Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Aug 4, 2023 66N27 IroquoisKankakeeDistrict 3 The installation of a flashing red beacon at each of the stop controlled approaches to the intersection of US This project consists of the installation of a flashing red beacon at each of the stop controlled approaches to the intersection of US 45/52 and W 8000S Rd. It also includes the installation of a flashing yellow beacon at each of the advanced intersection warning signs adjacent to US 45/52. — Executed Nov 26 New Outsen Electric, Incorporated $148,037 ·
Aug 4, 2023 66N29 VariousDistrict 3 The installation, maintenance, and pickup/removal of smart traffic monitoring systems or real-time traffic con This project consists of the installation, maintenance, and pickup/removal of smart traffic monitoring systems or real-time traffic control systems. The work will be completed on a work order basis for repairs and maintenance activities. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $648,625 ·
Aug 4, 2023 66N37 LaSalleDistrict 3 The removal and replacement of 6 foot of the structrure slab and sidewalls, guardrail replacement, striping, p This project is located at Structure No. 050-2540 carrying IL Route 170 over a stream approximately 3.8 miles north of Ransom. This project consists of the removal and replacement of 6 foot of the structrure slab and sidewalls, guardrail replacement, striping, pavement patching and other related work. — Executed Nov 26 New Riber Construction, Inc. $495,072 ·
Aug 4, 2023 66N49 LivingstonDistrict 3 Class B pavement patching This project is located on US 24 Beginning at the Intersection of N. 2000 E. Rd and ending at the curb and gutter just east of Tenth Street in Fairbury. This work consists of Class B pavement patching. — Executed Nov 26 New G. M. Sipes Construction, Inc. $459,272 ·
Aug 4, 2023 66N51 GrundyLivingstonDistrict 3 Class A pavement Patching, striping and other related work This project is located on Interstate Route 55 beginning at M.M. 2.15 (Beginning of concrete section) to M.M. 218.81(Livingston/Grundy County Line) to M.M. 222 end of concrete section in Grundy County. This work consists of Class A pavement Patching, striping and other related work. — Executed Nov 26 New G. M. Sipes Construction, Inc. $378,840 ·
Aug 4, 2023 66N55 KankakeeDistrict 3 Milling and resurfacing a 2 foot wide path along the centerline of roadway and micro-surfacing 4' wide path al This project is located on IL Route 17 beginning at the east abutment of SN 046-0027 (+/-1200 feet east of Livingston/Kankakee County Line and ending at S. 2000 W. Rd (Herscher Rd). This work consists of milling and resurfacing a 2 foot wide path along the centerline of roadway and micro-surfacing 4' wide path along the centerline, pavement striping and raised reflective pavement markers. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $368,861 ·
Aug 4, 2023 87828 IroquoisDistrict 3 Resurfacing CH 47 from Ford County line to IL 54. — Executed Nov 26 New Iroquois Paving Corporation $495,258 ·
Aug 4, 2023 87841 DeKalbDistrict 3 Streetscape improvements along US 30 from South Shabbona Road to Illini Road in Shabbona — Executed Nov 26 New Elliott and Wood, Inc. $1,654,900 ·
Sep 22, 2023 46632 VariousDistrict 3 Removing and replacing raised reflective pavement markers and reflectors on F This work consists of removing and replacing raised reflective pavement markers and reflectors on F.A.I Route 80 (1-80) in Bureau, LaSalle and_Grundy Counties. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $519,668 ·
