IDOT Jobs

All dates · 4,218 jobs · $20,005,846,000
★ My Jobs

4,218 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jun 12, 2026 76M95 WashingtonDistrict 8 Resurfacing on I-64 from 0.5 miles west of Beaver Pond Creek to 0.9 miles west of CH 11. — Executed Nov 25 New Samron Midwest Contracting, Inc. $74,388,393 ·
Jun 12, 2026 76R32 MadisonDistrict 8 New bridge deck on SN 060-0120 carrying IL 111 / IL 3 over Rodgers Avenue and Bloomer Drive in Alton. — Executed Nov 25 New Stutz Excavating, Inc. $4,611,184 ·
Jun 12, 2026 76R36 St. ClairDistrict 8 Bridge deck patching, microsilica concrete overlay, joint replacement, end diaphragm replacement, and cleaning and painting of beam ends and fascia beams on I-64 over Little Silver Creek and Silver Creek, 1.5 miles west of the IL 4 interchange. (SN 082-0186, 082-0188, 082-0187 and 082-0189) — Executed Nov 25 New The Kilian Corporation $4,888,194 ·
Jun 12, 2026 76U38 MadisonSt. ClairDistrict 8 Traffic signal replacement at various locations in Madison and St. Clair Counties. — Executed Nov 25 New Gerstner Electric, Inc. $2,898,157 ·
Jun 12, 2026 76U54 BondDistrict 8 9.6 miles of micro-surfacing on IL 127 from the Montgomery County line to 0.1 miles north of IL 140. — Executed Nov 25 New Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $830,276 ·
Jun 12, 2026 76U76 St. ClairDistrict 8 Bridge deck repairs and deck overlay on SN 082-0007 carrying I-55 / I-64 over Trendley Avenue in East St. Louis. — Executed Nov 25 New Keeley & Sons, Inc. $1,093,567 ·
Jun 12, 2026 76U77 MarionDistrict 8 Bridge repairs, deck repairs and joint replacement/repairs on SN 061-0077 carrying US 51 over IC Railroad. — Executed Nov 25 New Samron Midwest Contracting, Inc. $1,125,909 ·
Jun 12, 2026 76U81 MadisonSt. ClairDistrict 8 Bridge cleaning at various locations in Madison and St. Clair counties. — Executed Nov 25 New M & M Concrete, Inc. $560,000 ·
Jun 12, 2026 76U82 St. ClairDistrict 8 Bridge deck repairs on SN 082-0251 and 082-0252 carrying I-55 / I-64 over IL 3 ramps and UP Railroad. — Executed Nov 25 New Keeley & Sons, Inc. $2,195,979 ·
Jun 12, 2026 76U86 MadisonDistrict 8 Bridge painting on IL 3 over NS Railroad in Granite City. (SN 060-0193 and 060-0194) — Executed Nov 25 New Eagle Painting & Maintenance Company, Inc. $314,406 ·
Jun 12, 2026 76U96 VariousDistrict 8 Highway lighting and traffic signal maintenance at various locations throughout District 8. — Executed Nov 25 New Electrico, Inc. $2,003,468 ·
Jun 12, 2026 76U97 VariousDistrict 8 Guardrail and cable median repairs at various locations in District 8. — Executed Nov 25 New Illini Excavation & Reclamation, Inc. $5,201,570 ·
Jun 12, 2026 76U98 VariousDistrict 8 Maintenance and service of all ITS equipment at various locations throughout District 8. — Executed Nov 25 New Electrico, Inc. $573,010 ·
Jun 12, 2026 76V03 MadisonDistrict 8 Bridge painting on SN 060-0350 and 060-0351 carrying I-270 over the Mississippi River. — Executed Nov 25 New Capital Industrial Services, LLC $2,933,300 ·
Jun 12, 2026 76V06 JerseyMadisonDistrict 8 40.25 miles of tree removal at various locations in Madison and Jersey Counties. — Executed Nov 25 New Homer Tree Service, Inc. $762,370 ·
Jun 12, 2026 76V08 VariousDistrict 8 Various interstate bridge deck patching on a callout basis throughout District 8. — Executed Nov 25 New Keeley & Sons, Inc. $2,580,521 ·
Jun 12, 2026 76V09 VariousDistrict 8 Structural repairs to various bridges at various locations throughout District 8. — Executed Nov 25 New Keeley & Sons, Inc. $3,642,071 ·
Jun 12, 2026 76V12 St. ClairDistrict 8 0.4 miles of patching and slurry seal on South 26th Street from Bond Avenue to IL 15 in East St. Louis. — Executed Nov 25 New Kinney Contractors, Inc. $414,711 ·
