| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Nov 7, 2025 | 46944 | WhitesideDistrict 2 | Bridge deck replacement and other brige repairs to structure SN 098-3751 in Whiteside County. | — | Executed | Martin & Company Excavating $1,029,566 · | ||
| Nov 7, 2025 | 61J54 | DuPageDistrict 1 | Extension of the west branch of DuPage River Trail from Gary's Mill Road to an existing trail within the West DuPage Woods Forest Preserve. | — | Executed | Lorig Construction Company $6,927,969 · | ||
| Nov 7, 2025 | 61J94 | CookDistrict 1 | Construct a shared-use path adjacent to Meacham Road, from IL 72 to American Lane, and adjacent to Golf Road from Meacham Road to Roosevelt Boulevard in Schaumburg. | — | Executed | A Lamp Concrete Contractors, Inc. $997,000 · | ||
| Nov 7, 2025 | 61L43 | CookDistrict 1 | HMA resurfacing on Woodfield Road from Plum Grove Road to Meacham Road in Schaumburg. Includes; HMA full depth patching, curb and gutter, sidewalks, shared use path, traffic signal modifications, and lighting. | — | Executed | K-Five Construction Corporation $5,837,039 · | ||
| Nov 7, 2025 | 61L57 | DuPageDistrict 1 | Resurfacing Stonebridge Boulevard from Sheffer Road to Indian head Road, and from Sheffer Road to Eola Road in Aurora. | — | Executed | K-Five Construction Corporation $1,786,248 · | ||
| Nov 7, 2025 | 61L73 | WillDistrict 1 | Extension of Old Renwick Road Trial from the DuPage River to West Renwick Road. | — | Executed | D. Construction, Inc. $352,856 · | ||
| Nov 7, 2025 | 61L76 | CookDistrict 1 | Resurfacing and pedestrian safety improvements at the intersection of 9th Ave. at Van Buren Street, and at Quiney Street in Maywood. | — | Executed | Davis Concrete Construction Co. $298,167 · | ||
| Nov 7, 2025 | 61L77 | CookDistrict 1 | Construct PCC Sidewalks along Center Avenue from Maple Avenue to Laurel Avenue. Includes: ADA Ramps, curb and gutter, landscaping, pavement markings and driveways. | — | Executed | Triggi Construction, Inc. $359,832 · | ||
| Nov 7, 2025 | 61L78 | DuPageDistrict 1 | Resurfacing Rober Palmer Drive from North York Street to South York Street in Elmhurst. | — | Executed | A Lamp Concrete Contractors, Inc. $1,308,888 · | ||
| Nov 7, 2025 | 61L79 | DuPageDistrict 1 | HMA resurfacing on Lambert Road from the South Village limits to IL 38 in Glen Ellyn. Includes; pavement patching, curb and gutter, sidewalks, ADA ramps, and q traffic signal maintenance. | — | Executed | K-Five Construction Corporation $1,759,309 · | ||
| Nov 7, 2025 | 61L80 | DuPageDistrict 1 | Resurfacing Riford Road from St. Harles Road to Crescent Boulevard in Glen Ellyn. | — | Executed | Schroeder Asphalt Services, Inc. $603,175 · | ||
| Nov 7, 2025 | 61L82 | CookDistrict 1 | Construction of a three-span cast-in-place RC slab bridge to carry 21st Street over Addison Creek in Broadview. Includes; full depth HMA pavement, sidewalk, curb and gutter, storm sewer, and lighting. | — | Executed | Dunnet Bay Construction Company $2,582,436 · | ||
| Nov 7, 2025 | 61L83 | LakeDistrict 1 | HMA resurfacing on Oak Spring Road from Appley Avenue to St. Mary's Road in Libertyville. Includes; pavement pathcing, ADA ramps, and signage. | — | Executed | Peter Baker & Son Co. $774,012 · | ||
| Nov 7, 2025 | 61L88 | McHenryDistrict 1 | Construct a four-span RC slabl bridge to carry Allendale Road over Nippersink C Creek. Includes HMA pavement, and guardrail. | — | Executed | Dunnet Bay Construction Company $5,134,451 · | ||
