IDOT Jobs

2019 · 936 jobs · — Sign up free
★ My Jobs

936 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 18, 2019 72K97 MacoupinDistrict 6 Replacing expansion joints, placing microsilica overlay, performing substructure repairs and painting beam ends on SN 059-0035 carrying IL 108 over Lick Creek. — Executed Nov 26 New RCS Construction, Inc. $365,553 ·
Jan 18, 2019 74177 LawrenceDistrict 7 Replacement of two structures on US 50 over an abandoned railroad and Otter Pond Ditch; and replacement of two superstructures on US 50 over IL 1 and CH 12 north of Lawrenceville (SN 051-0012, 0013, 0014, 0015). — Executed Nov 26 New Sangamo Construction Company $10,061,291 ·
Jan 18, 2019 74261 ColesDistrict 7 3.1 miles of pavement patching, HMA milling and resurfacing, rehab of 2 bridges 3 culvert extensions and guardrail on IL 16 from Ashmore to the Edgar County line. — Executed Nov 26 New Howell Paving, Inc. $2,177,289 ·
Jan 18, 2019 74432 CumberlandDistrict 7 Removing and replacing concrete deck beams with a PCC slab superstructure, Bridge approach pavements, HMA resurfacing and guardrail on Montrose Blacktop approximately 1.5 miles south of IL 121 (SN 018-0056). — Executed Nov 26 New White Construction, Inc. $633,093 ·
Jan 18, 2019 74561 ColesDistrict 7 Superstructure replacement on SN 015-0070 carrying 900 N/IL 316 over Riley Creek Branch, 0.8 miles northwest of Loxa. — Executed Nov 26 New County Contractors, Inc. $511,648 ·
Jan 18, 2019 74849 MaconDistrict 7 Culvert removal and replacement on Old US 36 over an unnamed stream approximately 0.1 mile west of US 36. — Executed Nov 26 New Otto Baum Company, Inc. $509,397 ·
Jan 18, 2019 74863 VariousDistrict 7 Sealing the bridge decks on 114 structures throughout District 7. — Executed Nov 26 New All States Painting, Inc. $118,898 ·
Jan 18, 2019 74868 ColesDistrict 7 7.8 miles of microsurfacing on Old IL 316 from 0.2 mile north of IL 16 to D Street in Charleston. — Executed Nov 26 New A. C. Pavement Striping Co. $494,881 ·
Jan 18, 2019 74869 MoultrieDistrict 7 8.1 miles of bituminous surface treatment on Cadwell Road from IL 121 to IL 133. — Executed Nov 26 New Beniach Construction Co., Inc. $313,710 ·
Jan 18, 2019 74888 RichlandDistrict 7 8.3 miles of base repair, pot hole patching and application of bituminous surface treatment at 2 locations on Old US 50; 1) from just west of the Lawrenceville Correctional Center (CR 2100 E) to the intersection of US 50/IL 250; 2) from 1100 North (IL 250 to 1400 East (St. Marie Road). — Executed Nov 26 New Mt. Carmel Stabilization Group, Inc. $328,966 ·
Jan 18, 2019 74889 ColesShelbyDistrict 7 10.5 miles of bituminous surface treatment at 3 locations in Coles County and 4 locations in Shelby County. — Executed Nov 26 New Earl Walker Company, Inc. $418,569 ·
Jan 18, 2019 74892 ClayDistrict 7 Placing aggregate wedge shoulders on the Kinmundy/Louisville Blacktop from the Marion County line to US 45 in Louisville. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $163,597 ·
Jan 18, 2019 76J12 MadisonDistrict 8 Replace bridge 060-2454 carrying IL 157 over Silver Creek Tributary south of Hamel. — Executed Nov 26 New Baxmeyer Construction, Inc. $644,578 ·
