IDOT Jobs

2019 · 936 jobs · — Sign up free
★ My Jobs

936 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Mar 8, 2019 87694 LivingstonDistrict 3 Replace the bridge carrying TR 97 over Deer Creek, 4 miles northeast of Pontiac. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $347,256 ·
Mar 8, 2019 87700 DeKalbDistrict 3 Construction of a right turn lane with safety shoulders on Barber Greene from Peace Road to Somonauk Road. — Executed Nov 26 New Curran Contracting Company $159,355 ·
Mar 8, 2019 87707 LivingstonDistrict 3 Replace the bridge carrying TR 108 over a tributary of Baker Run, located 3 miles northwest of Pontiac. — Executed Nov 26 New H. J. Eppel & Co. $259,317 ·
Mar 8, 2019 89713 TazewellDistrict 4 Resurfacing, sidewalks, street and pedestrian lighting, storm sewer, curb and g gutter, and pavement markings on IL 29 (Main Street) from Poplar Street to Margaret Drive in Creve Coeur. — Executed Nov 26 New Illinois Civil Contractors, Inc. $3,914,270 ·
Mar 8, 2019 91752 VermilionDistrict 5 Reconstruction of Old Ottawa Road with on-street bicycle lanes, between Rue Bienville Street and Denmark Road, and along Denmark Road between the Old Ottawa Road and the intersection with Winter Avenue and logan Avenue in the City of Danville. — Rejected Nov 26 New Cross Construction, Inc. $4,652,537 ·
Mar 8, 2019 95821 CumberlandDistrict 7 Full-depth reclamation, HMA resurfacing and aggregate shoulders on CH 1, from US 45 to IL 121. — Executed Nov 26 New Howell Paving, Inc. $1,151,588 ·
Mar 8, 2019 95843 MoultrieDistrict 7 Replace the bridge carrying TR 81B over Jonathon Creek, 2 miles south of Cadwell. — Executed Nov 26 New County Contractors, Inc. $292,400 ·
Mar 8, 2019 95845 WayneDistrict 7 Replace the bridge carrying TR 383 over Little Dry Fork, 3 miles northeast of Sims. — Executed Nov 26 New Allendale Gravel Co., Inc. $490,950 ·
Mar 8, 2019 97672 MadisonDistrict 8 Construct dedicated left turn lanes on all approaches and install new traffic signals at the intersection of US 40 and Spring Valley Rd. in the City of Troy. — Executed Nov 26 New Keller Construction, Inc. $1,958,010 ·
Mar 8, 2019 97680 MadisonDistrict 8 Pavement reconstruction on Fehling Road from State Street to Bradley Avenue in Granite City. — Executed Nov 26 New Stutz Excavating, Inc. $511,907 ·
Mar 8, 2019 97681 MarionDistrict 8 Resurfacing Kinoka Road from Garrett Road to the I-57 ramp southwest of Kinmundy. — Executed Nov 26 New Howell Paving, Inc. $1,158,465 ·
Mar 8, 2019 97683 MadisonDistrict 8 Replace the superstructure and modifications to the abutments of the structure carrying New Poag Road over the MCT Goshen Trail, 1.0 mile west of IL 157 in Edwardsville. — Executed Nov 26 New Keller Construction, Inc. $1,597,542 ·
Mar 8, 2019 97685 St. ClairDistrict 8 Resurface Scott-Troy Road from the Madison County Line to US 50. — Executed Nov 26 New The Kilian Corporation $1,097,760 ·
Mar 8, 2019 97687 MadisonDistrict 8 Resurfacing and patching on Franklin Avenue from IL 140 to California Avenue in the Village of East Alton. — Executed Nov 26 New Stutz Excavating, Inc. $402,256 ·
Mar 8, 2019 99605 PerryDistrict 9 Replace the Bridge carrying Pyatt-Cutles Road over Little Galum Creek, 4 miles west of IL 13. — Executed Nov 26 New Samron Midwest Contracting, Inc. $312,228 ·