| Nov 7, 2025 | 61L92 | CookDistrict 1 | Rehabilitation of Devon Avenue from Lincoln Avenue to McCormick Boulevard in Lincolnwood. Includes; HMA resurfacing, curb and gutter, sidewalks, lighting, parkway ebhancements and water main. | — | Executed | Capitol Cement Co., Inc. $5,462,909 · | ||
| Nov 7, 2025 | 61L97 | KaneDistrict 1 | HMA resurfacing on Spruce and E. Main Street from Gilbert Street to Kenyon Road in South Elgin. Includes; curb and gutter, drainage, parkway restoration, patching, replacment of pedestrian push buttons and detector loops. | — | Executed | Everlast Blacktop Inc. $763,936 · | ||
| Nov 7, 2025 | 61L98 | CookDistrict 1 | Reconstruction and HMA resurfacing of shoenbeck Road from US 12 to Camp McDonald Road in Mount Prospect. Includes; sidewalks, ADA ramps, pedestrian signals, driveways, storm sewers, and curb and gutter. | — | Executed | PirTano Construction Co., LLC $1,778,510 · | ||
| Nov 7, 2025 | 62R51 | WillDistrict 1 | (3,400-Ft) Intersection Improvement (channelization, pavement widening, resurfacing),traffic signal Installation at railroad crossing, traffic signal modernization, Interconnect, minor lighting improvements, drainage Improvements (including new storm sewer at Monee Maintenance Yard), Location: IL 50 (Cicero Avenue) at Dralle Road, at Governors Hwy and at Monee Maintenance Yard, located withing the Villages of University Park and Monee. | — | Executed | Iroquois Paving Corporation $3,192,530 · | ||
| Nov 7, 2025 | 62R63 | CookDistrict 1 | (2,891-Ft) Bridge Replacement Project. lighting, traffic signals and ADA improvements for structure (SN 016-0834) for I-94 (Edens Expressway) at Devon Avenue (Overhead) in the City of Chicago and the Village of Lincolnwood within Cook County. | — | Executed | Dunnet Bay Construction Company $15,646,955 · | ||
| Nov 7, 2025 | 62U41 | CookDistrict 1 | (481-Ft) Bridge Replacement Project, bridge approach slab replacement for Structure Number (016-2068), lighting, traffic signal modernization, ADA improvement, resurfacing, I-290 at Keeler Avenue. | — | Executed | Lorig Construction Company $22,596,336 · | ||
| Nov 7, 2025 | 62Y00 | WillDistrict 1 | Building demolition for eleven (11) residential and/or commercial parcels and outbuildings The work consists of building demolition for eleven (11) residential and/or commercial parcels and outbuildings. Each parcel removal will include removing any structure above and below the ground, including the main building frames, attached and detached buildings, facilities, and filling of basements, removal of fences, sidewalks and driveways, utilities, and trees within the parcels' limits. Interim grading and seeding. The project located in the City of Joliet, in the vicinity of FAI Route 80 | — | Executed | C & D Recycling Services, Inc. $346,900 · | ||
| Nov 7, 2025 | 62Y33 | VariousDistrict 1 | The installing new signs, removal, relocation and repair of existing signs Project consist of the installing new signs, removal, relocation and repair of existing signs. Location of the project is in various counties in District 1. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $484,900 · | ||
| Nov 7, 2025 | 62Y36 | VariousDistrict 1 | The intent of this contract is to provide prompt repair to the high-tension cable barrier median system. This work includes removing and replacing damaged high tension cable barrier system components. This work is located on various State maintained routes in Various Counties. | — | Executed | Fence Masters, Inc. $857,222 · | ||