Jun 12, 2026 76V13 VariousDistrict 8 Traffic signal modernization at various locations throughout District 8. — Executed Nov 25 New Gerstner Electric, Inc. $1,847,416 ·
Jun 12, 2026 76V17 MadisonDistrict 8 10.4 miles of bridge repairs and resurfacing on I-55/I-70/US 40 from 0.5 miles west of Black Lane to 0.4 miles east of IL 159. — Executed Nov 25 New The Kilian Corporation & Christ Brothers Asphalt & Keeley & Sons, Inc. tri-venture $24,110,330 ·
Jun 12, 2026 76V18 ClintonSt. ClairDistrict 8 6.5 miles of longitudinal joint repair on I-64 from 0.5 miles west of IL 4 in Mascoutah to 0.3 miles east of the Clinton County line. — Executed Nov 25 New The Kilian Corporation $3,286,837 ·
Jun 12, 2026 78791 AlexanderDistrict 9 Removal and replacement of SN 002-0012 carrying IL 3 over a drainage ditch 0.5 miles west of IL 127. — Executed Nov 25 New Samron Midwest Contracting, Inc. $3,285,578 ·
Jun 12, 2026 78977 FranklinDistrict 9 Reconstruction of Benton Square (IL 14 / IL 37) with improved turning movements and island crosswalks. — Executed Nov 25 New Samron Midwest Contracting, Inc. $967,393 ·
Jun 12, 2026 78A13 UnionDistrict 9 Box culvert replacements at 4 locations: 1) SN 091-2005 carrying IL 127 over a stream, 3.0 miles northwest of Jonesboro; 2) SN 091-2012 carrying IL 146 over a stream, 0.6 miles west of Jonesboro 3) SN 091-7022 carrying Old US 51 over an unnamed ditch south of Dongola 4) SN 091-7027 carrying US 51 over an unnamed ditch. 3.0 miles south of Anna. — Executed Nov 25 New E. T. Simonds Construction Company $2,686,720 ·
Jun 12, 2026 78A85 AlexanderDistrict 9 Pavement patching, HMA removal, HMA resurfacing, shoulder work and ADA upgrades on US 51 from 0.29 miles south of New Cross Street to 3.38 miles south of New Cross Street. Includes small portions of Patierdale Road, Kessler Road and Turner Lane. — Executed Nov 25 New E. T. Simonds Construction Company $5,912,328 ·
Jun 12, 2026 78B49 JeffersonDistrict 9 0.4 miles of pavement removal with PCC replacement, aggregate subgrade improvement, shoulders, curb and gutter, median island and ramp pavement patching on I-64 from Bunny Farm Road to just past the I-64 westbound ramp. — Executed Nov 25 New Samron Midwest Contracting, Inc. $4,558,321 ·
Jun 12, 2026 78B59 FranklinDistrict 9 1.8 miles of resurfacing on IL 148 from IL 14 to Yellow Bank Road. — Executed Nov 25 New Samron Midwest Contracting, Inc. $1,230,184 ·
Jun 12, 2026 78B94 SalineDistrict 9 Mast arm upgrades at the intersection of US 45 and IL 13. — Executed Nov 25 New Brown Electric, Inc. $612,761 ·
Jun 12, 2026 78C10 WhiteDistrict 9 Repairs to SN 097-0062 carrying US 45 over Skillet Fork Creek, 0.8 miles south of Mill Shoals. — Executed Nov 25 New E. T. Simonds Construction Company $583,277 ·
Jun 12, 2026 78C13 WilliamsonDistrict 9 Slope repairs on IL 148 over Crab Orchard Lake, 1.5 miles south of Old IL 13. — Executed Nov 25 New Samron Midwest Contracting, Inc. $328,825 ·
Jun 12, 2026 78C15 WhiteDistrict 9 Painting two bridges over I-64 in White County. (SN 097-0045 and 097-0050) — Executed Nov 25 New Eagle Painting & Maintenance Company, Inc. $409,970 ·
Jun 12, 2026 78C20 VariousDistrict 9 Various electrical repairs and/or replacements at various locations throughout District 9. — Executed Nov 25 New F. W. Electric, Inc. $318,316 ·
Jun 12, 2026 78C24 PerryDistrict 9 5.8 miles of resurfacing on IL 127 from 0.3 miles north of Deer Run Road to the Washington County line. — Executed Nov 25 New Samron Midwest Contracting, Inc. $1,989,087 ·
Jun 12, 2026 78C25 PerryDistrict 9 2.8 miles of resurfacing on IL 150 from 0.2 miles north of Cutler (Reeses Hill Road) to IL 154. — Executed Nov 25 New Samron Midwest Contracting, Inc. $1,618,916 ·
Jun 12, 2026 80B17 WillDistrict 1 Thermoplastic pavement markings, and incidental work (2,809-Ft) Smart Overlay consists of thermoplastic pavement markings, and incidental work. Located in the City of Crete in Will County. — Executed Nov 25 New Iroquois Paving Corporation $197,734 ·