Mar 8, 2019 99608 JacksonDistrict 9 Place embankment along the proposed horizontal and vertical alignment and resurfacing from 1.5 miles west of Reed Station Road to 0.2 mile Westerly. — Executed Nov 26 New E. T. Simonds Construction Company $721,679 ·
Mar 8, 2019 99611 UnionDistrict 9 Replace the bridge carrying TR 116 over Dutch Creek, 1.2 miles southwest of Jonesboro. — Executed Nov 26 New Dees, Inc. $180,759 ·
Mar 8, 2019 99614 JeffersonDistrict 9 Resurfacing Log Cabin Lane from East Adams to Road to East Ina Road. — Executed Nov 26 New E. T. Simonds Construction Company $465,785 ·
Apr 26, 2019 46915 RandolphDistrict 8 Reconstruction of 0.4 mile HMA pavement, oil and chip existing roads and cart paths, and seal and strip the parking lot at the World Shooting Complex in Sparta. — Executed Nov 26 New DMS Contracting, Inc. $629,149 ·
Apr 26, 2019 60N21 CookDistrict 1 Replacement of bridge superstructure and substructure repairs on SN 016-2417 carrying Glenwood Road over Thorn Creek in Chicago Heights. — Executed Nov 26 New D. Construction, Inc. $2,337,418 ·
Apr 26, 2019 60R42 CookDistrict 1 3P resurfacing on US 45 from IL 83 to West Creek Road in Palos Park. — Executed Nov 26 New D. Construction, Inc. $1,719,110 ·
Apr 26, 2019 60R52 WillDistrict 1 Approximately 3 miles of roadway reconstruction, resurfacing, replacement of bridge structures carrying US 6 over Marley Creek, drainage improvement, pavement markings, and aesthetic landscaping from Cedar Rd to Will-Cook Rd in Homer Glen. — Executed Nov 26 New D. Construction, Inc. $14,392,722 ·
Apr 26, 2019 60R74 WillDistrict 1 Bridge deck overlay and bridge joint repair of the bridge carrying IL 50 over rock creek in unincorporated Wilton Township. — Executed Nov 26 New Iroquois Paving Corporation $658,368 ·
Apr 26, 2019 60T21 KaneDistrict 1 Reconstruction of IL 47 at Main Street intersection including raising the profile, removal and replacement of 2 structures (IL 47 over Blackberry Creek and Main St over Blackberry Creek), and traffic signal installation. — Executed Nov 26 New D. Construction, Inc. $9,758,131 ·
Apr 26, 2019 60V17 DuPageDistrict 1 2.42 miles of resurfacing on IL 56 from I-355 to 22nd Street in Lombard, Oak Brook and Downers Grove. — Executed Nov 26 New K-Five Construction Corporation $4,278,640 ·
Apr 26, 2019 60V94 CookDistrict 1 0.26 mile resurfacing on California Avenue from Cermak Road to 19th Street in the City of Chicago. — Executed Nov 26 New Gallagher Asphalt Corporation $230,632 ·
Apr 26, 2019 61D48 WillDistrict 1 Construction of a multi-use path and sidewalk replacement algon the west parkway of Farrell Road from Division Street to south of 7th Street in the City of Lockport. — Executed Nov 26 New P. T. Ferro Construction Co. $334,680 ·
Apr 26, 2019 61D85 CookDistrict 1 Pavement widening, resurfacing, curb and gutter, sidewalk, traffic signal modernization and street lighting at the intersection of Pulaski Road and 183rd Street in Country Club Hills. — Executed Nov 26 New D. Construction, Inc. $4,586,119 ·
Apr 26, 2019 61E24 LakeDistrict 1 Pavement reconstruction, sidewalks, HMA pedestrian path, box culvert, water main relacation, traffic signal and street lighting on Weiland Road from Deerfield Parkway to Lake Cook Road. — Executed Nov 26 New Lake County Grading Company, LLC $12,090,770 ·