Jan 18, 2019 76K30 MadisonDistrict 8 Bridge joint replacement at south abutment and other repairs on Clark Bridge (US 67 over the Mississippi River (SN 060-0255). — Executed Nov 26 New Keeley & Sons, Inc. $567,212 ·
Jan 18, 2019 76L35 MadisonDistrict 8 Crack and joint sealing on I-55 from 1.3 miles north of Il 140 to the Macoupin County line. — Executed Nov 26 New Freehill Asphalt, Inc. $96,445 ·
Jan 18, 2019 76L99 MadisonDistrict 8 Bridge painting SN 060-0238 and 060-0239 on I-255 over Collinsville Road. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $397,725 ·
Jan 18, 2019 76M03 ClintonDistrict 8 Bridge and jooint repair on SN 014-0031 on Old US 50 approximately 1.2 miles east of Aviston. — Executed Nov 26 New Keller Construction, Inc. $305,388 ·
Jan 18, 2019 76M04 St. ClairDistrict 8 Bridge and joint repair on Sn 082-0267 carryingh Bond Avenue over Alton and Southern Railroad. — Executed Nov 26 New Keeley & Sons, Inc. $249,557 ·
Jan 18, 2019 76M05 MadisonDistrict 8 Bridge repair and guardrail improvements on SN 060-0177 carrying I-55 over Maple Grove Road. — Executed Nov 26 New Keeley & Sons, Inc. $357,463 ·
Jan 18, 2019 76M06 BondDistrict 8 Patching on IL 127 from Montgomery County line to IL 140. — Executed Nov 26 New G. M. Sipes Construction, Inc. $419,131 ·
Jan 18, 2019 76M08 GreeneDistrict 8 Patching on US 67 from Pine Street to Walnut Street in Carrolton. — Executed Nov 26 New Kinney Contractors, Inc. $53,955 ·
Jan 18, 2019 78455 JeffersonDistrict 9 Removal and replacement SN 041-055 carrying CH 42 over I-57 at Ina. — Executed Nov 26 New Sierra Bravo Contractors, LLC $2,683,572 ·
Jan 18, 2019 78502 MassacDistrict 9 Removal and replacement of the existing structures (SN 064-0024 and SN 064-0028) carrying I-24 over CH13 (Country Club Road) near Metropolis. — Executed Nov 26 New E. T. Simonds Construction Company $4,921,275 ·
Jan 18, 2019 78596 UnionDistrict 9 1.3 miles of patching, resurfacing and sidewalk ramps along IL 146 in Anna. — Executed Nov 26 New E. T. Simonds Construction Company $1,235,395 ·
Jan 18, 2019 78617 UnionDistrict 9 Scour repair below SN 091-0068 carrying IL 127 over Clear Creek south of Alto Pass. — Executed Nov 26 New Pinoy Construction Inc. $47,537 ·
Jan 18, 2019 78630 WhiteDistrict 9 Inlaying 1.5" HMA, deck repairs, joint replacement and bearing replacement on SN 097-000 and 097-0004 carrying I-64 over the Wabash River into Indiana. — Executed Nov 26 New E. T. Simonds Construction Company $763,012 ·
Jan 18, 2019 78650 VariousDistrict 9 Steel, bearing and joint repairs on 11 structures in Alexander, Hamilton and Jefferson Counties. (SN 041-0007, 0087, 0088, 0077, 0078, 002-0032, 033-0038, 0041-0041, 0042, 0097) — Executed Nov 26 New Sangamo Construction Company $1,642,481 ·
Jan 18, 2019 78658 FranklinDistrict 9 0.66 miles of HMA partial depth patching over existing PCC pavement on IL 149 from Ken Grey Boulevard to Joiner Street — Executed Nov 26 New E. T. Simonds Construction Company $134,883 ·
Jan 18, 2019 78659 FranklinDistrict 9 5.6 miles of replacing aggregate shoulder with a 2' safety shoulder consisting of 8" HMA on IL 14 from Mt. Zion Road to Ewing Road. — Executed Nov 26 New E. T. Simonds Construction Company $534,970 ·
Jan 18, 2019 78667 WilliamsonDistrict 9 Bridge repairs and approach work on SN 100-0062 carrying Cambria Rd. over Big Muddy River, 1 mile south of Hurst. — Executed Nov 26 New E. T. Simonds Construction Company $299,154 ·
