15-00278-00-FP
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Kankakee Valley Construction Company, Inc. Low bidder | $6,698,482 | ||
| 2 | Ruben E. Smith Const. dba R & R, Inc. | $7,265,739 | +8.5% | |
| 3 | Gallagher Asphalt Corporation | $9,662,948 | +44.3% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Kankakee Valley… | #2 Ruben E. Smith … | #3 Gallagher Aspha… |
|---|---|---|---|---|---|---|---|---|
| 1 | XX005431 | LOC UNDERGR UTILITY | 5 | EACH | $735.00 | $800.00 | $1,100.00 | |
| 2 | X0322208 | TEMP STORM SEWER PLUG | 20 | EACH | $475.00 | $300.00 | $360.00 | |
| 3 | X0322936 | REMOV EX FLAR END SEC | 1 | EACH | $260.00 | $275.00 | $330.00 | |
| 4 | X0325405 | FILL EX STORM SEWERS | 18 | CU YD | $310.00 | $209.00 | $250.00 | |
| 5 | X0326806 | WASHOUT BASIN | 1 | L SUM | $1,400.00 | $600.00 | $3,000.00 | |
| 6 | X0327727 | PLANTER REMOVAL | 1 | L SUM | $120.00 | $175.00 | $500.00 | |
| 7 | X0327754 | TEMPORARY BULKHEAD | 4 | EACH | $485.00 | $657.00 | $780.00 | |
| 8 | X1200024 | INTERIM T1 FRM & GRT | 9 | EACH | $475.00 | $667.00 | $800.00 | |
| 9 | X1200044 | TEMP STORM SEWER 12 | 99 | FOOT | $90.00 | $56.00 | $67.00 | |
| 10 | X2111000 | TOPSOIL EXCAVATION | 736 | CU YD | $25.00 | $18.00 | $54.00 | |
| 11 | X2200020 | FENCE REM & REINSTALL | 285 | FOOT | $1.00 | $22.00 | $95.00 | |
| 12 | X3400004 | RETAINING WALL REMOV | 17 | FOOT | $14.50 | $200.00 | $51.00 | |
| 13 | X5538000 | SS CLEANED 18 | 118 | FOOT | $19.50 | $25.00 | $17.00 | |
| 14 | X6022055 | MAN TA 6 DIA T11VF&G | 3 | EACH | $7,625.00 | $5,452.00 | $6,470.00 | |
| 15 | X6022060 | MAN TA 7 DIA T11VF&G | 2 | EACH | $10,740.00 | $9,910.00 | $11,760.00 | |
| 16 | X6026050 | SANITARY MANHOLE ADJ | 13 | EACH | $1,300.00 | $866.00 | $1,030.00 | |
| 17 | X6026051 | SAN MAN RECONST | 2 | EACH | $1,850.00 | $1,847.00 | $2,190.00 | |
| 18 | X6028050 | TEMPORARY MANHOLE | 5 | EACH | $4,000.00 | $2,155.00 | $2,560.00 | |
| 19 | X6061005 | CONC CURB TB SPL | 220 | FOOT | $65.00 | $47.00 | $120.00 | |
| 20 | X6640560 | CH LK FENCE 6 SPL | 100 | FOOT | $137.27 | $130.00 | $163.00 | |
| 21 | X6640570 | CH LK FENCE 8 SPL | 67 | FOOT | $147.50 | $135.00 | $175.00 | |
| 22 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $84,300.00 | $100,000.00 | $532,000.51 | |
| 23 | X8860100 | LOOP DET TESTING | 1 | EACH | $750.00 | $5,600.00 | $6,050.00 | |
| 24 | X8950114 | MOD EX CONTR & CAB | 1 | EACH | $1,700.00 | $4,000.00 | $4,160.00 | |
| 25 | Z0004510 | HMA DRIVEWAY PAVT 3 | 5 | SQ YD | $86.00 | $61.00 | $58.00 | |
| 26 | Z0004530 | HMA DRIVEWAY PAVT 8 | 435 | SQ YD | $86.00 | $135.00 | $130.00 | |
| 27 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $75,000.00 | $70,000.00 | $60,000.00 | |