Apr 26, 2019 61E94 CookDistrict 1 Sidewalk improvements at various locations within the the Village of Barrington — Executed Nov 26 New Copenhaver Construction, Inc. $303,835 ·
Apr 26, 2019 61E96 DuPageDistrict 1 Construction of an HMA pedestrian path, sidewalks, storm sewer and the extension of Church Road from Grove Avenue to IL 19 in Bensenville. — Rejected Nov 26 New Martam Construction Incorporated $697,572 ·
Apr 26, 2019 61F01 CookDistrict 1 Resurfacing with sidewalk, curb and gutter work on Riverside Drive from Harlem Avenue to Cermak Road in the City of Berwyn. — Executed Nov 26 New K-Five Construction Corporation $1,813,626 ·
Apr 26, 2019 61F09 CookDistrict 1 Pavement removal, storm sewers, HMA pavement, curb and gutter, sidewalks, traffic signals, street lighting and pavement markings on Woodfiled Road, from Martingale Road to the East Frontage Road in Schaumburg. — Executed Nov 26 New R. W. Dunteman Company $8,043,997 ·
Apr 26, 2019 61F10 CookDistrict 1 Pavement removal, storm sewers, HMA pavement, curb and gutter, sidewalks, traffic signals, street lighting and pavement markings on Woodfiled Road, from Meacham Road to Martingale Road in Schaumburg. — Executed Nov 26 New R. W. Dunteman Company $6,586,314 ·
Apr 26, 2019 61F26 DuPageDistrict 1 Resurfacing Spring Road from Vallette Street to St. Charles Road in the City of Elmhurst. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $569,103 ·
Apr 26, 2019 61F29 DuPageDistrict 1 Sidewalk construction on County Line Road from 60th Street to Longwood Drive in the Village of Burr Ridge. — Executed Nov 26 New Davis Concrete Construction Co. $667,394 ·
Apr 26, 2019 61F39 CookDistrict 1 Roadway Reconstruction on Braga Drive from 25th Avenue to West 16th Street and on West 16th Street from Braga Drive to 21st Avenue in the Village of Broadview. — Executed Nov 26 New J. Nardulli Concrete, Inc. $1,657,606 ·
Apr 26, 2019 61F46 CookDistrict 1 Resurfacing Roy Avenue from North Avenue to Winters Drive in the City of Northlake. — Executed Nov 26 New Plote Construction, Inc. $1,225,697 ·
Apr 26, 2019 61F50 DuPageDistrict 1 Resurfacing Blanchard Street from south of Tara Court to President Street and President Street from Blanchard Street to IL 38 in the City of Wheaton. — Executed Nov 26 New K-Five Construction Corporation $922,751 ·
Apr 26, 2019 61F51 DuPageDistrict 1 Roadway reconstruction on Arlington Heights Road from Pierce Road to Thorndale Road in the village of Itasca. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $808,321 ·
Apr 26, 2019 61F52 DuPageDistrict 1 Channelization improvements on Diehl Road from Davis Parkway to Winfield Road in the City of Warrenville. — Executed Nov 26 New Alliance Contractors, Inc. $383,892 ·
Apr 26, 2019 61F53 CookDistrict 1 Resurfacing Illinois Street from Orchard Drive to Western Avenue in the Village of Park Forest. — Executed Nov 26 New Iroquois Paving Corporation $1,016,064 ·
Apr 26, 2019 61F55 DuPageDistrict 1 Resurfacing, curb and gutter, sidewalks, Street lighting and pavement markings on Forest Avenue from Joliet Street to IL 59 in West Chicago. — Executed Nov 26 New J. A. Johnson Paving Company $581,927 ·
