| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 7, 2025 | 76T84 | RandolphDistrict 8 | 4 miles of microsurfacing on IL 4 from 0.2 miles south of IL 13 to 0.1 miles north of VFW Drive in Sparta. | — | Executed | A. C. Pavement Striping Co. $416,962 · | ||
| Mar 7, 2025 | 76T85 | St. ClairDistrict 8 | 5 miles of longitudinal partial depth patching on I-64 from 0.1 miles west of 15th Street to 0.2 miles west of IL 157. | — | Executed | Christ Bros. Asphalt, Inc. $3,895,613 · | ||
| Mar 7, 2025 | 76T97 | VariousDistrict 8 | Pavement patching at various locations throughout District 8. | — | Executed | Kinney Contractors, Inc. $1,950,920 · | ||
| Mar 7, 2025 | 76U15 | MadisonDistrict 8 | 0.8 miles of patching and resurfacing on IL 162 from 0.4 miles west of I-255 to 0.4 miles east of I-255. | — | Executed | The Kilian Corporation $564,097 · | ||
| Mar 7, 2025 | 76U17 | St. ClairDistrict 8 | Bridge deck repairs on 5 structures carrying I-64 over various routes and railroads. | — | Executed | Keeley & Sons, Inc. $1,087,066 · | ||
| Mar 7, 2025 | 76U20 | MadisonDistrict 8 | 0.7 miles of chip seal on West Delmar Avenue from State Street in Alton to IL 3 in Godfrey. | — | Rejected | DMS Contracting, Inc. $107,062 · | ||
| Mar 7, 2025 | 76U28 | St. ClairDistrict 8 | Resurfacing on CH 42 (Foley Drive) from IL 157 in Cahokia Heights to 0.1 miles west of Gerold Lane in Belleville. | — | Executed | Christ Bros. Asphalt, Inc. $1,985,692 · | ||
| Mar 7, 2025 | 76U29 | WashingtonDistrict 8 | 8 miles of patching on I-64 from 0.9 miles west of CH 11 to the Jefferson County line. | — | Executed | E. T. Simonds Construction Company $2,422,705 · | ||
| Mar 7, 2025 | 78844 | HardinDistrict 9 | Box culvert replacement on IL 34 over Tributary of Pinhook Creek, about 0.7 miles south of the Pope County line and on IL 34 over a Ditch located 1.5 miles north of IL 146 and approximately 0.5 miles south of Eichorn. | — | Executed | Sierra Bravo Contractors, LLC $897,358 · | ||
| Mar 7, 2025 | 78A38 | WhiteDistrict 9 | Reconstruction of IL 1 and US 45 intersection in Norris City with improved turning radii and island crosswalks. | — | Executed | Samron Midwest Contracting, Inc. $1,668,898 · | ||
| Mar 7, 2025 | 78A90 | JohnsonDistrict 9 | 9.7 miles of resurfacing on IL 146 from Old Metropolis Road to the Pope County line. | — | Executed | Samron Midwest Contracting, Inc. $3,367,965 · | ||
| Mar 7, 2025 | 78A91 | UnionDistrict 9 | Installing PCC shoulders, curb and gutter, earth and furnished excavation, and riprap for slope repairs on US 51 near SN 091-2001, 3.8 miles north of Anna. | — | Executed | Sierra Bravo Contractors, LLC $359,872 · | ||
| Mar 7, 2025 | 78B01 | WhiteDistrict 9 | 667' of pavement removal, installation of 10- PCC pavement and ADA ramp reconstruction on IL 1 from South Street to Mill Street in Grayville. | — | Executed | Samron Midwest Contracting, Inc. $659,683 · | ||
| Mar 7, 2025 | 85765 | Rock IslandDistrict 2 | Construction of a PCC shared-use path with curb and gutter, earth shoulders, drainage structures, storm sewer, and more along 10th Street from Avenue of the Cities to Crosstown Avenue in Silvis. | — | Executed | Phoenix Corporation of the Quad Cities $1,156,075 · | ||
| Mar 7, 2025 | 85768 | OgleDistrict 2 | HMA Overlay with HMA Shoulders on Tower Road from Water Road to Montague Road north of Byron. | — | Executed | Martin & Company Excavating $534,977 · | ||
| Mar 7, 2025 | 85775 | LeeDistrict 2 | Surface Profile Milling, Cold-in-Place Recycling, and HMA Resurfacing on Perry Road from IL 251 to the BNSF Railroad in Steward. | — | Executed | Martin & Company Excavating $640,103 · | ||
| Mar 7, 2025 | 87738 | BureauDistrict 3 | Construct a single span PPC deck beam bridge to carrying 600 Avenue North over Silver Creek. | — | Executed | Curnyn Construction Co. $429,897 · | ||
| Mar 7, 2025 | 87769 | IroquoisDistrict 3 | Replace the bridge carrying 100 East Road over a tributary to Little Mud Creek, 3 miles northwest of Cissna Park. | — | Executed | Iroquois Paving Corporation $785,132 · | ||
