Filtered by: District: District 3 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Aug 4, 2023 | 66N27 | IroquoisKankakeeDistrict 3 | The installation of a flashing red beacon at each of the stop controlled approaches to the intersection of US This project consists of the installation of a flashing red beacon at each of the stop controlled approaches to the intersection of US 45/52 and W 8000S Rd. It also includes the installation of a flashing yellow beacon at each of the advanced intersection warning signs adjacent to US 45/52. | — | Executed | Outsen Electric, Incorporated $148,037 · | ||
| Aug 4, 2023 | 66N29 | VariousDistrict 3 | The installation, maintenance, and pickup/removal of smart traffic monitoring systems or real-time traffic con This project consists of the installation, maintenance, and pickup/removal of smart traffic monitoring systems or real-time traffic control systems. The work will be completed on a work order basis for repairs and maintenance activities. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $648,625 · | ||
| Aug 4, 2023 | 66N37 | LaSalleDistrict 3 | The removal and replacement of 6 foot of the structrure slab and sidewalls, guardrail replacement, striping, p This project is located at Structure No. 050-2540 carrying IL Route 170 over a stream approximately 3.8 miles north of Ransom. This project consists of the removal and replacement of 6 foot of the structrure slab and sidewalls, guardrail replacement, striping, pavement patching and other related work. | — | Executed | Riber Construction, Inc. $495,072 · | ||
| Aug 4, 2023 | 66N49 | LivingstonDistrict 3 | Class B pavement patching This project is located on US 24 Beginning at the Intersection of N. 2000 E. Rd and ending at the curb and gutter just east of Tenth Street in Fairbury. This work consists of Class B pavement patching. | — | Executed | G. M. Sipes Construction, Inc. $459,272 · | ||
| Aug 4, 2023 | 66N51 | GrundyLivingstonDistrict 3 | Class A pavement Patching, striping and other related work This project is located on Interstate Route 55 beginning at M.M. 2.15 (Beginning of concrete section) to M.M. 218.81(Livingston/Grundy County Line) to M.M. 222 end of concrete section in Grundy County. This work consists of Class A pavement Patching, striping and other related work. | — | Executed | G. M. Sipes Construction, Inc. $378,840 · | ||
| Aug 4, 2023 | 66N55 | KankakeeDistrict 3 | Milling and resurfacing a 2 foot wide path along the centerline of roadway and micro-surfacing 4' wide path al This project is located on IL Route 17 beginning at the east abutment of SN 046-0027 (+/-1200 feet east of Livingston/Kankakee County Line and ending at S. 2000 W. Rd (Herscher Rd). This work consists of milling and resurfacing a 2 foot wide path along the centerline of roadway and micro-surfacing 4' wide path along the centerline, pavement striping and raised reflective pavement markers. | — | Executed | Kankakee Valley Construction Company, Inc. $368,861 · | ||
| Aug 4, 2023 | 87828 | IroquoisDistrict 3 | Resurfacing CH 47 from Ford County line to IL 54. | — | Executed | Iroquois Paving Corporation $495,258 · | ||
| Aug 4, 2023 | 87841 | DeKalbDistrict 3 | Streetscape improvements along US 30 from South Shabbona Road to Illini Road in Shabbona | — | Executed | Elliott and Wood, Inc. $1,654,900 · | ||
| Sep 22, 2023 | 46632 | VariousDistrict 3 | Removing and replacing raised reflective pavement markers and reflectors on F This work consists of removing and replacing raised reflective pavement markers and reflectors on F.A.I Route 80 (1-80) in Bureau, LaSalle and_Grundy Counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $519,668 · | ||
