Filtered by: District: District 3 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jun 17, 2022 | 66L48 | GrundyDistrict 3 | Rest area and renovations, I-80 Three Rivers Rest Stop. | — | Executed | D. Construction, Inc. $2,364,030 · | ||
| Jun 17, 2022 | 66L58 | DeKalbKendallDistrict 3 | 5.41 miles, Milling and Resurfacing (Designed Overlay) and ADA 0.2 miles East of Somonauk Rd in Somonauk to Chilton Way in Plano. | — | Executed | D. Construction, Inc. $6,075,158 · | ||
| Jun 17, 2022 | 66L88 | KankakeeDistrict 3 | 3P milling and resurfacing (designed overlay), ADA This work is located at FAP 631 (IL 102) from Will County line to US 45/52 in Bourbonnais in Kankakee County (+/-8.14 miles). This work consists of 3P milling and resurfacing (designed overlay), ADA. | — | Executed | P. T. Ferro Construction Co. $8,398,082 · | ||
| Jun 17, 2022 | 66L89 | FordDistrict 3 | 3P milling and resurfacing (designed overlay), and drainage improvements including culvert replacement, ditch This work is located at FAP 697 (IL 9) from Stockholm Road in Paxton to Vermillion County Line in Ford County (+/- 7.68 miles). This work consists of 3P milling and resurfacing (designed overlay), and drainage improvements including culvert replacement, ditch grading, channel excavation and riprap placement. | — | Executed | Iroquois Paving Corporation $4,972,663 · | ||
| Jun 17, 2022 | 66M02 | DeKalbDistrict 3 | This work is located at Structure No. 019-0012 carrying FAP Route 17 (IL 64) over the Kishwaukee River approximately 1.5 miles West of Jct. IL 23 (Sycamore) This work consists riprap placement, guardrail removal and replacement, expansion joint replacement, deck patching, pavement striping, and other related construction items. | — | Executed | Sjostrom & Sons, Inc. $370,683 · | ||
| Jun 17, 2022 | 66M05 | IroquoisDistrict 3 | Replacing the high mast light towers This project is located at the Mainline Rest Areas in Buckley on I-57. The work consists of replacing the high mast light towers. | — | Executed | Van-Mack Electric Co. $785,218 · | ||
| Jun 17, 2022 | 66M13 | PutnamDistrict 3 | Cleaning and painting all structural and non-structural steel components of the structure This project is located at Structure No. 078-0022 carrying CH 1 over I-180, approximately 0.46 miles west of the I-180 and IL Route 26 Interchange near Hennepin. This project consists of cleaning and painting all structural and non-structural steel components of the structure. | — | Executed | Venus Painting Co. $258,968 · | ||
| Jun 17, 2022 | 66M15 | LaSalleDistrict 3 | The installation of an overhead flashing beacon at the intersection of IL 71 and US 52 in LaSalle County This project consists of the installation of an overhead flashing beacon at the intersection of IL 71 and US 52 in LaSalle County. An additional flashing beacon will be installed adjacent to each of the four legs at the existing intersection warning sign location. | — | Executed | D. Construction, Inc. $200,000 · | ||
| Jun 17, 2022 | 66M16 | LaSalleDistrict 3 | This project consists of 6.8 miles of shoulder widening and rumble strip installation on IL 170 from N 16th Rd to N 21st Rd in LaSalle County. | — | Executed | Advanced Asphalt Company $1,512,236 · | ||
| Jun 17, 2022 | 66M17 | KankakeeDistrict 3 | This project consists of 4.3 miles of shoulder widening and rumble strip installation on IL 115 from S 3000W Rd to 0.5 mi west of Curtis Ave in Kankakee County. | — | Executed | Gallagher Asphalt Corporation $1,297,408 · | ||