| Mar 7, 2025 | 87850 | IroquoisDistrict 3 | Removal of the existing sub-structure, and construction of a new concrete stub abutments, bearing and joint replacement, and reconstruction of the approaches to the bridge carrying CH 31 over the Iroquois River, one mile north of Watseka. | — | Executed | Iroquois Paving Corporation $1,179,351 · | ||
| Mar 7, 2025 | 87853 | LaSalleDistrict 3 | Replace the bridge carrying Kelly Street over Prairie Creek, north of Bluff Street. | — | Executed | D. Construction, Inc. $852,364 · | ||
| Mar 7, 2025 | 87861 | LaSalleDistrict 3 | HMA resurfacing wiht HMA and Aggregate shoulders on County Highway 51 from Old Chicago Road to the City of Marseilles. | — | Executed | Advanced Asphalt Company $1,516,752 · | ||
| Mar 7, 2025 | 87866 | DeKalbDistrict 3 | Reconstrut the intersection of Glidden Road and Baseline Road. | — | Executed | Martin & Company Excavating $442,950 · | ||
| Mar 7, 2025 | 87875 | DeKalbDistrict 3 | Reconstruction of Main Street between BNSF Railroad and Knights Road in Sandwich. Work includes fulldepth pavement reclamation, PCC and HMA Pavement, sidewalks, curb and gutter, and storm sewers. | — | Executed | Fischer Excavating, Inc. $4,466,099 · | ||
| Mar 7, 2025 | 87876 | LaSalleDistrict 3 | Construct a PCC Shared-use path with a pedestrian bridge over Il 125. This project is located south of Wenzel Road in the City of Peru. | — | Executed | D. Construction, Inc. $4,565,811 · | ||
| Mar 7, 2025 | 87877 | LaSalleDistrict 3 | Resurfacing and Shoulder Widening on CH 4 from CH 15 to the Grundy County Line. | — | Executed | D. Construction, Inc. $1,868,000 · | ||
| Mar 7, 2025 | 87878 | LaSalleDistrict 3 | Resurfacing and shoulder widening on CH 4 from IL 71 to CH 15. | — | Executed | Advanced Asphalt Company $1,448,524 · | ||
| Mar 7, 2025 | 87879 | LaSalleDistrict 3 | HMA resurfacing of Iowa Avenue, Proter Street, and Bronson Street from Main Street to Johnson Street in Streator. Inlcudes Curb and Gutter, sidewalks, and storm sewers. | — | Executed | Advanced Asphalt Company $1,674,922 · | ||
| Mar 7, 2025 | 89818 | TazewellDistrict 4 | Reconstruction of Camp Street and Riverside Drive intersection in East Peoria. Work includes PCC pavement, HMA overlay, asphalt shoulders, curb and gutter, storm sewer, and traffic signals. | — | Executed | Otto Baum Company, Inc. $2,668,000 · | ||
| Mar 7, 2025 | 89860 | FultonDistrict 4 | Bituminous Surface Treatment Class A-1 on various county highways in Fulton County | — | Executed | A. C. Pavement Striping Co. $1,034,857 · | ||
| Mar 7, 2025 | 91628 | McLeanDistrict 5 | Sidewalk construction and replacement, traffic improvements at various locations in Colfax. | — | Executed | Phoenix Corporation of the Quad Cities $314,690 · | ||
| Mar 7, 2025 | 91640 | McLeanDistrict 5 | Construction of an 3.9 mile Shared-use Path and parking lot along US 66 in the Village of McLean. | — | Executed | Rowe Construction, a div of UCM, Inc. $3,355,065 · | ||
| Mar 7, 2025 | 91644 | McLeanDistrict 5 | HMA Resurfacing, Widening, Curb and Gutter, and Shoulder Rumble Strips on PJ Keller Highway (CH 8) from lake Bloomington Spillway to I-55 Overpass. | — | Executed | Rowe Construction, a div of UCM, Inc. $3,188,964 · | ||
| Mar 7, 2025 | 95971 | FayetteDistrict 7 | Reconstruction of Randolph Street from west of Shelby Avenue to Sunset Drive in Vandalia. | — | Executed | Baxmeyer Construction, Inc. $693,518 · | ||
| Mar 7, 2025 | 97793 | MadisonDistrict 8 | Reconstruction of the IL 159 and Glen Carbon Road Intersection in Glen Carbon to create North and East Bound Right Turn Lanes. | — | Executed | Keller Construction, Inc. $1,439,471 · | ||
| Mar 7, 2025 | 97842 | St. ClairDistrict 8 | Resurface Sullivan Drive from Huntwood Drive to IL 161. | — | Executed | The Kilian Corporation $1,155,943 · | ||
| Mar 7, 2025 | 97854 | JerseyDistrict 8 | HMA resurfacing with HMA shoulders on Otterville Road from Main Street in Otterville to IL 3 in Jersey County. Includes rumble strips, drainage improvements, and signage. | — | Executed | Charles E. Mahoney Co. $4,379,708 · | ||
| Mar 7, 2025 | 97855 | St. ClairDistrict 8 | Resurfacing Kingsbury Drive from North 17th Street to Kenwood Drive, Kenwood Drive to Gilbert Street, and Gilbert Street from Kenwood to Kinsella Avenue in Swansea. | — | Executed | |||