| Sep 22, 2023 | 46633 | VariousDistrict 3 | Removing and replacing raised reflective pavement markers and reflectorsin Livingston, Grundy, Kankakee, Iroqu This work consists of removing and replacing raised reflective pavement markers and reflectorsin Livingston, Grundy, Kankakee, Iroquois and Ford Counties. | — | Executed | Precision Pavement Markings Inc. $309,545 · | ||
| Sep 22, 2023 | 46634 | VariousDistrict 3 | Removing and replacing raised reflective pavement markers and reflectors in Livingston, Iroquois, and Ford Cou This work consists of removing and replacing raised reflective pavement markers and reflectors in Livingston, Iroquois, and Ford Counties. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $289,980 · | ||
| Sep 22, 2023 | 66N33 | FordDistrict 3 | This project consists of 3.2 miles of shoulder widening and rumble strip installation on IL 9 from 160 ft east of Fall St in Paxton to just west of N 2300 E Rd in Ford County. | — | Executed | Iroquois Paving Corporation $1,340,112 · | ||
| Nov 17, 2023 | 46635 | VariousDistrict 3 | Repairing various widths of pavement marking including, lines, letters, numbers, and symbols on various roads throughout District 3. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,782,850 · | ||
| Nov 17, 2023 | 66N39 | VariousDistrict 3 | This project consists on performing Bridge Deck Concrete Sealing with the parapets/curbs on various routes at various locations throughout Ford, Iroquois, and Kankakee Counties. | — | Executed | All States Painting, Inc. $196,144 · | ||
| Nov 17, 2023 | 66N83 | VariousDistrict 3 | Tree Removal located within Bureau, DeKalb, Ford, Grundy, La Salle, and Livings on counties. | — | Executed | Clean Cut Tree Service, Inc. $210,216 · | ||
| Nov 17, 2023 | 66N99 | VariousDistrict 3 | Repairing and maintaining traffic signals, flashing beacons, and roadway lighting in Ford, Iroquois, and Livin This project consists of repairing and maintaining traffic signals, flashing beacons, and roadway lighting in Ford, Iroquois, and Livingston Counties. | — | Executed | Leo P. Kelly Electric, Incorporated $350,818 · | ||
| Jan 19, 2024 | 66967 | BureauDistrict 3 | HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors This job is located on FAP 587 (IL 92) from 0.1 mile east of IL 40 to WCL Walnut City, for a length of 4.36 miles. The work consists of HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $2,548,799 · | ||
| Jan 19, 2024 | 66E40 | IroquoisDistrict 3 | Replacing the bridge deck on SN 038-0076, HMA milling and resurfacing, interchange lighting replacement, pavem This project is located on FAI 57 (I-57) at SN 038-0076 (Onarga Interchange). The work consists of replacing the bridge deck on SN 038-0076, HMA milling and resurfacing, interchange lighting replacement, pavement marking, and raised reflective markers. | — | Executed | Iroquois Paving Corporation $4,148,759 · | ||
| Jan 19, 2024 | 66K67 | GrundyDistrict 3 | This project includes milling and resurfacing (design overlay), structure repairs, pavement marking and minor drainage improvements on I-55 from 1.2 miles northeast of IL 47 near Dwight to the Gardner interchange. | — | Executed | D. Construction, Inc. $12,150,715 · | ||
| Jan 19, 2024 | 66L53 | DeKalbDistrict 3 | Removing and replacing SN 019-2538 with SN 019-2562, HMA milling and resurfacing, pavement marking, and raised This project is located on FAP 68 (IL 23) 0.6 mile south of US 30 at SN 019-2538. The work consists of removing and replacing SN 019-2538 with SN 019-2562, HMA milling and resurfacing, pavement marking, and raised reflective markers. | — | Executed | Sjostrom & Sons, Inc. $854,727 · | ||
| Jan 19, 2024 | 66M09 | FordDistrict 3 | This job is located on FAP 798 (IL-115), approximately 5.6 miles south of US-24 in Ford County, (SN 027-2507); box culvert replacement. | — | Executed | Iroquois Paving Corporation $568,073 · | ||