Apr 26, 2019 61F56 DuPageDistrict 1 Resurfacing Harrison Avenue from Gary Avenue to College Avenue in the City of Wheaton. — Executed Nov 26 New J. A. Johnson Paving Company $984,239 ·
Apr 26, 2019 61F64 WillDistrict 1 Reconstruct the intersection of Rodeo Drive at Kings Road in Bolingbrook. — Executed Nov 26 New K-Five Construction Corporation $2,914,616 ·
Apr 26, 2019 61F65 LakeDistrict 1 Reconstruction of Orchard Lane from Monaville Road to Rollins Road, and resurfacing of Hook Lane from Orchard Lane to Rollins Road in the Village of Round Lake Beach. — Executed Nov 26 New Campanella and Sons, Inc. $5,231,811 ·
Apr 26, 2019 61F66 DuPageDistrict 1 Intersection and traffic signal improvements at 75th Street and Naper Boulevard in the City of Naperville. — Executed Nov 26 New Home Towne Electric, Inc. $859,094 ·
Apr 26, 2019 61F67 WillDistrict 1 Resurfacing University Parkway from Steger-Monee Road to Western Avenue in the Village of University Park. — Executed Nov 26 New D. Construction, Inc. $583,358 ·
Apr 26, 2019 61F68 WillDistrict 1 Intersection improvement on US 52 at Gougar Road in the Village of Manhattan. — Executed Nov 26 New P. T. Ferro Construction Co. $874,335 ·
Apr 26, 2019 61F69 LakeDistrict 1 Resurfacing Grand Avenue from Nippersink Boulevard to Illinois Route 59 in the Village of Fox Lake. — Executed Nov 26 New Peter Baker & Son Co. $1,287,252 ·
Apr 26, 2019 61F70 DuPageDistrict 1 Resurface Collins Avenue from Swift Road to Rohwling Road, and resurface Fullerton Avenue from Rohwling Road to Addison Road in the village of Addison. — Executed Nov 26 New R. W. Dunteman Company $3,325,608 ·
Apr 26, 2019 61F71 DuPageDistrict 1 Pavement reconstruction, resurfacing, add curb islands, storm sewer, water main adjustments, sidewalks and pavement markings at various locations in Bensenville. — Executed Nov 26 New R. W. Dunteman Company $2,799,980 ·
Apr 26, 2019 61F72 DuPageDistrict 1 Resurfacing Janes Avenue from 75th Street to Center Drive in the Village of Woodridge. — Executed Nov 26 New K-Five Construction Corporation $529,749 ·
Apr 26, 2019 61F73 DuPageDistrict 1 Rehabilitate the bridge carrying St. Charles Road over Salt Creek, 0.2 mile west of IL 83 in Villa Park. — Executed Nov 26 New Rausch Infrastructure, LLC $1,988,969 ·
Apr 26, 2019 61F75 LakeDistrict 1 Roadway reconstruction on Rockland Road from IL 21 to the Des Plaines River in Libertyville. — Executed Nov 26 New Copenhaver Construction, Inc. $6,139,354 ·
Apr 26, 2019 61F77 CookDistrict 1 Resurfacing Burr Ridge Parkway from County Line Road to Bridewall Drive in the Village of Burr Ridge. — Executed Nov 26 New Lindahl Brothers, Inc. $597,901 ·
Apr 26, 2019 62C01 LakeDistrict 1 1.433 miles of 3P resurfacing and milled rumble strips on US 41 from IL 120 to Dorchester Avenue in Parck City and Gurnee. — Executed Nov 26 New Peter Baker & Son Co. $3,628,516 ·
Apr 26, 2019 62G23 DuPageDistrict 1 2.29 miles of resurfacing consisting of HMA surface removal, pavement patching, HMA resurfacing, ADA sidewalk repair, and thermoplastic pavement marking on IL 53 from I-88 to 59th St in Lisle. — Executed Nov 26 New K-Five Construction Corporation $2,942,254 ·
Apr 26, 2019 62G42 CookDistrict 1 0.46 mile 3P resurfacing, pedestrian ramps, storm sewer repair, and drainage on Lawrence Ave from 471 ft east of Manheim Centerline to Rose St through Schiller Park, and east of Canfield Ave in Norridge. — Rejected Nov 26 New R. W. Dunteman Company $1,919,386 ·