Jun 12, 2026 80B22 CookDistrict 1 (3.71-Mile) SMART overlay, proposed pavement markings, ADA ramp details at the ramps listed, installing APS push buttons at all signalized intersections listed, and replacement of all loop detectors impacted by the resurfacing. Project located at US 41 (Skokie Blvd)/ IL 50 (Cicero Ave) from Golf Road to Devon Ave is in the Villages of Skokie and Lincolnwood in Cook County, IL. — Executed Nov 25 New K-Five Construction Corporation $7,389,202 ·
Jun 12, 2026 80B23 KaneDistrict 1 Pavement patching, milling of existing HMA surface, placing HMA surface course, placement of pavement markings (2.81-Mile) SMART Overlay and Shoulder Repair consist of pavement patching, milling of existing HMA surface, placing HMA surface course, placement of pavement markings, shoulder work, rumble strips. The improvement is in the Villages of Gilberts and Pingree Grove in Kane County. — Executed Nov 25 New Plote Construction, Inc. $3,171,166 ·
Jun 12, 2026 80B28 CookDistrict 1 (4,957.13-Ft) HMA overlay of existing concrete pavement and ADA improvements. The roadway scope of work includes HMA pavement, curb removal and replacement, median removal and replacement, pavement patching, driveway removal and replacement, thermoplastic pavement markings, ADA improvements, and traffic signal/APS improvements. Project is located along IL Route 62 (Algonquin Road) from Radisson Way to Barker Avenue in Rolling Meadows and Schaumburg, Illinois. — Executed Nov 25 New K-Five Construction Corporation $3,929,710 ·
Jun 12, 2026 80B33 CookDistrict 1 (HMA) surface removal, pavement patching, (HMA) shoulders, resurfacing with (HMA) binder and surface course, c (5,764-Ft) Design Overlay, ADA Improvements consists of (HMA) surface removal, pavement patching, (HMA) shoulders, resurfacing with (HMA) binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, raised reflective pavement markers, thermoplastic pavement marking. The project is located within the City of Harvey in Cook County. — Executed Nov 25 New D. Construction, Inc. $933,943 ·
Jun 12, 2026 80B35 CookDistrict 1 (1.53-Mile) SMART overlay and ADA Improvement project includes hot-mix asphalt removal, earth excavation, pavement patching, resurfacing hot-mix asphalt, pavement markings, raised reflective pavement markers, ADA ramps, traffic signals, and detector loops. Project is in the Village of River Grove, Village of Schiller Park and City of Chicago in Cook County. — Executed Nov 25 New K-Five Construction Corporation $2,873,926 ·
Jun 12, 2026 80B47 CookDistrict 1 Reconstruction of the expansion joints with strip seals, slope wall repair and substructure repair Bridge Painting project consists of reconstruction of the expansion joints with strip seals, slope wall repair and substructure repair. Project is located on FAI 90/94 (Kennedy Expressway) under Ainslie Street in the City of Chicago. (SN 016-1105) — Executed Nov 25 New Areatha Construction Co., Inc. $641,982 ·
Jun 12, 2026 80B51 CookDistrict 1 Cleaning and painting steel surfaces as designated on the plans and any incidental work (0.20-Mile) Bridge Painting project consists of cleaning and painting steel surfaces as designated on the plans and any incidental work. The project is located at structure No. 1 (SN. 016-0436) carrying the IHB Railroad over US 12/20 (95th ST) in the Village of Bridgeview in Cook County. — Executed Nov 25 New Capital Industrial Services, LLC $493,330 ·
Jun 12, 2026 80B58 CookDistrict 1 Drainage structure cleaning, frame and grate replacement and any collateral or incident work located in the Vi (3.20-Mile) Project consists of drainage structure cleaning, frame and grate replacement and any collateral or incident work located in the Villages of Forest Park, Maywood, Broadview, Bellwood and Westchester within Cook County. — Executed Nov 25 New MYS, Incorporated $652,635 ·