| Jun 17, 2022 | 66M18 | IroquoisDistrict 3 | This project consists of 2.9 miles of shoulder widening and rumble strip installation on IL 54 from N 200E Rd to 0.22 mi west of N 500E Rd in Iroquois County. | — | Executed | Iroquois Paving Corporation $1,212,384 · | ||
| Jun 17, 2022 | 66M21 | LivingstonDistrict 3 | Cleaning all structural steel and other steel components of the structures This project is located at three structures: Structure No. 053-0123 carrying E1400N Rd. over I-55 and Mazon River, 3 miles Southwest of Pontiac; SN 053-0047 carrying IL 47 over Five Mile Creek, 0.3 miles North of IL 116; SN 053-0168 carrying IL 47 over the Vermilion River, 0.4 miles South of US 24. This project consists of cleaning all structural steel and other steel components of the structures. | — | Executed | Venus Painting Co. $710,553 · | ||
| Jun 17, 2022 | 66M25 | LaSalleDistrict 3 | Of cleaning and painting all structural and non-structural steel components of the structure This project is located at Structure No. 050-0233 carrying FAS 1265 (Old US 34, W. Union Street) over Indian Creek in Earlville. This work consists of of cleaning and painting all structural and non-structural steel components of the structure. | — | Executed | ERA-Valdivia Contractors, Inc. $189,647 · | ||
| Jun 17, 2022 | 66M35 | BureauLaSalleDistrict 3 | Washing all structural and non-structural steel, entire bridge deck surface, parapet walls, abutment seats, to This project is located at five structures spanning the Illinois River in IDOT District 3. This work consists of washing all structural and non-structural steel, entire bridge deck surface, parapet walls, abutment seats, tops of piers, deck drains and scuppers. | — | Executed | All States Painting, Inc. $378,400 · | ||
| Jun 17, 2022 | 66M40 | LaSalleDistrict 3 | Class A and B patching, pavement marking, and shoulder reconstruction This project is located on I-39 beginning at the Marshall Co line and ending at 0.3 mi S of the Lee Co line (36.2 miles); I-80 interchange ramps._The work shall consist of Class A and B patching, pavement marking, and shoulder reconstruction. | — | Executed | G. M. Sipes Construction, Inc. $2,515,927 · | ||
| Jun 17, 2022 | 66M44 | VariousDistrict 3 | One year contract repair damaged High Tension Cable Median Barrier, Guard Rail Attenuators, etc., caused by motorists along various routes in District 3. | — | Executed | Northern Contracting, Inc. $1,767,718 · | ||
| Jun 17, 2022 | 66M50 | KankakeeDistrict 3 | Milling and resurfacing, striping, and pavement markers This project is located on F.A.P. Route 332 (IL 71) beginning approximately 630 feet North of the intersection of IL Route 1 and IL Route 17 on the East side of Grant Park and ending approximately 650 feet North of The intersection of IL Route 1 and 9000N Rd. This work consists of milling and resurfacing, striping, and pavement markers. | — | Executed | Gallagher Asphalt Corporation $607,878 · | ||
| Jun 17, 2022 | 66M58 | VariousDistrict 3 | Districtwide, Vegetation Control - Tree Removal. | — | Executed | Nettle Creek Nursery, Inc. $396,348 · | ||
| Jun 17, 2022 | 66M59 | IroquoisLivingstonDistrict 3 | At Buckley interchange; at Limestone rest area south of Pontiac Vegetation Control - Tree Removal. | — | Executed | CSD Environmental Services, Inc. $456,330 · | ||
| Jun 17, 2022 | 66M60 | FordDistrict 3 | Class A Pavement Patching and related construction work This work is located on FAI Route 57 (I-57) beginning at the Champaign County Line (M.M. 257.08) and ending at the Iroquois County Line (M.M. 263.51). This work consists of Class A Pavement Patching and related construction work. | — | Executed | G. M. Sipes Construction, Inc. $231,790 · | ||