Apr 26, 2019 62G51 DuPageDistrict 1 Bridge deck and approach overlay and repairs, reconstrution of deck joint, and repair of substructure for 022-0034 carrying US 34 over St. Josepth Creek in Lisle. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $486,455 ·
Apr 26, 2019 62G96 LakeDistrict 1 0.947 mile of 3P resurfacing and overlaying including pedestrian curb improvements on US 41 from Lake-Cook Road to south of Chantilly Boulevard in Highland Park. — Executed Nov 26 New Plote Construction, Inc. $2,694,455 ·
Apr 26, 2019 62G97 WillDistrict 1 Jack column retrofitting, repairing bascule girders, modification of center and tail lock, repairing steel grid deck and railings, and painting of Brandon Rd over the Des Plaines River in Joliet. — Executed Nov 26 New D. Construction, Inc. $3,391,575 ·
Apr 26, 2019 62H12 CookDistrict 1 Resurfacing and pedestrian ramps on IL 58 from the intersection of IL 58 and Meijer Dr Easterly for 4.58 miles to the west leg of the intersection with Broadway St. — Executed Nov 26 New Arrow Road Construction Co. $5,713,416 ·
Apr 26, 2019 62H13 KendallWillDistrict 1 Clean and paint SN 099-0083 carrying US 52 over Hickory Creek in Joliet, and SN 047-0006 carrying IL 31 over BNSF RR in Oswego. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $279,700 ·
Apr 26, 2019 62H22 CookDistrict 1 6.00 miles of resurfacing, milled rumble strips, and pedestrian ramp improvements on US 6 from 94th Ave to west of Pulaski Rd/Crawford Ave in Oak Forest. — Executed Nov 26 New D. Construction, Inc. $5,035,013 ·
Apr 26, 2019 62H23 CookDistrict 1 Bridge repairs, structural steel repair, and deck slab repairs for the bridge carrying IL 43 over Cal Sag Channel in Palos Township. — Executed Nov 26 New Rausch Infrastructure, LLC $996,583 ·
Apr 26, 2019 62H28 LakeDistrict 1 Routing, cleaning and sealing longitudinal cracks on IL 137 from IL 83 to O'Plaine Road in Libertyville and Green Oaks. — Executed Nov 26 New SKC Construction, Inc. $254,148 ·
Apr 26, 2019 62H29 CookLakeDistrict 1 A total of 10.2 miles of routing, cleaning, and sealing of longitudinal cracks at 3 locations on IL 21/US 45 in Niles, Glenview, Vernon Hills, Libertyville and Gurnee. — Executed Nov 26 New Denler, Inc. $525,544 ·
Apr 26, 2019 62H36 LakeDistrict 1 1.9 miles of resurfacing, pedestrian ramp improvements and culvert repairs on US 41 from West Park Avenue to Chantilly Boulevard in the City of Highland Park. — Executed Nov 26 New Peter Baker & Son Co. and Plote Construction, Inc JV $5,321,788 ·
Apr 26, 2019 62H44 CookDistrict 1 3.1 miles of resurfacing and pedestrian ramps on IL 62 (Algonquin Road) from IL 58 to IL 83 through Rolling Meadows, Des Plaines, Mount Prospect and Arlington Heights. — Executed Nov 26 New Arrow Road Construction Co. $3,932,574 ·
Apr 26, 2019 62H45 CookDistrict 1 2.5 miles of resurfacing and pedestrian ramps on IL 58 (Dempster Avenue) from IL 43 (Waukegan Avenue) to US 41 (Skokie Boulevard) in the Villages of Skokie and Martin Grove. — Executed Nov 26 New Plote Construction, Inc. $3,896,916 ·