| 28 | Z0017400 | DRAIN UTIL STR ADJ | 1 | EACH | $300.00 | $500.00 | $890.00 | |
| 29 | Z0018500 | DRAINAGE STR CLEANED | 1 | EACH | $1,700.00 | $600.00 | $2,020.00 | |
| 30 | Z0018700 | DRAINAGE STR REMOVED | 53 | EACH | $375.00 | $352.00 | $420.00 | |
| 31 | Z0022800 | FENCE REMOVAL | 188 | FOOT | $8.16 | $6.00 | $10.00 | |
| 32 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $5,500.00 | $2,500.00 | $16,000.00 | |
| 33 | Z0056606 | STORM SEW WM REQ 10 | 75 | FOOT | $86.00 | $84.00 | $100.00 | |
| 34 | Z0056608 | STORM SEW WM REQ 12 | 1,003 | FOOT | $92.00 | $137.00 | $163.00 | |
| 35 | Z0056610 | STORM SEW WM REQ 15 | 402 | FOOT | $133.00 | $176.00 | $209.00 | |
| 36 | Z0056612 | STORM SEW WM REQ 18 | 118 | FOOT | $169.00 | $154.00 | $183.00 | |
| 37 | Z0056616 | STORM SEW WM REQ 24 | 99 | FOOT | $260.00 | $269.00 | $320.00 | |
| 38 | Z0056620 | STORM SEW WM REQ 30 | 207 | FOOT | $375.00 | $392.00 | $470.00 | |
| 39 | Z0056624 | STORM SEW WM REQ 42 | 187 | FOOT | $583.00 | $647.00 | $770.00 | |
| 40 | Z0073510 | TEMP TR SIGNAL TIMING | 2 | EACH | $3,700.00 | $3,400.00 | $3,710.00 | |
| 41 | Z0076600 | TRAINEES | 1,000 | HOUR | $0.8000 | $0.8000 | $0.8000 | |
| 42 | Z0076604 | TRAINEES TPG | 1,000 | HOUR | $15.00 | $15.00 | $15.00 | |
| 43 | 20100110 | TREE REMOV 6-15 | 162 | UNIT | $50.00 | $51.00 | $34.00 | |
| 44 | 20100210 | TREE REMOV OVER 15 | 78 | UNIT | $90.00 | $95.00 | $74.00 | |
| 45 | 20101100 | TREE TRUNK PROTECTION | 9 | EACH | $110.00 | $130.00 | $240.00 | |
| 46 | 20101200 | TREE ROOT PRUNING | 9 | EACH | $125.00 | $130.00 | $155.00 | |
| 47 | 20101300 | TREE PRUN 1-10 | 1 | EACH | $100.00 | $100.00 | $72.00 | |
| 48 | 20101350 | TREE PRUN OVER 10 | 8 | EACH | $150.00 | $160.00 | $240.00 | |
| 49 | 20200100 | EARTH EXCAVATION | 10,126 | CU YD | $29.00 | $25.00 | $58.00 | |
| 50 | 20200200 | ROCK EXCAVATION | 240 | CU YD | $90.80 | $95.00 | $115.00 | |
| 51 | 20201200 | REM & DISP UNS MATL | 2,817 | CU YD | $28.35 | $25.00 | $64.00 | |
| 52 | 20800150 | TRENCH BACKFILL | 3,643 | CU YD | $38.00 | $35.00 | $42.00 | |
| 53 | 21001000 | GEOTECH FAB F/GR STAB | 5,635 | SQ YD | $1.50 | $2.25 | $2.75 | |
| 54 | 21101625 | TOPSOIL F & P 6 | 6,082 | SQ YD | $6.85 | $5.00 | $8.30 | |
| 55 | 25000110 | SEEDING CL 1A | 1.25 | ACRE | $2,825.00 | $3,000.00 | $3,350.00 | |
| 56 | 25000400 | NITROGEN FERT NUTR | 113 | POUND | $3.00 | $3.00 | $3.50 | |
| 57 | 25000500 | PHOSPHORUS FERT NUTR | 113 | POUND | $3.00 | $3.00 | $3.50 | |
| 58 | 25000600 | POTASSIUM FERT NUTR | 113 | POUND | $3.00 | $3.00 | $3.50 | |
| 59 | 25100630 | EROSION CONTR BLANKET | 6,082 | SQ YD | $1.00 | $1.10 | $1.10 | |
| 60 | 28000400 | PERIMETER EROS BAR | 2,534 | FOOT | $2.40 | $1.50 | $2.40 | |