| Jun 17, 2022 | 66M61 | IroquoisDistrict 3 | This project includes a small native planting project at the Ashkum Maintenance Yard using wildflower seeding. | — | Rejected | |||
| Jun 17, 2022 | 87756 | GrundyDistrict 3 | Replace the bridge carrying DuPont Road over Waupecan Creek. | — | Executed | Austin Tyler Construction, Inc. $1,177,778 · | ||
| Jun 17, 2022 | 87769 | IroquoisDistrict 3 | Replace the bridge carrying 1000 East Road over a tributary to Little Mud Creek , 3 miles northwest of Cissna. | — | Rejected | Iroquois Paving Corporation $785,132 · | ||
| Jun 17, 2022 | 87778 | BureauDistrict 3 | Replace the double barrel box culvert with a 10' x 12' double barrel reinforced concrete box culvert over Hickory Creek at Backbone Road. | — | Executed | Gensini Excavating, Inc. $961,378 · | ||
| Jun 17, 2022 | 87779 | DeKalbDistrict 3 | Replace two bridges in DeKalb; Lucinda Avenue over the south branch of the Kishwaukee River, and North First Street over the south branch of the Kishwaukee River. | — | Executed | Herlihy Mid-Continent Company $5,253,737 · | ||
| Jun 17, 2022 | 87786 | KendallDistrict 3 | Resurface Bristol Ridge Road from Kennedy Road to US 34 in Yorkville. | — | Executed | D. Construction, Inc. $446,274 · | ||
| Jun 17, 2022 | 87798 | FordDistrict 3 | Resurfacing and aggregate shoulders on Elliot Road from 12 North Road to IL 54. | — | Rejected | Iroquois Paving Corporation $397,927 · | ||
| Jul 15, 2022 | 66M52 | GrundyDistrict 3 | Removal and replacement of highway light poles, luminaries and breakaway couplings This work is located at the Interchange of I-80 and IL 47 in Grundy County. This work consists of removal and replacement of highway light poles, luminaries and breakaway couplings. | — | Active | Electric Conduit Construction $184,785 · | ||
| Sep 23, 2022 | 66D26 | KendallDistrict 3 | The reconstruction of IL 71 from 0 Project consists of the reconstruction of IL 71 from 0.16 mi. E of IL 126 to W of Orchard Rd_in Kendall County. Additional work involves several structure replacements within project limits, construction of shared-use path, tree removal, traffic signal and lighting upgrades. Length of the job is 3.8 miles. The job will be staged. | — | Executed | D. Construction, Inc. $32,993,337 · | ||
| Sep 23, 2022 | 66F92 | LivingstonDistrict 3 | Removal and replacement of the existing bridge (SN 053-0029) carrying IL 17 over Manville Drainage Ditch The project consists of removal and replacement of the existing bridge (SN 053-0029) carrying IL 17 over Manville Drainage Ditch. The work also includes slope/ditch grading, guardrail upgrades, and resurfacing. The temporary steel support shall be salvaged from the existing structure. A detour will be used. | — | Executed | Riber Construction, Inc. $1,025,425 · | ||
| Sep 23, 2022 | 66M39 | VariousDistrict 3 | This project includes the installation of various combinations of new traffic signal heads, retroreflective backplates, and LED signal face lens covers. The work is proposed at eight intersections located in DeKalb, Kankakee, Kendall, and LaSalle Counties. | — | Executed | H & H Electric Co. $449,954 · | ||
| Sep 23, 2022 | 66M68 | PutnamDistrict 3 | HMA milling and resurfacing (designed overlay), pavement marking, and raised reflectors This project is located on FAS 2370/OR 26 (IL 26) from Old IL 26 0.32 mile North to the factory entrance. The work consists of HMA milling and resurfacing (designed overlay), pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $762,771 · | ||