| Jan 19, 2024 | 66N34 | LaSalleLivingstonDistrict 3 | This project consists of 5.8 miles of shoulder widening and rumble strip installation on IL 17 from E 11th Rd in LaSalle County to IL 23 in Livingston County. | — | Executed | Kankakee Valley Construction Company, Inc. $1,328,740 · | ||
| Jan 19, 2024 | 66N48 | GrundyDistrict 3 | Pavement patching and related construction work This work is located on the I-80 and IL 47 Interchange Ramps in Morris. This work consists of pavement patching and related construction work. | — | Executed | D. Construction, Inc. $664,134 · | ||
| Jan 19, 2024 | 66N59 | LaSalleDistrict 3 | Pavement removal and replacement, PCC shoulder removal and replacement, drainage inlet box removal and replace This work is located on the I-80 and IL 178 interchange Structure No. 050-0248 at the north abutment bridge approach pavement connectors, northbound and southbound lanes. This work consists of pavement removal and replacement, PCC shoulder removal and replacement, drainage inlet box removal and replacement, concrete median removal and replacement, approach slab repair and other related construction work. | — | Executed | D. Construction, Inc. $156,145 · | ||
| Jan 19, 2024 | 66N91 | LivingstonDistrict 3 | Cleaning and painting all structural steel components of the bridges This project is located at 3 structures; SN 053-0119 carrying CH 26 over I-55, 0.5 miles north of Chenoa, SN's 053-0128 and 053-0129 carrying NB and SB I-55 over the Vermillion River 1.5 miles north of IL 116. This work consists of cleaning and painting all structural steel components of the bridges. | — | Executed | Venus Painting Co. $1,109,544 · | ||
| Jan 19, 2024 | 66N94 | FordDistrict 3 | Class B pavement Patching and other related work This work is located on US Route 45 beginning at the Champaign County Line (L.M. 0.00) and ending at Green Street in Paxton (L.M. 3.28). This project consists of Class B pavement Patching and other related work. | — | Executed | A&A Concrete LLC $126,426 · | ||
| Jan 19, 2024 | 66P05 | VariousDistrict 3 | Weed spraying to aid in weed control This project is located along various routes in Bureau, LaSalle, Grundy, Livingston, Kankakee, Iroquois, and Ford counties. The work consists of weed spraying to aid in weed control. | — | Executed | The Daltons Inc. $140,816 · | ||
| Jan 19, 2024 | 66P07 | GrundyKankakeeDistrict 3 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas hereinafter described as the areas to be cleaned in Grundy and Kankakee Counties. | — | Executed | The Final Connection, Inc. $105,464 · | ||
| Jan 19, 2024 | 87822 | LivingstonDistrict 3 | Replace the bridge carrying TR 24 over Mole Creek, 4 miles southeast of Long Point. | — | Executed | Riber Construction, Inc. $494,605 · | ||
| Mar 8, 2024 | 66H62 | IroquoisDistrict 3 | Milling and resurfacing I-57 interstate including IL-54 and US-24 interchange ramps in Iroquois County. | — | Executed | Iroquois Paving Corporation $27,992,940 · | ||
| Mar 8, 2024 | 66M28 | LivingstonDistrict 3 | This job is located on FAP 317 (US-24), approximately 2.8 mile west of IL 115 north at Piper city in Livingston county, (SN 053-0097). Bridge replacement. | — | Executed | Iroquois Paving Corporation $902,137 · | ||
| Mar 8, 2024 | 66M56 | LaSalleDistrict 3 | Milling and resurfacing (standard overlay), pavement marking, raised reflective markers, and ADA improvements on FAP 623 (US 6) from the Bureau County Line 4.35 miles to the Little Vermilion River bridge in LaSalle. | — | Executed | Advanced Asphalt Company $6,430,186 · | ||