| 61 | 28000500 | INLET & PIPE PROTECT | 1 | EACH | $103.00 | $190.00 | $76.00 | |
| 62 | 28000510 | INLET FILTERS | 132 | EACH | $179.00 | $167.00 | $180.00 | |
| 63 | 28200200 | FILTER FABRIC | 20 | SQ YD | $10.00 | $28.00 | $40.00 | |
| 64 | 28500400 | ARTICUL BLOCK REV MAT | 20 | SQ YD | $200.00 | $250.00 | $245.00 | |
| 65 | 30300001 | AGG SUBGRADE IMPROVE | 1,879 | CU YD | $32.75 | $31.50 | $59.00 | |
| 66 | 30300112 | AGG SUBGRADE IMPR 12 | 24,340 | SQ YD | $11.85 | $11.00 | $24.00 | |
| 67 | 31101200 | SUB GRAN MAT B 4 | 3,965 | SQ YD | $14.00 | $12.75 | $8.30 | |
| 68 | 35101600 | AGG BASE CSE B 4 | 168 | SQ YD | $14.00 | $13.00 | $20.00 | |
| 69 | 35101800 | AGG BASE CSE B 6 | 327 | SQ YD | $16.00 | $16.00 | $31.00 | |
| 70 | 35102200 | AGG BASE CSE B 10 | 440 | SQ YD | $19.00 | $17.00 | $58.00 | |
| 71 | 40600275 | BIT MATLS PR CT | 6,390 | POUND | $0.0100 | $0.0100 | $0.0100 | |
| 72 | 40600290 | BIT MATLS TACK CT | 10,536 | POUND | $0.0100 | $0.0100 | $0.0100 | |
| 73 | 40600370 | LONG JOINT SEALANT | 9,650 | FOOT | $2.60 | $4.00 | $4.10 | |
| 74 | 40600982 | HMA SURF REM BUTT JT | 29 | SQ YD | $21.00 | $26.00 | $25.00 | |
| 75 | 40602970 | HMA BC IL-9.5FG N70 | 36 | TON | $118.00 | $197.00 | $195.00 | |
| 76 | 40603085 | HMA BC IL-19.0 N70 | 9,835 | TON | $100.00 | $125.00 | $115.00 | |
| 77 | 40604062 | HMA SC IL-9.5 D N70 | 2,580 | TON | $118.00 | $135.00 | $130.00 | |
| 78 | 42300200 | PCC DRIVEWAY PAVT 6 | 168 | SQ YD | $125.00 | $107.00 | $149.00 | |
| 79 | 42300400 | PCC DRIVEWAY PAVT 8 | 327 | SQ YD | $135.00 | $99.00 | $160.00 | |
| 80 | 42400200 | PC CONC SIDEWALK 5 | 33,445 | SQ FT | $8.50 | $8.80 | $10.00 | |
| 81 | 42400410 | PC CONC SIDEWALK 8 | 1,625 | SQ FT | $12.00 | $12.00 | $14.00 | |
| 82 | 42400800 | DETECTABLE WARNINGS | 485 | SQ FT | $40.00 | $28.00 | $47.00 | |
| 83 | 44000100 | PAVEMENT REM | 20,475 | SQ YD | $9.65 | $10.00 | $10.00 | |
| 84 | 44000159 | HMA SURF REM 2 1/2 | 481 | SQ YD | $21.00 | $15.00 | $25.00 | |
| 85 | 44000200 | DRIVE PAVEMENT REM | 1,210 | SQ YD | $16.00 | $10.00 | $23.00 | |
| 86 | 44000500 | COMB CURB GUTTER REM | 7,600 | FOOT | $3.50 | $9.00 | $9.00 | |
| 87 | 44000600 | SIDEWALK REM | 27,300 | SQ FT | $1.00 | $2.00 | $1.50 | |
| 88 | 54261242 | CONC ES 542001 42 1:2 | 1 | EACH | $9,300.00 | $53,210.00 | $63,000.00 | |
| 89 | 550A0040 | STORM SEW CL A 1 10 | 13 | FOOT | $85.00 | $121.00 | $144.00 | |
| 90 | 550A0050 | STORM SEW CL A 1 12 | 579 | FOOT | $90.00 | $109.00 | $130.00 | |
| 91 | 550A0070 | STORM SEW CL A 1 15 | 9 | FOOT | $91.00 | $124.00 | $147.00 | |
| 92 | 550A0090 | STORM SEW CL A 1 18 | 89 | FOOT | $92.00 | $74.00 | $88.00 | |
| 93 | 550A0140 | STORM SEW CL A 1 30 | 257 | FOOT | $116.00 | $109.00 | $130.00 | |