| Mar 7, 2025 | 97856 | MadisonDistrict 8 | Construction of a Shared-Use Path along Glen Carbon Road from Lakewood Drive to Oakdale Lake Drive in Glen Carbon. | — | Executed | Baxmeyer Construction, Inc. $954,648 · | ||
| Apr 25, 2025 | 46657 | VariousDistrict 7 | Removal and replacement of existing interstate guide signs and logo signs, including the transfer of the business service signs, at various locations on I-70 from Exit 119 to Exit 154. | — | Executed | COLLINS & HERMANN, INC. $656,964 · | ||
| Apr 25, 2025 | 46659 | VariousDistrict 2 | Placing various widths of Preformed Plastic and Modified Urethane pavement marking lines, letters, and symbols within the limits specified on each individual work order within District 2. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $3,447,500 · | ||
| Apr 25, 2025 | 46660 | VariousDistrict 2 | Removing and replacing reflectors, removing damaged raised reflective pavement marker castings, and placing new raised reflective pavement marker castings within the limits shown on each individual work order within District 2. | — | Executed | P & P Construction Co. $1,683,900 · | ||
| Apr 25, 2025 | 46662 | VariousDistrict 3 | Removing and replacing raised reflective pavement markers and reflectors in Bureau, Grundy, Kendall, LaSalle, and Putnam Counties. | — | Executed | Marking Specialists Corporation $412,448 · | ||
| Apr 25, 2025 | 46663 | VariousDistrict 3 | Removing and replacing raised reflective pavement markers and reflectors_on various highways in Ford, Iroquois, Kankakee, and Livingston Counties. | — | Executed | Marking Specialists Corporation $583,460 · | ||
| Apr 25, 2025 | 46666 | VariousDistrict 2 | Maintenance of signs and delineators along state maintained routes in District 2. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $696,970 · | ||
| Apr 25, 2025 | 46940 | GrundyDistrict 3 | Roadway and parking lot improvements (HMA resurfacing, removal and replacement of existing parking lot, drainage improvements, ADA sidewalk, and pavement marking and other work) within the_Goose Lake Prairie State Natural Area in Grundy County. 1.4 miles gross length internal park roads. | — | Executed | D. Construction, Inc. $1,889,874 · | ||
| Apr 25, 2025 | 46945 | DouglasDistrict 5 | HMA resurfacing of roadway and parking areas, striping of parking areas, culvert replacements, sign replacements, aggregate resurfacing of camp sites and hunting lots, guardrail replacement, dump station reconstruction, site lighting replacements, installation of electric vehicle charging stations, and other miscellaneous improvement items at the Walnut Point State Park (IDNR) in Douglas County. 5.1 miles gross length. | — | Executed | Feutz Contractors, Inc. $3,572,604 · | ||
| Apr 25, 2025 | 61G79 | DuPageDistrict 1 | Widening the North Aurora road underpass and construction of railroad Bridges to carry WCL and BNSF Railways over North Aurora Road in Naperville. | — | Executed | OHLA Central, Inc. $33,197,030 · | ||
| Apr 25, 2025 | 61K19 | CookDistrict 1 | HMA resurfacing on Landmeier Road from Lively Boulevard to Cambridge Drive in Grove Village. Includes; patching, curb and gutter, storm sewer, sidewalks, traffic signal relocation, and ADA improvements. | — | Rejected | R. W. Dunteman Company $1,589,589 · | ||
| Apr 25, 2025 | 61K26 | KaneDistrict 1 | Replace the bridge carrying TR 2110 over the CN Railroad, 0.5 mile north of Bowes Road. | — | Executed | Rausch Infrastructure, LLC $3,894,087 · | ||
| Apr 25, 2025 | 61K44 | WillDistrict 1 | Construct an HMA shared-use path with pedestrial bridge and two boardwalks from 265th strett to the south end of the existing trail south of Burville Rd. | — | Executed | D. Construction, Inc. $3,654,428 · | ||
| Apr 25, 2025 | 61K61 | WillDistrict 1 | Construction of three 7'X 5' precast concrete box culverts to carry Woodcreek Drive over Lily Cache Lane Tributary in Bollingbrook. Includes; lighting, HMA Pavement, curb and gutter, and sidewalks. | — | Executed | D. Construction, Inc. $753,049 · | ||
| Apr 25, 2025 | 61K79 | DuPageDistrict 1 | Construct HMA bike paths at various locations in Carol Stream. | — | Executed | Everlast Blacktop Inc. $871,518 · | ||