| Mar 8, 2024 | 66M88 | BureauDistrict 3 | Crack routing and sealing, and pavement marking This project is located on FAP 646 (IL 40), it begins south of the BNSF Railroad at the south city limits of Buda and ends at the Stark County line. The work consists of crack routing and sealing, and pavement marking. | — | Executed | Complete Asphalt Service Co. $42,302 · | ||
| Mar 8, 2024 | 66M96 | BureauDistrict 3 | HMA milling and resurfacing, Class B patching, drainage work, paverment marking, and raised reflective markers This project is located on FAS 248 (Tiskilwa Spur), it begins 0.7 mile north of Lovers Lane Road and ends 0.3 mile south of 1075N Road. The work consists of HMA milling and resurfacing, Class B patching, drainage work, paverment marking, and raised reflective markers. | — | Executed | Advanced Asphalt Company $3,072,639 · | ||
| Mar 8, 2024 | 66N30 | LaSallePutnamDistrict 3 | This project consists of 6.2 miles of shoulder widening and rumble strip installation, guardrail removal, and guardrail replacement on IL 18 from 200 feet east of IL 89 in Putnam County to 1.1 miles east of E 3rd Rd in LaSalle County. | — | Executed | Advanced Asphalt Company $1,993,993 · | ||
| Mar 8, 2024 | 66P20 | KankakeeDistrict 3 | This project is located in a Kankakee county. The intent of the project to repair and maintain Traffic signal, Flashing beacons and Roadway lighting. | — | Rejected | Outsen Electric, Incorporated $152,655 · | ||
| Mar 8, 2024 | 87811 | BureauDistrict 3 | HMA resurfacing, curb and gutter, and traffic signals on South Main Street in Princeton. | — | Executed | Advanced Asphalt Company $845,557 · | ||
| Mar 8, 2024 | 87821 | LivingstonDistrict 3 | Replace the bridge carrying CH 16 over Prairie Creek, 1.5 miles south of IL 17. | — | Executed | Tobey's Construction & Cartage, Inc. $511,620 · | ||
| Mar 8, 2024 | 87830 | LaSalleDistrict 3 | HMA resurfacing with aggregate wedge shoulders and other miscellaneous work on County Highway 41 from the DeKalb County Line to Brown Street in Earlville. | — | Executed | Advanced Asphalt Company $567,219 · | ||
| Mar 8, 2024 | 87833 | DeKalbDistrict 3 | Resurface Somonauk Street from High Street to Conlin Avenue in Sycamore. | — | Executed | Curran Contracting Company $1,136,943 · | ||
| Mar 8, 2024 | 87842 | BureauDistrict 3 | Sidewalk construction along various streets in Ladd. | — | Executed | Gensini Excavating, Inc. $282,441 · | ||
| Mar 8, 2024 | 87844 | GrundyDistrict 3 | Sidewalk and driveway replacement, and landscaping along IL 13 from 5th Avenue to Curtis Street in Diamond. | — | Executed | P. T. Ferro Construction Co. $507,801 · | ||
| Mar 8, 2024 | 87845 | LaSalleDistrict 3 | Sidewalk construction on 11th Street from Rutland Street to Carrie Lane, and on Rutland street from 11th Street to Fillebrowne Street in Marseilles. | — | Executed | Gensini Excavating, Inc. $544,677 · | ||
| Apr 26, 2024 | 66C45 | IroquoisDistrict 3 | Work beings at the Iroquois/Ford county line on IL 116 extending 8.22 miles, ending at the interchange limits of IL 116 and I 57. The project is a milling and resurfacing designed overlay of IL 116 including drainage improvements. | — | Executed | Iroquois Paving Corporation $5,775,587 · | ||
| Apr 26, 2024 | 66M98 | IroquoisKankakeeDistrict 3 | Work beings at 0.1 Mi N of Ambrose St in St Anne to 1.8 Mi S of Papineau Rd. 6.22 Miles of smart overlay with ADA and drainage repairs. | — | Executed | Iroquois Paving Corporation $2,586,271 · | ||
| Apr 26, 2024 | 66N40 | LivingstonDistrict 3 | Micro surfacing Joint Repair, Located on FAI 55 in Livingston County, from McLean County Line to 1.7 miles South of IL 116. | — | Executed | A. C. Pavement Striping Co. $577,571 · | ||
| Apr 26, 2024 | 66N44 | IroquoisDistrict 3 | Milling and resurfacing the Illinois Department of Transportation Ashkum Maintenance facility. | — | Executed | H. J. Eppel & Co. $781,331 · | ||