| 94 | 550A0330 | STORM SEW CL A 2 10 | 78 | FOOT | $85.00 | $144.00 | $170.00 | |
| 95 | 550A0340 | STORM SEW CL A 2 12 | 1,026 | FOOT | $91.00 | $99.00 | $118.00 | |
| 96 | 550A0360 | STORM SEW CL A 2 15 | 427 | FOOT | $92.00 | $108.00 | $128.00 | |
| 97 | 550A0380 | STORM SEW CL A 2 18 | 598 | FOOT | $93.00 | $132.00 | $157.00 | |
| 98 | 550A0430 | STORM SEW CL A 2 30 | 545 | FOOT | $124.00 | $162.00 | $192.00 | |
| 99 | 550A4100 | SS CL A 1 EQRS 24 | 5 | FOOT | $194.00 | $200.00 | $237.00 | |
| 100 | 550A4500 | SS CL A 1 EQRS 36 | 651 | FOOT | $223.00 | $213.00 | $253.00 | |
| 101 | 55100400 | STORM SEWER REM 10 | 35 | FOOT | $14.60 | $22.00 | $26.00 | |
| 102 | 55100500 | STORM SEWER REM 12 | 1,668 | FOOT | $20.00 | $21.00 | $25.00 | |
| 103 | 55100700 | STORM SEWER REM 15 | 611 | FOOT | $21.00 | $22.00 | $26.00 | |
| 104 | 55100900 | STORM SEWER REM 18 | 1,538 | FOOT | $22.00 | $22.00 | $26.00 | |
| 105 | 55101200 | STORM SEWER REM 24 | 757 | FOOT | $26.50 | $24.00 | $28.00 | |
| 106 | 55200600 | STORM SEWERS JKD 18 | 59 | FOOT | $1,000.00 | $1,029.00 | $1,220.00 | |
| 107 | 56300100 | ADJ SAN SEWER 8 LESS | 150 | FOOT | $116.00 | $1,071.00 | $1,270.00 | |
| 108 | 56500600 | DOM WAT SER BOX ADJ | 40 | EACH | $270.00 | $125.00 | $475.00 | |
| 109 | 60108104 | PIPE UNDERDR T 1 4 | 1,200 | FOOT | $23.00 | $56.00 | $66.00 | |
| 110 | 60200105 | CB TA 4 DIA T1F OL | 1 | EACH | $3,150.00 | $2,095.00 | $2,485.00 | |
| 111 | 60200805 | CB TA 4 DIA T8G | 2 | EACH | $3,045.00 | $1,965.00 | $2,330.00 | |
| 112 | 60201110 | CB TA 4 DIA T11V F&G | 19 | EACH | $3,345.00 | $2,316.00 | $2,748.00 | |
| 113 | 60201340 | CB TA 4 DIA T24F&G | 8 | EACH | $3,200.00 | $2,156.00 | $2,558.00 | |
| 114 | 60204825 | CB TA 5 DIA T11V F&G | 6 | EACH | $4,790.00 | $3,594.00 | $4,263.00 | |
| 115 | 60206600 | CB TB T7G | 1 | EACH | $14,255.00 | $15,345.00 | $18,200.00 | |
| 116 | 60218400 | MAN TA 4 DIA T1F CL | 16 | EACH | $3,530.00 | $1,974.00 | $2,342.00 | |
| 117 | 60221100 | MAN TA 5 DIA T1F CL | 2 | EACH | $5,700.00 | $3,938.00 | $4,670.00 | |
| 118 | 60223800 | MAN TA 6 DIA T1F CL | 3 | EACH | $6,645.00 | $4,875.00 | $5,783.00 | |
| 119 | 60224446 | MAN TA 7 DIA T1F CL | 3 | EACH | $9,450.00 | $8,480.00 | $10,058.00 | |
| 120 | 60224449 | MAN TA 7 DIA T24F&G | 1 | EACH | $9,520.00 | $8,835.00 | $10,480.00 | |
| 121 | 60224458 | MAN TA 8 DIA T8G | 1 | EACH | $11,860.00 | $10,920.00 | $12,950.00 | |
| 122 | 60224459 | MAN TA 8 DIA T1F CL | 7 | EACH | $11,980.00 | $11,050.00 | $13,110.00 | |
| 123 | 60224469 | MAN TA 9 DIA T1F CL | 3 | EACH | $15,200.00 | $14,745.00 | $17,490.00 | |
| 124 | 60224476 | MAN TA 9 DIA T24F&G | 1 | EACH | $15,300.00 | $14,810.00 | $17,570.00 | |