Sep 22, 2023 46633 VariousDistrict 3 Removing and replacing raised reflective pavement markers and reflectorsin Livingston, Grundy, Kankakee, Iroqu This work consists of removing and replacing raised reflective pavement markers and reflectorsin Livingston, Grundy, Kankakee, Iroquois and Ford Counties. — Executed Nov 26 New Precision Pavement Markings Inc. $309,545 ·
Sep 22, 2023 46634 VariousDistrict 3 Removing and replacing raised reflective pavement markers and reflectors in Livingston, Iroquois, and Ford Cou This work consists of removing and replacing raised reflective pavement markers and reflectors in Livingston, Iroquois, and Ford Counties. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $289,980 ·
Sep 22, 2023 66N33 FordDistrict 3 This project consists of 3.2 miles of shoulder widening and rumble strip installation on IL 9 from 160 ft east of Fall St in Paxton to just west of N 2300 E Rd in Ford County. — Executed Nov 26 New Iroquois Paving Corporation $1,340,112 ·
Nov 17, 2023 46635 VariousDistrict 3 Repairing various widths of pavement marking including, lines, letters, numbers, and symbols on various roads throughout District 3. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $1,782,850 ·
Nov 17, 2023 66N39 VariousDistrict 3 This project consists on performing Bridge Deck Concrete Sealing with the parapets/curbs on various routes at various locations throughout Ford, Iroquois, and Kankakee Counties. — Executed Nov 26 New All States Painting, Inc. $196,144 ·
Nov 17, 2023 66N83 VariousDistrict 3 Tree Removal located within Bureau, DeKalb, Ford, Grundy, La Salle, and Livings on counties. — Executed Nov 26 New Clean Cut Tree Service, Inc. $210,216 ·
Nov 17, 2023 66N99 VariousDistrict 3 Repairing and maintaining traffic signals, flashing beacons, and roadway lighting in Ford, Iroquois, and Livin This project consists of repairing and maintaining traffic signals, flashing beacons, and roadway lighting in Ford, Iroquois, and Livingston Counties. — Executed Nov 26 New Leo P. Kelly Electric, Incorporated $350,818 ·
Jan 19, 2024 66967 BureauDistrict 3 HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors This job is located on FAP 587 (IL 92) from 0.1 mile east of IL 40 to WCL Walnut City, for a length of 4.36 miles. The work consists of HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors. — Executed Nov 26 New Advanced Asphalt Company $2,548,799 ·
Jan 19, 2024 66E40 IroquoisDistrict 3 Replacing the bridge deck on SN 038-0076, HMA milling and resurfacing, interchange lighting replacement, pavem This project is located on FAI 57 (I-57) at SN 038-0076 (Onarga Interchange). The work consists of replacing the bridge deck on SN 038-0076, HMA milling and resurfacing, interchange lighting replacement, pavement marking, and raised reflective markers. — Executed Nov 26 New Iroquois Paving Corporation $4,148,759 ·
Jan 19, 2024 66K67 GrundyDistrict 3 This project includes milling and resurfacing (design overlay), structure repairs, pavement marking and minor drainage improvements on I-55 from 1.2 miles northeast of IL 47 near Dwight to the Gardner interchange. — Executed Nov 26 New D. Construction, Inc. $12,150,715 ·
Jan 19, 2024 66L53 DeKalbDistrict 3 Removing and replacing SN 019-2538 with SN 019-2562, HMA milling and resurfacing, pavement marking, and raised This project is located on FAP 68 (IL 23) 0.6 mile south of US 30 at SN 019-2538. The work consists of removing and replacing SN 019-2538 with SN 019-2562, HMA milling and resurfacing, pavement marking, and raised reflective markers. — Executed Nov 26 New Sjostrom & Sons, Inc. $854,727 ·