| Nov 7, 2025 | 64R26 | Jo DaviessDistrict 2 | Bridge deck patching on SN 043-0043, carrying US 20/IL 84 over Galena River and ICG RR in Galena. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $732,334 · | ||
| Nov 7, 2025 | 64U80 | HenryDistrict 2 | 9 miles of intermittent resurfacing from IL 81 to culvert #1083 .25 miles South of I-80 ramps. | — | Executed | Advanced Asphalt Company $342,730 · | ||
| Nov 7, 2025 | 64U82 | HenryDistrict 2 | 9 miles of intermittent resurfacing along Atkinson Rd. from IL 92 to Atkinson and on I-80 ramps south of Atkinson. | — | Executed | Advanced Asphalt Company $529,895 · | ||
| Nov 7, 2025 | 64U87 | HenryDistrict 2 | 16.6 miles of agg. shoulder repair from Woodhull to Galva along IL 17/ US 34, and IL 91 to Henry Co. line. | — | Executed | Phoenix Corporation of the Quad Cities $355,924 · | ||
| Nov 7, 2025 | 64U98 | WinnebagoDistrict 2 | Furnishing the structural steel and bearings for the bridge on FAP Route 525 over the Kishwaukee River in Cherry Valley Township, in Winnebago, IL. | — | Executed | Industrial Steel Construction, Inc. $2,988,100 · | ||
| Nov 7, 2025 | 64V05 | Rock IslandDistrict 2 | Bridge washing of SN 081-0011 carrying I-80 over the Mississippi River in Rock Island County. | — | Executed | Interstate Maintenance, Incorporated $138,300 · | ||
| Nov 7, 2025 | 64V06 | Rock IslandDistrict 2 | Bridge washing of SN 081-0106 carrying I-280 over the Mississippi River in Rock Island County. | — | Executed | All States Painting, Inc. $53,333 · | ||
| Nov 7, 2025 | 64V07 | CarrollRock IslandWhitesideDistrict 2 | Bridge washing of 3 structures over the Mississippi River in Carroll, Rock Island, and Whiteside Counties. | — | Executed | M & M Concrete, Inc. $112,000 · | ||
| Nov 7, 2025 | 68B60 | WarrenDistrict 4 | Rehabilitation and resurfacing of the existing pavement including vertical adjustments, curve adjustments, shoulder widening, guardrail replacement, culvert replacements and extensions, addition of turn lanes, and all other related collateral work necessary to complete the project located on US 67 (FAP 310) from south of 270th St to south of 220th St_in Monmouth. Nearly 6 mi. | — | Executed | Gunther Construction, a div of UCM, Inc. $35,946,274 · | ||
| Nov 7, 2025 | 68F45 | WoodfordDistrict 4 | Class D patching, milling and resurfacing, ADA improvements, curb and gutter removal and replacement, drainage improvements, the addition of a turn-lane, and other related collateral work on IL 117 from 600' south of Grandview Circle to Mill St in Eureka. 1.87 miles. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $5,074,396 · | ||
| Nov 7, 2025 | 70F19 | McLeanDistrict 5 | Mill, patch and resurface FAP 693 (ILL 9) from Hinshaw Avenue to Center Street in Bloomington, IL._Approximately 1.291 miles. | — | Executed | Rowe Construction, a div of UCM, Inc. $8,303,728 · | ||
| Nov 7, 2025 | 72508 | SangamonDistrict 6 | Tree removal and vegetation removal along I-55 from 11th Street to Stevenson Drive in Springfield. | — | Executed | Homer Tree Service, Inc. $190,542 · | ||
| Nov 7, 2025 | 72523 | CassSchuylerDistrict 6 | 1.8 miles of tree removal on US 67 / IL 100 near the Illinois River Bridge in Beardstown. | — | Executed | Freesen, a div of UCM, Inc. $765,687 · | ||
| Nov 7, 2025 | 72688 | SangamonDistrict 6 | Tree clearing and ditch grading along the IDOT access road near the Lincolnshire Subdivision, northwest of I-72 and Chatham Road in Springfield. | — | Executed | Freesen, a div of UCM, Inc. $97,470 · | ||
| Nov 7, 2025 | 72A62 | SangamonDistrict 6 | Bridge removal on I-55 / I-72, 0.1 miles south of Stevenson Drive. | — | Executed | William Charles Construction Company, LLC $1,014,537 · | ||
