | ||
| Apr 25, 2025 | 62X39 | LakeDistrict 1 | (126-Ft) Surface Removal and HMA Overlay including guardrail and terminal removal and reinstallation, preformed joint seal removal and replacement, crack routing and filling, pavement markings. Located at the west approach of (S.N. 049-0221) on IL 120 (Belvidere Road) over I-94 in the Village of Libertyville in Lake County, and at the south approach of (S.N. 049-0209) on U.S. 41 (Skokie Highway) over IL 132 (Grand Avenue) in the Village of Gurnee in Lake County. | — | Executed | Schroeder Asphalt Services, Inc. $198,854 · | ||
| Apr 25, 2025 | 62X40 | CookDistrict 1 | Structural repair of concrete on the existing piers abutments The improvement consists of structural repair of concrete on the existing piers abutments. This improvement consists of 8 locations: (1) location is at I-57 at Wentworth Avenue (SN 016-2028) City of Chicago. (2) location is at I-57 at Union Pacific Railroad (SN 016-0071) City of Chicago (3) location is at I-57 at RR Bike Path (SN 016-0070) City of Chicago. (4) location is at I-57 at 107th Street (SN 016-2031) City of Chicago. (5) location is at I-57 at Throop Street (SN 016-2032) City of Chicago | — | Executed | ERA-Valdivia Contractors, Inc. $1,194,462 · | ||
| Apr 25, 2025 | 62X48 | McHenryDistrict 1 | (1.24- Mile) Pavement Grinding project including pavement grooving, remove and replace curb and gutter, pavement markings, concrete class B patching. IL 31 (Western Algonquin Bypass) at South Main Street to North Main Street in the Village of Algonquin within McHenry County. | — | Executed | Diamond Coring Company, Inc. $566,692 · | ||
| Apr 25, 2025 | 62X85 | WillDistrict 1 | (1.19-Mile) Pavement Patching includes asphalt surface removal, resurfacing asphalt binder and surface course, aggregate wedge shoulders, grading and shaping shoulders, pavement markings, raised reflective pavement marker. This project is located along I-55 West Frontage Road from South of Stripmine Road to IL 113 (Division Street) in the City of Wilmington and the Village of Diamond in Will County. | — | Executed | P. T. Ferro Construction Co. $410,872 · | ||
| Apr 25, 2025 | 62X92 | VariousDistrict 1 | Installing fence and gates at new locations and repairing existing damaged pedestrian barrier on a work order The work to be completed under this contract consists of installing fence and gates at new locations and repairing existing damaged pedestrian barrier on a work order basis._This work is located on various State maintained arterial and expressway routes within the counties of Cook, DuPage, Kane, Lake, McHenry and Will. | — | Executed | Fence Masters, Inc. $652,316 · | ||
| Apr 25, 2025 | 62X93 | WillDistrict 1 | Modernizing bridge lift gates at structures carrying McDonough Street and Brandon Street over the Des Plaines The work on this improvement consists of modernizing bridge lift gates at structures carrying McDonough Street and Brandon Street over the Des Plaines River. This improvement has 2 locations: the first locations is at McDonough Street (SN: 099-9904) over the Des Plaines River and the second location is at Brandon Street (SN: 099-9903) over the Des Plaines River in Will County. | — | Executed | D. Construction, Inc. $1,901,944 · | ||
| Apr 25, 2025 | 62X94 | McHenryDistrict 1 | (2.25-Mile) Roadway Reconstruction including construction of three roundabouts at Lake Street, McConnell Road and Judd Street/Irving Ave., water main, sanitary and storm sewer replacement, lighting, signing, retaining walls, ADA improvements and a building demolition from US 14 to IL 120 in the City of Woodstock and Woodstock Fire Rescue District within McHenry County. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $78,336,172 · | ||