Jan 19, 2024 66M09 FordDistrict 3 This job is located on FAP 798 (IL-115), approximately 5.6 miles south of US-24 in Ford County, (SN 027-2507); box culvert replacement. — Executed Nov 26 New Iroquois Paving Corporation $568,073 ·
Jan 19, 2024 66N34 LaSalleLivingstonDistrict 3 This project consists of 5.8 miles of shoulder widening and rumble strip installation on IL 17 from E 11th Rd in LaSalle County to IL 23 in Livingston County. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $1,328,740 ·
Jan 19, 2024 66N48 GrundyDistrict 3 Pavement patching and related construction work This work is located on the I-80 and IL 47 Interchange Ramps in Morris. This work consists of pavement patching and related construction work. — Executed Nov 26 New D. Construction, Inc. $664,134 ·
Jan 19, 2024 66N59 LaSalleDistrict 3 Pavement removal and replacement, PCC shoulder removal and replacement, drainage inlet box removal and replace This work is located on the I-80 and IL 178 interchange Structure No. 050-0248 at the north abutment bridge approach pavement connectors, northbound and southbound lanes. This work consists of pavement removal and replacement, PCC shoulder removal and replacement, drainage inlet box removal and replacement, concrete median removal and replacement, approach slab repair and other related construction work. — Executed Nov 26 New D. Construction, Inc. $156,145 ·
Jan 19, 2024 66N91 LivingstonDistrict 3 Cleaning and painting all structural steel components of the bridges This project is located at 3 structures; SN 053-0119 carrying CH 26 over I-55, 0.5 miles north of Chenoa, SN's 053-0128 and 053-0129 carrying NB and SB I-55 over the Vermillion River 1.5 miles north of IL 116. This work consists of cleaning and painting all structural steel components of the bridges. — Executed Nov 26 New Venus Painting Co. $1,109,544 ·
Jan 19, 2024 66N94 FordDistrict 3 Class B pavement Patching and other related work This work is located on US Route 45 beginning at the Champaign County Line (L.M. 0.00) and ending at Green Street in Paxton (L.M. 3.28). This project consists of Class B pavement Patching and other related work. — Executed Nov 26 New A&A Concrete LLC $126,426 ·
Jan 19, 2024 66P05 VariousDistrict 3 Weed spraying to aid in weed control This project is located along various routes in Bureau, LaSalle, Grundy, Livingston, Kankakee, Iroquois, and Ford counties. The work consists of weed spraying to aid in weed control. — Executed Nov 26 New The Daltons Inc. $140,816 ·
Jan 19, 2024 66P07 GrundyKankakeeDistrict 3 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas hereinafter described as the areas to be cleaned in Grundy and Kankakee Counties. — Executed Nov 26 New The Final Connection, Inc. $105,464 ·
Jan 19, 2024 87822 LivingstonDistrict 3 Replace the bridge carrying TR 24 over Mole Creek, 4 miles southeast of Long Point. — Executed Nov 26 New Riber Construction, Inc. $494,605 ·
Mar 8, 2024 66H62 IroquoisDistrict 3 Milling and resurfacing I-57 interstate including IL-54 and US-24 interchange ramps in Iroquois County. — Executed Nov 26 New Iroquois Paving Corporation $27,992,940 ·
Mar 8, 2024 66M28 LivingstonDistrict 3 This job is located on FAP 317 (US-24), approximately 2.8 mile west of IL 115 north at Piper city in Livingston county, (SN 053-0097). Bridge replacement. — Executed Nov 26 New Iroquois Paving Corporation $902,137 ·
Mar 8, 2024 66M56 LaSalleDistrict 3 Milling and resurfacing (standard overlay), pavement marking, raised reflective markers, and ADA improvements on FAP 623 (US 6) from the Bureau County Line 4.35 miles to the Little Vermilion River bridge in LaSalle. — Executed Nov 26 New Advanced Asphalt Company $6,430,186 ·