| Apr 25, 2025 | 61K95 | DuPageDistrict 1 | HMA resurfacing on Lombard Rod from Army Trail Boulevard to Lake Street in Addison. Includes; ADA improvements, storm sewers, and Landscaping. | — | Executed | R. W. Dunteman Company $1,638,372 · | ||
| Apr 25, 2025 | 61L06 | CookDistrict 1 | Construct a shared-use path and roadway reconstruction at various locations in Park Forest. | — | Executed | D. Construction, Inc. $6,160,173 · | ||
| Apr 25, 2025 | 61L18 | McHenryDistrict 1 | HMA roadway reconstruction and construction of a shared-use path from Washington Street to IL 176 on Prospect Street and on IL 176 from Prospect Street east for 600 feet, in the city of Marengo. Includes; storm sewer and parkway restoration. | — | Executed | PirTano Construction Co., LLC $3,549,900 · | ||
| Apr 25, 2025 | 61L22 | CookDistrict 1 | HMA resurfacing on North Avenue from Oak Avenue to Lake Street in Bartlett. Includes patching, sidewalks, and curb and gutter. | — | Executed | Everlast Blacktop Inc. $935,775 · | ||
| Apr 25, 2025 | 61L29 | DuPageDistrict 1 | HMA resurfacing on Fairfield Way between Lake Street and Bloomingdale Road in Bloomingdale. Includes; Patching, curb and gutter, and frame and grate adjustments. | — | Executed | Builders Paving, LLC $1,534,281 · | ||
| Apr 25, 2025 | 61L31 | LakeDistrict 1 | Resurfacing, curb and gutter, and sidewalk replacement on Sheridan Road from Washington Street to south of Liberty Street in Waukegan. | — | Executed | Peter Baker & Son Co. $605,278 · | ||
| Apr 25, 2025 | 61L32 | LakeDistrict 1 | Resurfcing, curb and gutter, and sidewalk replacement on Galilee Avenue from 21st Street to 33rd Street in Zion. | — | Executed | Peter Baker & Son Co. $892,838 · | ||
| Apr 25, 2025 | 61L33 | CookDistrict 1 | Resurfacing on Shermer Road from Golf road to East Lake Avenue in Glenview. Includes; patching, curb and gutter, and ADA improvements. | — | Executed | Peter Baker & Son Co. $2,603,039 · | ||
| Apr 25, 2025 | 61L41 | CookDistrict 1 | Sidewalk removal and replacement on various routes in Evanston. | — | Executed | Triggi Construction, Inc. $396,952 · | ||
| Apr 25, 2025 | 62J72 | KaneDistrict 1 | (5,107-Ft) Designed Overlay and ADA Improvements: HMA surface removal and replacement, Class D patches, sidewalk and curb removal and replacement, drainage structures adjustments, minor traffic signal (APS) improvements, detector loops replacement, pavement markings. Located along ILL 31/ ILL 56 (State Street) from I-88 to North River Road within the Village of North Aurora | — | Executed | Geneva Construction Company LLC. $1,373,951 · | ||
| Apr 25, 2025 | 62J79 | CookDistrict 1 | IL 64: Gross Length (5.53 miles), Net Length = (5.05 miles) Frontage Rd: (500 feet) Designed Overlay, Drainage and ADA Improvements. The project is located within the City of Northlake, Villages of Melrose Park, River Forest, Stone Park, River Grove and Elmwood Park in Cook County, Illinois. | — | Executed | Plote Construction, Inc. $17,639,508 · | ||
| Apr 25, 2025 | 62R02 | CookDistrict 1 | This is a curb ramp for sidewalk ADA improvements, HMA surface removal and overlay, sidewalk removal, combination concrete curb and gutter removal and replacement, concrete sidewalk and detectable warnings, drainage structure adjustments, placement of pavement markings. This work is located on various State maintained arterial routes within Cook County. | — | Executed | Triggi Construction, Inc. $1,609,615 · | ||
| Apr 25, 2025 | 62R62 | CookDistrict 1 | (1,239-Ft) Bridge Replacement Project for Michigan City Rd., bridge over I-94 (SN 016-1068) and reconstruction of a new bridge (SN 016-8320 and a new concrete retaining wall, underpass lighting at two locations and High Mast Lighting Towers (HMLT) modifications within I-94 corridor in Cook County, Village of Dolton, IL | — | Executed | Areatha Construction Co., Inc. $12,098,192 · | ||
| Apr 25, 2025 | 62T20 | CookDistrict 1 | Hot-mix asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replaceme (1.37-Mile) Smart Overlay and pedestrian ramp (ADA) consists of hot-mix asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, concrete sidewalk removal replacement, resurfacing with hot-mix asphalt surface course, thermoplastic pavement markings. Located in the Village of Midlothian and City of Oak Forest in Bremen Township in Cook County. | — | Executed | Iroquois Paving Corporation $2,071,695 · | ||