| Apr 26, 2024 | 66N50 | GrundyDistrict 3 | Raising existing concrete pavement adjacent to approach pavement IL 47 at the north abutment, southbound lanes of structure No. 032-0099; the work consists of raising existing concrete pavement adjacent to approach pavement. | — | Executed | D. Construction, Inc. $59,606 · | ||
| Apr 26, 2024 | 66N53 | BureauDistrict 3 | Bridge repairs at Structure No. 006-0083 carrying FAS 1252 (IL 26/29) over Bureau Creek Overflow, 0.3 mi. northeast of IL 26 and IL 29 junction. | — | Executed | Gensini Excavating, Inc. $431,733 · | ||
| Apr 26, 2024 | 66N54 | IroquoisDistrict 3 | Remove concrete slope wall, install stone riprap, filter fabric, stone bedding, replace expansion joint seal, and structural repair of concrete (pier) on SN 038-0174. | — | Executed | Iroquois Paving Corporation $313,415 · | ||
| Apr 26, 2024 | 66N92 | LaSalleDistrict 3 | Cleaning and painting all structural steel on Structure No. 050-0019 carrying IL 351 over the Lone Star Cement Railroad, 2.0 miles south of US Route 6 (Oglesby). | — | Executed | ERA-Valdivia Contractors, Inc. $186,186 · | ||
| Apr 26, 2024 | 66N93 | BureauDistrict 3 | Cleaning and painting all structural steel on Structure No. 006-0083 carrying IL 29/26 over Big Bureau Creek Overflow, 0.3 mi. north of the south junction of IL 26 and Structure No. 006-0084 carrying IL 29 over over Big Bureau Creek, 0.3 mi. south of the south junction of IL 26. | — | Executed | ERA-Valdivia Contractors, Inc. $548,417 · | ||
| Apr 26, 2024 | 66N96 | KankakeeDistrict 3 | SN 046-0108, riprap replacement, controlled low-strength material, riprap removal, grout for use with riprap. | — | Executed | Tobey's Construction & Cartage, Inc. $33,295 · | ||
| Apr 26, 2024 | 66N97 | IroquoisDistrict 3 | Traffic Signal Mast Arm Replacement. This project is located in Iroquois County, at the west intersection of US-24 and IL-1 in Watseka. | — | Executed | Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $299,323 · | ||
| Apr 26, 2024 | 87791 | GrundyDistrict 3 | Rehabilitate the bridge carrying CH 34V over the Mazon Ricer, 0.7 mile north of I-55, and replace the bridge carrying FAS 272 over an Unnamed Creek 3 miles southwest of Mazon. | — | Executed | D. Construction, Inc. $1,773,338 · | ||
| Apr 26, 2024 | 87792 | GrundyDistrict 3 | Replace 3 structures on Grand Ridge Road over Hog Run, Bills Run and Waupecan Creek, located between LaSalle Road anc Verona Road. | — | Executed | Riber Construction, Inc. $1,942,958 · | ||
| Apr 26, 2024 | 87794 | IroquoisDistrict 3 | Replace the bridge carrying CH 40 over a tributary to Possum Trot Ditch, 3.5 miles south of Sheldon. | — | Executed | Iroquois Paving Corporation $1,057,026 · | ||
| Apr 26, 2024 | 87815 | BureauDistrict 3 | Replace the bridge carrying TR 312 over the Tributary to Masters Creek, 4 miles west of LaMolle. | — | Executed | Curnyn Construction Co. $499,288 · | ||
| Apr 26, 2024 | 87820 | LivingstonDistrict 3 | Replace existng structure with a three-span RC slab bridge with HMA approach, aggregate and HMA shoulders, and guardrail improvements on CH 3 over Broughton Creek, one mile north of Campus. | — | Executed | Tobey's Construction & Cartage, Inc. $737,652 · | ||
| Apr 26, 2024 | 87824 | BureauDistrict 3 | Resurface CH 8 from east city limits of Walnut to 2600 Avenue/CH 22, and from the Lee County line to IL 92. | — | Executed | Advanced Asphalt Company $949,527 · | ||
| Apr 26, 2024 | 87826 | DeKalbDistrict 3 | HMA resurfacing and shoulders on Chicago Road from the Lee County line to Shabbona Road, on Rollo Road from Chicago Road to Suydam Road, and on Suydam Road from Rool Road to the LaSalle County Line. | — | Executed | Curran Contracting Company $2,522,533 · | ||