| Sep 23, 2022 | 66M91 | BureauLaSalleDistrict 3 | Centerline milling and resurfacing 2 feet wide, at a depth of 2", pavement marking, and raised reflectors This project is located on FAI 80 (I-80) from 0.7 mile East of I-180 to 0.7 mile West of Il 251. The work consists of centerline milling and resurfacing 2 feet wide, at a depth of 2", pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $1,093,285 · | ||
| Sep 23, 2022 | 87726 | KankakeeDistrict 3 | Pavement reconstruction and widening including drainage system improvements on Hobbie Avenue from IL 50 to IL 17 in Kankakee. | — | Executed | Kankakee Valley Construction Company, Inc. $6,698,482 · | ||
| Nov 18, 2022 | 66E96 | KendallDistrict 3 | .01 mi culvert replacement SN 047-2517 Stream 0.4 mi N of Chicago Rd. | — | Executed | D. Construction, Inc. $676,579 · | ||
| Nov 18, 2022 | 66F20 | KankakeeDistrict 3 | Work begins on IL 115 1/3 miles north of Gar Creek in southwest Kankakee and ends at the intersection of S Washington Avenue and W Jeffery Street in Kankakee. The project is a milling and resurfacing with a designed overlay of IL 115 including drainage and ADA improvements. | — | Executed | Kankakee Valley Construction Company, Inc. $2,189,960 · | ||
| Nov 18, 2022 | 66M31 | BureauDistrict 3 | Milling and resurfacing 1 1/2" (SMART), aggregate shoulders, guardrail work, pavement marking, and raised refl This project is located on FAP 587 (US 34) beginning N. of LaMoille and ending at the LaSalle County line,_for a total of 5.85 miles. Work consists of milling and resurfacing 1 1/2" (SMART), aggregate shoulders, guardrail work, pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $1,765,431 · | ||
| Nov 18, 2022 | 66M38 | IroquoisDistrict 3 | This project consists of 5.3 miles of shoulder widening and rumble strip installation on IL 1 from 0.02 mi South of E 2500N Rd to 0.22 mi North of E 1950N Rd in Iroquois County. | — | Executed | Iroquois Paving Corporation $2,063,122 · | ||
| Nov 18, 2022 | 66M51 | LaSalleDistrict 3 | Structure No. 050-2574, Box Culvert Rehabilitation, 2.47 miles north of US Route 52. | — | Executed | Riber Construction, Inc. $337,464 · | ||
| Nov 18, 2022 | 66M74 | BureauDistrict 3 | Structure No. 006-0153, Bridge Rehabilitation, 3.3 mi. west of US 34 (Lamoille). | — | Executed | D. Construction, Inc. $546,258 · | ||
| Nov 18, 2022 | 87768 | GrundyDistrict 3 | Replace superstructure carrying Brisbin Road over Collins Run Creek, 1.4 miles south of Minooka. | — | Executed | D. Construction, Inc. $787,230 · | ||
| Nov 18, 2022 | 87810 | LaSalleDistrict 3 | Construction of a soldier pile wall and slope stabilization along North 2550th Road from North 2551st Road to a point approximently 0.25 mile east along 2550th Road in the Peru Road District. | — | Executed | D. Construction, Inc. $1,662,869 · | ||
| Jan 20, 2023 | 66824 | DeKalbDistrict 3 | This project is located in Clinton Township, approximately 40 feet north of the intersection with US 30 (2.0 mile east of Waterman) in DeKalb County. | — | Executed | Herlihy Mid-Continent Company $431,778 · | ||
| Jan 20, 2023 | 66M66 | LaSallePutnamDistrict 3 | This project consists on performing Bridge Decks Concrete Sealing with the parapets/curbs on various routes at various location throughout LaSalle and Putnam Counties. | — | Executed | All States Painting, Inc. $169,800 · | ||
| Jan 20, 2023 | 66M73 | LaSalleDistrict 3 | Crack routing and filling as well as pavement marking This project is located on FAP 68 (IL 23) and FAP 623 (US 6). It consists of crack routing and filling as well as pavement marking. | — | Executed | Freehill Asphalt, Inc. $136,066 · | ||
| Jan 20, 2023 | 66N02 | IroquoisDistrict 3 | Bridge Painting at SN 038-0082, 2.62 miles South of IL 54 (Onarga). | — | Executed | Three Star Painting, Inc. $261,241 · | ||