| Apr 25, 2025 | 64N76 | HenryDistrict 2 | Intersection reconstruction including culvert replacement on US 6 and Green Riv River Rd/Osco Rd 0.3 mi W to 0.5 mi E of Osco Rd. 1,500 gross feet. | — | Executed | Phoenix Corporation of the Quad Cities $2,705,618 · | ||
| Apr 25, 2025 | 64N98 | OgleDistrict 2 | Reconstruction of the IL 38/I-39 Interchange including replacement of 2 traffic signals, construction of 1 new signal, and new roadway lighting. The project extends on IL 38 from Dement Rd east 2,150 ft. | — | Executed | William Charles Construction Company, LLC $23,945,140 · | ||
| Apr 25, 2025 | 64T76 | VariousDistrict 2 | Various routes on-call guardrail. | — | Executed | Northern Contracting, Inc. $922,284 · | ||
| Apr 25, 2025 | 64T78 | WinnebagoDistrict 2 | 1.72 miles of longitudinal joint repair along US Bus 20 420' west of Mill Rd. to Rockford College Entrance Dr. | — | Executed | Rock Road Companies, Inc. $395,040 · | ||
| Apr 25, 2025 | 64T79 | LeeDistrict 2 | Pavement patching along IL 38 from Franklin Grove to Ashton (9.22 miles gross length). | — | Executed | O'Brien Civil Works, Inc. $310,362 · | ||
| Apr 25, 2025 | 64T85 | OgleDistrict 2 | 0.10 mile HSIP improvements (pavement remarking) at IL 251 intersection. | — | Executed | Countryman, Inc. $90,474 · | ||
| Apr 25, 2025 | 64T87 | WhitesideDistrict 2 | Bridge cleaning and painting of SN 098-0095, carrying IL 84 over Johnson Creek, 2.5 miles north of IL 136 and partial bridge cleaning painting of SN 098-0096, carrying IL 84 over BNSF RR, 2 miles south of Carroll County line. | — | Executed | Three Star Painting, Inc. $245,276 · | ||
| Apr 25, 2025 | 64T89 | WhitesideDistrict 2 | Bridge cleaning and painting at SN's 098-0061 and 0062, carrying I-88 over BN RR 1.7 miles west of IL 78. | — | Executed | Three Star Painting, Inc. $339,776 · | ||
| Apr 25, 2025 | 64T92 | StephensonDistrict 2 | bridge cleaning and painting at SN's 089-0058 and 089-0059 carrying US 20 over Silver Creek, 0.5 miles east of Springfield Rd. | — | Executed | Three Star Painting, Inc. $195,000 · | ||
| Apr 25, 2025 | 64U13 | VariousDistrict 2 | LED lighting and coupling replacement on existing poles at the interchange of I-90/IL 75, IL 251 at Rockton Rd., and I-90 Welcome Center in Winnebago County. | — | Executed | |||
| Apr 25, 2025 | 64U23 | StephensonDistrict 2 | 9 miles of patching, milling, and resurfacing on IL 73 from Hickory Terrace in Lena to Wisconsin State Line. | — | Executed | Rock Road Companies, Inc. $4,096,256 · | ||
| Apr 25, 2025 | 64U31 | CarrollDistrict 2 | 7.6 miles of patching, milling and resurfacing on IL 40 from Marion Ave. in Chadwick to IL 78. | — | Executed | Martin & Company Excavating $4,435,198 · | ||
| Apr 25, 2025 | 64U32 | HenryDistrict 2 | 2.34 miles of HMA milling and resurfacing on US 6 from IL 78 in Annawan to 0.3 miles west of Bureau County Line. | — | Executed | Advanced Asphalt Company $1,442,827 · | ||
| Apr 25, 2025 | 64U34 | StephensonDistrict 2 | Bridge cleaning and painting at SN 089-0066 carrying IL 73 over Cedar Creek, 0.1 miles south of Cross St in Winslow. | — | Executed | Three Star Painting, Inc. $95,000 · | ||
| Apr 25, 2025 | 66A85 | KankakeeDistrict 3 | HMA milling and resurfacing (designed overlay), culvert replacement, pavement marking, ditch cleaning and raised reflective markers on FAS 1317 (IL 113) from the Will County Line to Edgewater Dr in Limestone, 6.14 miles gross. | — | Executed | Kankakee Valley Construction Company, Inc. $3,511,811 · | ||
| Apr 25, 2025 | 66M48 | BureauDistrict 3 | Replacing the deck and approaches, abutment conversion to semi-integral abutments, substructure repairs, slope wall replacement, roadway resurfacing, guardrail replacement as needed, a private driveway reconstruction, and pavement marking on FAP 646 (IL 40) on the south side of Buda at SN 006-0138 carrying FAP 646 over the Burlington Northern Santa Fe Railroad. | — | Executed | D. Construction, Inc. $1,939,442 · | ||