| Apr 26, 2024 | 87829 | KankakeeDistrict 3 | Resurfacing CH 3 from the Iroquois County line to CH 37. | — | Executed | Kankakee Valley Construction Company, Inc. $323,707 · | ||
| Apr 26, 2024 | 87831 | LivingstonDistrict 3 | HMA Resurfacing with Cold-In-Place Recycling, aggregate base course widening, and aggregate shoulders on CH 6 rom 20000N Road to CH 8. | — | Executed | Kankakee Valley Construction Company, Inc. $2,522,672 · | ||
| Apr 26, 2024 | 87847 | LaSalleDistrict 3 | Resurfacing CH 2 from the Somonauk South City Limits to US 52. | — | Executed | Curran Contracting Company $2,100,248 · | ||
| Jun 14, 2024 | 46644 | VariousDistrict 3 | Removing and replacing raised reflective pavememt_markers and reflectors on various highways, freeways, and expressways in various counties in District 3. | — | Executed | STF, LLC d/b/a Traffic Control Company $429,420 · | ||
| Jun 14, 2024 | 46652 | VariousDistrict 3 | Removing and replacing raised reflective pavement markers and reflectors on various highways, freeways, and expressways in various counties in District 3. | — | Executed | STF, LLC d/b/a Traffic Control Company $315,454 · | ||
| Jun 14, 2024 | 66H56 | LivingstonDistrict 3 | Milling and resurfacing, culvert repairs, and latex overlays on I-55 0.8 miles north of Wolf Creek to 1.8 miles south of IL 17 and CH1 in Odell from OR 66 to 0.25 miles east of N 2000 Rd. | — | Executed | Kankakee Valley Construction Company, Inc. $39,441,550 · | ||
| Jun 14, 2024 | 66K66 | BureauDistrict 3 | Arispie Township superstructure replacement of SN 006-0053 and SN006-0054 and bridge replacement of SN 006-0051 and SN 006-0052. SN 006-0051 and SN 006-0052 carry I 180 over Bureau Creek and SN 006-0053 and SN 006-0054 carry I 180 over CH 23 (Bottom Road). | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $24,206,955 · | ||
| Jun 14, 2024 | 66K85 | LaSalleDistrict 3 | 2.6 Miles. SN 050-0040 Bridge Replacement with 2 span SN 050-0265 US 34 reprofiling and detour route improvements. Located on US 34 over Indian Creek in Earlville 0.3 miles east of 1251st Road. | — | Executed | D. Construction, Inc. $5,077,494 · | ||
| Jun 14, 2024 | 66L10 | KankakeeDistrict 3 | This project is located on FAP 41 (IL 17) 0.7 mile east of Union Hill Road, consisting of replacing SN 046-0031 with SN 046-0162, carrying FAP 41 (IL 17) over Horse Creek. | — | Executed | Tobey's Construction & Cartage, Inc. $1,975,085 · | ||
| Jun 14, 2024 | 66N38 | GrundyDistrict 3 | Variable depth milling and resufacing of Ashley Road and US-6 intersection in Morris city (Grundy County). | — | Executed | Gallagher Asphalt Corporation $85,098 · | ||
| Jun 14, 2024 | 66N52 | KankakeeDistrict 3 | Bridge repairs including expansion joint replacement, deck and approach patching, structural repair of concret This project consists of bridge repairs including expansion joint replacement, deck and approach patching, structural repair of concrete, drain cleaning, traffic control, pavement striping; on F.A.P. Route 332 (IL 1/17) at two structures, Structure No. 046-0023 and Structure No. 046-0111 carrying IL 1/17 over the Kankakee River in Momence. | — | Executed | Tobey's Construction & Cartage, Inc. $850,262 · | ||
| Jun 14, 2024 | 66N60 | DeKalbDistrict 3 | I+stallation of a flashing red beacon at each of the stop controlled approaches to the intersections of IL 23 with and Melms, Perry and Baseline RD. It also includes the installation of a flashing yellow beacon at each of the advanced intersection warning signs adjacent to IL 23. | — | Executed | William Charles Construction Co, LLC $240,792 · | ||
| Jun 14, 2024 | 66N62 | GrundyDistrict 3 | Installation of flashing beacons. | — | Executed | D. Construction, Inc. $248,311 · | ||