| Apr 25, 2025 | 62T27 | WillDistrict 1 | (3,073-Ft) Bridge repairs on (S.N.099-0292), includes bridge deck scarification latex concrete overlay, joint reconstruction, bearings and substructures repair repairs and bearing painting. The roadway work encompasses concrete scarification, butt joints, asphalt overlay, removal and replacement of the median, and curb and gutter, reconstruction of a catch basin and adjustment of inlets. Located along IL 171 (N. State St.) over Fiddyment Creek in the City of Lockport in Will County, Illinois. | — | Executed | D. Construction, Inc. $1,260,740 · | ||
| Apr 25, 2025 | 62V35 | WillDistrict 1 | Hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement (4857.6-Ft) Smart overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement of thermoplastic pavement markings. Located on Illinois Route FAP 112, IL 53 (Independence Blvd), it begins N of University Pkwy and ends at Renwick Rd. in the City of Lockport in Will County. | — | Executed | Builders Paving, LLC $731,556 · | ||
| Apr 25, 2025 | 62V36 | CookDistrict 1 | Asphalt surface removal, pavement patching, resurfacing with polymerized asphalt surface course drainage struc (3.59-Mile) Smart Overlay and ADA improvements consists of asphalt surface removal, pavement patching, resurfacing with polymerized asphalt surface course drainage structures adjustment and cleaning, thermoplastic pavement markings, sidewalk curb ramps, accessible pedestrian signal (APS). Located within the municipal limits of the Village of Oak Lawn, Village of Alsip, and City of Chicago, in Cook County, IL. | — | Executed | Iroquois Paving Corporation $5,393,745 · | ||
| Apr 25, 2025 | 62V37 | KaneDistrict 1 | (2.08-Mile). Smart HMA surface removal and overlay, pavement widening, ADA curb ramp improvements, APS improvements, pavement widening, pavement markings, This project is located along IL 64 (Main Street) and begins just west of 13th Avenue and extends in an easterly direction to Kautz Road/Smith Road. This project is located within the City of St. Charles in Kane County. | — | Executed | Plote Construction, Inc. $3,811,382 · | ||
| Apr 25, 2025 | 62V38 | LakeDistrict 1 | (2.07-Mile) Pavement Patching, hot-mix asphalt surface removal and resurfacing, pavement patching, aggregate wedge shoulder and thermoplastic pavement marking. This improvement is in Village of Old Mill Creek and Unincorporated Lake Villa and Antioch Township in Lake County. | — | Executed | Peter Baker & Son Co. $682,917 · | ||
| Apr 25, 2025 | 62V41 | CookDistrict 1 | (3,705-Ft) Pavement patching, asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermoplastic pavement marking. This project in the Village of Arlington Heights, Cook County. | — | Executed | Plote Construction, Inc. $751,115 · | ||
| Apr 25, 2025 | 62V53 | McHenryDistrict 1 | Pavement patching, hot-mix asphalt surface removal, hot-mix asphalt surface and level binder resurfacing, shou (2,646-Ft) Standard Overlay consists of pavement patching, hot-mix asphalt surface removal, hot-mix asphalt surface and level binder resurfacing, shoulder and centerline rumble strips, placement of thermoplastic pavement markings on US 20 (Grant Highway) from 0.2 Miles Southeast of Harmony Road to Getty Road in Coral Township. | — | Executed | Schroeder Asphalt Services, Inc. $293,954 · | ||
| Apr 25, 2025 | 62V54 | CookDistrict 1 | (3,000-Ft) SMART Overlay, ADA Improvements HMA surface removal and resurfacing, sidewalk removal, pavement markings, combination curb and gutter removal and replacement, concrete sidewalk and detectable warnings, drainage structure adjustments and pedestrian ramp. Located on US 41 (Skokie Blvd) from South of Old Glenview Road to North of Golf Road within the Villages of Skokie. | — | Executed | Builders Paving, LLC $1,679,248 · | ||