Mar 8, 2024 66M88 BureauDistrict 3 Crack routing and sealing, and pavement marking This project is located on FAP 646 (IL 40), it begins south of the BNSF Railroad at the south city limits of Buda and ends at the Stark County line. The work consists of crack routing and sealing, and pavement marking. — Executed Nov 26 New Complete Asphalt Service Co. $42,302 ·
Mar 8, 2024 66M96 BureauDistrict 3 HMA milling and resurfacing, Class B patching, drainage work, paverment marking, and raised reflective markers This project is located on FAS 248 (Tiskilwa Spur), it begins 0.7 mile north of Lovers Lane Road and ends 0.3 mile south of 1075N Road. The work consists of HMA milling and resurfacing, Class B patching, drainage work, paverment marking, and raised reflective markers. — Executed Nov 26 New Advanced Asphalt Company $3,072,639 ·
Mar 8, 2024 66N30 LaSallePutnamDistrict 3 This project consists of 6.2 miles of shoulder widening and rumble strip installation, guardrail removal, and guardrail replacement on IL 18 from 200 feet east of IL 89 in Putnam County to 1.1 miles east of E 3rd Rd in LaSalle County. — Executed Nov 26 New Advanced Asphalt Company $1,993,993 ·
Mar 8, 2024 66P20 KankakeeDistrict 3 This project is located in a Kankakee county. The intent of the project to repair and maintain Traffic signal, Flashing beacons and Roadway lighting. — Rejected Nov 26 New Outsen Electric, Incorporated $152,655 ·
Mar 8, 2024 87811 BureauDistrict 3 HMA resurfacing, curb and gutter, and traffic signals on South Main Street in Princeton. — Executed Nov 26 New Advanced Asphalt Company $845,557 ·
Mar 8, 2024 87821 LivingstonDistrict 3 Replace the bridge carrying CH 16 over Prairie Creek, 1.5 miles south of IL 17. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $511,620 ·
Mar 8, 2024 87830 LaSalleDistrict 3 HMA resurfacing with aggregate wedge shoulders and other miscellaneous work on County Highway 41 from the DeKalb County Line to Brown Street in Earlville. — Executed Nov 26 New Advanced Asphalt Company $567,219 ·
Mar 8, 2024 87833 DeKalbDistrict 3 Resurface Somonauk Street from High Street to Conlin Avenue in Sycamore. — Executed Nov 26 New Curran Contracting Company $1,136,943 ·
Mar 8, 2024 87842 BureauDistrict 3 Sidewalk construction along various streets in Ladd. — Executed Nov 26 New Gensini Excavating, Inc. $282,441 ·
Mar 8, 2024 87844 GrundyDistrict 3 Sidewalk and driveway replacement, and landscaping along IL 13 from 5th Avenue to Curtis Street in Diamond. — Executed Nov 26 New P. T. Ferro Construction Co. $507,801 ·
Mar 8, 2024 87845 LaSalleDistrict 3 Sidewalk construction on 11th Street from Rutland Street to Carrie Lane, and on Rutland street from 11th Street to Fillebrowne Street in Marseilles. — Executed Nov 26 New Gensini Excavating, Inc. $544,677 ·
Apr 26, 2024 66C45 IroquoisDistrict 3 Work beings at the Iroquois/Ford county line on IL 116 extending 8.22 miles, ending at the interchange limits of IL 116 and I 57. The project is a milling and resurfacing designed overlay of IL 116 including drainage improvements. — Executed Nov 26 New Iroquois Paving Corporation $5,775,587 ·
Apr 26, 2024 66M98 IroquoisKankakeeDistrict 3 Work beings at 0.1 Mi N of Ambrose St in St Anne to 1.8 Mi S of Papineau Rd. 6.22 Miles of smart overlay with ADA and drainage repairs. — Executed Nov 26 New Iroquois Paving Corporation $2,586,271 ·
Apr 26, 2024 66N40 LivingstonDistrict 3 Micro surfacing Joint Repair, Located on FAI 55 in Livingston County, from McLean County Line to 1.7 miles South of IL 116. — Executed Nov 26 New A. C. Pavement Striping Co. $577,571 ·