| Jun 14, 2024 | 66N75 | LaSalleDistrict 3 | 3.46 Miles OF Class B pavement patching and shoulder repair. Work is at the exterior ramps of I-39. | — | Executed | Advanced Asphalt Company $1,918,205 · | ||
| Jun 14, 2024 | 66P02 | LivingstonDistrict 3 | Pavement patching_(ramps and parking areas), sidewalk (ADA), curb and gutter, driveway pavement, and striping on FAI 55 at the Northbound Limestone Rest Area, 3.52 miles south of IL 116 (Pontiac) and Southbound Limestone Rest Area, 2.52 miles south of IL 116 (Pontiac). | — | Executed | K-Five Construction Corporation $2,825,368 · | ||
| Jun 14, 2024 | 66P06 | LaSalleDistrict 3 | Removal and replacement of the finger plate expansion joint elastomeric troughs on SN 050-0191 carrying I-39 over the Illinois River, IAIS Railroad, and an abandoned railroad approximately 2.82 miles south of Interstate 80 (I-80). | — | Executed | D. Construction, Inc. $1,356,516 · | ||
| Jun 14, 2024 | 66P12 | FordDistrict 3 | Class B pavement patching on F This project consists of Class B pavement patching on F.A.P. Route 681 (IL 116) beginning at the Ford/Iroquois County Line and ending at the Ford/Livingston County Line. | — | Executed | G. M. Sipes Construction, Inc. $534,046 · | ||
| Jun 14, 2024 | 66P13 | FordDistrict 3 | Class B pavement patching on F This project consists of Class B pavement patching on F.A.P. Route 796 (IL 115) beginning at Pine street (1450E Rd.) in Piper City and ending at the intersection of IL 115/116. | — | Rejected | G. M. Sipes Construction, Inc. $622,863 · | ||
| Jun 14, 2024 | 66P14 | IroquoisDistrict 3 | Class A pavement patching on FAI 57 beginning at MM 285.5, 2.5 miles north of US 24 (Gilman Interchange) and ending at MM 293.5, 0.64 mile north of IL 116 (Ashkum Interchange). | — | Executed | G. M. Sipes Construction, Inc. $511,011 · | ||
| Jun 14, 2024 | 66P15 | BureauPutnamDistrict 3 | 17.63 Miles. Centerline joint repair 3' wide and 2" depth resurfacing. This project begins south of the interchange between I 80 and I 180 and continues south to IL 29 and east toward Hennipen. The project terminates at both: the west side of Coffee Creek in Hennepin IL 29 and south at The Illinois River Road National Scenic Byway. | — | Executed | Advanced Asphalt Company $1,857,288 · | ||
| Jun 14, 2024 | 66P23 | BureauDistrict 3 | Crack and Joint Sealing, located on FAP 698 (IL 89), FAU 5605 (US 6), FAS 1248 (US 34/US 6), FAP 316 (IL 26) i This project consists of Crack and Joint Sealing, located on FAP 698 (IL 89), FAU 5605 (US 6), FAS 1248 (US 34/US 6), FAP 316 (IL 26) in Bureau County. | — | Executed | Denler, Inc. $185,981 · | ||
| Jun 14, 2024 | 66P24 | LaSalleDistrict 3 | 14.45 miles of routing and crack sealing. Work begins in Ottawa at IL 23 and E Freemont Street on IL 23/IL71 including Columbus Street and LaSalle Street. Work continues at the intersection of Hitt Street and IL 23 to McKinley Rd. Work continues in Streator on IL 18, 0.1 miles east of IL 251 to east 0.1 miles West of E 16th Rd. | — | Executed | Denler, Inc. $88,496 · | ||
| Jun 14, 2024 | 66P27 | BureauDistrict 3 | Class B Pavement Patching on F.A.I. Route 80 (I-80) beginning at M.M. 45.0, 0.1 miles east of IL Route 40 and ending at M.M. 59.6, 0.47 miles east of US Route 34. | — | Executed | G. M. Sipes Construction, Inc. $798,437 · | ||
| Jun 14, 2024 | 66P28 | BureauDistrict 3 | This project is located at Structure_No. 006-0057 (EB) carrying F.A.I. Route 180 (I-180), Roadway "F" and structure No. 006-0058 (WB) carrying_F.A.I. Route 180 (I-180), Roadway "E" over IL Route 29 and the IAIS Railroad approximately 2.0 miles southwest of Bureau Junction. Removal of PCC slope wall/riprap placement. | — | Executed | Phoenix Corporation of the Quad Cities $405,752 · | ||