Apr 26, 2019 62H53 VariousDistrict 1 Repairing damaged concrete barrier wall, bridge parapet, bridge rail post, pipe handrail and wooden sound at various locations in Cook, Lake, and DuPage Counties. — Executed Nov 26 New D. Construction, Inc. $900,593 ·
Apr 26, 2019 62H72 CookDistrict 1 Concrete bridge deck sealing upon the entire bridge deck surface, sidewalks, inside and top of parapets of various structures within Cook County. — Executed Nov 26 New M & M Concrete, Inc. $246,000 ·
Apr 26, 2019 62H73 CookDistrict 1 Removing a portion of existing retaining wall, construction of new stem, temporary soil retention system, structural repair of concrete, pavement patching, coring weep holes and cleaning drainage structures on 1-90 in the City of Chicago. — Executed Nov 26 New Areatha Construction Co., Inc. $493,651 ·
Apr 26, 2019 62H75 McHenryDistrict 1 5.7 miles of ultra-thin bonded wearing surface on IL 31 from US 31 from US 12 to Johnsburg Road in the villages of Johnsburg, Richmond and Ringwood. — Executed Nov 26 New Curran Contracting Company $1,236,049 ·
Apr 26, 2019 62H76 McHenryDistrict 1 3 miles of ultra-thin bonded wearing course overlay on IL 176 from east of Smith Road to the Fox River in the City of Crystal Lake and Village of Prarie Grove. — Executed Nov 26 New Curran Contracting Company $702,491 ·
Apr 26, 2019 62H80 DuPageDistrict 1 Substructure bridge repair on the structure carrying Highland Avenue and IL 83 (Kingery Highway) over IL 56 (Butterfield Road) in the Villages of Lombard/Downers grove and City of Oak Brook Terrace. (SN 022-0154, 0117, 0118) — Executed Nov 26 New Areatha Construction Co., Inc. $478,908 ·
Apr 26, 2019 62H81 LakeDistrict 1 1.9 miles of ultra thin wearing course and ADA upgrades on US 41 from Ferndale Street to IL 21 in the Village of Gurnee. — Rejected Nov 26 New
Apr 26, 2019 64L08 CarrollDistrict 2 Removal and replacement of box culvert SN 008-1046, ditch reshaping, removal and replacement of field entrances on IL 40, just east of Stransky Road, east of Chadwick. — Executed Nov 26 New Martin & Company Excavating $316,459 ·
Apr 26, 2019 64L59 OgleDistrict 2 HMA resurfacing on IL 251 from Lakeview Dr to Veterans Parkway in Rochelle. — Executed Nov 26 New Martin & Company Excavating $390,364 ·
Apr 26, 2019 64M08 Rock IslandDistrict 2 HMA resurfacing on IL 192 from IL 92 to 0.3 mile west of 140th Street in Edgington; and on IL 92 from 0.1 mile west to 0.2 mile north of IL 192. — Executed Nov 26 New Valley Construction Co. $708,963 ·
Apr 26, 2019 64M39 Jo DaviessDistrict 2 Cold milling, pavement patching, and HMA resurfacing on US 20/IL 84 from Mt. Hope Rd to Tippett Rd., southeast of Galena. — Executed Nov 26 New Civil Constructors, Inc. $2,803,709 ·
Apr 26, 2019 64N52 VariousDistrict 2 Washing nineteen bridges at various locations within District 2. — Executed Nov 26 New Interstate Maintenance, Incorporated $159,850 ·
Apr 26, 2019 64N53 WinnebagoDistrict 2 Washing ten bridges at various locations in District 2. — Executed Nov 26 New M & M Concrete, Inc. $119,999 ·
Apr 26, 2019 64N54 VariousDistrict 2 Washing 12 bridges at various locations within District 2. — Executed Nov 26 New All States Painting, Inc. $119,400 ·
Apr 26, 2019 66879 IroquoisDistrict 3 Replace SN 038-0165 with a double box culvert (SN 038-2023) carrying IL 1 over Gay Creek, 2.3 miles south of Wellington. — Executed Nov 26 New Iroquois Paving Corporation $768,521 ·