| Apr 25, 2025 | 66M99 | LivingstonDistrict 3 | Milling and resurfacing (Standard Overlay) and ADA improvement on US 24 from the Mclean Co line to 0.3 mi E of 7th St in Fairbury City, 4.32 miles gross length. | — | Executed | Iroquois Paving Corporation $2,667,505 · | ||
| Apr 25, 2025 | 66N61 | KankakeeDistrict 3 | Installation of a flashing red beacon at each of the stop controlled approaches to the intersection of IL 115 and S 7000 W Rd (Lehigh RD), and installation of a flashing yellow beacon at each of the advanced intersection warning signs adjacent to IL 115. | — | Executed | D. Construction, Inc. $165,198 · | ||
| Apr 25, 2025 | 66P37 | LivingstonDistrict 3 | Bridge repairs including paved shoulder replacement, expansion joint replacement, bearing replacement, PPC I-Beam Repairs, approach slab repairs, deck patching and other related construction items at dual Structures, 053-0007 EB and 053-0008 WB carrying O.R. 66 over the Vermilion River, 0.55 miles south of IL Route 23 in Pontiac. | — | Executed | Tobey's Construction & Cartage, Inc. $1,048,761 · | ||
| Apr 25, 2025 | 66P47 | GrundyDistrict 3 | 6.77 miles of crack and joint sealing on FAS 301 from IL-47_to Mary Ave in Coal City. | — | Executed | Denler, Inc. $62,830 · | ||
| Apr 25, 2025 | 66P48 | LivingstonDistrict 3 | Routing and filling the cracks along the centerline, as well as any significant transverse cracks, and pavement markings along various routes in Livingston County. 45.61 miles gross length. | — | Executed | Denler, Inc. $193,871 · | ||
| Apr 25, 2025 | 66P73 | GrundyDistrict 3 | Furnishing and installing Buttertfly Dynamic Message Signs on I-80 in Grundy County at M.M. 108.5 and M.M. 119.5. 1.663 miles gross length. | — | Executed | John Burns Construction Company $1,251,719 · | ||
| Apr 25, 2025 | 66P89 | BureauDistrict 3 | Removing existing inlets, storm sewer, installing inlets, paved ditch, guardrail removal and replacement, pipe drains, pipe underdrains, grading and shaping ditches and other related construction items on IL 26 from the intersection with 1950 Ave North and ending at the City County Park Rd entrance north of Princeton. 1.1 mile gross lenth. | — | Executed | Gillan Construction LLC $601,985 · | ||
| Apr 25, 2025 | 66R11 | LaSalleDistrict 3 | Aggregate Wedge Shoulder, Type B along I 39 at LaSalle county extending from Marshall County Line (M.M. 40.32) to Lee County Line (M.M. 76.85) and includes exit and entrance ramps at the IL 18, Tonica, IL 71, IL 251, Oglesby Spur, US 6, US 52 and US 34 Interchanges, 36.5 miles gross length. | — | Executed | Phoenix Corporation of the Quad Cities $704,100 · | ||
| Apr 25, 2025 | 66R12 | GrundyLaSalleDistrict 3 | Pavement patching along I-80 in LaSalle and Grundy counties_extending from east of Illinois 23 interchange (M.M.90) to Grundy county line (M.M.103), LaSalle County Line (M.M.103) to Seneca interchange (M.M.105), Brisbon interchange Grundy county, and Minooka interchange (Ridge Rd), 15 miles gross length. | — | Executed | D. Construction, Inc. $579,432 · | ||
| Apr 25, 2025 | 66R13 | KendallDistrict 3 | Pavement patching along F.A.P. Route 326 extending from IL Route 47/71 intersection (L.M. 0.00) to IL Route 47/US 34 Intersection (L.M. 2.80), 2.8 miles gross length. | — | Executed | D. Construction, Inc. $186,398 · | ||
| Apr 25, 2025 | 66R14 | KendallDistrict 3 | Roadway resurfacing along IL 47 in Kendall county and extends from Sta6811 +72.00 to STA 6852+22.00, 0.757 miles gross length. | — | Executed | D. Construction, Inc. $457,951 · | ||
| Apr 25, 2025 | 66R15 | DeKalbLaSalleDistrict 3 | Furnishing and placing Aggregate Wedge Shoulders, Type B adjacent to existing mainline pavement or stabilized shoulders along IL 23 and US 34 in LaSalle County. | — | Executed | Phoenix Corporation of the Quad Cities $199,908 · | ||