Apr 26, 2024 66N44 IroquoisDistrict 3 Milling and resurfacing the Illinois Department of Transportation Ashkum Maintenance facility. — Executed Nov 26 New H. J. Eppel & Co. $781,331 ·
Apr 26, 2024 66N50 GrundyDistrict 3 Raising existing concrete pavement adjacent to approach pavement IL 47 at the north abutment, southbound lanes of structure No. 032-0099; the work consists of raising existing concrete pavement adjacent to approach pavement. — Executed Nov 26 New D. Construction, Inc. $59,606 ·
Apr 26, 2024 66N53 BureauDistrict 3 Bridge repairs at Structure No. 006-0083 carrying FAS 1252 (IL 26/29) over Bureau Creek Overflow, 0.3 mi. northeast of IL 26 and IL 29 junction. — Executed Nov 26 New Gensini Excavating, Inc. $431,733 ·
Apr 26, 2024 66N54 IroquoisDistrict 3 Remove concrete slope wall, install stone riprap, filter fabric, stone bedding, replace expansion joint seal, and structural repair of concrete (pier) on SN 038-0174. — Executed Nov 26 New Iroquois Paving Corporation $313,415 ·
Apr 26, 2024 66N92 LaSalleDistrict 3 Cleaning and painting all structural steel on Structure No. 050-0019 carrying IL 351 over the Lone Star Cement Railroad, 2.0 miles south of US Route 6 (Oglesby). — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $186,186 ·
Apr 26, 2024 66N93 BureauDistrict 3 Cleaning and painting all structural steel on Structure No. 006-0083 carrying IL 29/26 over Big Bureau Creek Overflow, 0.3 mi. north of the south junction of IL 26 and Structure No. 006-0084 carrying IL 29 over over Big Bureau Creek, 0.3 mi. south of the south junction of IL 26. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $548,417 ·
Apr 26, 2024 66N96 KankakeeDistrict 3 SN 046-0108, riprap replacement, controlled low-strength material, riprap removal, grout for use with riprap. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $33,295 ·
Apr 26, 2024 66N97 IroquoisDistrict 3 Traffic Signal Mast Arm Replacement. This project is located in Iroquois County, at the west intersection of US-24 and IL-1 in Watseka. — Executed Nov 26 New Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $299,323 ·
Apr 26, 2024 87791 GrundyDistrict 3 Rehabilitate the bridge carrying CH 34V over the Mazon Ricer, 0.7 mile north of I-55, and replace the bridge carrying FAS 272 over an Unnamed Creek 3 miles southwest of Mazon. — Executed Nov 26 New D. Construction, Inc. $1,773,338 ·
Apr 26, 2024 87792 GrundyDistrict 3 Replace 3 structures on Grand Ridge Road over Hog Run, Bills Run and Waupecan Creek, located between LaSalle Road anc Verona Road. — Executed Nov 26 New Riber Construction, Inc. $1,942,958 ·
Apr 26, 2024 87794 IroquoisDistrict 3 Replace the bridge carrying CH 40 over a tributary to Possum Trot Ditch, 3.5 miles south of Sheldon. — Executed Nov 26 New Iroquois Paving Corporation $1,057,026 ·
Apr 26, 2024 87815 BureauDistrict 3 Replace the bridge carrying TR 312 over the Tributary to Masters Creek, 4 miles west of LaMolle. — Executed Nov 26 New Curnyn Construction Co. $499,288 ·
Apr 26, 2024 87820 LivingstonDistrict 3 Replace existng structure with a three-span RC slab bridge with HMA approach, aggregate and HMA shoulders, and guardrail improvements on CH 3 over Broughton Creek, one mile north of Campus. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $737,652 ·
Apr 26, 2024 87824 BureauDistrict 3 Resurface CH 8 from east city limits of Walnut to 2600 Avenue/CH 22, and from the Lee County line to IL 92. — Executed Nov 26 New Advanced Asphalt Company $949,527 ·
Apr 26, 2024 87826 DeKalbDistrict 3 HMA resurfacing and shoulders on Chicago Road from the Lee County line to Shabbona Road, on Rollo Road from Chicago Road to Suydam Road, and on Suydam Road from Rool Road to the LaSalle County Line. — Executed Nov 26 New Curran Contracting Company $2,522,533 ·