Jan 18, 2019 78677 VariousDistrict 9 Cleaning and painting portions of 14 structures: 1 in Alexander County, 2 in Franklin County, 1 in Hamilton County, 8 in Jefferson County, 1 in Massac County, and 2 in White County. (SN 041-0039, 0040, 0041, 0042, 0077, 0078, 0087, 0088, 002-0032, 028-0038, 0041, 033-0012, 064-0003, 097-0024) — Executed Nov 26 New Venus Painting Co. $1,130,680 ·
Jan 18, 2019 78693 UnionDistrict 9 2.4 miles of milling and resurfacing of I-57 southbound from 0.5 miles south of IL 146 to 0.5 miles north of the rest area near the Cache River. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $1,121,786 ·
Jan 18, 2019 87710 GrundyDistrict 3 Pavement reconstruction, storm sewers, curb and gutter, sidewalk and roadway lighting, on Broadway Street from IL 113 to Park Street in Coal City. — Executed Nov 26 New D. Construction, Inc. $4,631,410 ·
Jan 18, 2019 89712 PeoriaDistrict 4 Pavement reconstruction, PCC pavement, curb and gutter, storm sewers, PCC multi-use path, street lighting and pedestrian signals, on Dirksen Parkway from Middle Road to Airport Road. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $5,449,818 ·
Jan 18, 2019 89732 PeoriaDistrict 4 Construction of 4' HMA shoulders with rumble strips, 2' aggregate shoulders and the reconstruction of ditches on Kickapoo-Edwards Road from Shamrock Lane to Countryside Lane. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,175,654 ·
Jan 18, 2019 91568 ChampaignDistrict 5 Construct 7" PCC pavement, aggregate shoulder and culvert replacment on Sunny Acres Road from South Mahomet Road to US 150 in the Village of Mahomet. — Executed Nov 26 New Beniach Construction Co., Inc. $796,767 ·
Jan 18, 2019 91569 ChampaignDistrict 5 Pavement reconstruction, PCC pavement, curb and gutter, storm sewer, street lighting and traffic signals on Prospect Avenue from Curtis Road to Windsor Rd. in the City of Champaign. — Executed Nov 26 New Feutz Contractors, Inc. $4,531,726 ·
Jan 18, 2019 91575 VermilionDistrict 5 Replace the bridge carrying TR 54 over Baum Branch, 3 miles southwest of Jamaica. — Executed Nov 26 New Newell Construction Co., Inc. $284,521 ·
Jan 18, 2019 93722 BrownDistrict 6 Resurfacing, lighting, and sidewalk improvements on Main Street, from Cross Street to Capitol Street in Mt. Sterling. — Executed Nov 26 New Rees Construction Company of Quincy $1,965,321 ·
Jan 18, 2019 95841 MaconDistrict 7 Rehabilitate 058-3035 and 058-3036 carrying Mound Road over Spring Creek in the City of Decatur. — Executed Nov 26 New Sangamo Construction Company $2,504,685 ·
Jan 18, 2019 95842 FayetteDistrict 7 Resurfacing on CH 28 from IL 37 to the Effingham County line. — Executed Nov 26 New Howell Paving, Inc. $1,613,463 ·
Jan 18, 2019 97682 JerseyDistrict 8 County-wide guardrail replacement and/or repair at various locations in Jersey County. — Executed Nov 26 New Clevenger Contractors, Inc. $884,774 ·
Jan 18, 2019 97686 MadisonDistrict 8 Construction of roundabouts at Broadway/St. Rose Road, and at Iberg Road/ Veterans Honor Parkway, in the City of Highland. — Executed Nov 26 New Stutz Excavating, Inc. $1,070,995 ·