| Jan 20, 2023 | 66N03 | IroquoisDistrict 3 | Bridge Painting at SN 038-0032, 2.1 mi. East of US 45 and SN 038-0033, 3.1 mi. East of US 45. | — | Executed | ERA-Valdivia Contractors, Inc. $248,590 · | ||
| Jan 20, 2023 | 87673 | LaSalleDistrict 3 | Replace the bridge carrying CH 57 over the Vermilion River, 1.2 miles north of 18th Road. | — | Executed | D. Construction, Inc. $4,537,912 · | ||
| Jan 20, 2023 | 87759 | KankakeeDistrict 3 | HMA multi-use path with concrete sidewalk replacement, curb and gutter, concrete pavement replacement, HMA surface removal and replacement, erosion control, landscaping, lighting, on the north side of IL1/IL17 in Grant Park. | — | Executed | Ruben E. Smith Const. and R & R, Inc. $416,337 · | ||
| Jan 20, 2023 | 87783 | KendallDistrict 3 | Convert 4-way intersection to HMA roundabout with drainage improvements, lighting and a multi-use path with ADA ramps. | — | Executed | Lake County Grading Company, LLC $10,257,420 · | ||
| Jan 20, 2023 | 87799 | KankakeeDistrict 3 | Resurfacing CH 18 from IL 17 to IL 115. | — | Executed | Kankakee Valley Construction Company, Inc. $1,044,289 · | ||
| Jan 20, 2023 | 87807 | LaSalleDistrict 3 | Resurface Chartres Street from Raccuglia Drive to Pershing Road in LaSalle. | — | Rejected | Advanced Asphalt Company $400,127 · | ||
| Mar 10, 2023 | 66M37 | LivingstonDistrict 3 | 5.52 miles of shoulder widening and rumble strip installation on IL 17 from IL 170 (N 1500E Rd) to N 2100E Rd in Livingston County. | — | Executed | D. Construction, Inc. $1,244,052 · | ||
| Mar 10, 2023 | 66M64 | LivingstonDistrict 3 | 1.55 mi. Ditch grading and shaping, CMP culvert removal, concrete slope wall removal, installing Precast Concrete Box Culverts, Precast Box Culvert End Sections, earthwork, seeding. Beginning at the Intersection of IL 116 and Deerfield Rd and ending at approximately 192 feet east of SN 053-0066. | — | Executed | Tobey's Construction & Cartage, Inc. $384,412 · | ||
| Mar 10, 2023 | 66M72 | KendallDistrict 3 | This project is located on FAU 2503 68 (IL 25) and FAP 860 (IL 31). | — | Executed | SKC Construction, Inc. $47,368 · | ||
| Mar 10, 2023 | 66N01 | BureauDistrict 3 | Removal of existing light structures and construction of new light poles and electrical control unit. | — | Executed | Electric Conduit Construction $406,731 · | ||
| Mar 10, 2023 | 66N04 | GrundyDistrict 3 | Bridge Painting: 032-0005 NB, 032-0006 SB over the Mazon River, 4.0 mi. south of Reed Rd.; 032-0007 NB, 032-0008 SB over the Union Pacific Railroad, 3.2 mi. south of Reed Rd. | — | Executed | ERA-Valdivia Contractors, Inc. $1,046,975 · | ||
| Mar 10, 2023 | 66N07 | BureauDistrict 3 | The work includes turf restoration, aerating, applying herbicide and soil amendments to all existing lawn areas, mulch placement in playgrounds and around existing landscape trees, tree trimming of existing landscape trees, and setup and removal of traffic control at the Great Sauk Trail Rest Area grounds on Eastbound and Westbound I-80 in Bureau County at approximately mile marker 51. | — | Rejected | |||
| Mar 10, 2023 | 66N08 | LivingstonDistrict 3 | The work includes turf restoration, aerating, applying herbicide and soil amendments to all existing lawn areas, mulch placement in playgrounds and around existing landscape trees, tree trimming of existing landscape trees, and setup and removal of traffic control at the Limestone Rest Area grounds on Northbound and Southbound I-55 in Livingston County at approximately mile marker 193/194. | — | Rejected | |||