Apr 26, 2024 87829 KankakeeDistrict 3 Resurfacing CH 3 from the Iroquois County line to CH 37. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $323,707 ·
Apr 26, 2024 87831 LivingstonDistrict 3 HMA Resurfacing with Cold-In-Place Recycling, aggregate base course widening, and aggregate shoulders on CH 6 rom 20000N Road to CH 8. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $2,522,672 ·
Apr 26, 2024 87847 LaSalleDistrict 3 Resurfacing CH 2 from the Somonauk South City Limits to US 52. — Executed Nov 26 New Curran Contracting Company $2,100,248 ·
Jun 14, 2024 46644 VariousDistrict 3 Removing and replacing raised reflective pavememt_markers and reflectors on various highways, freeways, and expressways in various counties in District 3. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $429,420 ·
Jun 14, 2024 46652 VariousDistrict 3 Removing and replacing raised reflective pavement markers and reflectors on various highways, freeways, and expressways in various counties in District 3. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $315,454 ·
Jun 14, 2024 66H56 LivingstonDistrict 3 Milling and resurfacing, culvert repairs, and latex overlays on I-55 0.8 miles north of Wolf Creek to 1.8 miles south of IL 17 and CH1 in Odell from OR 66 to 0.25 miles east of N 2000 Rd. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $39,441,550 ·
Jun 14, 2024 66K66 BureauDistrict 3 Arispie Township superstructure replacement of SN 006-0053 and SN006-0054 and bridge replacement of SN 006-0051 and SN 006-0052. SN 006-0051 and SN 006-0052 carry I 180 over Bureau Creek and SN 006-0053 and SN 006-0054 carry I 180 over CH 23 (Bottom Road). — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $24,206,955 ·
Jun 14, 2024 66K85 LaSalleDistrict 3 2.6 Miles. SN 050-0040 Bridge Replacement with 2 span SN 050-0265 US 34 reprofiling and detour route improvements. Located on US 34 over Indian Creek in Earlville 0.3 miles east of 1251st Road. — Executed Nov 26 New D. Construction, Inc. $5,077,494 ·
Jun 14, 2024 66L10 KankakeeDistrict 3 This project is located on FAP 41 (IL 17) 0.7 mile east of Union Hill Road, consisting of replacing SN 046-0031 with SN 046-0162, carrying FAP 41 (IL 17) over Horse Creek. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $1,975,085 ·
Jun 14, 2024 66N38 GrundyDistrict 3 Variable depth milling and resufacing of Ashley Road and US-6 intersection in Morris city (Grundy County). — Executed Nov 26 New Gallagher Asphalt Corporation $85,098 ·
Jun 14, 2024 66N52 KankakeeDistrict 3 Bridge repairs including expansion joint replacement, deck and approach patching, structural repair of concret This project consists of bridge repairs including expansion joint replacement, deck and approach patching, structural repair of concrete, drain cleaning, traffic control, pavement striping; on F.A.P. Route 332 (IL 1/17) at two structures, Structure No. 046-0023 and Structure No. 046-0111 carrying IL 1/17 over the Kankakee River in Momence. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $850,262 ·
Jun 14, 2024 66N60 DeKalbDistrict 3 I+stallation of a flashing red beacon at each of the stop controlled approaches to the intersections of IL 23 with and Melms, Perry and Baseline RD. It also includes the installation of a flashing yellow beacon at each of the advanced intersection warning signs adjacent to IL 23. — Executed Nov 26 New William Charles Construction Co, LLC $240,792 ·
Jun 14, 2024 66N62 GrundyDistrict 3 Installation of flashing beacons. — Executed Nov 26 New D. Construction, Inc. $248,311 ·