Jun 12, 2026 80B66 CookDistrict 1 Installation of permanent protective shielding as shown on the plans and any incidental and collateral work ne This is a permanent protective shielding project and the work to be performed under this contract consists of installation of permanent protective shielding as shown on the plans and any incidental and collateral work necessary to complete located at various structures carrying Circle Ave, Harlem Ave and California Ave Over I-290 (Eisenhower) in the Villages of Oak Park, Forest Park and City of Chicago, in Cook County. — Executed Nov 25 New Lorig Construction Company $397,833 ·
Jun 12, 2026 80B77 WillDistrict 1 The removal and replacement of a fixed platform scale that includes removal and replacement of pavement, curb The project consists of the removal and replacement of a fixed platform scale that includes removal and replacement of pavement, curb and gutter removal and replacement, median surface removal and replacement, sidewalk improvements, pavement marking, landscaping, and erosion control located in Village of Bolingbrook, Will County, Illinois. — Executed Nov 25 New D. Construction, Inc. $1,130,242 ·
Jun 12, 2026 80B78 CookDistrict 1 Refinishing surface art medallions on existing retaining walls along the Dan Ryan Local Lanes with limits from (1.90-Mile) Project consists of refinishing surface art medallions on existing retaining walls along the Dan Ryan Local Lanes with limits from 51st Street to 59th Street in the City of Chicago, in Cook County. — Rejected Nov 25 New MYS, Incorporated $1,409,040 ·
Jun 12, 2026 80B87 CookDistrict 1 A design overlay of the existing pavement with HMA surface course and binder course, thermoplastic pavement ma (5.37-Mile) Project consists of a design overlay of the existing pavement with HMA surface course and binder course, thermoplastic pavement markings, ADA improvements for curb ramps, combination concrete curb and gutter located in the Villages of Wheeling and Arlington Heights and the City of Prospect Heights in Cook County. — Executed Nov 25 New Builders Paving, LLC $3,116,448 ·
Jun 12, 2026 80C45 McHenryDistrict 1 (1.2-Mile) Standard Overlay for US 14 and SMART Overlay for South Frontage Road project includes pavement patches, HMA surface removal, resurfacing with HMA binder and surface course, longitudinal joint sealing, curb and gutter removal and replacement, drainage structures adjustments and cleaning, new thermoplastic pavement markings, detector loops replacement, raised reflective pavement markers. The project is located within the City of Woodstock. — Executed Nov 25 New Peter Baker & Son Co. $1,605,106 ·
Jun 12, 2026 80C48 LakeDistrict 1 (3,760-Ft) Standard Overlay, HMA surface removal and overlay, pavement patching maintenance of traffic, pavement marking, landscaping, ADA curb ramps, APS improvements, curb and gutter removal and replacement, median removal and replacement, guardrail removal and replacement, impact attenuator installation, bridge pier crash wall repairs. Located on W. Peterson Road from west of IL 137 to US 45 in the Village of Libertyville in Lake County. — Executed Nov 25 New Peter Baker & Son Co. $2,084,785 ·
Jun 12, 2026 80C89 CookLakeDistrict 1 This work includes mast arm and pole replacement, installation of LED signal heads, installation of accessible pedestrian signals, controller replacement and all incidental and collateral work necessary to complete the project. This project is located in Lake and Cook Counties in District 1. — Executed Nov 25 New H & H Electric Co. $2,718,198 ·