Apr 26, 2019 66E67 KankakeeDistrict 3 3.43 miles of 3R resurfacing, patching, and bridge repairs on I-57 from north of the Kankakee River bridge to south of the IL 50 interchange in Bourbonnais. — Rejected Nov 26 New Kankakee Valley Construction Co., Inc. & Gallagher Asphalt Corporation $10,429,101 ·
Apr 26, 2019 66J07 KankakeeDistrict 3 Installation of approximately 2.37 miles of high tension cable median barrier from 6000N RD to 0.7 mile south of 9000N Rd. — Executed Nov 26 New Lion Construction 1, LLC $412,968 ·
Apr 26, 2019 66J09 IroquoisDistrict 3 2.91 miles of shoulder widening and rumble strips on US 24 from IL 1 to 2580E Road. — Executed Nov 26 New Iroquois Paving Corporation $595,879 ·
Apr 26, 2019 66J10 IroquoisDistrict 3 3.97 miles of shoulder widening and rumble strips on IL 49 from E 2600 Rd to E 2200N Rd. — Executed Nov 26 New Iroquois Paving Corporation $996,392 ·
Apr 26, 2019 66J66 GrundyLaSalleDistrict 3 Intermittent milling and resurfacing on IL 47 from Illinois Ave. to south of Jefferson Street in Morris and on IL 170 from US 6 to just south of the CSX Railroad crossing in Seneca. — Executed Nov 26 New D. Construction, Inc. $426,301 ·
Apr 26, 2019 66J68 IroquoisLivingstonDistrict 3 Installing back up generators at 2 pump stations, and removal and replacement of all electrical, plumbing, HVAC, and mechanical equipment at the Reading pump station. — Active Nov 26 New D. Construction, Inc. $1,953,400 ·
Apr 26, 2019 68D77 TazewellDistrict 4 Rehabilitation of SN 090-0047 carrying IL 29/IL 116/IL 8/US 24 over Farm Creek west of Camp Street in East Peoria. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $571,771 ·
Apr 26, 2019 68D98 PeoriaDistrict 4 Surfacing maintenance including pavement patching, HMA surface removal, HMA surface course, and the construction of ADA ramps at various locations on IL Rte 40. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $919,865 ·
Apr 26, 2019 68E37 TazewellDistrict 4 Bridge painting at various locations in Taxewell County. (SN 090-0117, 0116, 0102, 0118, and 090-0119). — Executed Nov 26 New Civil Coatings and Construction Inc. $2,237,590 ·
Apr 26, 2019 70790 ChampaignVermilionDistrict 5 5.4 miles of resurfacing on I-74 from 2 miles east of St. Joseph interchange to IL 49 N. — Executed Nov 26 New Open Road Paving Company LLC $11,754,738 ·
Apr 26, 2019 70D14 McLeanDistrict 5 Replace piers, joints and place surface treatment on deck of SN 057-6301 carrying US 51 Business S.B. (S. Center Street) in downtown Bloomington. — Executed Nov 26 New St. Louis Bridge Construction Company $835,079 ·
Apr 26, 2019 70D32 ChampaignPiattDistrict 5 Microsurfacing 2 pass and crack and joint sealing on IL 47 from the Ford County Line to US 136, and on IL 105 south of Bement to south of Monticello. — Executed Nov 26 New Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $665,489 ·
Apr 26, 2019 70D50 EdgarDistrict 5 New PCC shoulder with inlet and curb, and new pipe drains at US 150 east of Paris. — Rejected Nov 26 New
Apr 26, 2019 70D53 VariousDistrict 5 District-wide on-call guardrail and fence repairs. — Executed Nov 26 New Northern Contracting, Inc. $692,386 ·
301–400 of 936‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.