Jun 14, 2024 66N75 LaSalleDistrict 3 3.46 Miles OF Class B pavement patching and shoulder repair. Work is at the exterior ramps of I-39. — Executed Nov 26 New Advanced Asphalt Company $1,918,205 ·
Jun 14, 2024 66P02 LivingstonDistrict 3 Pavement patching_(ramps and parking areas), sidewalk (ADA), curb and gutter, driveway pavement, and striping on FAI 55 at the Northbound Limestone Rest Area, 3.52 miles south of IL 116 (Pontiac) and Southbound Limestone Rest Area, 2.52 miles south of IL 116 (Pontiac). — Executed Nov 26 New K-Five Construction Corporation $2,825,368 ·
Jun 14, 2024 66P06 LaSalleDistrict 3 Removal and replacement of the finger plate expansion joint elastomeric troughs on SN 050-0191 carrying I-39 over the Illinois River, IAIS Railroad, and an abandoned railroad approximately 2.82 miles south of Interstate 80 (I-80). — Executed Nov 26 New D. Construction, Inc. $1,356,516 ·
Jun 14, 2024 66P12 FordDistrict 3 Class B pavement patching on F This project consists of Class B pavement patching on F.A.P. Route 681 (IL 116) beginning at the Ford/Iroquois County Line and ending at the Ford/Livingston County Line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $534,046 ·
Jun 14, 2024 66P13 FordDistrict 3 Class B pavement patching on F This project consists of Class B pavement patching on F.A.P. Route 796 (IL 115) beginning at Pine street (1450E Rd.) in Piper City and ending at the intersection of IL 115/116. — Rejected Nov 25 New G. M. Sipes Construction, Inc. $622,863 ·
Jun 14, 2024 66P14 IroquoisDistrict 3 Class A pavement patching on FAI 57 beginning at MM 285.5, 2.5 miles north of US 24 (Gilman Interchange) and ending at MM 293.5, 0.64 mile north of IL 116 (Ashkum Interchange). — Executed Nov 26 New G. M. Sipes Construction, Inc. $511,011 ·
Jun 14, 2024 66P15 BureauPutnamDistrict 3 17.63 Miles. Centerline joint repair 3' wide and 2" depth resurfacing. This project begins south of the interchange between I 80 and I 180 and continues south to IL 29 and east toward Hennipen. The project terminates at both: the west side of Coffee Creek in Hennepin IL 29 and south at The Illinois River Road National Scenic Byway. — Executed Nov 26 New Advanced Asphalt Company $1,857,288 ·
Jun 14, 2024 66P23 BureauDistrict 3 Crack and Joint Sealing, located on FAP 698 (IL 89), FAU 5605 (US 6), FAS 1248 (US 34/US 6), FAP 316 (IL 26) i This project consists of Crack and Joint Sealing, located on FAP 698 (IL 89), FAU 5605 (US 6), FAS 1248 (US 34/US 6), FAP 316 (IL 26) in Bureau County. — Executed Nov 26 New Denler, Inc. $185,981 ·
Jun 14, 2024 66P24 LaSalleDistrict 3 14.45 miles of routing and crack sealing. Work begins in Ottawa at IL 23 and E Freemont Street on IL 23/IL71 including Columbus Street and LaSalle Street. Work continues at the intersection of Hitt Street and IL 23 to McKinley Rd. Work continues in Streator on IL 18, 0.1 miles east of IL 251 to east 0.1 miles West of E 16th Rd. — Executed Nov 26 New Denler, Inc. $88,496 ·
Jun 14, 2024 66P27 BureauDistrict 3 Class B Pavement Patching on F.A.I. Route 80 (I-80) beginning at M.M. 45.0, 0.1 miles east of IL Route 40 and ending at M.M. 59.6, 0.47 miles east of US Route 34. — Executed Nov 26 New G. M. Sipes Construction, Inc. $798,437 ·
Jun 14, 2024 66P28 BureauDistrict 3 This project is located at Structure_No. 006-0057 (EB) carrying F.A.I. Route 180 (I-180), Roadway "F" and structure No. 006-0058 (WB) carrying_F.A.I. Route 180 (I-180), Roadway "E" over IL Route 29 and the IAIS Railroad approximately 2.0 miles southwest of Bureau Junction. Removal of PCC slope wall/riprap placement. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $405,752 ·