Jun 12, 2026 80C90 CookDistrict 1 Repairs and temporary shoring to the existing Pershing Road Bridge (SN 016-0396) over Racine Avenue and Norfol (2,470-Ft) Bridge repair work consists of repairs and temporary shoring to the existing Pershing Road Bridge (SN 016-0396) over Racine Avenue and Norfolk Southern Railroad east and west spurs. Work includes installation of temporary shoring towers, structural steel repair, protective shielding, pavement marking and signing, traffic control and protection in the City of Chicago, Cook County — Rejected Nov 25 New F. H. Paschen, S.N. Nielsen & Associates LLC $2,448,235 ·
Jun 12, 2026 80C96 VariousDistrict 1 Forestry, weed control, and landscape work includes pruning, tree removal, and selective clearing of trees, shrubs, and brush, controlling and removing invasive weeds repairing, installing, and establishing new vegetative material including trees, shrubs, and seeding. Located within the right-of-way limits within the municipal limits of Chicago, Lincolnwood, Skokie, Morton Grove, Wilmette, Northfield, Glencoe, and Northbrook. — Executed Nov 25 New Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $3,638,649 ·
Jun 12, 2026 80C97 CookDistrict 1 Advanced shoring at structures (SN 016-2047 and SN 016-2049) along I-90/94 at Ogden Avenue (110-Ft) Project consists of advanced shoring at structures (SN 016-2047 and SN 016-2049) along I-90/94 at Ogden Avenue. The total length of the project is 110 feet (0.02 miles). The project is in the City of Chicago in Cook County. — Executed Nov 25 New Rausch Infrastructure, LLC $727,711 ·
Jun 12, 2026 80D00 CookDistrict 1 (4,498-Ft) Smart Overlay, ADA Improvements include Hot-Mix Asphalt (HMA) removal, Portland Cement Concrete (PCC) pavement removal and replacement, resurfacing with HMA surface course, concrete curb and gutter removal and replacement, brick paver removal and reinstallation, detector loop replacement, Accessible Pedestrian Signal (APS), ADA curb ramps improvements, raised reflective markers, thermoplastic and modified urethane pavement marking. Location is in the Village of Schiller Park within Co — Executed Nov 25 New Plote Construction, Inc. $2,322,000 ·
Jun 12, 2026 80D36 WillDistrict 1 This is an advanced procurement of selective mechanical and electrical components for the existing movable bridge (SN 099-0101) including the furnishing of the machinery brakes, motor brakes, and select bearings for the movable structure located at US 30 (Cass Street) Bridge over the Des Plaines River in the City of Joliet in Will County. — Executed Nov 25 New GRANITE CONSTRUCTION COMPANY $900,000 ·
Jun 12, 2026 80D46 LakeDistrict 1 The scope of work for this improvement includes a new 5x3 culvert under US 41 with associated pavement removal and patching, ditch grading, pavement removal and patching, temporary concrete barriers, curb and gutter, barrier median and landscaping. Located in the Village of Lake Bluff and Shields Township in Lake County. — Executed Nov 25 New Curran Contracting Company $1,087,000 ·
Jun 12, 2026 85791 WinnebagoDistrict 2 Construction of a shared-use path along Rockton Road from 0.1 mile west of Aspland Drive to Old Meadow Lane in the village of Rockton. — Executed Nov 25 New N-Trak Group LLC $659,834 ·
Jun 12, 2026 85794 Rock IslandDistrict 2 Sidewalk replacement and construction of new sidewalks at various locations in the city of Rock Island. — Executed Nov 25 New Centennial Contractors of the Quad Cities, Inc. $609,125 ·
Jun 12, 2026 87851 KankakeeDistrict 3 Replace the bridge carrying CH 14 over Trim Creek located 3.3 miles south of IL 17. — Executed Nov 25 New Riber Construction, Inc. $1,225,921 ·
Jun 12, 2026 87859 IroquoisDistrict 3 Resurfacing of E 980N Road from IL 99 to the west corporate limits of Milford. — Executed Nov 25 New Iroquois Paving Corporation $3,970,513 ·