| Nov 7, 2025 | 74595 | CumberlandDistrict 7 | Bridge replacement on US 40 over the Embarras River, 0.5 miles east of Cumberland Road, west of Greenup. | — | Executed | Samron Midwest Contracting, Inc. $6,831,745 · | ||
| Nov 7, 2025 | 74B78 | WayneDistrict 7 | Bridge deck overlay, bridge deck repairs and approach pavement on SN 096-0010 carrying IL 15 over the Little Wabash River, 0.3 miles east of CR 2500 East. | — | Executed | C-Hill Civil Contractors, Inc. $1,592,673 · | ||
| Nov 7, 2025 | 76T66 | GreeneDistrict 8 | Structural, mechanical and electrical repairs to the Joe Page Bridge in Hardin. (SN 031-0001) | — | Rejected | Keeley & Sons, Inc. and Wissehr Electric, Inc. JV $22,242,413 · | ||
| Nov 7, 2025 | 76U47 | VariousDistrict 8 | Bridge deck sealing on various bridges in Calhoun, Greene and Jersey Counties in District 8. | — | Executed | M & M Concrete, Inc. $43,640 · | ||
| Nov 7, 2025 | 76U48 | VariousDistrict 8 | Bridge deck sealing on various bridges in Bond, Clinton, Marion, and Washington Counties in District 8. | — | Executed | All States Painting, Inc. $274,243 · | ||
| Nov 7, 2025 | 76U50 | MonroeRandolphDistrict 8 | Bridge deck sealing on various bridges in Monroe and Randolph Counties in in District 8. | — | Executed | All States Painting, Inc. $56,364 · | ||
| Nov 7, 2025 | 76U64 | VariousDistrict 8 | Litter removal - IL 100 from Norman-s Landing to US 67; US 67 from IL 100 to IL 143; I-270 from the Mississippi River to IL 3; I-70 from the Mississippi Riv River to I-55/64; I-55/64 from the Mississippi River to I-70; I-255 from the Mississippi River to IL 3. | — | Executed | The Final Connection, Inc. $76,044 · | ||
| Nov 7, 2025 | 78209 | WilliamsonDistrict 9 | Replacement of SN 100-0031 carrying IL 166 over Sugar Creek at the east corporate limits of Creal Springs. | — | Executed | Samron Midwest Contracting, Inc. $2,526,591 · | ||
| Nov 7, 2025 | 78813 | PerryDistrict 9 | 1.6 miles of milling, resurfacing, shoulder work, culvert replacement and patching on IL 14 from US 51 in DuQuoin to Old Route 14. | — | Executed | Samron Midwest Contracting, Inc. $2,731,937 · | ||
| Nov 7, 2025 | 78994 | FranklinDistrict 9 | Adjustment of a sanitary sewer forced main and the repair of two eroded downstream channels at I-57 Northbound Rend Lake Rest Area. | — | Executed | Samron Midwest Contracting, Inc. $124,571 · | ||
| Nov 7, 2025 | 78B23 | FranklinDistrict 9 | Replacement of SN 028-7049 on IL 14, 1 mile east of Benton. | — | Executed | Samron Midwest Contracting, Inc. $758,456 · | ||
| Nov 7, 2025 | 78B42 | UnionDistrict 9 | Installation of culvert liners at various locations along I-57 in District 9 (SN 091-7066, 091-7071, 091-7072, 091-7073 and 091-7077). | — | Executed | Samron Midwest Contracting, Inc. $1,423,409 · | ||
| Nov 7, 2025 | 78B54 | JacksonDistrict 9 | Resurfacing Sweets Drive from Reed Station Road to 0.5 miles west of Reed Station Road in Carbondale. | — | Executed | E. T. Simonds Construction Company $175,469 · | ||
| Nov 7, 2025 | 78B64 | VariousDistrict 9 | Bridge deck concrete sealing on various bridges in Alexander, Johnson, Massac, Pulaski and Union Counties. | — | Executed | M & M Concrete, Inc. $396,418 · | ||
| Nov 7, 2025 | 78B74 | WilliamsonDistrict 9 | Patching on IL 166 from IL 13 to Tune Road east of Marion. | — | Executed | E. T. Simonds Construction Company $118,588 · | ||