| Apr 25, 2025 | 66R16 | LaSalleDistrict 3 | 4 miles Centerline Crack Sealing beginning at 0.3 Mi South of N. 40th Rd and ends at 1.3 MI. South of US Route 34. | — | Executed | SKC Construction, Inc. $23,407 · | ||
| Apr 25, 2025 | 66R17 | IroquoisDistrict 3 | Class B pavement patching and other related construction items on US Route 24 beginning at the east ramps of I-57 Interchange and ends at the US 24/45 intersection. | — | Executed | SNC Construction, Inc. $306,453 · | ||
| Apr 25, 2025 | 66R19 | BureauDistrict 3 | Milling, resurfacing, aggregate shoulders, rumble strips, pavement marking, raised reflective pavement markers, and other related construction items on IL Route 89 beginning at the north approach pavement of SN 006-0178 and ending at Cleveland St in Ladd. It also includes the djacent I-80 Frontage Rd beginning at IL 89 intersection and ends at the Ladd Maintenance facility. | — | Executed | Advanced Asphalt Company $987,951 · | ||
| Apr 25, 2025 | 66R26 | GrundyKendallDistrict 3 | Over 70,000 feet of pavement marking in various locations in District 3. | — | Executed | Precision Pavement Markings Inc. $847,344 · | ||
| Apr 25, 2025 | 66R28 | LivingstonDistrict 3 | CMP culvert entrance removal and replacement with a Precast Concrete Box Culvert on IL 116 0.61 miles east of F.A.I Route 55. At commercial entrance (Walmart Dr). | — | Executed | H. J. Eppel & Co. $257,331 · | ||
| Apr 25, 2025 | 66R31 | GrundyLivingstonDistrict 3 | Milling and resurfacing (Designed Overlay), patching,_pavement marking and raised reflectors on FAS 298 from IL 47 in Dwight to IL 53 in Gardner, for a total of 8.1 miles. | — | Executed | D. Construction, Inc. $3,397,233 · | ||
| Apr 25, 2025 | 66R33 | KankakeeDistrict 3 | Milling and resurfacing 1 1/2" (SMART), patching, aggregate shoulders, pavement marking, and raised reflectors on FAP 332 (IL 1) from Will County Line to IL 17, 3.91 miles total. | — | Executed | Gallagher Asphalt Corporation $1,938,778 · | ||
| Apr 25, 2025 | 66R35 | KankakeeDistrict 3 | 8.84 miles milling and SMART resurfacing from 0.5 miles south of Larry Power Road to Will County Line. | — | Executed | Kankakee Valley Construction Co., Inc. & Gallagher Asphalt Corporation $19,511,604 · | ||
| Apr 25, 2025 | 66R36 | LaSalleDistrict 3 | Milling and resurfacing 2" on I 80 from 1.4 miles east of the Bureau County Line to 0.1 miles east of IL 351. Additional work includes shoulder improvement and ramp resurfacing at IL 251, 2.4 miles gross length. | — | Executed | Advanced Asphalt Company $5,338,646 · | ||
| Apr 25, 2025 | 68A65 | TazewellDistrict 4 | Resurfacing IL 9 from 350 feet east of Dillion Creek to East Street in Tazewell County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $11,849,961 · | ||
| Apr 25, 2025 | 68F43 | WarrenDistrict 4 | Designed overlay on US 34 from 0.1 mile west of 20th St to east of US 67 in Monmouth in Warren County. 7.09 miles gross. | — | Executed | Gunther Construction, a div of UCM, Inc. $9,337,044 · | ||
| Apr 25, 2025 | 68G11 | HendersonDistrict 4 | 4.69 Miles, Cold-in-place recycling on Carman Rd from US 34 to North of CH 7. | — | Executed | Gunther Construction, a div of UCM, Inc. $6,192,933 · | ||
| Apr 25, 2025 | 68G27 | TazewellDistrict 4 | Bridge repairs to SN 090-0030 carrying IL 8/IL 116 over the Illinois River. | — | Executed | William Charles Construction Company, LLC $3,383,301 · | ||
| Apr 25, 2025 | 68H42 | MercerWarrenDistrict 4 | Designed overlay along US 67 and IL 135 in Mercer and Warren Counties (>7 miles gross) and bridge preservation to SN 066-0016 carrying US 67 over Tom's Creek. | — | Executed | Gunther Construction, a div of UCM, Inc. $6,563,945 · | ||