Jan 18, 2019 99584 UnionDistrict 9 Replace the bridge carrying TR 203 (Nash Road) over Big Creek, located 3 miles southeast of Anna. — Executed Nov 26 New Samron Midwest Contracting, Inc. $254,345 ·
Jan 18, 2019 99610 WilliamsonDistrict 9 Pavement widening, resurfacing, and water main improvements on East Grand Avenue, from Hofer Road to Hurricane Road in Crainville. — Executed Nov 26 New Samron Midwest Contracting, Inc. $872,797 ·
Mar 8, 2019 60M72 CookDistrict 1 Bridge deck overlay, joint repairs, structural repair of concrete and steel to I-94 at IL 68 (Dundee Road). — Executed Nov 26 New Rausch Infrastructure, LLC $1,199,708 ·
Mar 8, 2019 60M75 DuPageDistrict 1 Bridge deck overlay and bridge joint repair improvement of Emroy Ave over I-290. — Executed Nov 26 New Martam Construction Incorporated $396,588 ·
Mar 8, 2019 60N00 WillDistrict 1 Bridge deck overlay and joint repairs on the bridge carrying US 52 over Forked Creek. — Executed Nov 26 New MYS, Incorporated $301,046 ·
Mar 8, 2019 60N83 CookDistrict 1 Rehabilitation and widening on SN 016-0533 carrying Willow Road over Lehigh and SOO line in Glenview. — Executed Nov 26 New Lorig Construction Company $8,661,763 ·
Mar 8, 2019 60P68 DuPageDistrict 1 Resurfacing on IL-56 from Naperville Rd. to IL 53; includes retrofitting sidewalks to comply with ADA and Signal modernaization at the intersection with Park Ave. — Executed Nov 26 New K-Five Construction Corporation $3,038,712 ·
Mar 8, 2019 60R65 CookDistrict 1 Overlay 016-2525 bridge deck with thin polymer in the City of Harvey. — Executed Nov 26 New MYS, Incorporated $116,107 ·
Mar 8, 2019 60R68 LakeDistrict 1 Bridge deck scarification and latex concrete overlay, retrofitting bridge parapets, and reconstruction of transverse bridge joints to IL 43 over IL 120. — Executed Nov 26 New Areatha Construction Co., Inc. $1,777,994 ·
Mar 8, 2019 60R69 CookDistrict 1 Deck patching, deck scarification, latex concrete overlay abutment repairs, joint repairs, slab repairs and debris removal on Golf Road over the East and West Fork N. Branch Chicago River (SN 016-0355, 016-0356, 016-1256 and 016-1257) — Executed Nov 26 New Martam Construction Incorporated $973,368 ·
Mar 8, 2019 60R75 CookDistrict 1 Bridge deck scarification and latex concrete overlay, reconstruction of transverse bridge joints, and substructure repairs on US 30 over Thorn Creek. — Executed Nov 26 New MYS, Incorporated $380,278 ·
Mar 8, 2019 60T49 CookDistrict 1 Resurfacing and pedestrian ramp improvements on US 14 (Northwest Highway) through the Village of Arlington Heights, Village of Mount Prospect and the city of Des Plaines — Executed Nov 26 New Arrow Road Construction Co. $4,073,824 ·
Mar 8, 2019 60W87 CookDistrict 1 Surface preparation and painting of structrual steel, containment and disposal of lead waste and maintenance of traffic at 5 bridge structures located on IL 171 and on I-55 in Villages of McCook and Summit. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $2,284,150 ·
Mar 8, 2019 61F40 WillDistrict 1 Construct an extension of Kings Road from Rodeo Drive to Hassert Boulevard in Bollingbrook. — Executed Nov 26 New K-Five Construction Corporation & Herlihy Mid-Continent Company $7,485,866 ·
Mar 8, 2019 61F41 CookDistrict 1 Roadway reconstruction on Irving Park Road from east of IL 59 to Bartlett Road in Streamwood. — Executed Nov 26 New Plote Construction, Inc. $6,796,581 ·