Jun 12, 2026 87895 IroquoisDistrict 3 Resurface 800 N Road from I-57 ramps to US 45. — Executed Nov 25 New Iroquois Paving Corporation $967,933 ·
Jun 12, 2026 89864 MercerDistrict 4 Removal and replacement of sidewalk along SW 6th St. from west of College Ave. (IL 94) to west of SW 9th Ave. in the city of Aledo. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $180,475 ·
Jun 12, 2026 89892 MercerDistrict 4 Cape seal with pavement markings on CH 2 and bituminous surface treatment on CH 9 and CH 16 in Mercer County. — Executed Nov 25 New A. C. Pavement Striping Co. $1,647,297 ·
Jun 12, 2026 93848 AdamsDistrict 6 HMA resurfacing of North 36th St. from Wavering Park Rd. to Wisman Ln. — Executed Nov 25 New Diamond Construction Company $1,087,655 ·
Jun 12, 2026 93854 ChristianDistrict 6 Construction of PCC sidewalk with ADA compliance from Pana Junior High School to residential areas in the city of Pana. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $347,507 ·
Jun 12, 2026 93857 ScottDistrict 6 Full-depth reclamation with soil cement base, surface profiling and bituminous surface treatment on CH 14 from north of Walnut Creek to I-72 in Scott County. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $1,074,717 ·
Jun 12, 2026 93858 HancockDistrict 6 Microsurfacing on Ferris Road from 1000E Road to 1750 Road in Hancock County. — Executed Nov 25 New A. C. Pavement Striping Co. $578,700 ·
Jun 12, 2026 95996 EffinghamDistrict 7 Reconstruction of intersections along US 40 from Race Street to Wall Street in the village of Teutopolis. — Executed Nov 25 New A&A Concrete LLC $274,477 ·
Jun 12, 2026 95997 FayetteDistrict 7 Construction of sidewalks from Kaskakia College to various locations in the city of Vandalia. — Executed Nov 25 New McCarthy Improvement Company $1,645,985 ·
Jun 12, 2026 95A06 CumberlandDistrict 7 Full-depth pavement reclamation with an A-2 bituminous surface treatment on 1200E Road from the north corporate limits of Toledo to 1050N Road. — Executed Nov 25 New Dunn Company $1,257,379 ·
Jun 12, 2026 95A12 ShelbyDistrict 7 A-2 bituminous surface treatment on CH 15 from the southern city limit of Tower Hill to the northern city limit of Herrick. — Executed Nov 25 New Howell Paving, Inc. $732,605 ·
Jun 12, 2026 97827 St. ClairDistrict 8 Construction of a southbound right-turn lane at the intersection of Old Collinsville Road and Ashland Avenue. — Executed Nov 25 New Hank's Excavating & Landscaping, Inc. $649,527 ·
Jun 12, 2026 97884 MadisonDistrict 8 Resurfacing North Alby Street from Humbert Road to Wesley Way in the village of Godfrey. — Executed Nov 25 New Stutz Excavating, Inc. $1,096,234 ·
Jun 12, 2026 97896 MadisonDistrict 8 Sidewalk construction along various streets in the village of Worden. — Executed Nov 25 New Stutz Excavating, Inc. $295,673 ·
Jun 12, 2026 97897 MonroeDistrict 8 Cold-in-place pavement recycling on Bluff Road from DD Road to Hanover Road in Monroe County. — Executed Nov 25 New Christ Bros. Asphalt, Inc. $3,056,088 ·
Jun 12, 2026 97899 St. ClairDistrict 8 Resurfacing Martin Luther King Jr. Drive from State Street to Columbia Place in the city of East St. Louis. — Executed Nov 25 New Hank's Excavating & Landscaping, Inc. $1,579,164 ·
Jun 12, 2026 97903 MadisonDistrict 8 Traffic signal installation at the intersection of Horseshoe Lake Road and McDonough Lake Road in the city of Collinsville. — Executed Nov 25 New Gerstner Electric, Inc. $361,779 ·
Jun 12, 2026 99748 WilliamsonDistrict 9 Construction of new sidewalks along Fair St. and Morning Side Dr. in the city of Marion. — Rejected Nov 25 New
Jun 12, 2026 99769 MassacDistrict 9 Resurfacing Grand Chain Road from Pulaski County Line to Boaz Road. — Rejected Nov 25 New Samron Midwest Contracting, Inc. $1,054,105 ·
Jun 12, 2026 99770 PopeDistrict 9 Resurfacing Bay City Road from 0.4 mile south of Azotus Road to 1.1 miles north of Upper Bottom Road. — Executed Nov 25 New Samron Midwest Contracting, Inc. $1,079,783 ·