| Mar 10, 2023 | 66N09 | IroquoisDistrict 3 | This project is located at the Main Line Station Rest Area grounds on NB and SB I-57 in Iroquois County at approximately mile marker 269. The work includes turf restoration, aerating, applying herbicide and soil amendments to all existing lawn areas, mulch placement in playgrounds and around existing landscape trees, tree trimming of existing landscape trees, and setup and removal of traffic control. | — | Rejected | |||
| Mar 10, 2023 | 66N10 | VariousDistrict 3 | Weed spraying to aid in weed control This project is located along various routes in Bureau, LaSalle, Grundy, Livingston, Kankakee, Iroquois, and Ford Counties. The work consists of weed spraying to aid in weed control. | — | Executed | Endrizzi Contracting, Inc $141,133 · | ||
| Mar 10, 2023 | 66N13 | LivingstonDistrict 3 | Milling, resurfacing and drainage work at the Pontiac Traffic Facility at 401 S. Ladd St. in Pontiac. | — | Executed | H. J. Eppel & Co. $203,759 · | ||
| Mar 10, 2023 | 87772 | DeKalbDistrict 3 | HMA resurfacing on Somonauk Road from North Avenue to IL 38 in Cortland. | — | Executed | Curran Contracting Company $422,826 · | ||
| Mar 10, 2023 | 87795 | KendallDistrict 3 | Replace existing box culvert with a triple-barrel box culvert with approaches to Schlapp Road and Walker Road at East Aux Sable Creek, 2 miles south of IL 126. | — | Executed | Riber Construction, Inc. $1,047,965 · | ||
| Mar 10, 2023 | 87796 | LivingstonDistrict 3 | Replace the bridge carrying TR 268 over Gosseberry Creek, 0.9 mile south of E 2700 Road North. | — | Executed | Tobey's Construction & Cartage, Inc. $336,879 · | ||
| Mar 10, 2023 | 87800 | KendallDistrict 3 | Extend Collins Road on a new alignment from Miknles Road to Grove Road, and the construction of Minkler Road from IL 71 to collins Road, in Oswego. | — | Executed | D. Construction, Inc. $12,117,223 · | ||
| Mar 10, 2023 | 87803 | LivingstonDistrict 3 | Resurfacing CH 6 from CH 8 to Cherry Street and CH 8 from CH 10 to CH 6. | — | Executed | H. J. Eppel & Co. $2,004,192 · | ||
| Mar 10, 2023 | 87804 | DeKalbDistrict 3 | HMA resurfacing with ADA Ramps, sidewalks, curb and gutter on DeKalb Avenue from Center Cross Street to West Elm Street, and on West Elm Street to South Main Street in Sycamore. | — | Executed | Curran Contracting Company $356,964 · | ||
| Mar 10, 2023 | 87808 | LivingstonDistrict 3 | Replace the bridge carrying TR 129 over Broughton Creet, 0.3 mile west of North 3300. | — | Executed | Tobey's Construction & Cartage, Inc. $472,941 · | ||
| Mar 10, 2023 | 87812 | KankakeeDistrict 3 | Construct an HMA Shared-Use Path with earth shoulders, storm sewers and ADA ramps along Esson Farm Road from east of Griffin Street to North Main Street in Grant Park. | — | Executed | M & J Underground Inc. $269,969 · | ||
| Mar 10, 2023 | 87813 | LaSalleDistrict 3 | Remove and replace sidewalks along various streets in the Kimes Elementary School area of Streator. | — | Executed | Tobey's Construction & Cartage, Inc. $417,120 · | ||
| Apr 28, 2023 | 46607 | VariousDistrict 3 | Repairing various widths of pavement marking including lines, letters, numbers and symbols This project is located on various highways, freeways and expressways throughout District 3. This work consists of repairing various widths of pavement marking including lines, letters, numbers and symbols. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,285,750 · | ||
| Apr 28, 2023 | 46608 | VariousDistrict 3 | Removing and replacing raised reflective pavement markers and reflectors This project is located on various highways, freeways and expressways throughout District 3. This work consists of removing and replacing raised reflective pavement markers and reflectors. | — | Executed | Marking Specialists Corporation $648,137 · | ||