Mar 8, 2019 61F44 WillDistrict 1 Replace the bridge carrying TR 68 over Lily Creek, 0.1 mil north of Caton Farm Road in Plainfield Township. — Executed Nov 26 New D. Construction, Inc. $945,717 ·
Mar 8, 2019 61F45 KaneDistrict 1 Replace the bridge carrying Silver Glen Road over Otter Creek. — Executed Nov 26 New D. Construction, Inc. $2,118,804 ·
Mar 8, 2019 61F47 LakeDistrict 1 Resurfacing Greenwood Avenue from Wilmot Road to Waukegan Road in Deerfield. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $1,668,129 ·
Mar 8, 2019 61F48 CookDistrict 1 Sidewalk construction adjacent to 79th Street from Garden Lane to Oak Grove Avenue in the Village of Justice. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $113,944 ·
Mar 8, 2019 61F49 CookDistrict 1 Reconstruction of Northfield Road from Winnetka Road to Willow Road in the Village of Northfield. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $1,588,343 ·
Mar 8, 2019 61F54 CookDistrict 1 Resurfacing Schick Road from Petersdorf Road to Fairfax Lane, and resurfacing Petersdorf Road from Schick Road to Army Trial Road in the Village of Bartlett. — Executed Nov 26 New Plote Construction, Inc. $1,214,960 ·
Mar 8, 2019 61F57 KaneDistrict 1 construction of a dedicated entrance ramp from northbound Randall Road to eastbound US 20, removal of the Weld Road connection to Randall Road, creation of a cul-de-sac on Weld Road and the reconfiguration of Randall Road, in the City of Elgin. — Executed Nov 26 New Curran Contracting Company $6,244,244 ·
Mar 8, 2019 61F59 KaneDistrict 1 Trffic signal interconnect along Indian Trail between Aurora Avenue and Pennsbury Lane in Aurora. — Executed Nov 26 New H & H Electric Co. $826,220 ·
Mar 8, 2019 61F60 CookDistrict 1 Construction of a multi-use path along Brainard Avenue from Joliet Road to 55th Street in the City of Countryside. — Executed Nov 26 New K-Five Construction Corporation $964,375 ·
Mar 8, 2019 61F61 WillDistrict 1 Resurfacing Burville Road from stte Street to IL 394 in the Village of Crete. — Executed Nov 26 New Iroquois Paving Corporation $395,403 ·
Mar 8, 2019 61F62 DuPageDistrict 1 Roadway reconstruction on Washington Street from Town Road to Arbor Avenue in the city of West Chicago. — Executed Nov 26 New Schroeder Asphalt Services, Inc. $1,120,972 ·
Mar 8, 2019 62C14 KaneDistrict 1 Bridge deck replacement with widened roadway, new expansion joints, and approach slab replacement on IL 38 over UPRR. — Executed Nov 26 New Herlihy Mid-Continent Company $2,789,910 ·
Mar 8, 2019 62D38 LakeDistrict 1 Remove and replace original section of the culvert (approximately 40 ft) in the center portion of the culvert carrying IL 21 (Milwaukee Ave.) over a ditch in the village of Vernon Hills (SN 049-0599) — Executed Nov 26 New Martam Construction Incorporated $377,924 ·
Mar 8, 2019 62F35 McHenryDistrict 1 Bridge joint repairs and deck overlay on SN 056-0007 carrying US 14/IL 173 (Division Street) over UPRR in the City of Harvard. — Executed Nov 26 New Sjostrom & Sons, Inc. $1,257,790 ·
Mar 8, 2019 62F37 CookDistrict 1 Repairs on Bridge SN 016-0225 carrying US 34 (Ogden Avenue) over IHB Railroad in the Village of LaGrange. — Executed Nov 26 New D. Construction, Inc. $513,202 ·