| Apr 25, 2025 | 62V56 | CookDistrict 1 | (2.70-Mile) Standard and Designed Overlay, ADA Improvements Accessible pedestrian signal additions, pavement marking restriping. Project located on IL 171 (Archer Avenue) from South of Ogden Avenue to West of Harlem Avenue, in the Villages of Summit, McCook, and Lyons in Cook County. | — | Executed | K-Five Construction Corporation $5,412,662 · | ||
| Apr 25, 2025 | 62V61 | CookDistrict 1 | (2.55-Mile) Standard Overlay and ADA sidewalk ramp improvement, pavement patching, milling of HMA surface, placing HMA surface course and HMA binder course, drainage structures adjustment and cleaning, pavement markings, ramp improvements located on Pulaski Rd. / Crawford Ave. from S. of 123rd St to 103rd St. in the Villages of Oak Lawn, Alsip and the City of Chicago in Cook County. | — | Executed | K-Five Construction Corporation $5,275,535 · | ||
| Apr 25, 2025 | 62V73 | CookDistrict 1 | Asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, resu (2.90-Mile) Smart Overlay project consists of asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, resurfacing with asphalt binder course and asphalt surface course, pavement markings This project located on Illinois Route 68 (Dundee Rd) begins at Kane County Line and ends at IL 62 (Algonquin Rd) located within the Village of Barrington Hills in Cook County. | — | Executed | Plote Construction, Inc. $991,171 · | ||
| Apr 25, 2025 | 62V75 | LakeDistrict 1 | (2.80-Mile) SMART Overlay, Traffic Signal Modernization and ADA Ramp Improvements hot-mix asphalt surface removal, placement of hot mix surface course, pedestrian ramp improvements, pavement patching, placement of pavement markings. Location: IL 59 (Fox Lake Rd) from IL 173 to Highwoods Dr within the Village of Antioch. | — | Executed | Peter Baker & Son Co. $1,949,721 · | ||
| Apr 25, 2025 | 62V85 | CookDistrict 1 | (4.87- Mile) SMART Overlay, ADA including HMA surface course replacement. Pavement patching and curb and gutter removal and replacement. Curb ramps for sidewalks (ADA) improvements. Drainage structures adjustment and cleaning. New pavement markings and raised reflective pavement markers. Pedestrian signals improvements (APS), detector loops replacement. Location: IL 72 (Higgins Road) from I-290 (Eisenhower Expwy) going East to Northwest of Landmeier Road, within the Villages of Schaumburg and El | — | Rejected | Builders Paving, LLC $8,106,254 · | ||
| Apr 25, 2025 | 62V86 | DuPageDistrict 1 | (1.929-Mile) SMART Overlay, ADA Improvements: Removing and replace (HMA) surface course, pavement patching and curb removal and replacement, curb ramps, drainage structures adjustment and cleaning, pavement markings, raised reflective pavement markers. Pedestrian signals improvements (APS), detector loops replacement located on IL 53 (Lincoln Avenue), from North of 61st Street to 75th Street in the Villages of Woodridge and Lisle in DuPage County. | — | Executed | K-Five Construction Corporation $2,285,003 · | ||
| Apr 25, 2025 | 62V87 | CookDistrict 1 | (1.43-Mile) SMART Overlay and ADA improvement consisting of hot-mix asphalt surface removal, pavement patching, curb and gutter replacement, curb ramps for sidewalks (ADA) improvements, hot-mix asphalt resurfacing, and thermoplastic pavement markings on Western Avenue from south of Broadway Street to Interstate 57 within the City of Blue Island and the Villages of Posen and Dixmoor. | — | Executed | D. Construction, Inc. $1,137,768 · | ||
| Apr 25, 2025 | 62V89 | CookDistrict 1 | (1.27-Mile) SMART Overlay and ADA Improvements: HMA surface removal and replacement, Class D patches, sidewalk and curb removal and replacement, drainage structures adjustments, minor traffic signal (APS) improvements, detector loops replacement, pavement markings. Located along IL 72 (Higgins Road) from Audubon Street to Lexington Drive within the Villages of Hoffman Estates and Schaumburg. | — | Executed | Plote Construction, Inc. $2,516,963 · | ||
| Apr 25, 2025 | 62W50 | CookDistrict 1 | (1.08-miles) SMART Overlay, curb ramps for sidewalks (ADA) Improvements, asphalt surface removal, pavement patching, new asphalt surface, curb and gutter removal and replacement, sidewalk removal and replacement, pavement markings, raised reflective pavement markers. Location: IL 53 West Frontage Road from US 12 (Rand Rd) to Anderson Drive, located within the Village of Palatine. | — | Executed | Schroeder Asphalt Services, Inc. $458,691 · | ||