| Nov 7, 2025 | 78B82 | VariousDistrict 9 | Painting structures on various routes in various counties: 3 in Johnson County, 7 in Union County and 2 in Williamson County. | — | Executed | Eagle Painting & Maintenance Company, Inc. $2,044,033 · | ||
| Nov 7, 2025 | 80B53 | CookDistrict 1 | A full bridge painting and cleaning for the BNSF Bridges (SN 016-0020) and (SN 016-0021) over FAI 55 (Stevenso This improvement consists of a full bridge painting and cleaning for the BNSF Bridges (SN 016-0020) and (SN 016-0021) over FAI 55 (Stevenson Expressway) in the City of Chicago and Cook County. | — | Executed | Eagle Painting & Maintenance Company, Inc. $1,180,528 · | ||
| Nov 7, 2025 | 80B69 | CookDistrict 1 | Full Arterial Cleaning Cycle, Supplemental Sweeping including pickup, removal and satisfactory disposal of lim The project consists of Full Arterial Cleaning Cycle, Supplemental Sweeping including pickup, removal and satisfactory disposal of limbs, sticks, leaves, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter on various State maintained arterial routes located within the northern half of Cook County. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $4,622,500 · | ||
| Nov 7, 2025 | 80B70 | DuPageDistrict 1 | Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of lim The project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes within DuPage County. | — | Executed | Central Sweeping of Illinois, LLC $2,013,220 · | ||
| Nov 7, 2025 | 80B71 | CookDistrict 1 | Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of lim This project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes located within southern half of Cook County. | — | Executed | Central Sweeping of Illinois, LLC $4,010,755 · | ||
| Nov 7, 2025 | 80B72 | WillDistrict 1 | Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of lim This project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes located within the county of Will. | — | Executed | Central Sweeping of Illinois, LLC $1,303,855 · | ||
| Nov 7, 2025 | 80B73 | CookDistrict 1 | GRAFFITI REMOVAL and shall consist of removing graffiti from the surfaces on State DOT right of way located on The project consists of GRAFFITI REMOVAL and shall consist of removing graffiti from the surfaces on State DOT right of way located on the inbound and outbound mainlines and ramps of the Kennedy (I-90/94), Dan Ryan (I-90/94), Bishop Ford (I-94), the Stevenson (I-55), and I-57 Expressways in Cook County. | — | Executed | ERA-Valdivia Contractors, Inc. $1,110,000 · | ||
| Nov 7, 2025 | 85779 | WhitesideDistrict 2 | Replace the bridge carrying East 11th Street over the Illinois-Mississippi Feeder Canal and re-align the canal's parallel path, in Rock Falls. | — | Executed | Martin & Company Excavating $1,699,166 · | ||
| Nov 7, 2025 | 85783 | HenryDistrict 2 | Construction of PCC Sidewalk along Lake Street in Kewanee. Includes: storm sewer, PCC entrances, HMA pavement, and seeding. | — | Executed | Advanced Asphalt Company $535,939 · | ||
| Nov 7, 2025 | 85785 | Rock IslandDistrict 2 | Construction of a PCC shared-use path along 19th Street and 27th Street from Avenue of the Cities to 36th Avenue in Moline. Includes; curb and gutter, storm sewer, and traffic signal improvements. | — | Executed | Gensini Excavating, Inc. $5,092,254 · | ||
| Nov 7, 2025 | 87843 | DeKalbDistrict 3 | Construction of HMA multi-use trail from Old Mill Park to Pleasant Street in Sycamore. Includes a prefabricated pedestrian bridge with boardwalk and concrete approach pavement, storm sewer, and signage. | — | Executed | Martin & Company Excavating $1,580,482 · | ||