Jun 12, 2026 99771 JeffersonDistrict 9 HMA resurfacing of Tolle Rd. from E. Breezeway Rd. to N. Miller Lake Ln. in Jefferson County. — Executed Nov 25 New E. T. Simonds Construction Company $1,680,906 ·
Jun 12, 2026 99772 HamiltonDistrict 9 HMA resurfacing with aggregate shoulders and pavement marking on Blairsville Rd. from IL 242 to the White County Line in Hamilton County. — Executed Nov 25 New E. T. Simonds Construction Company $3,108,776 ·
Jul 31, 2026 46949 ClintonDistrict 8 Resurfacing parking areas with PCC surface, sidewalk construction and drainage improvements at Eldon State Recreational Area. — Executed Nov 25 New McCarthy Improvement Company $2,907,718 ·
Jul 31, 2026 46951 VermilionDistrict 5 Resurfacing of internal park roads and parking areas with an HMA surface; culvert replacement; sidewalk construction; drainage improvements; and associated work at the Kickapoo State Recreation Area in Vermilion County. Approximately 1.741 miles gross length. — Executed Nov 25 New Feutz Contractors, Inc. $4,107,350 ·
Jul 31, 2026 61K67 KaneDistrict 1 Resurfacing Prairie St. from the west city limit to Randall Rd. in the city of Aurora. — Executed Nov 25 New Builders Paving, LLC $1,538,538 ·
Jul 31, 2026 61K85 CookDistrict 1 Reconstruction of Weber Dr. from Central Rd. to IL 62 in the city of Rolling Meadows. — Executed Nov 25 New Plote Construction, Inc. $2,813,311 ·
Jul 31, 2026 61M13 KaneDistrict 1 Demolition of existing 18-span bridge and construction of three PPC beam single span bridges carrying Kirk Rd. over Reed Rd., UPRR and White's Creek. — Executed Nov 25 New Dunnet Bay Construction Company $36,611,206 ·
Jul 31, 2026 61M40 DuPageDistrict 1 Implementation of flashing yellow arrow signals at five existing signalized intersections along 63rd St. in Dupage County. — Executed Nov 25 New Home Towne Electric, Inc. $2,996,846 ·
Jul 31, 2026 61M50 CookDistrict 1 Construction of a single-lane roundabout at the intersection of Ravina Ave. and 153rd St. in the village of Orland Park. — Active Nov 25 New
Jul 31, 2026 62J64 CookDistrict 1 Hot-mix asphalt surface removal, placement of hot mix surface course, pedestrian ramp improvements, pavement p (3,478-Ft) SMART overlay, Traffic Signal Modernization and ADA improvement project consists of hot-mix asphalt surface removal, placement of hot mix surface course, pedestrian ramp improvements, pavement patching, placement of pavement markings.Located within the Villages of Glencoe and Northbrook in Cook County. — Executed Nov 25 New Peter Baker & Son Co. $2,925,476 ·
Jul 31, 2026 62T84 CookDistrict 1 Sidewalk and ADA improvements (848.83-Ft) The improvement includes replacement of the existing concrete box culvert (SN 016-0926) with a proposed triple cell concrete box culvert (SN 016-8321) consists of sidewalk and ADA improvements. This improvement is located along FAU 2843 (Dixie Highway) over Thron Creek Tributary (0.4 miles North of IL 1) in the City of Chicago Heights, Cook County, IL. — Executed Nov 25 New D. Construction, Inc. $1,552,966 ·
Jul 31, 2026 62V29 CookDistrict 1 Cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement (3.4-Mile) The improvement consists of cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement, refreshing existing pavement markings with modified urethane pavement marking lines. Location is in villages of Maywood, Forest Park, Melrose Park and River Grove in Cook counties. — Executed Nov 25 New Denler, Inc. $334,302 ·