Mar 8, 2019 62F49 CookWillDistrict 1 6.45 miles of 3P resurfacing and ADA ramps on IL 43 from north of US 30 to just north of US 6. — Executed Nov 26 New D. Construction, Inc. $5,880,439 ·
Mar 8, 2019 62F54 DuPageDistrict 1 2.5 miles of resurfacing and ADA sidewalk improvements on IL 64 (North Avenue) from Villa Avenue to the Cook County line in the Village of Villa Park and the City of Elmhurst. — Executed Nov 26 New R. W. Dunteman Company $2,773,288 ·
Mar 8, 2019 62F66 CookDistrict 1 1.91 miles of HMA resurfcing, pavement patching, removal and replacement of curb and gutter, sidewalk removal and replacement and placement of thermoplastic markings along Avondale Avenue from Ogallah Avenue to Bryn Mawr Avenue in Chicago. — Executed Nov 26 New Arrow Road Construction Co. $1,771,483 ·
Mar 8, 2019 62G21 CookDistrict 1 Resurfacing and pedestrian ramp improvements on US 12/20/41 (Indianapolis Ave) from S. Ewing Ave. to 106th Street in the City of Chicago. — Executed Nov 26 New MAT Construction Leasing, Inc. $1,035,977 ·
Mar 8, 2019 62G47 CookDistrict 1 7.33 miles of resurfacing and pedestrian ramp projects on IL 171 (First Ave.) from 43rd Street to Des Plaines River Road. — Executed Nov 26 New R. W. Dunteman Company $7,076,939 ·
Mar 8, 2019 62G48 McHenryDistrict 1 Removal and replacement of culvert SN 056-0227 on IL 31 in the City of McHenry. — Executed Nov 26 New Alliance Contractors, Inc. $1,033,397 ·
Mar 8, 2019 62G50 CookDistrict 1 Deck overlay, joint repair and structural steel repair on SN 016-0344 carrying US 45 over the Cal Sag Channel in Palos Township. — Executed Nov 26 New MYS, Incorporated $474,229 ·
Mar 8, 2019 62G58 LakeDistrict 1 2 miles of resurfacing on IL 137 (Amstutz Expressway) from IL 120 (Belvidere Street) to just south of IL 137 (Greenwood Avenue) in the City of Waukegan. — Executed Nov 26 New J. A. Johnson Paving Company $2,327,169 ·
Mar 8, 2019 62G62 DuPageDistrict 1 6 miles of resurfacing on US 34 (Ogden Avenue) from Ivanhoe Ave to east of IL 83 (Kingery Highway in the Villages of Lisle, Downers Grove, Westmont and Clarendon Hills. — Executed Nov 26 New R. W. Dunteman Company $7,098,580 ·
Mar 8, 2019 62G64 DuPageDistrict 1 2.4 miles of resurfacing and pedestrian ramp improvements on US 20 (W. Lake Street) from west of Summerfield Drive to west of I-355 (Veterans Memorial Tollway) in the Villages of Addison and Bloomingdale. — Executed Nov 26 New K-Five Construction Corporation $3,428,345 ·
Mar 8, 2019 62G67 CookDistrict 1 Resurfacing and ADA pedestrian ramp improvements on vincennes Avenue from 119th Street to 127th Street in Blue Island. — Executed Nov 26 New K-Five Construction Corporation $827,549 ·
Mar 8, 2019 62G80 CookDistrict 1 3P resurfacing and median rehabilitation with pedestrian ramps along 127th Street/Burr Oak Ave from east of I-294 to Atesian Avenue in Blue Island. — Executed Nov 26 New Gallagher Asphalt Corporation $3,053,618 ·
Mar 8, 2019 62G90 LakeDistrict 1 Sheet pile retaining wall and parking improvement at Illinois Beach State Park — Executed Nov 26 New Alliance Contractors, Inc. $953,418 ·
Mar 8, 2019 62G98 WillDistrict 1 Removal and replacement of bridge decks of SN 099-0286, 099-0005 and 099-0304 c carrying I-55 over BNSF Railroad and Grant Creek in Wilminton and Channahon Townships. — Executed Nov 26 New D. Construction, Inc. $7,870,946 ·