| Jun 14, 2024 | 66P29 | IroquoisDistrict 3 | 8.09 miles, Crack and joint sealing, US 24 to US 45/52. | — | Executed | Freehill Asphalt, Inc. $83,979 · | ||
| Jun 14, 2024 | 66P31 | VariousDistrict 3 | One year contract to repair damaged High Tension Cable Median Barrier, Guardrail, Attenuators, etc., caused by motorists along various routes in District 3. Funded by MCHD funds, Contract Maintenance funds, and Maintenance of HTC Median Barrier funds. | — | Rejected | Northern Contracting, Inc. $1,803,903 · | ||
| Jun 14, 2024 | 66P38 | LaSalleDistrict 3 | Class A pavement patching, joint and pothole repairs, striping and traffic control on FAI 39 beginning at the Marshall/LaSalle County Line and ending at the LaSalle/Lee County Line in LaSalle County. | — | Executed | G. M. Sipes Construction, Inc. $793,086 · | ||
| Jun 14, 2024 | 66P40 | GrundyLaSalleDistrict 3 | Centerline striping on I-39 in LaSalle County and on I-80 in LaSalle and Grundy Counties. | — | Executed | Maintenance Coatings Co. $1,382,491 · | ||
| Jun 14, 2024 | 66P41 | VariousDistrict 3 | Pavement striping This project is located on IL 23 in LaSalle CO., IL 47 in Grundy Co. and IL 17 in Kankakee Co. This work consists of pavement striping. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $428,427 · | ||
| Jun 14, 2024 | 87722 | DeKalbDistrict 3 | Replace the bridge carrying Pearl Street over South branch of the Kishwaukee ri ver in the Village of Kirkland. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $3,263,762 · | ||
| Jun 14, 2024 | 87749 | DeKalbDistrict 3 | HMA bike path with concrete sidewalk, curb and gutter, storm sewers, and other work along Fairview Drive from Macom Drive to West of Peace Road in the City of Dekalb. | — | Executed | Elliott and Wood, Inc. $498,000 · | ||
| Jun 14, 2024 | 87789 | DeKalbDistrict 3 | Replace the bridge carrying Perry Road over Branch Battle Creek located 1 mile East of Somonauk Road. | — | Executed | Sjostrom & Sons, Inc. $626,763 · | ||
| Jun 14, 2024 | 87801 | LaSalleDistrict 3 | HMA Resurfacing and widening with HMA shoulders, aggregate shoulder, culvert re placement, pavement marking, shoulder rubmble strips, gaurdrail replacement, an d other work along county highway from 21st road to the Livingston county line. | — | Executed | Advanced Asphalt Company $6,972,036 · | ||
| Jun 14, 2024 | 87816 | BureauDistrict 3 | Replace the bridge carring TR 85 over Masters Creek, 3 miles southest of Ohio. | — | Executed | Curnyn Construction Co. $539,871 · | ||
| Jun 14, 2024 | 87817 | BureauDistrict 3 | Replace the bridge carrying CH 12 over East Bureau Creek, 2 miles west of Arlington. | — | Executed | Sjostrom & Sons, Inc. $436,742 · | ||
| Jun 14, 2024 | 87818 | DeKalbDistrict 3 | Replace the bridge carrying TR 230 over West branch of Big Rock Creek located 0 .8 miles Northeast of Hinckley Scott Road. | — | Executed | Sjostrom & Sons, Inc. $1,281,196 · | ||
| Jun 14, 2024 | 87819 | FordDistrict 3 | Constuct a cast-in-place box culvert with HMA approaches and guardrail to carry Thawville Road over an unnamed creek. | — | Executed | Tobey's Construction & Cartage, Inc. $462,541 · | ||
| Jun 14, 2024 | 87823 | LivingstonDistrict 3 | Construct a single-span PPC deck beam bridge on spill-through abutments to carry TR 18C (400 E Road) over Scattering Point Creek, 1 mile south of Flanagan . Projects includes HMA approaches, aggregate shoulders, channel excavation, and seeding. | — | Executed | Tobey's Construction & Cartage, Inc. $432,451 · | ||
| Jun 14, 2024 | 87825 | DeKalbDistrict 3 | HMA resurfacing with 3-foot HMA shoulders on Glidden Road from IL 72 to IL 64. | — | Executed | Rock Road Companies, Inc. $2,477,234 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.