| Apr 25, 2025 | 68H82 | TazewellDistrict 4 | PCC patching on EB I-74, patching on WB I-74 ramp to Morton Ave, pavement jacking on WB I-74 at US 150. 2.56 miles gross. | — | Executed | G. M. Sipes Construction, Inc. $409,507 · | ||
| Apr 25, 2025 | 68J18 | PeoriaDistrict 4 | Resurfacing of US24/IL 9 from Kingston Mines to W of IL 9 (E). 5.78 miles. | — | Executed | Advanced Asphalt Company $9,772,668 · | ||
| Apr 25, 2025 | 68J21 | WarrenDistrict 4 | PPP designed overlay on US 67 from north of 40th Ave and south end of BUS 67; SMART overlay on Roseville Bypass and north end of BUS 67, including IL 116 from 0.2 mile west to 0.2 mile east of US 67 west of Roseville. Approximately 6.65 miles gross length. | — | Executed | Gunther Construction, a div of UCM, Inc. $12,640,388 · | ||
| Apr 25, 2025 | 68J36 | VariousDistrict 4 | Districtwide pavement marking restoration. | — | Executed | Varsity Striping & Construction Co. $376,474 · | ||
| Apr 25, 2025 | 68K08 | PeoriaDistrict 4 | Replacing natural gas to electric generator along with concrete pad at Operations Peoria West Yard. | — | Executed | Laser Electric, Inc. $189,900 · | ||
| Apr 25, 2025 | 70991 | ChampaignDistrict 5 | 3.038 miles of standard overlay with ADA improvements and traffic signal modernization from Springfield Ave in Champaign to Curtis Rd in Savoy. | — | Executed | Cross Construction, Inc. $14,499,778 · | ||
| Apr 25, 2025 | 70G71 | VermilionDistrict 5 | Bridge deck overlay and other repairs to SN's 092-0058 and 092-0196. | — | Executed | Sangamo Construction Company $1,634,866 · | ||
| Apr 25, 2025 | 70H36 | ChampaignDistrict 5 | Traffic signal modernization and ADA improvements at the intersection of FAP 709 (US 136) with Murray Rd in Rantoul Township. | — | Executed | Champaign Signal and Lighting Co. a division of Evergreen Roadworks, LLC $647,450 · | ||
| Apr 25, 2025 | 70H39 | McLeanDistrict 5 | 1.62 miles SMART overlay project, NB and SB ramps at Towanda Interchange. | — | Executed | Rowe Construction, a div of UCM, Inc. $1,012,723 · | ||
| Apr 25, 2025 | 70H42 | ChampaignDistrict 5 | 9.72 miles of patching from Piatt County Line to Duncan Rd and ramps at Prairieview Rd in Mahomet. | — | Executed | Kinney Contractors, Inc. $829,326 · | ||
| Apr 25, 2025 | 70H43 | ChampaignVermilionDistrict 5 | Bridge deck overlay at Saline Branch Ditch east of Leverette; at Fountain Creek 0.2 mi south 4300 North north of East Lynn. | — | Executed | Stark Excavating, Inc. $349,587 · | ||
| Apr 25, 2025 | 70H47 | VariousDistrict 5 | Bridge Painting of 4 Structure locations on various routes in Mclean, Douglas, Dewitt and Piatt Counties. | — | Executed | Three Star Painting, Inc. $402,640 · | ||
| Apr 25, 2025 | 70H50 | DeWittDistrict 5 | Bridge deck repairs, IL-54 over Salt Creek SN 020-0020. | — | Executed | Freesen, a div of UCM, Inc. $517,733 · | ||
| Apr 25, 2025 | 70H54 | ChampaignDistrict 5 | Patching FAI 57 (I 57) at the I-72 interchange in Champaign, 1.705 miles gross. | — | Executed | Beniach Construction Co., Inc. $445,307 · | ||
| Apr 25, 2025 | 70H56 | PiattDistrict 5 | 3.81 miles of microsurfacing joint repair 1 mile east of 900E Rd to 1.3 miles west of Champaign County Line. | — | Executed | Beniach Construction Co., Inc. $345,053 · | ||
| Apr 25, 2025 | 72040 | SangamonDistrict 6 | 1.9 miles of patching, HMA surface removal, HMA overlay, curb and gutter replacement and sidewalk ramp improvements on 9th Street (Peoria Road) from north of Madison Street to south of Sangamon Avenue. | — | Executed | Truman L. Flatt & Sons Co., Inc. $1,821,344 · | ||
| Apr 25, 2025 | 72220 | LoganDistrict 6 | Bridge deck replacement on SN 054-0050 and 054-0051 carrying I-155 northbound over I-55 southbound and I-155 southbound ramp over I-155 northbound, northwest of Lincoln (I-55/I-155 Interchange). | — | Executed | Sangamo Construction Company $4,994,242 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.