Mar 8, 2019 62H01 DuPageDistrict 1 Bridge deck overlay, joint repair, structural repair of concrete, drainage structure adjustment and concrete repair of beam ends for the structures carrying IL 83 of US 34 and the BNSF Railroad in the Villages of Hinsdale, Clarendon Hills and Westmont. — Executed Nov 26 New Herlihy Mid-Continent Company $2,269,678 ·
Mar 8, 2019 62H04 DuPageDistrict 1 Bridge deck scarification, latex overlay, joint repairs, structural concrete and steel repairs on IL 38 (Roosevelt Road) over Salt Creek, also Bridge deck scarification, latex overlay, and joint repairs on IL 38 Frontage Road over Salt Creek. — Executed Nov 26 New Martam Construction Incorporated $1,330,256 ·
Mar 8, 2019 62H07 CookDistrict 1 0.5 miles of HMA resurfacing, pavement patching, milled shoulder rumble strips and pavement marking on IL 19 from Taft Avenue to Seymour Avenue in Chicago. — Executed Nov 26 New Plote Construction, Inc. $673,920 ·
Mar 8, 2019 62H14 VariousDistrict 1 Vegetation management on various expressway and primary routes along Historic US Route 66 — Executed Nov 26 New Endrizzi Contracting, Inc $422,930 ·
Mar 8, 2019 62H17 CookDistrict 1 Structural repairs of concrete on the structure carrying Joliet Road over the BandOCT RR in the Village of McCook — Executed Nov 26 New D. Construction, Inc. $262,345 ·
Mar 8, 2019 62H19 CookDistrict 1 Bridge joint replacement and bridge deck sealing on SN 016-0273 carrying Torrence Avenue over I-80/I-94 in the Village of Lansing — Executed Nov 26 New D. Construction, Inc. $272,594 ·
Mar 8, 2019 62H24 DuPageDistrict 1 2.4 miles of resurfacing and pedestrian ramp work on IL 56 (Butterfield Road) from the Kane County line to the CNRR overpass in Aurora. — Executed Nov 26 New Geneva Construction Company $1,241,694 ·
Mar 8, 2019 62H27 CookDistrict 1 Routing, cleaning, and sealing longitudinal cracks in the existing HMA pavement, and longitudinal joints between existing pavement and Curb and gutter and restriping with hot spray thermoplastic pavement marking. — Executed Nov 26 New Denler, Inc. $252,444 ·
Mar 8, 2019 62H30 DuPageDistrict 1 Routing, cleaning, and sealing longitudinal cracks in the existing HMA pavement; longitudinal joints between the existing HMA pavement and curb and gutter; and restriping with hot spray thermoplastic pavement marking. — Executed Nov 26 New Freehill Asphalt, Inc. $285,968 ·
Mar 8, 2019 62H32 KaneDistrict 1 7.55 miles of Resurfacing (SMART) and pedestrian ramp project on IL 64 from IL 47 to Randall Road. — Executed Nov 26 New Curran Contracting Company $2,608,470 ·
Mar 8, 2019 62H35 WillDistrict 1 Repairs on SN 099-0056 carrying I-80 over the Des Plaines River in Joliet. — Executed Nov 26 New Lakes & Rivers Contracting, Inc. $847,500 ·
Mar 8, 2019 62H39 LakeDistrict 1 Demolition of a single-family home in Mundelein and an auto repair building in Grayslake. — Executed Nov 26 New Lima Contractors $158,946 ·
Mar 8, 2019 62H41 CookDistrict 1 2.4 miles of resurfacing and pedestrian ramp upgrades on IL 171 (Archer Ave.) from west of Ashland Avenue to State Street in the City of Chicago. — Executed Nov 26 New MAT Construction Leasing, Inc. $1,424,366 ·
101–200 of 936‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.