| Apr 25, 2025 | 62W56 | VariousDistrict 1 | The work under Full Expressway Nighttime Cleaning Cycle and Supplement Sweeping includes the pickup, removal, and proper disposal of debris such as limbs, sticks, leaves, sand, stones, dirt, weeds, deceased animal carcasses, refuse, litter. This work is located on various State maintained expressway routes located within the counties of Cook, DuPage, and Will. | — | Active | Interstate Business Solutions, LLC $4,828,264 · | ||
| Apr 25, 2025 | 62W59 | LakeDistrict 1 | Trombone Mast Arms replacement project including new traffic signal heads, pedestrian traffic signal heads, accessible pedestrian signals, traffic signal posts, conduits, electric cable, and handholes installations at various locations in District 1. | — | Executed | H & H Electric Co. $1,101,716 · | ||
| Apr 25, 2025 | 62W69 | KaneDistrict 1 | Pavement patching, hot-mix asphalt pavement removal and replacement combination curb and gutter removal and re (3.37-Mile) This is a standard overlay and ADA improvement. This project consists of pavement patching, hot-mix asphalt pavement removal and replacement combination curb and gutter removal and replacement, ADA pedestrian ramp improvements, thermoplastic pavement marking, sidewalk removal and replacement. This improvement is on FAU 2503: IL-25, US 30 (Aurora Avenue) within the City of Aurora in Kane County. | — | Executed | Geneva Construction Company LLC. $4,184,234 · | ||
| Apr 25, 2025 | 62X20 | CookWillDistrict 1 | (627-Ft) Bridge Painting project consisting of cleaning and painting steel surfaces. The project is located at the structure No. 1 (SN. 016-1062) carrying I-94 eastbound to I-55 southbound over Archer Avenue/BNSF and ICC RR in the City of Chicago in Cook County, and structure No. 2 (SN. 099-0198) carrying Maple Road Over I-80 in the Village of Mokena in Will County. | — | Executed | ERA-Valdivia Contractors, Inc. $649,580 · | ||
| Apr 25, 2025 | 62X22 | CookWillDistrict 1 | This is a bridge painting project includes cleaning and painting steel surfaces as designated on the plans. LOCATION #1: New Avenue over Long Run Creek Overflow City of Lockport in Will County (SN: 099-0299). LOCATION #2: US 45 over Hickory Creek Village of Frankfort in Will County (SN: 099-0293). LOCATION #3: IL 43 (Harlem Ave.) over I-80 Village of Tinley Park in Cook County (SN: 016-0325). | — | Executed | Capital Industrial Services, LLC $503,300 · | ||
| Apr 25, 2025 | 62X25 | CookDistrict 1 | Partial replacement of the bridge deck thin polymer overlay, partial depth bridge deck repair, cleaning and resealing of relief joints. This project is located at bridge SN 016-0254 on FAP route 345 (US Rte 20) over IL Route 59 and at bridge SN 016-2786 on FAP route 305 (Palatine Rd) over IL Route 21/US 45 Milwaukee Ave in Cook County, Illinois. | — | Executed | Martam Construction Incorporated $241,055 · | ||
| Apr 25, 2025 | 62X27 | CookDistrict 1 | Replacement of the bridge joint sealers, partial depth approach slab repair, concrete curb repair, concrete parapet repair, replacement of curved bridge fence. This project is located at bridge SN 016-0243 on FAP route 374 (IL Rte 21) over Union Pacific Railroad and at bridge SN 016-0309 on FAP route 348 (IL Rte 43) over Interstate 90 and CTA in Cook County, Illinois. | — | Executed | Lorig Construction Company $433,056 · | ||
| Apr 25, 2025 | 62X32 | LakeDistrict 1 | (3.38-Mile) Standard and Designed Overlay, ADA Improvements: HMA surface removal and replacement, Class D patches, sidewalk and curb removal and replacement, drainage structures adjustments, detector loops replacement, pavement markings and collateral work. Location 1) Sheridan Road (Naval Station G Street to Moffett Road), Location 2) Scranton Avenue (Green Bay Road to Sheridan Road, both located in the Village of Lake Bluff. | — | Executed | Peter Baker & Son Co. $2,996,992 · | ||