| 125 | 60234200 | INLETS TA T1F OL | 4 | EACH | $1,175.00 | $1,228.00 | $1,460.00 | |
| 126 | 60236200 | INLETS TA T8G | 7 | EACH | $1,070.00 | $1,097.00 | $1,300.00 | |
| 127 | 60236825 | INLETS TA T11V F&G | 34 | EACH | $1,365.00 | $1,452.00 | $1,725.00 | |
| 128 | 60237470 | INLETS TA T24F&G | 15 | EACH | $1,240.00 | $1,292.00 | $1,535.00 | |
| 129 | 60240210 | INLETS TB T1F OL | 1 | EACH | $1,900.00 | $1,552.00 | $1,840.00 | |
| 130 | 60240312 | INLETS TB T11V F&G | 18 | EACH | $2,100.00 | $1,777.00 | $2,110.00 | |
| 131 | 60240328 | INLETS TB T24F&G | 4 | EACH | $1,960.00 | $1,616.00 | $1,920.00 | |
| 132 | 60250200 | CB ADJUST | 7 | EACH | $720.00 | $485.00 | $585.00 | |
| 133 | 60255500 | MAN ADJUST | 6 | EACH | $780.00 | $500.00 | $950.00 | |
| 134 | 60266600 | VALVE BOX ADJ | 25 | EACH | $420.00 | $250.00 | $475.00 | |
| 135 | 60600605 | CONC CURB TB | 325 | FOOT | $50.00 | $47.00 | $59.00 | |
| 136 | 60603800 | COMB CC&G TB6.12 | 8,505 | FOOT | $40.00 | $28.00 | $47.00 | |
| 137 | 63200310 | GUARDRAIL REMOV | 89 | FOOT | $8.28 | $12.00 | $10.00 | |
| 138 | 66900200 | NON SPL WASTE DISPOSL | 5,265 | CU YD | $95.00 | $85.00 | $150.00 | |
| 139 | 66900530 | SOIL DISPOSAL ANALY | 8 | EACH | $1,100.00 | $1,700.00 | $1,600.00 | |
| 140 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,300.00 | $2,400.00 | $3,970.00 | |
| 141 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,400.00 | $2,400.00 | $1,425.00 | |
| 142 | 66901006 | REG SUB MON | 30 | CAL DA | $1,250.00 | $1,500.00 | $890.00 | |
| 143 | 67100100 | MOBILIZATION | 1 | L SUM | $266,000.00 | $143,770.00 | $579,000.00 | |
| 144 | 70106800 | CHANGEABLE MESSAGE SN | 14 | CAL MO | $1,100.00 | $1,200.00 | $427.00 | |
| 145 | 72000100 | SIGN PANEL T1 | 371 | SQ FT | $25.00 | $26.00 | $36.00 | |
| 146 | 72900100 | METAL POST TY A | 843 | FOOT | $13.00 | $14.00 | $17.80 | |
| 147 | 78000100 | THPL PVT MK LTR & SYM | 1,240 | SQ FT | $9.95 | $6.25 | $10.70 | |
| 148 | 78000200 | THPL PVT MK LINE 4 | 10,031 | FOOT | $0.6600 | $1.85 | $0.7000 | |
| 149 | 78000400 | THPL PVT MK LINE 6 | 8,098 | FOOT | $0.7900 | $2.85 | $0.8000 | |
| 150 | 78000500 | THPL PVT MK LINE 8 | 1,453 | FOOT | $0.9200 | $3.80 | $0.9500 | |
| 151 | 78000600 | THPL PVT MK LINE 12 | 1,670 | FOOT | $4.97 | $5.50 | $5.34 | |
| 152 | 78000650 | THPL PVT MK LINE 24 | 550 | FOOT | $9.95 | $11.00 | $10.70 | |
| 153 | 78006100 | PREF THPL PM LTR-SYM | 10,626 | SQ FT | $23.31 | $48.00 | $23.70 | |
| 154 | 78100100 | RAISED REFL PAVT MKR | 322 | EACH | $43.37 | $56.00 | $46.00 | |
| 155 | 78300201 | PAVMT MRKG REM GRIND | 380 | SQ FT | $5.00 | $4.00 | $5.90 | |
| 156 | 88600100 | DET LOOP T1 | 850 | FOOT | $22.00 | $17.00 | $19.50 |