Jun 14, 2024 66P29 IroquoisDistrict 3 8.09 miles, Crack and joint sealing, US 24 to US 45/52. — Executed Nov 26 New Freehill Asphalt, Inc. $83,979 ·
Jun 14, 2024 66P31 VariousDistrict 3 One year contract to repair damaged High Tension Cable Median Barrier, Guardrail, Attenuators, etc., caused by motorists along various routes in District 3. Funded by MCHD funds, Contract Maintenance funds, and Maintenance of HTC Median Barrier funds. — Rejected Nov 26 New Northern Contracting, Inc. $1,803,903 ·
Jun 14, 2024 66P38 LaSalleDistrict 3 Class A pavement patching, joint and pothole repairs, striping and traffic control on FAI 39 beginning at the Marshall/LaSalle County Line and ending at the LaSalle/Lee County Line in LaSalle County. — Executed Nov 26 New G. M. Sipes Construction, Inc. $793,086 ·
Jun 14, 2024 66P40 GrundyLaSalleDistrict 3 Centerline striping on I-39 in LaSalle County and on I-80 in LaSalle and Grundy Counties. — Executed Nov 26 New Maintenance Coatings Co. $1,382,491 ·
Jun 14, 2024 66P41 VariousDistrict 3 Pavement striping This project is located on IL 23 in LaSalle CO., IL 47 in Grundy Co. and IL 17 in Kankakee Co. This work consists of pavement striping. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $428,427 ·
Jun 14, 2024 87722 DeKalbDistrict 3 Replace the bridge carrying Pearl Street over South branch of the Kishwaukee ri ver in the Village of Kirkland. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $3,263,762 ·
Jun 14, 2024 87749 DeKalbDistrict 3 HMA bike path with concrete sidewalk, curb and gutter, storm sewers, and other work along Fairview Drive from Macom Drive to West of Peace Road in the City of Dekalb. — Executed Nov 26 New Elliott and Wood, Inc. $498,000 ·
Jun 14, 2024 87789 DeKalbDistrict 3 Replace the bridge carrying Perry Road over Branch Battle Creek located 1 mile East of Somonauk Road. — Executed Nov 26 New Sjostrom & Sons, Inc. $626,763 ·
Jun 14, 2024 87801 LaSalleDistrict 3 HMA Resurfacing and widening with HMA shoulders, aggregate shoulder, culvert re placement, pavement marking, shoulder rubmble strips, gaurdrail replacement, an d other work along county highway from 21st road to the Livingston county line. — Executed Nov 26 New Advanced Asphalt Company $6,972,036 ·
Jun 14, 2024 87816 BureauDistrict 3 Replace the bridge carring TR 85 over Masters Creek, 3 miles southest of Ohio. — Executed Nov 26 New Curnyn Construction Co. $539,871 ·
Jun 14, 2024 87817 BureauDistrict 3 Replace the bridge carrying CH 12 over East Bureau Creek, 2 miles west of Arlington. — Executed Nov 26 New Sjostrom & Sons, Inc. $436,742 ·
Jun 14, 2024 87818 DeKalbDistrict 3 Replace the bridge carrying TR 230 over West branch of Big Rock Creek located 0 .8 miles Northeast of Hinckley Scott Road. — Executed Nov 26 New Sjostrom & Sons, Inc. $1,281,196 ·
Jun 14, 2024 87819 FordDistrict 3 Constuct a cast-in-place box culvert with HMA approaches and guardrail to carry Thawville Road over an unnamed creek. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $462,541 ·
Jun 14, 2024 87823 LivingstonDistrict 3 Construct a single-span PPC deck beam bridge on spill-through abutments to carry TR 18C (400 E Road) over Scattering Point Creek, 1 mile south of Flanagan . Projects includes HMA approaches, aggregate shoulders, channel excavation, and seeding. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $432,451 ·
Jun 14, 2024 87825 DeKalbDistrict 3 HMA resurfacing with 3-foot HMA shoulders on Glidden Road from IL 72 to IL 64. — Executed Nov 26 New Rock Road Companies, Inc. $2,477,234 ·
601–700 of 1,128‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.