| Apr 25, 2025 | 62X39 | LakeDistrict 1 | (126-Ft) Surface Removal and HMA Overlay including guardrail and terminal removal and reinstallation, preformed joint seal removal and replacement, crack routing and filling, pavement markings. Located at the west approach of (S.N. 049-0221) on IL 120 (Belvidere Road) over I-94 in the Village of Libertyville in Lake County, and at the south approach of (S.N. 049-0209) on U.S. 41 (Skokie Highway) over IL 132 (Grand Avenue) in the Village of Gurnee in Lake County. | — | Executed | Schroeder Asphalt Services, Inc. $198,854 · | ||
| Apr 25, 2025 | 62X40 | CookDistrict 1 | Structural repair of concrete on the existing piers abutments The improvement consists of structural repair of concrete on the existing piers abutments. This improvement consists of 8 locations: (1) location is at I-57 at Wentworth Avenue (SN 016-2028) City of Chicago. (2) location is at I-57 at Union Pacific Railroad (SN 016-0071) City of Chicago (3) location is at I-57 at RR Bike Path (SN 016-0070) City of Chicago. (4) location is at I-57 at 107th Street (SN 016-2031) City of Chicago. (5) location is at I-57 at Throop Street (SN 016-2032) City of Chicago | — | Executed | ERA-Valdivia Contractors, Inc. $1,194,462 · | ||
| Apr 25, 2025 | 62X48 | McHenryDistrict 1 | (1.24- Mile) Pavement Grinding project including pavement grooving, remove and replace curb and gutter, pavement markings, concrete class B patching. IL 31 (Western Algonquin Bypass) at South Main Street to North Main Street in the Village of Algonquin within McHenry County. | — | Executed | Diamond Coring Company, Inc. $566,692 · | ||
| Apr 25, 2025 | 62X85 | WillDistrict 1 | (1.19-Mile) Pavement Patching includes asphalt surface removal, resurfacing asphalt binder and surface course, aggregate wedge shoulders, grading and shaping shoulders, pavement markings, raised reflective pavement marker. This project is located along I-55 West Frontage Road from South of Stripmine Road to IL 113 (Division Street) in the City of Wilmington and the Village of Diamond in Will County. | — | Executed | P. T. Ferro Construction Co. $410,872 · | ||
| Apr 25, 2025 | 62X92 | VariousDistrict 1 | Installing fence and gates at new locations and repairing existing damaged pedestrian barrier on a work order The work to be completed under this contract consists of installing fence and gates at new locations and repairing existing damaged pedestrian barrier on a work order basis._This work is located on various State maintained arterial and expressway routes within the counties of Cook, DuPage, Kane, Lake, McHenry and Will. | — | Executed | Fence Masters, Inc. $652,316 · | ||
| Apr 25, 2025 | 62X93 | WillDistrict 1 | Modernizing bridge lift gates at structures carrying McDonough Street and Brandon Street over the Des Plaines The work on this improvement consists of modernizing bridge lift gates at structures carrying McDonough Street and Brandon Street over the Des Plaines River. This improvement has 2 locations: the first locations is at McDonough Street (SN: 099-9904) over the Des Plaines River and the second location is at Brandon Street (SN: 099-9903) over the Des Plaines River in Will County. | — | Executed | D. Construction, Inc. $1,901,944 · | ||
| Apr 25, 2025 | 62X94 | McHenryDistrict 1 | (2.25-Mile) Roadway Reconstruction including construction of three roundabouts at Lake Street, McConnell Road and Judd Street/Irving Ave., water main, sanitary and storm sewer replacement, lighting, signing, retaining walls, ADA improvements and a building demolition from US 14 to IL 120 in the City of Woodstock and Woodstock Fire Rescue District within McHenry County. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $78,336,172 · | ||
| Apr 25, 2025 | 64N76 | HenryDistrict 2 | Intersection reconstruction including culvert replacement on US 6 and Green Riv River Rd/Osco Rd 0.3 mi W to 0.5 mi E of Osco Rd. 1,500 gross feet. | — | Executed | Phoenix Corporation of the Quad Cities $2,705,618 · | ||
| Apr 25, 2025 | 64N98 | OgleDistrict 2 | Reconstruction of the IL 38/I-39 Interchange including replacement of 2 traffic signals, construction of 1 new signal, and new roadway lighting. The project extends on IL 38 from Dement Rd east 2,150 ft. | — | Executed | William Charles Construction Company, LLC $23,945,140 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.