| Apr 28, 2023 | 46609 | VariousDistrict 3 | Removing and replacing raised reflective pavement markers and reflectors This project is located on various highways, freeways and expressways in the following counties in District 3. Livingston, Grundy, Kankakee, Iroquois, and Ford. This work consists of removing and replacing raised reflective pavement markers and reflectors. | — | Executed | P & P Construction Co. $275,059 · | ||
| Apr 28, 2023 | 66F93 | LivingstonDistrict 3 | This project is located at the I-55 and IL 17 interchange, beginning at Sta. 32+90 and ending at Sta. 66+40, for a total of 0.63 miles, and includes the removal of SN 053-0014 and replacement with SN 053-0193. Other work includes HMA milling and resurfacing, pavement marking and raised reflective pavement markers. | — | Executed | D. Construction, Inc. $9,100,026 · | ||
| Apr 28, 2023 | 66J65 | BureauDistrict 3 | 9.49 miles of designed overlay with bridge repairs from the Henry county Line to IL 40 on Interstate 80. | — | Executed | Advanced Asphalt Company $36,870,619 · | ||
| Apr 28, 2023 | 66M19 | IroquoisDistrict 3 | This project consists of 8.0 miles of shoulder widening and rumble strip installation on IL 49 from 725 ft south of E 1200N Rd to just south of E 2000N Rd in Iroquois County. | — | Executed | Iroquois Paving Corporation $2,590,845 · | ||
| Apr 28, 2023 | 66M33 | LaSalleDistrict 3 | This project is located in LaSalle county, on I-80 over Fox River, 2.5 mile east of IL 23, Latex Overlay and bridge deck repairs. | — | Executed | D. Construction, Inc. $3,081,875 · | ||
| Apr 28, 2023 | 66M69 | LaSalleDistrict 3 | This project is located on county highway 13 over I-80, 0.45 mi west of the I-80 and I-39 interchange, and 6th Road over I-80, 0.57 mi east of the I-80 and I-39 interchange, in LaSalle county. Latex overlay, Bridge deck repairs. | — | Executed | D. Construction, Inc. $1,439,925 · | ||
| Apr 28, 2023 | 66M70 | BureauDistrict 3 | Bridge Approach removal and replacement, resurfacing, guardrail removal, and re-installation and pavement marking on IL 26 over Big Bureau Creek. | — | Executed | Stark Excavating, Inc. $653,949 · | ||
| Apr 28, 2023 | 66M75 | LivingstonDistrict 3 | Bridge Repairs at SN 053-0027, 2.5 mi. east of IL 23 and SN 053-0167, 2.8 mi. east of IL 23. | — | Executed | P. T. Ferro Construction Co. $959,278 · | ||
| Apr 28, 2023 | 66N14 | FordDistrict 3 | Milling, resurfacing at the Gibson City Maintenance Facility located at 401 S. Illinois Dr. just east of Gibson City. | — | Executed | Iroquois Paving Corporation $294,354 · | ||
| Apr 28, 2023 | 66N20 | VariousDistrict 3 | Repair and maintain Traffic signal, Flashing beacons and Roadway lighting in various counties in District 3. | — | Executed | Laser Electric, Inc. $2,104,115 · | ||
| Apr 28, 2023 | 87793 | IroquoisDistrict 3 | Remove existing structure and replace with a single span PPC deck beam bridge with aggregate approach on 1100 E Road over Branch of Prairie Creek, 2.9 miles southeast of Ashkum. | — | Executed | Iroquois Paving Corporation $455,093 · | ||
| Apr 28, 2023 | 87797 | BureauDistrict 3 | HMA overlay with aggregate shoulders on CH 8 from CH 12 to US 6. | — | Executed | Advanced Asphalt Company $2,153,163 · | ||
| Apr 28, 2023 | 87814 | IroquoisDistrict 3 | Resurfacing CH 10 from the Ford County line to US 45. | — | Executed | Iroquois Paving Corporation $1,002,116 · | ||