Jul 31, 2026 62V45 CookDistrict 1 HMA pavement resurfacing with binder and surface courses, class B patching, cleaning and sealing of longitudin (3.3-Mile) Designed Overlay consists of HMA pavement resurfacing with binder and surface courses, class B patching, cleaning and sealing of longitudinal pavement joints between traffic lanes and curb and gutter, placement of thermoplastic and modified urethane pavement markings. This project is located within the City of Alsip and Blue Island in Cook County. — Executed Nov 25 New D. Construction, Inc. $1,062,900 ·
Jul 31, 2026 62V46 WillDistrict 1 (3,381-Ft) Crack and Joint Seal project includes routing, cleaning, and sealing of longitudinal cracks in existing hot-mix asphalt (HMA) pavement and PCC pavement, performing class B patching on PCC Pavement and refreshing existing pavement marks with modified urethane pavement markings. This project is in the City of Joliet, Will County. — Executed Nov 25 New Mosley Construction 1, LLC $424,498 ·
Jul 31, 2026 62V64 CookDistrict 1 Cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement (3,765-Ft) Project consists of cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement, refreshing existing pavement markings with modified urethane marking lines. Located through the Municipalities of Hanover Park, Bartlett, and Streamwood in Cook County. — Executed Nov 25 New Denler, Inc. $85,435 ·
Jul 31, 2026 62V79 LakeDistrict 1 5,203-Ft) Crack and Joint Sealant improvement consisting of routing, cleaning, and sealing of longitudinal cracks and joints within the hot-mix asphalt pavement, grading and shaping shoulders, restriping with modified urethane pavement marking is located within the Villages of Island Lake and Wauconda in Lake County. — Executed Nov 25 New Denler, Inc. $190,610 ·
Jul 31, 2026 62V80 WillDistrict 1 Routing, cleaning, and sealing of longitudinal cracks in existing pavement, between the existing pavement and (2,897-Ft) This improvement consists of routing, cleaning, and sealing of longitudinal cracks in existing pavement, between the existing pavement and curb and gutter, restriping with modified urethane marking lines. This project is located within the Village of Plainfield in Will County. — Executed Nov 25 New Denler, Inc. $51,792 ·
Jul 31, 2026 62W20 CookDistrict 1 Widening shoulder widths, replaced approach slabs, continuation of the new shared use pedestrian path, removal (1.413-Mile) Bridge Superstructure Replacement (SN 016-0927) consists of widening shoulder widths, replaced approach slabs, continuation of the new shared use pedestrian path, removal and installation of new guardrail, striping ond drainage improvements. The project is in Oak Park Avenue (FAU Route 2774) over I-80 in Tinley Park, IL. — Executed Nov 25 New D. Construction, Inc. $7,166,048 ·
Jul 31, 2026 62X43 CookDistrict 1 Reconstruction of the joints with strip seals, hydro scarification 3/4-), deck repairs, installation of a late (166-Ft) Glenwood Road Bridge (SN 016-0793) over Butterfield Creek project consists of reconstruction of the joints with strip seals, hydro scarification 3/4-), deck repairs, installation of a latex concrete overlay (2¼-) with diamond grinding, application of a protective coat, and substructure concrete repairs, installation of HMA on each side of the bridge. Located within Glenwood Road over Butterfield Creek in the Village of Glenwood in Cook County. — Executed Nov 25 New D. Construction, Inc. $290,657 ·
Jul 31, 2026 62Y20 CookDistrict 1 Deck patching, bridge deck joint replacements, and hydro-scarification and overlay bridge deck overlay (262-Ft) Bridge Deck Overlay and Bridge Joint Replacement will involve bridge repairs. These repairs will generally consist of deck patching, bridge deck joint replacements, and hydro-scarification and overlay bridge deck overlay. This proposed Bridge Repair (SN 016-2705) is located on Ogden Avenue over IL 50 Cicero Avenue, located in Cook County, IL. — Executed Nov 25 New Martam Construction Incorporated $1,236,716 ·
1,601–1,700 of 4,218‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.