(068-2323.3-CF)BR,I 24
- Let date
- Friday, April 25, 2025
- Contract
- 62X40 · job page
- District
- District 1
- County
- Cook
- Highway
- Limits
- The improvement consists of structural repair of concrete on the existing piers abutments. This improvement consists of 8 locations: (1) location is at I-57 at Wentworth Avenue (SN 016-2028) City of Chicago. (2) location is at I-57 at Union Pacific Railroad (SN 016-0071) City of Chicago (3) location is at I-57 at RR Bike Path (SN 016-0070) City of Chicago. (4) location is at I-57 at 107th Street (SN 016-2031) City of Chicago. (5) location is at I-57 at Throop Street (SN 016-2032) City of Chicago
- Classification
- Structural repair of concrete on the existing piers abutments ·
- Project number
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | ERA-Valdivia Contractors, Inc. Low bidder | $1,194,462 | ||
| 2 | D. Construction, Inc. | $1,327,163 | +11.1% | |
| 3 | Areatha Construction Co., Inc. | $1,343,754 | +12.5% | |
| 4 | Rausch Infrastructure, LLC | $1,345,711 | +12.7% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 ERA-Valdivia Co… | #2 D. Construction… | #3 Areatha Constru… | #4 Rausch Infrastr… |
|---|---|---|---|---|---|---|---|---|---|
| 1 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $1,000.00 | $6,000.00 | $2,500.00 | $5,500.00 | |
| 2 | X7011015 | TR C-PROT EXPRESSWAYS | 1 | L SUM | $50,750.00 | $138,000.00 | $250,000.00 | $230,000.00 | |
| 3 | X7013820 | TR CONT SURVEIL EXPWY | 35 | CAL DA | $575.00 | $0.0100 | $500.00 | $500.00 | |
| 4 | X7830050 | RRPM REFLECTOR REMOVL | 10 | EACH | $50.00 | $50.00 | $25.00 | $31.00 | |
| 5 | X7830052 | RRPM REFLECTOR REPLAC | 10 | EACH | $50.00 | $165.00 | $25.00 | $31.00 | |
| 6 | X8211002 | PROT-MAINT EX UP LUM | 1 | L SUM | $25,000.00 | $40,000.00 | $7,500.00 | $25,000.00 | |
| 7 | Z0012754 | STR REP CON DP = < 5 | 4,636 | SQ FT | $157.00 | $155.00 | $159.95 | $120.00 | |
| 8 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $15,000.00 | $5,000.00 | $16,261.55 | $25,000.00 | |
| 9 | Z0073200 | TEMP SHORING & CRIB | 11 | EACH | $15,750.00 | $10,000.00 | $9,506.60 | $12,000.00 | |
| 10 | 63301210 | REM RE-E SPBGR TY A | 26 | FOOT | $75.00 | $250.00 | $49.25 | $61.00 | |
| 11 | 67100100 | MOBILIZATION | 1 | L SUM | $45,000.00 | $72,000.00 | $80,553.00 | $80,000.00 | |
| 12 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $7,500.00 | $15,000.00 | $441.95 | $14,000.00 | |
| 13 | 70300150 | SHRT TRM PAVT MK REM | 800 | SQ FT | $0.6300 | $3.00 | $0.5500 | $0.6000 | |
| 14 | 70307120 | TEMP PVT MK L4 T4 TAPE | 1,928 | FOOT | $1.75 | $4.00 | $1.50 | $1.80 | |
| 15 | 70307140 | TEMP PVT MK L8 T4 TAPE | 208 | FOOT | $3.50 | $8.00 | $3.00 | $3.70 | |
| 16 | 70307160 | TEMP PVT MK L12 T4 TAPE | 37 | FOOT | $9.25 | $12.00 | $8.00 | $10.00 | |
| 17 | 70400100 | TEMP CONC BARRIER | 1,287.5 | FOOT | $39.00 | $35.00 | $28.20 | $92.00 | |
| 18 | 70400200 | REL TEMP CONC BARRIER | 725 | FOOT | $9.00 | $20.00 | $17.65 | $33.00 | |
| 19 | 70600260 | IMP ATTN TEMP FRN TL3 | 4 | EACH | $7,500.00 | $6,500.00 | $5,516.00 | $6,900.00 | |
| 20 | 70600332 | IMP ATTN REL FRN TL3 | 2 | EACH | $3,000.00 | $2,500.00 | $2,192.00 | $2,700.00 | |
| 21 | 78000200 | THPL PVT MK LINE 4 | 329 | FOOT | $7.00 | $16.50 | $6.00 | $7.50 | |
| 22 | 78000500 | THPL PVT MK LINE 8 | 808 | FOOT | $9.25 | $27.50 | $8.00 | $10.00 | |
| 23 | 78000600 | THPL PVT MK LINE 12 | 268 | FOOT | $11.50 | $38.50 | $10.00 | $12.50 | |
| 24 | 78300202 | PVT MKG REM WTR BLAST | 898 | SQ FT | $5.00 | $8.00 | $3.00 | $3.70 |