| Nov 7, 2025 | 87889 | DeKalbDistrict 3 | Construct a three-span PPC deck beam bridge to carry Pratt Road over Somonauk Creek in Sandwich. | — | Executed | D. Construction, Inc. $1,441,346 · | ||
| Nov 7, 2025 | 87890 | FordDistrict 3 | Replace the bridge carrying Clarence Road over Sugar Creek, 0.01 mile south of IL 9 | — | Executed | Tobey's Construction & Cartage, Inc. $679,036 · | ||
| Nov 7, 2025 | 87891 | FordDistrict 3 | Replace the bridge carrying Gallahue Road over an un-named stream, 0.1 mile northeast of N 1200 E Road. | — | Executed | Tobey's Construction & Cartage, Inc. $637,458 · | ||
| Nov 7, 2025 | 89832 | TazewellDistrict 4 | Guardrail replacement on various routes in Tazewell, Peoria and Woodford Counties. Includes, curb and gutter, and pedestrian railing. | — | Executed | Lovewell Fencing, Inc. $2,498,941 · | ||
| Nov 7, 2025 | 89872 | PeoriaDistrict 4 | Intersection improvements at Northmoor Road and University Street in Peoria. Includes; full-depth HMA, traffic signals, lighting, and storm sewer. | — | Executed | Otto Baum Company, Inc. $5,897,500 · | ||
| Nov 7, 2025 | 93843 | MenardDistrict 6 | Widening and HMA resurfacing of Kent Street to Ingram Street west of Athens. Includes; aggregate shoulders, and pipe culverts. | — | Executed | L. W. Rouland Trucking Service, Inc. $2,121,212 · | ||
| Nov 7, 2025 | 93846 | LoganDistrict 6 | Replace PCC deck beams on a three-span structure carrying CH 24 over Prairie Creek, 5 miles South of San Jose. | — | Executed | County Contractors, Inc. $474,620 · | ||
| Nov 7, 2025 | 93847 | PikeDistrict 6 | HMA Resurfacing on N. Monroe Street, E. Adams Street, and Madison Street in Pittsfield. Includes; watermain, sidewalk, ADA ramps, storm sewer, and Lighting. | — | Executed | Rees Construction Company of Quincy $5,451,649 · | ||
| Jan 16, 2026 | 46939 | TazewellDistrict 4 | Removal and replacement of SN's 090-9922 and 090-9923, and resurfacing and rehabilitation of internal park roads and campgrounds at the Spring Lake State Fish and Wildlife Area in rural Tazewell County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $4,375,041 · | ||
| Jan 16, 2026 | 46943 | LakeDistrict 1 | Bridge replacement (Ex SN 049-0185, Pr SN 049-0400) and other misc repairs at Illinois Beach State Park in Lak This project consists of bridge replacement (Ex SN 049-0185, Pr SN 049-0400) and other misc repairs at Illinois Beach State Park in Lake County, IL. | — | Executed | Alliance Contractors, Inc. $578,450 · | ||
| Jan 16, 2026 | 60R94 | CookDistrict 1 | (3366.37-Ft) Intersection Reconstruction of IL-171 at 95th Street, reconfigure the existing "wye" intersection into a "tee" intersection, in Unincorporated Willow Springs, Illinois in. Cook County. | — | Executed | OHLA Central, Inc. $8,643,219 · | ||
| Jan 16, 2026 | 61J01 | DuPageDistrict 1 | Intersection improvements and traffic signal modification on Lemont Road from 83rd Street to 87th Street, and on 87th Street from Havens Drive to Lemont Rd. | — | Executed | R. W. Dunteman Company $9,341,000 · | ||
| Jan 16, 2026 | 61K16 | CookDistrict 1 | Roadway reconstruction, lighting and traffic signal modernization on Belmont Avenue from Williams Drive to Mannheim Road and on Mannheim Road from South of Gage Avenue to Anderson Place in Franklin Park. | — | Executed | Alliance Contractors, Inc. $3,835,382 · | ||
| Jan 16, 2026 | 61L19 | LakeDistrict 1 | Construction of a single-span PPC IL-beam bridge with intgral abutments carrying Greenwood Avenue over the Union Pacific Railroad in Waukegan. Additional work includes MSE retaining walls, HMA approach roadways, guardrail, and lighting. | — | Executed | Dunnet Bay Construction Company $7,980,812 · | ||