| Jun 16, 2023 | 66B05 | LaSalleLivingstonDistrict 3 | Milling and resurfacing with a designed overlay of IL 18 including storm_sewer construction, drainage and ADA ramp improvements. From the intersection of IL 17 and IL 18 in south eastern Streator and ends at the intersection of Otter Creek Road and IL 18 in Streator. | — | Executed | Advanced Asphalt Company $4,236,173 · | ||
| Jun 16, 2023 | 66M71 | GrundyDistrict 3 | Crack Filling on FAP 326 (IL 47) 0.1 MI S of Southmor Rd to 0.2 MI S of IL 113 for a total of 3.59 MI. | — | Executed | Denler, Inc. $69,016 · | ||
| Jun 16, 2023 | 66M76 | LaSalleDistrict 3 | This work is located at two box culverts on IL Route 170: SN 050-2542 and SN 050-2543. | — | Executed | D. Construction, Inc. $627,241 · | ||
| Jun 16, 2023 | 66N26 | GrundyDistrict 3 | Pavement widening with resurfacing of Morey Road and Seneca Road including minor drainage improvements. | — | Executed | D. Construction, Inc. $375,288 · | ||
| Jun 16, 2023 | 66N28 | VariousDistrict 3 | Repair damaged High Tension Cable Median Barrier, Guardrail, Attenuators, etc., caused by motorists along various routes in District 3. One year contract. | — | Executed | Northern Contracting, Inc. $2,597,629 · | ||
| Jun 16, 2023 | 66N43 | GrundyLaSalleDistrict 3 | Washing the bridge components and replacing the elastomeric (expansion) trough on SN 050-0079 and the structur This project consists of washing the bridge components and replacing the elastomeric (expansion) trough on SN 050-0079 and the structure carrying IL 47 over the Illinois River and the IandM Canal approximately 1.2 miles south of US 6 in Morris. | — | Executed | All States Painting, Inc. $349,800 · | ||
| Jun 16, 2023 | 87790 | FordDistrict 3 | Replace the bridge carrying Buckingham Road over Kelly Creek located 3.3 mile north of IL 116. | — | Executed | Tobey's Construction & Cartage, Inc. $613,170 · | ||
| Jun 16, 2023 | 87806 | BureauDistrict 3 | HMA resurfacing with ADA curb ramps, curb and gutter, sidewalks, and Pavement markings on 4th Street from Strong Avenue to Greenwood Street in Spring Valley. | — | Executed | Advanced Asphalt Company $381,331 · | ||
| Jun 16, 2023 | 87809 | IroquoisDistrict 3 | Resurfacing various routes within the City of Watseka. | — | Executed | Iroquois Paving Corporation $537,824 · | ||
| Jun 16, 2023 | 87836 | LaSalleDistrict 3 | Resurface Chartres Street Raccuglia Drive to 24th Street in La Salle. | — | Executed | Advanced Asphalt Company $353,063 · | ||
| Jun 16, 2023 | 87837 | LaSalleDistrict 3 | Sidewalk reconstruction with ADA accommodations along Shooting Park Road from Sycamore Street to Parkside School entrance in Peru. | — | Executed | Gensini Excavating, Inc. $119,776 · | ||
| Aug 4, 2023 | 66M89 | IroquoisDistrict 3 | HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors This job is located on FAP 317 (US 24) from 0.1 mile east of IL 45 to IL 49 in Crescent City, for a length of 5.87 miles. The work consists of HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors. | — | Executed | Iroquois Paving Corporation $2,370,974 · | ||
| Aug 4, 2023 | 66N15 | KankakeeDistrict 3 | This project is located at the intersection of IL-17 and IL-1 in Kankakee County, to replace two traffic signal mast arms in northbound and southbound traffic. | — | Executed | Outsen Electric, Incorporated $160,756 · | ||
| Aug 4, 2023 | 66N21 | VariousDistrict 3 | Repairing and maintaining traffic signals, flashing beacons, and roadway lighting in Grundy and Kankakee Count Repairing and maintaining traffic signals, flashing beacons, and roadway lighting in various counties in District 3. | — | Active | Outsen Electric, Incorporated $339,315 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.