| Jan 16, 2026 | 61L36 | DuPageDistrict 1 | HMA resurfacing and intersection channelization at Main Street and Oxford St. in Downers Grove. Includes sidewalks, curb and gutter, storm sewers, street light relocation and pavement markings. | — | Executed | Acura Inc. $2,105,861 · | ||
| Jan 16, 2026 | 61L42 | LakeDistrict 1 | Roadway widening and HMA resurfacing of Waukegan Road and Westleigh Road in Lake Forest. Includes traffic signal modernization, lighting, curb and gutter, sidewalks, and storm sewer. | — | Executed | D'Land Construction, LLC $3,663,043 · | ||
| Jan 16, 2026 | 61L44 | DuPageDistrict 1 | Resurfacing Mittel Drive from Thorndale Avenue to Devon Avenue in Wood Dale. | — | Executed | Builders Paving, LLC $895,259 · | ||
| Jan 16, 2026 | 61L56 | KaneDistrict 1 | Resurfacing Molitor Road from Elizebeth Lane to Felton Road, Diehl Road from Felton Road to Eola Road, Molitor Road from Diehl Road to Eola Road in Aurora. | — | Executed | K-Five Construction Corporation $2,502,456 · | ||
| Jan 16, 2026 | 61L75 | CookDistrict 1 | Resurfacing 5th Avenue from Harrison Street to Quincy Street in Maywood. | — | Executed | A Lamp Concrete Contractors, Inc. $424,594 · | ||
| Jan 16, 2026 | 61L81 | WillDistrict 1 | Resurfacing Remington Road from Weber Road to Claar Boulevard in Romeoville. | — | Executed | K-Five Construction Corporation $596,750 · | ||
| Jan 16, 2026 | 61L89 | CookDistrict 1 | HMA resurfacing on Maple Avenue from Brookfield Avenue to 31st Street in Brookfield. Includes pavement patching, curb and gutter, sidewalk, driveways, ADA ramps, curb bump-outs, and flashing beacons. | — | Executed | Builders Paving, LLC $1,934,050 · | ||
| Jan 16, 2026 | 61L90 | CookDistrict 1 | Resurfacing on Jackson Boulevard from Des Plaines Avenue to Harlem Avenue in Forest Park. | — | Executed | A Lamp Concrete Contractors, Inc. $3,554,981 · | ||
| Jan 16, 2026 | 61L94 | McHenryDistrict 1 | Resurfacing on Raffel Road from Ware Road to IL 120 in Woodstock. | — | Executed | Geske and Sons, Inc. $928,920 · | ||
| Jan 16, 2026 | 61L95 | KaneDistrict 1 | Resurfacing various routes and locations in Aurora. | — | Executed | Geneva Construction Company LLC. $3,133,675 · | ||
| Jan 16, 2026 | 61L99 | WillDistrict 1 | Decorative lighting, landscaping and parkway restoration on IL 50 from Bruce Street Road to Steger Drive in University Park. | — | Executed | Iroquois Paving Corporation $1,829,797 · | ||
| Jan 16, 2026 | 61M01 | WillDistrict 1 | Widening and reconstruction of Seil Road and replacement of the Seil Road Bridge across the DuPage River in Shorewood. Includes; mini roundabouts and street lighting at Seil Road and Raven Road, and at Seil Road and States Lane. | — | Executed | Austin Tyler Construction, Inc. $8,923,156 · | ||
| Jan 16, 2026 | 61M02 | KaneDistrict 1 | Traffic signals improvements at various locations on Kimball Street between Grove Avenue to Dundee Avenue in Elgin. | — | Executed | H & H Electric Co. $584,382 · | ||
| Jan 16, 2026 | 61M07 | McHenryDistrict 1 | HMA resurfacing and culvert replacement on Winn Road from US 12 to East Solon Road, and from East Solon Road to Main Street in Spring Grove. Inclues aggregate shoulders. | — | Executed | Curran Contracting Company $910,908 · | ||
| Jan 16, 2026 | 61M08 | LakeDistrict 1 | Reconstruction of Green Bay Road from IL 176 to South of Witchwood Lane in the Village of Lake Bluff. | — | Executed | Campanella and Sons, Inc. $3,131,134 · | ||
| Jan 16, 2026 | 61M09 | CookDistrict 1 | HMA resurfacing on 34th Street from Harlem Avenue to Ogden Avenue in Berwyn. Includes patching, PCC base course widening, sidewalk, curb and gutter, drainage improvements and traffic signal modernization. | — | Executed | Martam Construction Incorporated $7,777,148 · | ||
| Jan 16, 2026 | 62321 | CookDistrict 1 | (1,375-Ft) Standard Overlay, ADA Improvements Project with HMA surface and binder course, thermoplastic pavement markings, curb ramps located on Kimball Avenue from Diversey Avenue to Wellington Avenue located in the City of Chicago Cook County. | — | Executed | MAT Construction Leasing, Inc. $548,280 · | ||
| Jan 16, 2026 | 62D34 | CookDistrict 1 | The removal and replacement of the existing bridge including traffic signal modernization and ADA improvements (430-Ft) Proposed improvement consists of the removal and replacement of the existing bridge including traffic signal modernization and ADA improvements located on Touhy Avenue at North Branch of the Chicago River in Cook County. | — | Executed | Lorig Construction Company $6,966,559 · | ||
| Jan 16, 2026 | 62F94 | WillDistrict 1 | The realignment and reconstruction of the mainline and interchange pavement and related roadway elements, incl (2,577-Ft) The work consists of the realignment and reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, enclosed storm sewer system with drainage structures and detention ponds, earth excavation and embankment grading, installation of retaining and noise walls, barrier and moment slab construction, bridge replacement, roadway lighting, traffic signals ITS implementation, erosion and sediment | — | Executed | D. Construction, Inc. $104,386,503 · | ||
| Jan 16, 2026 | 62K62 | CookDistrict 1 | The construction of the Central Park Avenue bridge (SN 016-2091) includes bridge construction, roadway reconst (480-Ft) The work consists of the construction of the Central Park Avenue bridge (SN 016-2091) includes bridge construction, roadway reconstruction, erosion control and protection, utility relocation of existing storm sewers, earth excavation and embankment, storm sewers, pavements, pavement marking and signage, roadway lighting, traffic signals, ITS, traffic control and protection urban enhancements. Located along Central Park Avenue over I-290 in the City of Chicago, Cook County, Illinois. | — | Executed | F. H. Paschen, S.N. Nielsen & Associates LLC $19,469,072 · | ||
| Jan 16, 2026 | 62K64 | CookDistrict 1 | (780-Ft) Bridge Superstructure (S.N. 016-0098) replacement including approach slab replacement, pier repairs, lighting, ADA improvements, traffic signal modernization, pedestrian walkways, bike lanes, curb ramp, and curb and gutter replacement located at I-290 at Paulina Street. | — | Executed | F. H. Paschen, S.N. Nielsen & Associates LLC $13,918,848 · | ||
| Jan 16, 2026 | 62K65 | CookDistrict 1 | (740-Ft) Bridge Superstructure reconstruction (SN-016-0754), approach slab reconstruction, bridge railing, fencing, earth excavation, topsoil excavation and placement, seeding and sodding, storm sewer and drainage structures, erosion control, hot-mix asphalt base, binder, and surface courses, PCC driveway pavement, PCC sidewalk, combination curb and gutter, traffic signal modernization, roadway and underpass lighting located I-290 at Sacramento Boulevard. | — | Executed | F. H. Paschen, S.N. Nielsen & Associates LLC $13,380,221 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.